Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Ac”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,405 records · Page 78

Bad River Band of Lake Superior Chippewa Indians Solar Project

The Bad River Band of Lake Superior Chippewa (the Tribe) implemented its first phase of energy independence through the installation of approximately 520 kW DC of solar photovoltaic (PV) at three tribal buildings: 200kW DC at the Wastewater Treatment Plant (WWTP), 300 kW DC at the Health & Wellness Center (Health Clinic), and 20 kW AC at the Chief Blackbird Administration Building (Administration Building). The solar PV systems were integrated with the existing utility grid and can operate independent of the grid using Battery Energy Storage Systems (BESS) in combination with solar and existing back-up gas generators. The BESS also creates resiliency, providing power when the grid is down. All three buildings are essential Tribal buildings.

14 SOLAR ENERGY↗

Design, Deployment, and Characterization of the World’s First Flexible Large Power Transformer

GE Research and its partner Prolec GE have designed, built and deployed in the field the world’s first flexible power transformer. The flexible power transformer is a transmission class 3-phase autotransformer configurable in impedance and in voltage which allows it to serve as a universal spare for multiple units in a given fleet. However, the key innovation in this new concept is the online adjustable leakage impedance which allows the transformer to change its impedance without interrupting the transmission line operation. The flexible power transformer can be designed with up to three low voltage transmission class ratings and up to 12 impedance values changeable both online and offline. This report provides an overview of the design, manufacturing, testing, and commissioning of the 165kV, 60MVA prototype built including the results of the field performance validation tests. The prototype was specified in collaboration with Cooperative Energy, the utility host. It was designed and tested in the factory according to IEEE standard C57.12.00 and followed all protocols for transportation, installation, and commissioning of a power transformer. In addition to the prototype, a flexible protection system capable of automatically adjusting its settings upon the transformer impedance was also developed and deployed in the for testing and validation. On September 3, 2021 the prototype was energized in Cooperative Energy’s substation in Columbia, Mississippi to become the world’s first flexible power transformer in operation. Its performances and impact on the grid operation were demonstrated through different field tests. Results obtained confirm that the impedance of the flexible transformer can be varied under load through its full range, from 4.3% to 9.3%, without adverse impacts on the line operation, the protection system, the transformer stability and health condition. Results also proved that the flexible transformer is very effective in controlling power transfer through the line or load sharing between units operating in parallel. Indeed, it was proven that higher impedances decrease the thruput power of the transformer while lower impedances increase it. Up to 26MW was controllable on a line loading of 45MVA. It was also possible to demonstrate that the variation of the transformer impedance has no effect on the circulating current between units in parallel, except a minor transient during the impedance change. It was also proven that the flexible protection relay can update its protection settings automatically when the impedance change was detected. The prototype has operated continuously for more than 12 months now with a peak load exceeding 50MVA corresponding to >80% of its ONAN power rating. No alarm, trip or sign of failure has been reported by the utility. In addition to the development and deployment of the flexible transformer prototype, investigations were carried out on new nanodielectric fluids to replace the mineral oil used in power transformers with the goal of reducing their footprint and weight. The key parameters that were targeted for improvement included the breakdown voltage to reduce clearances between windings and tank hence the footprint; viscosity and thermal conductivity to increase the cooling efficiency and therefore to reduce the winding material. Several nanodielectric mixtures with mineral oil including with alumina (Al2O3), titania (TiO2) and Borum Nitrate (BN) with different surfactants have been analyzed and tested. Unfortunately, despite encouraging results no nanofluid candidate has been found viable to replace mineral oil. With the formulations tested, breakdown voltages are generally similar to mineral oil at lower particle contents and worse at higher particle contents. Viscosity appreciably increased at particles concertation over 2 wt% and thermal conductivity increased slightly at 5wt% and appears to be 10-15% higher at 10 wt% particle content. It is recommended to continue investigations to find solutions that can help increase the power density of future flexible power transformers. Flexible power transformers can significantly help the future power grid by providing more flexibility and resiliency. Indeed, by providing voltage and impedance flexibility, flexible power transformers reduce the need for multiple spares, hence inventory costs for utilities. With their online controllable impedance, they can provide support to the grid and help manage short-circuit currents, power flow, line congestion, and grid stability which will become more important with higher penetrations of intermittent renewable resources. During the field validation tests, it was demonstrated that up to 26MW was controllable on a line loading of 45MVA when the transformer impedance was varied from its minimum to its maximum range. Also, with the impedance range, the short-circuit currents could be reduced by up to 38% at the load side of the transformer. With its controllable impedance, flexible transformers can be used in future strategies of grid resilience to help better prepare the grid to face forecasted severe events including storms, heat waves and contingencies. The flexible power transformers can also find role in other applications including high voltage transmission cables such as offshore wind farms where solutions for energizing the cables and managing the reactive power are of critical importance. The designed flexible power transformer is now fully validated and ready for commercialization. Further analysis on the benefits of flexible power transformers for grid stability and short-circuit management including current limiting capability, reclosure and line restoration, control of inrush current, sizing of flexible AC components (FACTS) would help its rapid adoption by the industry.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Tier 2 Safety Basis Document: Weapons and Complex Integration - Building 225

