Small-Signal Stability Support from Dynamically Configurable Grid-Forming/Following Inverters for Distribution Systems: Preprint

As the penetration of inverter-based resources (IBRs) continues to increase in modern power systems, system stability is challenged by the insufficient inertia induced by IBRs; hence, there is a need to develop various methods to address the potential instabilities. In this paper, grid-forming (GFM) and grid-following (GFL) controls are implemented for inverters with flexible-mode transitions between them. The operation mode transition between GFM and GFL controls is adopted as an additional degree of control flexibility to adjust the small signal stability margin. Further, a holistic and detailed small signal model of the entire system with the dynamics from both synchronous generators (SGs) and IBRs is derived. The effectiveness of the proposed work in adjusting the system small signal stability margin is validated by conducting case studies with varying penetration levels of IBRs. A test system with one SG and five inverters was implemented in MATLAB/Simulink to demonstrate the effectiveness of the proposed approach. Index Terms - grid-following control, grid-forming control, operation mode transition, small-signal stability analysis

grid-following control↗

Model Predictive Voltage Control of Large-Scale PV or Hybrid PV-BESS Plants

Increased penetration level of inverter-based resources (IBRs) and renewable energy in the power grid has called for more requirements from the control of IBRs. In this paper, the voltage-reactive power control of a photovoltaic (PV) power plant or hybrid PV-battery energy storage system (BESS) plant connected to a bulk power grid, whilst meeting the grid requirements, is studied. In this paper, a continuous-set model predictive control (MPC) formulation is proposed for voltage-reactive power control. For the same, an aggregated dynamic PV plant model is developed based on the recursive system equivalencing method. The formulation is then implemented in PSCAD simulation on a 125 MW PV plant or hybrid PV-BESS plant. The MPC implementation achieves 10.13% voltage improvement based on PSCAD simulation results in a balanced fault case study. Simulation results further demonstrate that MPC provides improved voltage support over the conventional proportional-integral (PI) controller post-fault occurrence.

Abu rub, Omar↗

Topology-Agnostic, Scalable, Self-Healing, and Cost-Aware Protection of Microgrids

Most microgrid protection schemes found in published literature suffer from a lack of generality in that they work well for the assumed topology, including type and placement of sources. Other generic protection schemes tend to be too complicated, too expensive, or both. To overcome these draw- backs, a topology-agnostic, scalable, and cost-aware protection based on fundamental principles that work in the presence of high penetration of inverter-based resources (IBRs) is developed and tested in this paper. Here, the protection system also implements stable automatic reconfiguration of the healthy sections of the system after clearance of fault, thus increasing resilience by self- healing. To achieve this ambitious goal, stable inverter models are developed that operate in unbalanced networks in grid-connected and islanded modes, even with 100% IBRs, share power without conflicting controls, and can ride through faults while limiting fault currents. The scheme is tested for primary and backup protection and reconfiguration on the IEEE 123-node feeder in grid-connected and islanded modes with 15 IBRs connected to the system.

42 ENGINEERING↗

Small-Signal Stability Support from Dynamically Configurable Grid-Forming/Following Inverters for Distribution Systems

The growth of inverter-based resources (IBRs) in modern power systems can challenge system stability since they do not natively provide inertia, prompting a need to develop new methods to address the potential instabilities. In this paper, a dynamically configurable grid-forming (GFM) and grid-following (GFL) control is proposed, which enables inverters to flexibly transition to support system needs. The operation mode transition between GFM and GFL controls is adopted as an additional degree of control flexibility to adjust the small-signal stability margin. In addition, a holistic and detailed small-signal model for a distribution feeder that captures the dynamics from both synchronous generators (SGs) and IBRs is also derived and used to evaluate the effectiveness of the proposed GFM/GFL controls to augment the system small-signal stability margin. Case studies with varying levels of IBRs were implemented in MATLAB/Simulink to demonstrate the effectiveness of the proposed approach.

grid-following control↗

Black Start of Unbalanced Microgrids Harmonizing Single- and Three-Phase Grid-Forming Inverters

