Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “installation tests”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,405 records · Page 78

Investigation of storage options for scientific computing on Grid and Cloud facilities

In recent years, several new storage technologies, such as Lustre, Hadoop, OrangeFS, and BlueArc, have emerged. While several groups have run benchmarks to characterize them under a variety of configurations, more work is needed to evaluate these technologies for the use cases of scientific computing on Grid clusters and Cloud facilities. This paper discusses our evaluation of the technologies as deployed on a test bed at FermiCloud, one of the Fermilab infrastructure-as-a-service Cloud facilities. The test bed consists of 4 server-class nodes with 40 TB of disk space and up to 50 virtual machine clients, some running on the storage server nodes themselves. With this configuration, the evaluation compares the performance of some of these technologies when deployed on virtual machines and on bare metal nodes. In addition to running standard benchmarks such as IOZone to check the sanity of our installation, we have run I/O intensive tests using physics-analysis applications. This paper presents how the storage solutions perform in a variety of realistic use cases of scientific computing. One interesting difference among the storage systems tested is found in a decrease in total read throughput with increasing number of client processes, which occurs in some implementations but not others.

Garzoglio, Gabriele↗

Multi-Column Experimental Test Bed Using CaSDB MOF for Xe/Kr Separation

Processing of spent nuclear fuel produces off-gas from which several volatile radioactive components must be separated for further treatment or storage. As part of the Off-gas Sigma Team, parallel research at INL and PNNL has produced several promising sorbents for the selective capture of xenon and krypton from these off-gas streams. In order to design full-scale treatment systems, sorbents that are promising on a laboratory scale must be proven under process conditions to be considered for pilot and then full-scale use. To that end, a bench-scale multi-column system with capability to test multiple sorbents was designed and constructed at INL. This report details bench-scale testing of CaSDB MOF, produced at PNNL, and compares the results to those reported last year using INL engineered sorbents. Two multi-column tests were performed with the CaSDB MOF installed in the first column, followed with HZ-PAN installed in the second column. The CaSDB MOF column was placed in a Stirling cryocooler while the cryostat was employed for the HZ-PAN column. Test temperatures of 253 K and 191 K were selected for the first column while the second column was held at 191 K for both tests. Calibrated volume sample bombs were utilized for gas stream analyses. At the conclusion of each test, samples were collected from each column and analyzed for gas composition. While CaSDB MOF does appear to have good capacity for Xe, the short time to initial breakthrough would make design of a continuous adsorption/desorption cycle difficult, requiring either very large columns or a large number of smaller columns. Because of the tenacity with which Xe and Kr adhere to the material once adsorbed, this CaSDB MOF may be more suitable for use as a long-term storage solution. Further testing is recommended to determine if CaSDB MOF is suitable for this purpose.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