This Safety Basis Document (SBD) covers operations in the Weapons and Complex Integration (WCI) Building 225 (B225) facility. B225 is located in the southwestern quadrant of Lawrence Livermore National Laboratory (LLNL) and is operated and owned by WCI. This SBD satisfies the requirements of LLNL ES&H Manual Document 3.1, Nonnuclear Safety Basis Program (Ref. 2). B225 is classified as a Low Hazard Facility based on the inventory of radiological materials. Other hazards in B225: chemicals, radiation generating devices, and industrial hazards are managed at the Light Science and Industry (LSI) level. Biological and explosive hazards are not authorized in B225. There are four general Administrative Controls (ACs) identified as the B225 Operational Safety Requirements (OSRs). These administrative controls are deemed sufficient to ensure safe operations with respect to co-located workers and the public. Other safety features and administrative requirements are required by the LLNL ES&H Manual, including those to protect the facility workers and the environment, but these have not been selected as credited controls to protect the co-located workers or the public, which are the target populations of concern for the SBD.

61 RADIATION PROTECTION AND DOSIMETRY↗

Beam and Spin Optics Simulation Tutorials, Using Zgoubi Exercises and Solutions 2 - RHIC Run 22 Spin Transparency Experiment

High electron and ion polarizations are paramount design requirements for the future Electron Ion Collider (EIC) at BNL. A “spin transparency” mode of operation, inherited from the “figure-8” ring design [1], allows preservation and control of electron and ion spin polarization in a collider or storage ring [2, 3]. It makes the ring lattice “invisible” to the spin and allows for polarization control by small quasi-static magnetic fields with practically no effect on beam orbital parameters. Beam polarization can then be fully controlled by small adjustments of snake axis orientation (a few degrees) and snake strengths (a few percent); polarization orientation at IPs can be controlled without spin rotators, spins can be adiabatically flipped without the need of ac magnets. The transparent spin mode has been demonstrated in simulations [2] for the purpose of being tested experimentally during RHIC Run 22. This experiment was aimed at providing data to validate the principles. Yellow RHIC ring (Fig. 1.1) was configured in the transparent spin mode by aligning the axes of its two helical snakes (located respectively in the 3 o’clock and 9 o’clock sextants) parallel to the longitudinal axis. Experiment goals and expected results, ad hoc procedures and hardware requirements, are addressed in Refs. [2, 3].