As power systems are transforming with increasing penetrations of inverter-based resources (IBRs), system restoration using IBRs has drawn attention. Using distributed grid-forming (GFM) assets located near critical loads, either three-phase or single-phase, to establish microgrid voltages in the absence of a bulk grid, a distribution system could obtain high system survivability. For swift and secure recovery of a critical load in a single-phase lateral, local single-phase GFM inverters can form a microgrid, and then it can be combined with a neighbouring grid with the inverters remaining in GFM mode for voltage and frequency regulation until the bulk grid comes online. It leads to dynamic interoperation of single-phase GFM inverters with three-phase ones in the black start process. This paper studies the novel approach with electromagnetic transient (EMT) simulations. To evaluate the potential and the technical challenges of the heterogeneous IBR-driven black start, three-phase and single-phase GFM inverter models are developed, including negative-sequence control for voltage balance and a phase-by-phase current limiter (three-phase) and current magnitude limiter (single-phase). To examine dynamic aspects of the black-start process, the EMT simulation also models transformer and motor dynamics emulating their inrush and startup behavior as well as network dynamics. Involvement of grid-following assets to facilitate the black-start process is also modeled. By allowing multiple GFM inverters to collectively black start without leader-follower coordination, regardless of phases, a system can achieve extreme resilience. An inverter-driven black start of a heavily unbalanced 2-MVA distribution feeder using 1 three-phase and 3 single-phase GFM inverters is demonstrated. The simulation shows the heterogeneous system can maintain stability with the single-phase GFM dynamics coupled with the three-phase one.

grid-forming inverter↗

Black Start of Unbalanced Microgrids Harmonizing Single- and Three-Phase Grid-Forming Inverters: Preprint

As power systems are transforming with increasing penetrations of inverter-based resources (IBRs), system restoration using IBRs has drawn attention. Using distributed grid-forming (GFM) assets located near critical loads, either three-phase or single-phase, to establish microgrid voltages in the absence of a bulk grid, a distribution system could obtain high system survivability. For swift and secure recovery of a critical load in a single-phase lateral, local single-phase GFM inverters can form a microgrid, and then it can be combined with a neighbouring grid with the inverters remaining in GFM mode for voltage and frequency regulation until the bulk grid comes online. It leads to dynamic interoperation of single-phase GFM inverters with three-phase ones in the black start process. This paper studies the novel approach with electromagnetic transient (EMT) simulations. To evaluate the potential and the technical challenges of the heterogeneous IBR-driven black start, three-phase and single-phase GFM inverter models are developed, including negative-sequence control for voltage balance and a phase-by-phase current limiter (three-phase) and current magnitude limiter (single-phase). To examine dynamic aspects of the black-start process, the EMT simulation also models transformer and motor dynamics emulating their inrush and startup behavior as well as network dynamics. Involvement of grid-following assets to facilitate the black-start process is also modeled. By allowing multiple GFM inverters to collectively black start without leader-follower coordination, regardless of phases, a system can achieve extreme resilience. An inverter-driven black start of a heavily unbalanced 2-MVA distribution feeder using 1 three-phase and 3 single-phase GFM inverters is demonstrated. The simulation shows the heterogeneous system can maintain stability with the single-phase GFM dynamics coupled with the three-phase one.

grid-forming inverter↗

Revisiting Power Systems Time-Domain Simulation Methods and Models

The changing nature of power systems dynamics is challenging present practices related to modeling and study of system-level dynamic behavior. While developing new techniques and models to handle the new modeling requirements, it is also critical to review some of the terminology used to describe existing simulation approaches and the embedded assumptions. This article provides a first-principles review of the simplifications and transformations commonly used in the formulation of time-domain simulation models. It introduces a taxonomy and classification of time-domain simulation models depending on their frequency bandwidth, network representation, and software availability. Furthermore, it focuses on the fundamental aspects of averaging techniques, and model reduction approaches that result in modeling choices, and discusses the associated challenges and opportunities of applying these methods in systems with large shares of Inverter Based Resources (IBRs). The article concludes with an illustrative simulation that compares the trajectories of an IBR-dominated system.