QUALIFICATION OF THE SECOND ICS-3000 ION CHROMATOGRAPH FOR USE AT THE DEFENSE WASTE PROCESSING FACILITY

The ICS-3000 Ion Chromatography (IC) system installed in 221-S M-14 has been qualified for use. The qualification testing was a head to head comparison of the second ICS-3000 with the initial ICS-3000 system that was installed in 221-S M-13. The crosscheck work included standards for instrument calibration and calibration verifications and standards for individual anion analysis, where the standards were traceable back to the National Institute of Standards and Technology (NIST). In addition the crosscheck work included the analysis of simulated Sludge Receipt and Adjustment Tank (SRAT) Receipt, SRAT Product, and Slurry Mix Evaporator (SME) samples, along with radioactive Sludge Batch 5 material from the SRAT and SME tanks. The Defense Waste Processing Facility (DWPF) requires the analysis of specific anions at various stages of its processing of high level waste (HLW). The anions of interest to the DWPF are fluoride, formate, chloride, nitrite, nitrate, sulfate, oxalate, and phosphate. The anion analysis is used to evaluate process chemistry including formic acid/nitric acid additions to establish optimum conditions for mercury stripping, reduction-oxidation (REDOX) chemistry for the melter, nitrite destruction, etc. The DWPF Laboratory (Lab) has recently replaced the Dionex DX-500 ion chromatography (IC) systems that had been used since 1998 by the first of two new ICS-3000 systems. The replacement effort was necessary due to the vendor of the DX-500 systems no longer supporting service contracts after 2008. DWPF purchased three new ICS-3000 systems in September of 2006. The ICS-3000 instruments are (a) designed to be more stable using an eluent generator to make eluent, (b) require virtually no daily chemical handling by the analysts, (c) require less line breaks in the hood, and (d) generally require less maintenance due to the pump configuration only using water versus the current system where the pump uses various hydroxide concentrations. The ICS-3000 instruments also allow the DWPF to maintain current service contracts, which support routine preventive maintenance and emergency support for larger problems such as component failure. One of the three new systems was set up in the DWPF Lab trailers in January of 2007 to be used for the development of methods and procedures. This system will continue to be used for training, new method development and potential improvements to current methods. The qualification of the other two ICS-3000 instruments was a phased effort. This effort was supported by the Applied Computational Engineering and Statistical (ACES) group of the Savannah River National Laboratory (SRNL) as authorized by the Technical Task Request (TTR) [1] and as directed by the corresponding Task Technical and Quality Assurance (TT&QA) plan [2]. The installation of the first 'rad' system into the M-13 Lab module required modifications to both the Lab module and to the radiohood. The installation was completed in July 2008. The testing of this system was conducted as directed by the TT&QA plan [2], and the instrument was qualified for use at the DWPF Lab as documented in [3]. As part of that evaluation, a recommendation was made that the second ICS-3000 be installed in the M-14 module and that qualification testing of that system be conducted. The purpose of this technical report is to provide a review of the data generated by these tests that will lead to the recommendation for the qualification of the M-14 ICS-3000 instrument.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Design and Fabrication of the Mu2e Cable Test Solenoid

Superconducting solenoids developed for the Fermilab Mu2e require an extended R&D on superconductor cables performance, working in strong field in the critical currents range. To test these cables, the Mu2e Cable Test Solenoid was designed and fabricated at Fermilab. The solenoid contains three coils (two Main coils, and one Test coil), connected in series. The Main coils are wound with the well known SSC NbTi cable. They are permanently attached to the solenoid top and bottom carbon steel flanges. The Test coil is replaceable, and meant to be installed between two Main coils. This coil can be wound with any superconductor cable which needs to be tested (the first Test coil was wound with RIKEN heavy aluminum stabilized NbTi cable). The cables cross section ratio in the Main Coils and the Test coil ensures operating of Main coils in the current ranges well below the critical value for their cable, while the Test coil always works near its critical current range. The solenoid design and some cable splicing issues are presented.

43 PARTICLE ACCELERATORS↗

Noninterference Systems Developed for Measuring and Monitoring Rotor Blade Vibrations

In the noninterference measurement of blade vibrations, a laser light beam is transmitted to the rotor blade tips through a single optical fiber, and the reflected light from the blade tips is collected by a receiving fiber-optic bundle and conducted to a photodetector. Transmitting and receiving fibers are integrated in an optical probe that is enclosed in a metal tube which also houses a miniature lens that focuses light on the blade tips. Vibratory blade amplitudes can be deduced from the measurement of the instantaneous time of arrival of the blades and the knowledge of the rotor speed. The in-house noninterference blade-vibration measurement system was developed in response to requirements to monitor blade vibrations in several tests where conventional strain gauges could not be installed or where there was a need to back up strain gauges should critical gauges fail during the test. These types of measurements are also performed in the aircraft engine industry using proprietary in-house technology. Two methods of measurement were developed for vibrations that are synchronous with a rotor shaft. One method requires only one sensor; however, it is necessary to continuously record the data while the rotor is being swept through the resonance. In the other method, typically four sensors are employed and the vibratory amplitude is deduced from the data by performing a least square fit to a harmonic function. This method does not require continuous recording of data through the resonance and, therefore, is better suited for monitoring. The single-probe method was tested in the Carl facility at the Wright- Patterson Air Force Base, and the multiple-probe method was tested in NASA Glenn Research Center's Spin Rig facility, which uses permanent magnets to excite synchronous vibrations. Representative results from this test are illustrated in the bar chart. Nonsynchronous vibrations were measured online during testing of the Quiet High Speed Fan in Glenn s 9- by 15-Foot Low-Speed Wind Tunnel. Three sensors were employed, enabling a reconstruction of the vibratory patterns at the leading and trailing edges at the tip span, as well as a determination of vibratory amplitudes for every blade.