43 PARTICLE ACCELERATORS↗

The BREKTRIA 500 – A Breakthrough in Technology and Power Density for an Advanced 500kW Utility-Scale String Inverter (Final Technical Report)

The primary goal of this development project, planned to be 36 months in duration, was to create a 500kW utility-scale string inverter, demonstrating an advanced hybrid architecture that would achieve unprecedented high power density, and bring the inverter to the stage of production readiness. Specific key objectives for the 500kW utility-scale string inverter were: Create a 500kW 3-phase 600Vac inverter that was similar in overall size to the existing 250kW string inverters in the market, thereby demonstrating dramatically increased power density; Achieve a cost of goods, including all manufacturing-related costs and overheads, at or below 2.5¢/Wac ($12,500); Demonstrate full-power operation at a 45-50C ambient temperature with no power de-rating; Accommodate a PV array DC input of up to 1MWdc, aka a DC/AC Ratio of 2.0; Demonstrate peak efficiency greater than 99% at any operating dc voltage, and a CEC weighted average efficiency greater than or equal to 98.5%. The motivation for this project was to leapfrog the competition by creating the world’s most powerful string inverter, utilizing an innovative topology and achieving a step change increase in power density. Achieving the goals of the project would have enabled Yaskawa Solectria Solar to demonstrate its technology leadership, manufacture the utility-scale string inverter in the company’s facilities in Illinois, and bring to the market a highly-differentiated and compelling product to help the company grow its share in the large and growing utility market segment. During the course of this project, BREK Electronics’ hybrid architecture inverter was taken from an early-stage 125kW prototype, to a more mature and successfully demonstrated power stage at twice the power. Two 250kW power stages were planned to build the 500kW inverter. Significant progress was made in the inverter controls, achieving a clean AC sinewave and closed-loop operation into the grid, and improved efficiency by control of the high-speed switching. Further, the updated 250kW power stage was on track to achieve full power operation at an ambient temperature of 50C. At the time of the project’s closure in September 2022, global semiconductor supply remained limited, with shortages creating dramatic swings in both availability and price. Given this situation, our ability to predict cost-of-goods two years out with any accuracy or confidence was limited. As a result, the probability of attaining the target cost of 2.5¢/Wac for the 500kW inverter remained uncertain at the closure of the project. This project successfully demonstrated the potential for the advanced hybrid architecture inverter that emerged from a decade of university research on Si IGBTs and SiC mosfets, leading to this unique inverter topology. The team has taken the first steps toward an evolutionary advancement in inverter technology that remains to be fully realized.

14 SOLAR ENERGY↗

Nuclear Data for Spallation Neutron Radioisotope Production (Final Technical Report)

Over 50 million nuclear medicine procedures are performed annually, leading to a multi-billion dollar market for radioisotope production. The demand for new medical and research isotopes is growing, and radioisotope supply is insufficient. Most radioisotope production today utilizes charged particle or low-energy neutron irradiation of a target. Isotope production with tens to hundred MeV incident energies is a relatively unexplored option. There is a tremendous opportunity associated with a growing number of suitable domestic and international facilities buttressed by hundred million dollar global investments (e.g., the Los Alamos and Brookhaven Isotope Production Facilities, the European Spallation Source in Lund, and the Korean Multi-purpose Accelerator Complex in Gyeongbuk). In part due to a lack of supporting nuclear data that would make modeling radioisotope yields and purities possible, these facilities do not utilize their high-energy neutron fluxes for isotope production. This project attempted to measure neutron reaction excitation functions relevant to the large-scale production of critical radioisotopes, enabling development of cost-efficient isotope production methods, contributing to the improvement of theoretical models, and enhancing the value of national isotope production facilities. Reactions which form 67 Cu, 32 Si, and alpha-emitting isotopes like 225 Ac were chosen for their consistent prioritization by expert panels, representation of diverse reaction mechanisms, and relative lack of supporting nuclear data. Accurate measurement of these data is presently made only using quasi-monoenergetic neutron beams, which are produced by bombarding thin lithium targets with protons at only a few laboratories in the world. Ultimately, the projects efforts were incompletely accomplished due to a combination of multi-year technical issues at the only laboratory in the world which can make the proposed measurements, iThemba Labs in South Africa, and the onset of a global pandemic, which precluded the significant effort and time required to develop an independent measurement capability in the United States.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