behavioral sciences↗

Analysis of a Disturbance Event with Inverter-Based Resources Using EMT Simulations

Increasing penetration of inverter-based resources (IBRs) necessitates newer methods of planning and analysis of disturbances. The existing phasor-domain transient stability (TS) analysis may not capture the dynamics of IBRs during fault events. Here, in this paper, electromagnetic transient (EMT) simulations using high-fidelity detailed model of power grid and one of the affected photovoltaic (PV) plants during the Angeles Forest disturbance in 2018 are performed. In these simulations, the processes to develop EMT models of power grid from traditional phasor-domain TS data and PV plant from collected data are described. Thereafter, using these simulations, the response of the PV plant during the fault event in 2018 is replicated and a sensitivity analysis is performed. The sensitivity analysis consists of making changes to the components within the PV plant and in the power grid to evaluate the impact they have on the response observed by the PV plant during the fault event. This analysis provides an understanding of the components that impact the operation of a PV plant during fault events and provide guidance to system planners on the studies that need to be performed to maintain a reliable power grid as new IBR plants are integrated.

42 ENGINEERING↗

Forced Oscillation Grid Vulnerability Analysis and Mitigation Using Inverter-Based Resources: Texas Grid Case Study

Forced oscillation events have become a challenging problem with the increasing penetration of renewable and other inverter-based resources (IBRs), especially when the forced oscillation frequency coincides with the dominant natural oscillation frequency. A severe forced oscillation event can deteriorate power system dynamic stability, damage equipment, and limit power transfer capability. This paper proposes a two-dimension scanning forced oscillation grid vulnerability analysis method to identify areas/zones in the system that are critical to forced oscillation. These critical areas/zones can be further considered as effective actuator locations for the deployment of forced oscillation damping controllers. Additionally, active power modulation control through IBRs is also proposed to reduce the forced oscillation impact on the entire grid. The proposed methods are demonstrated through a case study on a synthetic Texas power system model. The simulation results demonstrate that the critical areas/zones of forced oscillation are related to the areas that highly participate in the natural oscillations and the proposed oscillation damping controller through IBRs can effectively reduce the forced oscillation impact in the entire system.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Kinetics calculation of fast periodic pulsed reactors using MCNP6

Fast periodic pulsed reactor is a type of reactor in which the fission bursts are formed entirely with external reactivity modulation with a specified time periodicity. This type of reactors could generate much larger intensity of neutron beams for experimental use, compared with the steady state reactors. In the design of fast periodic pulsed reactors, the time dependent simulation of the power pulse is majorly based on a point kinetic model, which is known to have limitations. A more accurate calculation method is desired for the design analyses of fast periodic pulsed reactors. Monte Carlo computer code MCNP6 is used for this task due to its three dimensional transport capability with a continuous energy library. Some new routines were added to simulate the rotation of the movable reflector parts in the time dependent calculation. Fast periodic pulsed reactor IBR-2M was utilized to validate the new routines. This reactor is periodically in prompt supercritical state, which lasts for similar to 400 mu s, during the equilibrium state. This generates long neutron fission chains, which requires tremendously large amount of computation time during Monte Carlo simulations. Russian Roulette was applied for these very long neutron chains in MCNP6 calculation, combined with other approaches to improve the efficiency of the simulations. In the power pulse of the IBR-2M at equilibrium state, there is some discrepancy between the experimental measurements and the calculated results using the point kinetics model. MCNP6 results matches better the experimental measurements, which shows the merit of using MCNP6 calculation relative to the point kinetics model.

Zhong, Z.↗

From Event Data to Wind Power Plant DQ Admittance and Stability Risk Assessment

This paper presents a dynamic event data-based stability risk assessment method for power grids with high penetrations of inverter-based resources (IBRs). This method relies on obtaining the IBRs' DQ admittance through dynamic event data and computing the system's eigenvalues based on the admittance models. Two critical technologies are employed in this research, including time-domain and frequency-domain data fitting and dq-frame voltage and current signal derivation. The first technology is key to obtaining the s-domain expressions from the transient response data, and the s-domain DQ admittance model from the frequency-domain measurements. The second technology is key to obtaining the dq-frame voltage and current signals from either the three-phase instantaneous measurements or the phasor measurement unit (PMU) data. The method is illustrated using data generated from a Type-4 wind power plant modeled in PSCAD. This paper demonstrates the technical feasibility of the proposed approach.