Kurkov, Anatole P.↗

USE OF SILICON CARBIDE MONITORS IN ATR IRRADIATION TESTING

In April 2007, the Department of Energy (DOE) designated the Advanced Test Reactor (ATR) a National Scientific User Facility (NSUF) to advance US leadership in nuclear science and technology. By attracting new users from universities, laboratories, and industry, the ATR will support basic and applied nuclear research and development and help address the nation's energy security needs. In support of this new program, the Idaho National Laboratory (INL) has developed in-house capabilities to fabricate, test, and qualify new and enhanced temperature sensors for irradiation testing. Although most efforts emphasize sensors capable of providing real-time data, selected tasks have been completed to enhance sensors provided in irradiation locations where instrumentation leads cannot be included, such as drop-in capsule and Hydraulic Shuttle Irradiation System (HSIS) or 'rabbit' locations. For example, silicon carbide (SiC) monitors are now available to detect peak irradiation temperatures between 200°C and 800°C. Using a resistance measurement approach, specialized equipment installed at INL's High Temperature Test Laboratory (HTTL) and specialized procedures were developed to ensure that accurate peak irradiation temperature measurements are inferred from SiC monitors irradiated at the ATR. Comparison examinations were completed by INL to demonstrate this capability, and several programs currently rely on SiC monitors for peak temperature detection. This paper discusses the use of SiC monitors at the ATR, the process used to evaluate them at the HTTL, and presents representative measurements taken using SiC monitors.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Solar heating and cooling demonstration project at the Florida solar energy center

The retrofitted solar heating and cooling system installed at the Florida Solar Energy Center is described. The system was designed to supply approximately 70 percent of the annual cooling and 100 percent of the heating load. The project provides unique high temperature, nonimaging, nontracking, evacuated tube collectors. The design of the system was kept simple and employs five hydronic loops. They are energy collection, chilled water production, space cooling, space heating and energy rejection. Information is provided on the system's acceptance test results operation, controls, hardware and installation, including detailed drawings.

Source record↗

User guide for STRMLN: A boundary-layer program for contoured wind-tunnel liner design

A 2-D boundary layer computer code developed to process data for an arbitrary number of streamlines is presented. Provisions are included for the computer code to determine either mass transfer rates necessary for an effective boundary layer displacement of zero thickness or the effective displacement thickness for a specified mass transfer-rate distribution. The computer code was developed to be compatible with other computer codes which are being modified and/or developed at the NASA-Langley Research Center in order to design the three dimensional, contoured, wind tunnel liner used in transonic testing of a laminar flow control system installed on a supercritical airfoil section. A brief discription of the liner design procedure, representative liner calculations, adaptive-wall design for a two dimensional wind tunnel test, and other applications are reported.

Anderson, E. C.↗

NASA/GE Collaboration on Open Rotors - High Speed Testing

A low-noise open rotor system is being tested in collaboration with General Electric and CFM International, a 50/50 joint company between Snecmaand GE. Candidate technologies for lower noise will be investigated as well as installation effects such as pylon integration. Current test status for the 8x6 SWT high speed testing is presented as well as future scheduled testing which includes the FAA/CLEEN test entry. The tunnel blockage and propeller thrust calibration configurations are shown.

VanZante, Dale E.↗

Thermodynamic Model and Initial Experimental Investigation of Air Dehumidification through Electrically Charged Vapor Capturing Electrostatic Droplets