SiC Based Modular Transformer-less MW-Scale Power Conditioning System and Control for Flexible CHP System

This project aims at developing a SiC-based, modular, transformer-less (60-Hz-transformers-free), MW-scale, four-wire DC/AC power conditioning system (PCS) converter, and a corresponding control system for flexible-CHP (F-CHP) systems. With the help of an F-CHP controller and power electronics converters, different CHP sources, renewable sources, and batteries can be assembled to the DC grid, which is then connected to the medium voltage (MV) AC grid through the PCS converter. To meet grid support and performance requirements, the F-CHP controller design and PCS converter design follow IEEE 1547 and IEEE 2030.7 standards. Five main tasks, including PCS converter design, F-CHP controller development, PCS converter prototype building and testing, F-CHP controller testing, and PCS paralleling, have been carried out. In this project, the F-CHP controller testing has been completed in simulation, HIL and HTB, and the PCS converter prototypes have been successfully built and tested.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Tunisia Air Conditioner Market Assessment

Air conditioners contribute significantly to peak power demand during Tunisia's hot summers. In 2021, the Tunisian Electricity and Gas Company (STEG) recorded a peak demand of 4,472 megawatts in August, estimating that 44% of that demand was due to the operation of air conditioners. The Tunisian government, through its Agence Nationale pour la Maitrise de L'Energie (ANME) and all of its partners, is called on to take advantage of the significant potential for energy efficiency and to achieve the objectives it has set for itself by accelerating the implementation of programs that expand the adoption of efficient appliances, including air conditioners. This report aims to assess the Tunisian market for air conditioners, particularly in terms of energy performance. The report provides an overview of the size and characteristics of the AC market in Tunisia, including product types, origins, and proportion of imports to locally manufactured units; an estimation of the informal market; energy performance; and price.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Cybersecurity Platform and Certification Framework Development for Extreme Fast Charging (XFC)-Integrated Charging Ecosystem (Final Project Report)

This report summarizes a pioneering effort in Electric Vehicle charging infrastructure ecosystem cybersecurity requirements, assessment methodologies, functional verification, as well as embodiment of the key technologies in the form of hardware and software tools being made available to the public. EPRI led a team of experts, as well as a stakeholder coalition encompassing all key actors in the EV charging infrastructure ecosystem that includes eXtreme Fast Charging (XFC) equipment (defined as 200kW or above). EV charging infrastructure in the United States is a patchwork of networks that have continued to grow organically and have been designed to serve the charging needs of the EV owners, who are their customers. In doing so, each network provider, as well as their connected entities such as the cloud Electric Vehicle Service Providers or EVSPs, utility back office, utility AMI networks, payment networks, as well as Original Equipment Manufacturer (EV manufacturer) telematics networks, have designed systems that may work well individually, but no single entity is responsible for the entire ecosystem to be secure in terms of data exchange. Furthermore, there is no uniformity in how each actor has implemented the cybersecurity requirements since no system-wide cybersecurity requirements existed prior to this project. The final project report describes the technical approach guided by the EV charging infrastructure cybersecurity working group, convened specifically for this project. The technical approach included definition of requirements at the ecosystem level, treated as a ‘system of systems’, and then passed down to individual systems (EVSE, EV, cloud EVSP, utility, and the payment networks), followed by developing the cybersecurity risk and vulnerability assessment methods, that were later applied to real-world cyber-physical systems at EPRI, ANL, and NREL laboratories, to validate both the process and the results. Finally, in a spotlight over the most vulnerable equipment, which is the EV charge station (AC or DC), the team developed a multi-layer cybersecurity implementation in the embedded domain embodied by the open-source Secure Network Interface Card (SNIC) demonstrating the various ways in which the infrastructure can be secured protecting against the identified attack surfaces. Finally, the entire process of EV infrastructure cybersecurity assessment was encapsulated in the Electric Vehicle Charging Cybersecurity Management (EVC2M) online GUI-based tool, that is expected to be released to the public. The report presents the objectives, the technical approach, the key results, and recommendations for future work.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Improved Understanding of Zircaloy Hydrogen Pickup Mechanisms in BWRs. NSUF Report (Final Report)