17 WIND ENERGY↗

Control and Real-Time Simulation of Microgrids with EV Fast-Charging and Grid-Forming Resources

Fast charging stations (FCSs) for electric vehicles (EVs) can behave as constant power loads, which is problematic for the operation of grid-forming (GFM) inverter-based resources (IBRs). To tackle this problem, this paper proposes a control suite that makes FCSs responsive to ac voltage and frequency disturbances. To test the performance of the FCS controls, the paper also sets forth theory to compensate for time-delays appearing in the real-time simulation of microgrid models divided into several central processing units (CPUs). Furthermore, these contributions are showcased via multi-CPU real-time simulations of a faulted microgrid having EV FCSs and GFM IBRs powered by photovoltaic solar arrays as well as power hardware-in-the-loop experiments. These contributions are significant to address NERC recommendations and IEEE standards.

14 SOLAR ENERGY↗

An Open-Source Parallel EMT Simulation Framework

As the integration level of inverter-based resources (IBRs) increases, ensuring the reliable operation of the bulk power systems requires the use of electromagnetic transient (EMT) simulation tools to identify and mitigate system-wide stability risks. Conducting EMT studies for large-scale, IBR-rich grids, however, is challenging due to the inherent computational bottleneck caused by the underlying high-fidelity models and required small time steps. This paper introduces ParaEMT: an open-source, generic EMT simulation framework designed to accelerate simulations by leveraging advanced parallel computational technologies, such as high-performance computers. This paper presents a comprehensive exposition of ParaEMT, covering its modeling library, simulation strategy, framework structure, operational procedures, and auxiliary features, alongside its extensible parallel computational architecture. Notably, ParaEMT is a publicly accessible and modularized framework written in Python, thereby facilitating future development and the integration of new models and algorithms. The accuracy and efficiency of ParaEMT are demonstrated by rigorous validations via multiple case studies.

electromagnetic transient simulation↗

An Open-Source Parallel EMT Simulation Framework: Preprint

As the integration level of inverter-based resources (IBR) increases, ensuring the reliable operation of the bulk power systems requires the use of electromagnetic transient (EMT) simulation tools to identify and mitigate system-wide stability risks. Conducting EMT studies for large-scale, IBR-rich grids, however, is challenging due to the inherent computational bottleneck caused by the underlying high-fidelity models and required small time steps. This paper introduces ParaEMT: an open-source, generic EMT simulation framework designed to accelerate simulations by leveraging advanced parallel computational technologies, such as high-performance computers. This paper presents a comprehensive exposition of ParaEMT, covering its modeling library, simulation strategy, framework structure, operational procedures, and auxiliary features, alongside its extensible parallel computational architecture. Notably, ParaEMT is a publicly accessible and modularized framework written in Python, thereby facilitating future development and the integration of new models and algorithms. The accuracy and efficiency of ParaEMT are demonstrated by rigorous validations via multiple case studies.

electromagnetic transient simulation↗

Study the Protection Improvements for a Weak Grid Area With High IBRs

NLR is collaborating with Florida Power & Light (FPL) and GE to investigate power system stability and protection reliability challenges in a weak-grid region with high penetration of inverter-based resources (IBRs). This presentation will primarily focus on the protection aspects of the study. We will share key insights from this real-world project, including best practices for developing high-fidelity fault study models, establishing a controller-hardware-in-the-loop (CHIL) platform for testing physical relays, identifying system-level protection challenges, and designing enhanced protection schemes to address those issues. Through this discussion, the audience will gain practical understanding of protection studies in IBR-dominated systems, the emerging challenges associated with reduced fault current and altered transient behavior, and effective mitigation strategies. In particular, we will highlight the critical importance of IBR compliance with IEEE 2800-2022 to ensure dependable and secure protection relay operation in modern transmission systems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Efficient Topology Assessment for Integrated Transmission and Distribution Network with 10,000+ Inverter-based Resources