The removal of water vapor from the air to reduce relative humidity is a well known indoor environmental comfort requirement. Common dehumidification approaches require a substantial amount of energy and usually involve the cooling of atmospheric humid air below its dew point or the use of absorbent/adsorbent materials to extract water vapor out of the air. More recently, researchers investigated the effect of electrostatic forces for enhancing water vapor condensation with the goal to reduce the energy consumption associated with dehumidification. However, the studies are limited, and there is a lack of correlations that can predict the dehumidification rate. In this thesis, a broad theoretical investigation to study the electrostatically enhanced condensation processes was carried out. These processes consist of the use of highly charged particles, preferably highly charged water droplets to attract polar water vapor molecules to their surfaces and promote condensation, a phenomenon known as dielectrophoresis. The electrical charge promotes the reduction of the vapor pressure on the droplets' surface with respect to the saturated pressure predicted by the Kelvin equation on curved surfaces and, consequently, the equilibrium between evaporation and condensation is shifted towards condensation. This investigation resulted in the development of a thermodynamics model, which was able to predict an effective size range of the charged droplets for optimal dehumidification, under ideal conditions. The range resulted in about 2 to 4 m in diameter, while the electrical charge was kept to the maximum limit predicted by the Rayleigh model. A sensitivity analysis on the variation of the size and the charge of the charged droplets was also performed. In terms of dehumidification rates, when six electrospray heads, i.e. the maximum number of heads tested in the experimental campaign, were considered, the model predicted very limited rates, way lower than the target of this research, i.e. a dehumidification rate in terms of relative humidity of 5 % with an air flow rate of 5 cfm. While ways to increase this rate existed, their implementation proved difficult for this initial investigation. According to the requirements predicted by the model, the use of electrosprays appeared the most suitable solution for the production of small but highly charged droplets. The electrospray features and operational modes were studied in detail and an electrospray assembly was designed to be tested in this initial experimental investigation. For this initial investigation, an experimental system was designed and built to validate the thermodynamics model and with the goal to achieve a dehumidification rate of 5 % in terms of relative humidity with an air flow rate of 5 cfm. The experimental system consisted of a wind tunnel test apparatus, dew point sensors, thermocouples for temperature measurements, pressure sensors and other devices. The experimental system was equipped with a computerized data acquisition and storage system. The system was suitable to evaluate the air water content differential before and after the test section where the electrospray heads were installed. The air water content differential was evaluated in terms of the ∆ω/ω_1 ratio, to eliminate the dependence on the dry bulb temperature along the test apparatus. This work presented initial experimental data for electrostatically enhanced dehumidification processes. Working parameters, such as air and water flow rates, high voltage potentials and polarity, deionized water types with different electrical conductivity, were varied to find the best combination for an improved dehumidification. With the set up used and the conditions considered, it was never possible to achieve a 5 % dehumidification rate with 5 cfm. In general, the dehumidification rate was always limited and lower than 1 % for all the air flow rates considered and mainly within the uncertainty of the dew point sensors. These results confirmed the already limited predictions of the thermodynamics model, for ideal conditions and the interesting and promising results obtained in some experimental investigations available in the open literature were not achievable in this thesis. The more probable reasons were the higher air flow rates considered and the complete absence of the use of cooling power, which was mainly implemented to facilitate the vapor condensation.

Morcelli, Stefano↗

Application of Strain Gages in a Highly Advective Environment for Measurement of Fluid-Structure Interactions

A multi-year experimental program has been conducted to develop a program for applying strain gages to prototypic, plate-type fuel for high performance research reactors for use during flow testing. Plate strain measurements were intended to support the qualification of new fuel materials for use in high performance research reactors under the Materials Management and Minimization (MMM) Fuels Qualification Program (FQP). A survey of currently available strain gaging materials and processes was undertaken with a focus on applications towards thin, wide aspect ratio flow channels and fuel plates exposed to high velocity flows. Special consideration was taken to minimize the effect of the strain gage installations on the flow field. This test program has resulted in the selection of appropriate strain gage construction, adhesives, protective coatings, and assembly techniques to allow the real-time acquisition of plate strain during flow testing of the Generic Test Plate Assembly (GTPA) within the Oregon State University (OSU) Hydro-Mechanical Fuel Test Facility (HMFTF). All processes have been documented in procedures developed and utilized within the ASME NQA-1 compliant quality assurance program under which the HMFTF operates. Matrix testing has been completed using the results of this work with successful measurement of plate deformation due to hydraulic loading during flow testing.

Weiss, Aaron↗

Development of an Integrated Residential Heating, Ventilation, Cooling, and Dehumidification System for Residences