Using an instrumented autoclave operating at 288°C and 1100 psi, electrical impedance spectroscopy (EIS) measurements were taken from three neutron irradiated fuel channel samples (Zircaloy-2 and Zircaloy-4). The three high priority fuel channel samples were tested at 288°C using a simulated PWR water with the AC frequency range extending down through 10 -4 Hz, with corresponding DC measurements to validate the resistance measurements. EIS measurements were also taken at room temperature using a simulated PWR water from four neutron irradiated fuel channel samples (Zircaloy-2 and Zircaloy-4). and four water rod samples (Zircaloy-2). EIS measurements were also performed on unirradiated Zircaloy-2 tubes that were previously oxidized in autoclaves at various temperatures for different time durations to obtain oxide layers of different thicknesses. These experiments proved to be more challenging than anticipated because of the small size of the samples, which required development of fixtures to allow valid testing of the materials, some of which are radioactive, under pressure and temperature. Equivalent circuits were used to model the data. Some samples resulted in Nyquist plots where the arcs were too close to each other resulting in the inability to separate the different oxide morphological thicknesses. Microstructural characterization in the form of optical microscopy, scanning electron microscopy and (scanning) transmission electron microscopy was performed to document the microstructural features of the oxidized Zr-2 and Zr-4 samples (oxide and metal/oxide interface) and to interpret the EIS results. At the start of this work, it was assumed that despite the laminar cracks and porosity visible in both optical and SEM, the oxide scale is dense near the metal, effectively preventing the water from contacting the metal directly. While it is generally accepted that the large laminar cracks pores allow the water to percolate into the oxide film, it is unknown just how deep it can go, and how interconnected is the porosity, which will dictate how much the porosity is connected electrically to the water within the oxide scale. The EIS results demonstrated that there is in fact a distribution of oxide thicknesses over the various samples, and within each material condition, that are communicating to the liquid. This is derived from the fact that Nyquist plots have an arc radius whose center point is often below the Z’ axis, implying that instead of a single oxide thickness, these oxides have a distribution of thicknesses. This distribution of thicknesses produces arcs that are not clearly separable in most of the samples.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

High-Efficiency, Medium-Voltage-Input, Solid-State-Transformer-Based 400-kW/1000V/400A Extreme Fast Charger for Electric Vehicles

Range anxiety and long battery charging time continue to be critical challenges to mass adaptation of EVs. A major identified gap to wider adoption of BEVs is the ability and availability to refuel quickly or to fast charge. Studies have shown that in areas where drivers have access to 50-kW or 120-kW fast charge stations, annual electric vehicle (EV) miles traveled (i.e., eVMT) increased by over 25%, even in cases where fast charging was used for 1% to 5% of total charging events. Charge stations of higher power not only alleviate the “range anxiety” and reduce the driver’s waiting time, but also requires less investment. Michigan Energy Office completed a study in early 2019 titled “Electric Vehicle Charger Placement Optimization in Michigan: Phase I – Highways”. This study finds a system with 150kW chargers, though more expensive individually, actually has lower total system cost when compared to a 50kW charging system when serving the same battery size EV. To be truly competitive to the ICEV refueling experience, even higher power stations are necessary. However, high power charge stations would create large power draws from the grid. If this occurs during peak demand periods, grid capacity could be overloaded. This problem needs to be addressed to reduce the impact on the electric utility infrastructure. The main goal of this project is to develop a 400-kW/400-A XFC system targeting total efficiency of 96.5 percent from the MVAC grid to a vehicle. The novel SST power cell topology, combined with a new silicon carbide (SiC) MOSFET device, enables a 3.5 percent improvement in system efficiency, a 50-percent smaller equipment footprint, and four times less weight than today’s DCFC systems. The SST technology would directly utilize MVAC at 4.8-kV or 13.2-kV. This would eliminate the line frequency transformer (LFT), which steps down medium-voltage AC to 3-Phase 480-V line-to-line voltage in current DCFC systems.