The renewable energy proliferation calls upon the grid operators and planners to systematically evaluate the potential impacts of distributed energy resources (DERs). Considering the significant differences between various inverter-based resources (IBRs), especially the different capabilities between grid-forming inverters and grid-following inverters, it is crucial to develop an efficient and effective assessment procedure besides available co-simulation framework with high computation burdens. This paper presents a streamlined graph-based topology assessment for the integrated power system transmission and distribution networks. Graph analyses were performed based on the integrated graph of modified miniWECC grid model and IEEE 8500-node test feeder model, high performance computing platform with 40 nodes and total 2400 CPUs has been utilized to process this integrated graph, which has 100,000+ nodes and 10,000+ IBRs. The node ranking results not only verified the applicability of the proposed method, but also revealed the potential of distributed grid forming (GFM) and grid following (GFL) inverters interacting with the centralized power plants.

Graph Analysis, Topology evaluation, Infrastructur↗

Dynamic Modeling and Analysis for Large-Scale Renewable Energy Integration

Lina He will present dynamic modeling techniques for the integration of large-scale renewable energy systems. The presentation will address the challenges associated with high renewable penetration and provide frameworks for ensuring smooth and reliable grid operations.

Dynamic modeling, large-scale renewable integratio↗

Multi-Timescale Integrated Dynamics and Scheduling for Solar (MIDAS-Solar) (Final Technical Report)

Solar photovoltaic (PV) installations have experienced unprecedented growth in the United States. PV will become not only an energy producer but also a necessary provider of ancillary services at multiple timescales. Conventional methods to simulate power systems operations - such as long-term production simulation (which typically considers schedules from hours to minutes by using an optimization framework) and short-term transient studies (which simulate dynamics from seconds to sub-seconds using state variables and differential equations) - are not sufficient for studying the multiple-timescale variation of solar generation and its impact on system reliability. Long-term system economics and short-term system dynamics are highly coupled, particularly when the penetration level of renewable generation is extremely high, because the uncertainty and variability of solar generation will impact both power system steady-state and dynamic performance. This project helps meet and exceed the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Solar Energy Technologies Office goal of systems integration by directly addressing this stability and reliability challenge for power grid planning and operation. We have developed a temporally comprehensive, closed-loop simulation model, named Multi-timescale Integrated Dynamics and Scheduling (MIDAS), that seamlessly simulates power system operations from economic scheduling (day-ahead to hours) to dynamic response analysis (seconds to sub-seconds). For schedules with very high levels of inverter-based resources (IBRs), up to and including 100%, the stability of grid controls has been evaluated through electromagnetic transient (EMT) simulations and power-hardware-in-the-loop (PHIL) simulations of key transient events at key schedule points. Specifically, MIDAS provides: 1) a closed-loop simulation framework for simulating timescales from economic scheduling to dynamic stability analysis; 2) machine learning-based stability assessment; 3) EMT modeling and analysis for large-scale power systems; 4) MIDAS PHIL test bed. We worked with Hawaii Electric Companies to apply the MIDAS study framework to a Maui grid study. The entire island's transmission system was modeled in detail - from a yearly scheduling model, to a second-level frequency dynamic model, down to a sub-second-scale EMT model to address critical stability issues. The project demonstrated how MIDAS can help system planners and operators assess system reliability and stability while the power grid is marching toward a high-renewable, high-IBR future. In this Maui grid study, we found that 100% instantaneous IBR operation is achievable in EMT simulation and PHIL testing, and grid planners and operators might need new analysis/simulation tools to assess grid reliability and stability in the scheduling stage. MIDAS will bring Maui and other systems closer to 100% clean and stable energy futures. (In this study, we examined transient stability. Other topics necessary for 100% IBR operation, such as protection and resource adequacy, were not examined.)