The Need and the Opportunity Codes such as ASHRAE 90.2 and IECC, and programs such as Energy Star and Builders Challenge, are causing new homes to be built to higher performance standards. As a result sensible cooling loads in new homes are going down, but indoor air quality prerogatives are causing ventilation rates and moisture loads to increase in humid climates. Conventional air conditioners are unable to provide the low sensible heat ratios that are needed to efficiently cool and dehumidify homes since dehumidification potential is strongly correlated with cooling system operating hours. The project team saw an opportunity to develop a system that is at least as effective as a conventional air conditioner plus dehumidifier, removes moisture without increasing the sensible load, reduces equipment cost by integrating components, and simplifies installation. Project Overview Prime contractor Davis Energy Group led a team in developing an Integrated Heating, Ventilation, Cooling, and Dehumidification (I-HVCD) system under the DOE SBIR program. Phase I and II SBIR project activities ran from July 2003 through December 2007. Tasks included: (1) Mechanical Design and Prototyping; (2) Controls Development; (3) Laboratory and Field Testing; and (4) Commercialization Activities Technology Description. Key components of the prototype I-HVCD system include an evaporator coil assembly, return and outdoor air damper, and controls. These are used in conjunction with conventional components that include a variable speed air handler or furnace, and a two-stage condensing unit. I-HVCD controls enable the system to operate in three distinct cooling modes to respond to indoor temperature and relative humidity (RH) levels. When sensible cooling loads are high, the system operates similar to a conventional system but varies supply airflow in response to indoor RH. In the second mode airflow is further reduced, and the reheat coil adds heat to the supply air. In the third mode, the reheat coil adds additional heat to maintain the supply air temperature close to the return air temperature (100% latent cooling). Project Outcomes Key Phase II objectives were to develop a pre-production version of the system and to demonstrate its performance in an actual house. The system was first tested in the laboratory and subsequently underwent field-testing at a new house in Gainesville, Florida. Field testing began in 2006 with monitoring of a 'conventional best practices' system that included a two stage air conditioner and Energy Star dehumidifier. In September 2007, the I-HVCD components were installed for testing. Both systems maintained uniform indoor temperatures, but indoor RH control was considerably better with the I-HVCD system. The daily variation from average indoor humidity conditions was less than 2% for the I-HVCD vs. 5-7% for the base case system. Data showed that the energy use of the two systems was comparable. Preliminary installed cost estimates suggest that production costs for the current I-HVCD integrated design would likely be lower than for competing systems that include a high efficiency air conditioner, dehumidifier, and fresh air ventilation system. Project Benefits This project verified that the I-HVCD refrigeration compacts are compact (for easy installation and retrofit) and can be installed with air conditioning equipment from a variety of manufacturers. Project results confirmed that the system can provide precise indoor temperature and RH control under a variety of climate conditions. The I-HVCD integrated approach offers numerous benefits including integrated control, easier installation, and reduced equipment maintenance needs. Work completed under this project represents a significant step towards product commercialization. Improved indoor RH control and fresh air ventilation are system attributes that will become increasingly important in the years ahead as building envelopes improve and sensible cooling loads continue to fall. Technologies like I-HVCD will be instrumental in meeting goals set by Building America and other programs to reduce energy use while improving the indoor environment. Next Steps The following steps are needed to bring the product to commercialization: (1) Value engineering to reduce costs; (2) Addition of zoning capability to improve marketability; (3) Fabrication and testing of additional prototypes; and (4) Identification of a manufacturer. Initial efforts to interest large air conditioner manufacturers has shown some interest, but the preferred path to market may be to employ a boutique manufacturer that markets to HVAC contractors. Distribution of the results of this work will improve opportunities for attracting manufacturers. Additional funding is needed to prepare the product for this final step.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Performance Testing of Software Upgrade for SRNL CPC Instrument at the Nuclear Material Laboratory, Office of Safeguards Analytical Services, International Atomic Energy Agency

This report summarizes the performance testing for the Software upgrade for the Savannah River National Laboratory (SRNL) Controlled Potential Coulometry (CPC) instrument. This upgrade is specifically to meet the needs of the Nuclear Material Laboratory, Office of Safeguards Analytical Services, International Atomic Energy Agency at Seibersdorf, Austria. The instrument hardware was upgraded in 2010, but the software continued to operate on a Windows platform using a High Tech Basic (HT Basic) application. HT Basic usage is declining. The IAEA requested an upgrade to the existing coulometer software to Laboratory Virtual Instrument Engineering Workbench (LabVIEW), an object-oriented programming language in wide use and one the NML staff is familiar with. The software was developed by SRNL Software Engineer, with assistance from Electrical Engineer and Scientist. Once developed, the new LabVIEW software was validated, tested with Iron (surrogate for plutonium) and plutonium. Once testing was completed, the software was installed at the International Atomic Energy Agency Nuclear Material Laboratory (IAEA NML) coulometer, and SRNL provided hands on training to NML staff on using the new software.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Status and specifications of a Project X front-end accelerator test facility at Fermilab