42 ENGINEERING↗

Modular, Multifunction, Multiport and Medium Voltage Utility Scale SiC PV Inverter (Final Report)

This project is to develop and demonstrate a Modular, Multi-function, Multiport and Medium Voltage utility scale SiC solar inverter (M4 Inverter). The M4 Inverter is a next generation utility scale PV + storage inverter that can substantially reduce the levelized cost of energy (LCOE) while providing grid friendly ancillary services. Conventional utility scale solar inverters includes three parts, a megawatt rated solar inverter, a low frequency transformer (LFT) and a medium voltage switch gear. The proposed M4 Inverter directly converts the DC output of solar panels to medium voltage AC, eliminating the bulky and costly LFT. The M4 Inverter also has a DC port to interface with an additional energy storage device. This plus its bidirectional power flow capability, allows multiple functions in addition to PV maximum power tracking be achieved. These additional functionalities include but not limited to reactive power support, peak shaving, fast frequency regulation and synthetic inertia. Predicted LCOE reductions with these added functionalities, improved efficiency and longer lifetime time are more than 30% compared with the 2017 utility scale solar LCOE. A 1MVA SiC M4 Inverter was developed and tested at high power level. The project has also advanced the state of the art in controller hardware in the loop simulation capability. Power electronic innovations introduced in the M4 Inverter includes 1700V SiC MOSFET application in 1500V PV system, soft switching three-port power converters and modular converter architecture.

24 POWER TRANSMISSION AND DISTRIBUTION↗

ACE: Proton beam upgrade plan at Fermilab

aFor Snowmass and P5, Fermilab recently proposed a new upgrade plan known as Accelerator Complex Evolution (ACE) to occur after PIP-II upgrade in tandem with DUNE/LBNF operation. The first phase of ACE, ACE-MIRT, is the ACE Main Injector Ramp and Targetry upgrade, which would raise the LBNF beam power from 1.2 MW to 2 MW by shortening the Main Injector cycle time to around 0.65s. The second phase of ACE, AC-BR, is the ACE Booster Replacement, which would replace the Booster with a new machine and achieve 2.4 MW for DUNE/LBNF. The implications for the Fermilab neutrino program and future experiments hosted at Fermilab will be discussed.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Utility-Scale Solar, 2023 Edition: Empirical Trends in Deployment, Technology, Cost, Performance, PPA Pricing, and Value in the United States [Slides]

