The Water Recovery System (WRS) is a critical component of life support aboard the International Space Station (ISS) and will play an essential role in future missions beyond Low Earth Orbit (LEO). Its primary functional units – the Urine Processor Assembly (UPA), Brine Processor Assembly (BPA), and Water Processor Assembly (WPA) – must be evaluated for extended operation, dormancy resilience, material obsolescence, and reliability under exploration-driven constraints. Ground testing is vital for developing these technologies and generating statistically relevant reliability assessments, which requires extended runtime under integrated, Flight-like conditions. Currently, no high-fidelity, fully integrated WPA ground test bed exists to support these objectives. To address this gap, NASA is developing a WPA test bed at Marshall Space Flight Center (MSFC) that combines downgraded ISS flight hardware with functionally flight-like components in a cost-effective configuration while maintaining priority hardware investigations. This paper describes the current status of hardware assembly and integration, outlines key challenges such as simulating microgravity effects and mitigating obsolescence, and presents future test objectives including software development, reliability assessments, dormancy studies, and exploration-oriented upgrades.

Keep this discovery

BibTeXRIS

Mary-Elizabeth Davis, Jill Williamson, Colin Boggs. Assembly and Integration Status of a High Fidelity Ground Test Bed for the Water Processor Assembly. https://ntrs.nasa.gov/citations/20260003634

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

Assembly and Integration Status of a High Fidelity Ground Test Bed for the Water Processor Assembly

The Water Recovery System (WRS) is a critical component of life support aboard the International Space Station (ISS) and will play an essential role in future missions beyond Low Earth Orbit (LEO). Its primary functional units – the Urine Processor Assembly (UPA), Brine Processor Assembly (BPA), and Water Processor Assembly (WPA) – must be evaluated for extended operation, dormancy resilience, material obsolescence, and reliability under exploration-driven constraints. Ground testing is vital for developing these technologies and generating statistically relevant reliability assessments, which requires extended runtime under integrated, Flight-like conditions. Currently, no high-fidelity, fully integrated WPA ground test bed exists to support these objectives. To address this gap, NASA is developing a WPA test bed at Marshall Space Flight Center (MSFC) that combines downgraded ISS flight hardware with functionally flight-like components in a cost-effective configuration while maintaining priority hardware investigations. This paper describes the current status of hardware assembly and integration, outlines key challenges such as simulating microgravity effects and mitigating obsolescence, and presents future test objectives including software development, reliability assessments, dormancy studies, and exploration-oriented upgrades.

Water Processor Assembly

The Roman Space Telescope Optical System: Status, Test, and Verification Update

The Nancy Grace Roman Space Telescope (“Roman”) is NASA’s next flagship observatory. Launching in 2026, Roman will explore the nature of dark energy as well as expand the census of exoplanets in our galaxy via microlensing. Roman’s large field of view, agile survey capabilities, and excellent stability enable these scientific objectives, yet present unique challenges for the design, test, and verification of its optical system. Roman recently completed a comprehensive thermal vacuum test of the Spacecraft bus + Integrated Payload Assembly (SCIPA), followed by integrating the Outer Barrel Assembly (OBA), Solar Array Sunshield (SASS), and Deployable Aperture Cover (DAC) with SCIPA to complete the Observatory. This paper will present an overview of the thermal vacuum optical testing as well as a status of the optical system performance and verification.

Matthew Bolcar

A Review of Pump Package Assembly Anomalies and Demonstration to Gain Motor Controller Replacement Capability

The International Space Station (ISS) generates heat within the US modules from systems used to operate the station, maintain crew health, and conduct science experiments in the orbiting laboratory. The Internal Thermal Control System (ITCS) collects this heat in water loops and transfers it to the external ammonia system for rejection to space. The ITCS uses six Pump Package Assemblies (PPA) as the motive force to circulate the water within the Lab, Node 2, and Node 3 (Node 1 is parasitic to the Lab and Node 3 ITCS loops). In the life of ISS, 3 PPAs have had to be replaced and 2 PPAs are currently showing signs of degradation. The first PPA to fail in 2003 was due to early coolant chemistry issues; the remaining pump failures and current pump degradations are determined to be related to the Pump/Fan Motor Controller (PFMC), with their individual signatures all being unique to this point. The PFMC of one of the failed PPAs was returned and testing confirmed its sub-components to be the root cause of the PPA failure. Due to the relative size and weight of the standalone PFMC in comparison to the integrated assembly, it is desired, from a launch and on-orbit stowage perspective, to replace the PFMC component of the degraded PPA instead of the entire PPA. The PPA was not designed for this capability, so on the ground demonstrations are planned using crew tools to show that the PFMC can be replaced on-orbit while maintaining full functionality. This paper will focus on the signatures of the two most recent PPA failures and the two PPAs showing signs of degradation, in addition to presenting the findings from the PFMC demonstration effort.