This paper describes the construction and operational status of an accelerator test facility for Project X. The purpose of this facility is for Project X component development activities that benefit from beam tests and any development activities that require 325 MHz or 650 MHz RF power. It presently includes an H- beam line, a 325 MHz superconducting cavity test facility, a 325 MHz (pulsed) RF power source, and a 650 MHz (CW) RF power source. The paper also discusses some specific Project X components that will be tested in the facility. Fermilab's future involves new facilities to advance the intensity frontier. In the early 2000's, the vision was a pulsed, superconducting, 8 GeV linac capable of injecting directly into the Fermilab Main Injector. Prototyping the front-end of such a machine started in 2005 under a program named the High Intensity Neutrino Source (HINS). While the HINS test facility was being constructed, the concept of a new, more versatile accelerator for the intensity frontier, now called Project X, was forming. This accelerator comprises a 3 GeV CW superconducting linac with an associated experimental program, followed by a pulsed 8 GeV superconducting linac to feed the Main Injector synchrotron. The CW Project X design is now the model for Fermilab's future intensity frontier program. Although CW operation is incompatible with the original HINS front-end design, the installation remains useful for development and testing many Project X components.

43 PARTICLE ACCELERATORS↗

Design and Test of Advanced Thermal Simulators for an Alkali Metal-Cooled Reactor Simulator

The Early Flight Fission Test Facility (EFF-TF) at NASA Marshall Space Flight Center (MSFC) has as one of its primary missions the development and testing of fission reactor simulators for space applications. A key component in these simulated reactors is the thermal simulator, designed to closely mimic the form and function of a nuclear fuel pin using electric heating. Continuing effort has been made to design simple, robust, inexpensive thermal simulators that closely match the steady-state and transient performance of a nuclear fuel pin. A series of these simulators have been designed, developed, fabricated and tested individually and in a number of simulated reactor systems at the EFF-TF. The purpose of the thermal simulators developed under the Fission Surface Power (FSP) task is to ensure that non-nuclear testing can be performed at sufficiently high fidelity to allow a cost-effective qualification and acceptance strategy to be used. Prototype thermal simulator design is founded on the baseline Fission Surface Power reactor design. Recent efforts have been focused on the design, fabrication and test of a prototype thermal simulator appropriate for use in the Technology Demonstration Unit (TDU). While designing the thermal simulators described in this paper, effort were made to improve the axial power profile matching of the thermal simulators. Simultaneously, a search was conducted for graphite materials with higher resistivities than had been employed in the past. The combination of these two efforts resulted in the creation of thermal simulators with power capacities of 2300-3300 W per unit. Six of these elements were installed in a simulated core and tested in the alkali metal-cooled Fission Surface Power Primary Test Circuit (FSP-PTC) at a variety of liquid metal flow rates and temperatures. This paper documents the design of the thermal simulators, test program, and test results.

Garber, Anne E.↗

Precision temperature gradient measurements on window glass

Surface temperature gradients were measured with miniature thermocouples installed in a 58.5 cm (23-inch) square window. Test measurements at 25 locations were made under vacuum and with the window operating in radiant heat transfer mode. The analysis of thermocouple design and installation is presented along with a lead wire routing scheme to allow for both differential and absolute temperature measurements while using a minimum number of signal feedthru paths through the test chamber wall. Typical test data and operational precautions are presented along with the accuracy analysis for installation effects and measurement effects to support differential temperature measurement precision values of + or - 0.06 C RMS + or - 0.1 F RMS).

Mikk, G.↗

Qualification of the First ICS-3000 ION Chromatograph for use at the Defense Waste Processing Facility