Berkeley Lab’s “Utility-Scale Solar, 2023 Edition” presents analysis of empirical plant-level data from the U.S. fleet of ground-mounted photovoltaic (PV), PV+battery, and concentrating solar-thermal power (CSP) plants with capacities exceeding 5 MWAC (PV plants of 5 MWAC or less, including residential rooftop systems, are covered separately in Berkeley Lab’s companion annual report, Tracking the Sun). Highlights of this year’s update include: -10.4 GWAC of new utility-scale PV capacity came online in 2022, bringing cumulative installed capacity to more than 61.7 GWAC across 46 states. -94% of all new utility-scale PV capacity added in 2022 uses single-axis tracking. -Median installed project costs declined to $\$1.32$/WAC (or $\$1.07$/WDC) in 2022. -Plant-level capacity factors vary widely, from 9% to 35% (on an AC basis), with a sample median of 24%. The report explores drivers of this variation. -Utility-scale PV’s LCOE fell to $\$39$/MWh in 2022 ($\$29$/MWh if factoring in the federal investment tax credit, or ITC). -PPA prices have largely followed the decline in solar’s LCOE over time, but have recently stagnated and even moved slightly higher. Prices from a sample of recent contracts average around $\$20-30$/MWh (levelized) in the West and $\$30-40$/MWh elsewhere in the continental US. -In 2022, solar’s average market value (defined in the report to include only energy and capacity value) rose by 40% to $\$71$/MWh and exceeded average wholesale prices in 4 of the 7 ISOs/RTOs and 11 of 18 other balancing authorities analyzed. -Adding battery storage is one way to increase the value of solar. Our public data file tracks metadata and PPA prices from ~100 PV+battery hybrid projects that are already online or that have secured offtake arrangements. -the end of 2022, there were at least 947 GW of utility-scale solar power capacity within the interconnection queues across the nation, 456 GW of which include batteries. For more information, and to explore related interactive data visualizations, go to utilityscalesolar.lbl.gov.

14 SOLAR ENERGY↗

2023 SAGE-Camp Report

The 7 th Summer Physics Camp for Young Women was successfully held in person in 2023 from June 5 th to 16 th at the New Mexico School for the Arts in Santa Fe, NM at Hilo Intermediate School in Hawaii. This year’s camp was dedicated to the topic of Energy Security and was made possible thanks to the strong collaboration of Los Alamos, Sandia and Hawaii teams and the logistical and financial support of Los Alamos and Sandia National Laboratories, New Mexico Consortium, SAGE- Moore Foundation, LANL Foundation, ACS, IEE, APS four corners, N3B, Hawaii Museum of Science and Technology, New Mexico School for the Arts (NMSA) and Tech Source. The camp mobilized more than 120 volunteers who made the camp a success. The camp is free of charge to the students and included free lunch and snacks for the busy brains to have plenty of energy, also included all materials needed for the hands-on activities (like drone building, crystal structure, solar panels, wind turbine fabrication, soldering, coding etc) and also a stipend for students who attended for the full two weeks and for two educators and two student mentors in NM. The camp offered 32 high school students from New Mexico and 8 from Hawaii a unique opportunity to explore science topics and meet a broad range of role model professionals across STEM fields including astrophysics, cybersecurity, Energy fields, space science, engineering, biophysics, environmental science, robotics, computer science, nuclear engineering, radiological science, physics and chemistry. With nearly 120 volunteers who came mainly from Los Alamos National Laboratory (66%) and Sandia national laboratories (18%), two funded educators from NM, Dr. Weldon Beauchamp and Dr. Ellee Cook, and two educators from Hilo, Dr. Pascale Creek Pinner and LeAnn Ragasa, the camp was educationally sound and extremely varied. The collaboration with school educators is critical for the goal of this camp to not only impact students' lives but also improve STEM education in NM and Hawaii. The ultimate goal of the camp is to increase higher education aspirations of students, empower them to consider careers in STEM and learn more about the opportunities available to them in our local colleges and DOE National Laboratories. In addition, the camp also hired 2 past students as student mentors, Megan Odom and Elisea Jackson, who currently attend NMSA and were students at the camp in 2022 when it was virtual. The in-person camp which aims at empowering under-represented minorities in STEM in our community received more than 52 applications this year from all over NM and 8 applications from Hawaii. Our selection criteria are based on diversity, equity and inclusion, and students for whom the camp can be a life-changing opportunity are given a chance to attend the camp. During COVID, the camp was held virtually and gave the opportunity to students from remote areas in NM and Hawaii to attend from their homes. This year, fantastic families supported students everyday even when home was in remote areas in NM like Lea county, Sandoval county, Bernalillo or Mora county. The organizers hope next year they can offer a residential option for students from remote areas.

99 GENERAL AND MISCELLANEOUS↗

Optimal Power Flow Derived Sparse Linear Solver Benchmarks

Due to the changing nature of the power grid, it is increasingly important to be able to solve a high-fidelity optimal power-flow models on large power networks. This high-fidelity problem, called AC Optimal Power Flow (ACOPF), is a nonlinear, nonconvex optimization problem. One of the few reliable ways of solving such a problem is interior point methods. These methods result in sparse linear systems where the coefficient matrix is symmetric, indefinite and nearly always ill-conditioned. As such, they are particularly challenging for sparse linear solvers and represent a considerable computational bottleneck in solving the ACOPF problem. In this paper, we introduce a repository of linear systems captured from ACOPF problems when solved by the open-source optimizer IPOPT. These matrices are meant to be used as a test suite for sparse linear solver development.

97 MATHEMATICS AND COMPUTING↗

Development of a BlueCRAB/MELCOR Framework for Supporting Realistic Mechanistic Source Term Calculations in Microreactors

Efforts are currently underway to deploy microreactor modeling and simulation tools to better support vendors and regulatory authorities in submitting and reviewing licensing applications. In particular, the Nuclear Regulatory Commission is expected to rely on the Comprehensive Reactor Analysis Bundle (BlueCRAB) multiphysics toolset in performing design- and beyond-design-basis accident analyses. In addition, the Nuclear Regulatory Commission has been using the MELCOR code to estimate mechanistic source terms during accidents. As MELCOR relies on isotopic inventory and reactor temperature/power evolution profiles during accident conditions—all of which can theoretically be obtained from BlueCRAB—the ultimate goal of this activity is to establish a common BlueCRAB-MELCOR framework. However, prior to the present research, BlueCRAB had never been used to calculate such quantities of interest at the full-core level. While there are many Monte Carlo (MC) codes capable of computing such quantities of interest, they are unable to readily account for multiphysics feedback. BlueCRAB allows for the coupling of different physics codes together to perform multiphysics-informed calculations. Therefore, the purpose of this fiscal year 2023 work is to investigate the feasibility and challenges of performing such calculations within BlueCRAB so as to generate the data that MELCOR relies on. To demonstrate the methodology, the proposed workflow was applied to a prototypical heat pipe-cooled microreactor model. To predict isotopic concentrations (taking into account the ac- cumulation of fission products during operation), the necessary microscopic cross sections were generated via OpenMC and tabulated with respect to temperature and burnup. Next, a recently developed capability in Griffin (the reactor physics application in BlueCRAB) was used to convert the OpenMC output format into the ISOXML format used by Griffin. A multiphysics microscopic depletion calculation that involved performing a coupled full-core, heterogeneous neutron trans- port and thermal calculation at each depletion step was conducted to deplete the core to end of life (EOL) conditions so as to provide both isotopics and the initial condition for the transient calculation. Following a brief null-transient to verify that the initial condition had been properly restarted and was indeed in thermal equilibrium, a heat pipe failure transient was simulated. Thus, the entire workflow of using BlueCRAB to generate MELCOR inputs, from cross-section generation to producing isotopic inventory and power/temperature evolution profiles during transients, is demonstrated. This report also details the identified gaps in the workflow and how they were (for the most part) addressed. Future work should focus on directly including MEL- COR into the workflow by performing a MELCOR calculation using the BlueCRAB-generated input data. In addition, the heat pipe reactor design should be improved so as to reflect more prototypical burnup characteristics at EOL.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Single DC Source Based Cascaded Multilevel Inverter

The objective of this project is to develop a high-efficiency solid-state transformer that converts a fixed DC voltage to a medium-voltage AC for utility distribution network connections without having the conventional low-frequency bulky transformers and switch gears. The initial target of 99% efficiency was achieved with the use of wide bandgap semiconductor devices using a proposal novel multilevel inverter. The medium-voltage was successfully tested at 7.2/12.47 kV phase/line voltage level for a 100-kW three-phase inverter.

14 SOLAR ENERGY↗