The ICS-3000 Ion Chromatography (IC) system installed in 221-S M-13 has been qualified for use. The qualification was a head to head comparison of the ICS-3000 with the currently used DX-500 IC system. The crosscheck work included standards for instrument calibration and calibration verifications and standards for individual anion analysis, where the standards were traceable back to the National Institute of Standards and Technology (NIST). In addition the crosscheck work included the analysis of simulated Sludge Receipt Adjustment Tank (SRAT) Receipt, SRAT Product, and Slurry Mix Evaporator (SME) samples, along with radioactive Sludge Batch 5 material from the SRAT and SME tanks. Based upon the successful qualification of the ICS-3000 in M-13, it is recommended that this task proceed in developing the data to qualify, by a head to head comparison of the two ICS-3000 instruments, a second ICS-3000 to be installed in M-14. The Defense Waste Processing Facility (DWPF) requires the analysis of specific anions at various stages of its processing of high level waste (HLW). The anions of interest to the DWPF are fluoride, formate, chloride, nitrite, nitrate, sulfate, oxalate, and phosphate. The anion analysis is used to evaluate process chemistry including formic acid/nitric acid additions to establish optimum conditions for mercury stripping, reduction-oxidation (REDOX) chemistry for the melter, nitrite destruction, organic acid constituents, etc. The DWPF Laboratory (Lab) has been using Dionex DX-500 ion chromatography (IC) systems since 1998. The vendor informed DWPF in 2006 that the instruments would no longer be supported by service contracts after 2008. DWPF purchased three new ICS-3000 systems in September of 2006. The ICS-3000 instruments are (a) designed to be more stable using an eluent generator to make eluent, (b) require virtually no daily chemical handling by the analysts, (c) require less line breaks in the hood, and (d) generally require less maintenance due to the pump configuration only using water versus the current system where the pump uses various hydroxide concentrations. The ICS-3000 instruments also allow the DWPF to maintain current service contracts, which support routine preventive maintenance and emergency support for larger problems such as component failure. One of the three new systems was set up in the DWPF Lab trailers in January of 2007 to be used for the development of methods and procedures. This system will continue to be used for training, new method development and potential improvements to current methods. The qualification of the other two ICS-3000 instruments is to be a phased effort. This effort is to be supported by the Applied Computational Engineering and Statistical (ACES) group of the Savannah River National Laboratory (SRNL) as authorized by the Technical Task Request (TTR) and as directed by the corresponding Task Technical and Quality Assurance (TT&QA) plan. The installation of the first 'rad' system into the M-13 Lab module required modifications to both the Lab module and to the radiohood. The installation was completed in July 2008. The testing of this system was conducted as directed by the TT&QA plan. The purpose of this technical report is to provide a review of the data generated by these tests that will lead to the recommendation for the qualification of the M-13 ICS-3000 instrument. With the successful qualification of this first ICS-3000, plans will be developed for the installation of the second 'rad' system in the M-14 Lab module later in fiscal year 2009. When the second 'rad' ICS-3000 system is installed, the DX-500 systems will be removed and retired from service.

47 OTHER INSTRUMENTATION↗

CHLORIDE WASHER PERFORMACE TESTING

Testing was performed to determine the chloride (Cl-) removal capabilities of the Savannah River National Laboratory (SRNL) designed and built Cl- washing equipment intended for HB-Line installation. The equipment to be deployed was tested using a cerium oxide (CeO2) based simulant in place of the 3013 plutonium oxide (PuO2) material. Two different simulant mixtures were included in this testing -- one having higher Cl- content than the other. The higher Cl- simulant was based on K-Area Interim Surveillance Inspection Program (KIS) material with Cl- content approximately equal to 70,000 ppm. The lower Cl- level simulant was comparable to KIS material containing approximately 8,000-ppm Cl- content. The performance testing results indicate that the washer is capable of reducing the Cl- content of both surrogates to below 200 ppm with three 1/2-liter washes of 0.1M sodium hydroxide (NaOH) solution. Larger wash volumes were used with similar results - all of the prescribed test parameters consistently reduced the Cl- content of the surrogate to a value below 200 ppm Cl- in the final washed surrogate material. The washer uses a 20-micron filter to retain the surrogate solids. Tests showed that 0.16-0.41% of the insoluble fraction of the starting mass passed through the 20-micron filter. The solids retention performance indicates that the fissile masses passing through the 20-micron filter should not exceed the waste acceptance criteria for discard in grout to TRU waste. It is recommended that additional testing be pursued for further verification and optimization purposes. It is likely that wash volumes smaller than those tested could still reduce the Cl- values to acceptable levels. Along with reduced wash volumes, reuse of the third wash volume (in the next run processed) should be tested as a wash solution minimization plan. A 67% reduction in the number of grouted paint pails could be realized if wash solution minimization testing returned acceptable results.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