Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “upgrading”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,387 records · Page 77

Modeling of Reactor Design and Optimization for Scale-Up of the Catalyxx Process for Ethanol Conversion to Higher Alcohol Biofuels

This report summarizes the results of a collaborative efforts between Oak Ridge National Laboratory (ORNL) and Catalyxx Inc. to investigate scale-up of Catalyxx’s Ethanol upgrading to higher alcohols process. The study was funded by the U.S. Department of Energy (DOE) Bioenergy Technologies Office (BETO) under CRADA (Cooperative Research and Development Agreement) No: NFE-20-08396. The project is part of the Direct Funding Opportunity (DFO) for Computational Science to Enable Bioenergy program which utilized computational toolsets developed by the Consortium for Computational Physics and Chemistry, a multi-laboratory consortium in BETO. The report here summarizes a packed-bed reactor modeling effort spanning the range from lab to industrial scale (from 4 gram to 5-ton catalyst beds), and examining reactor design, process optimization strategies, and suggested design and operating conditions for Catalyxx’s ethanol upgrading plants. The results in this report have been shared in monthly steering meetings and presentations are available in the shared data house owned by Catalyxx. The modeling effort helped to define optimum operation conditions for maximum alcohol selectivity and yield: i.e., temperature control scenarios ranging from adiabatic to isothermal, feed rate, pressure, and inlet H 2 /Ethanol ratio. The modeling results were verified at lab-(4 gram) and pre-pilot (4 kg) scales and has been used to evaluate a 5-ton packed-bed reactor and identify operating conditions to maximize the butanol yield. Special focus was given to understanding mass-transfer effects in the pre-pilot and pilot-scale reactors, over the domain of flow rate, pressure, feed composition, pellet size, shape, porosity, bed voidage, and reactor dimensions (i.e., length/diameter). Modeling was also used to evaluate innovative reactor design concepts such as water removal to improve alcohol selectivity and yield, and a reactor with an additional side inlet to facilitate quenching. These concepts were thoroughly explored, and potential benefits were disclosed. The results in this report are summarized and described qualitatively to protect the IP rights of Catalyxx. The details have been shared with the Catalyxx team in the regular steering meetings. At the end of the project, Catalyxx Inc. announced a successful demonstration of pilot scale operation in Seville, Spain.

02 PETROLEUM↗

Electron Cloud Simulations for the Electron-Ion Collider in Brookhaven National Laboratory

For high-intensity circular accelerators and storage rings, if the secondary electron emission yield (SEY) of the vacuum chamber surfaces is high, an EC (Electron Cloud) could build up with the passage of the circulating beam. The presence of EC can strongly affect the beam quality, such as transverse instabilities, transverse emittance growth, and beam loss. Furthermore, the heat load from EC can exceed the available cryogenic capability. For the RHIC superconducting (SC) arc magnets, to be used for the hadron storage ring of the Electron-Ion Collider (EIC), the dynamic heat load budget is 0.5 W/m to the 4.5 K stainless steel beam pipe. This can limit the maximum beam bunches or intensity of the EIC, hence diminishing the luminosity provided by the EIC. The EC has affected the beam instability and significantly contributed to cryogenic heat load in the Large Hadron Collider (LHC). Positron storage rings for which ECs have been a critical factor in the design and performance include KEKB in Japan and EC buildup remains one of the concerns for future high-intensity accelerators design. EC considerations have driven the SuperKEKB collider design and the positron damping ring for the proposed International Linear Collider (ILC). The LHC luminosity upgrade is contingent on reducing the bunch spacing to 25 ns; at this bunch spacing, severe EC buildup has been observed. The success of the upgrade is likely contingent on limiting EC buildup. To study the EC heat load, we did some EC simulations with PyECLOUD code for the dipole, quadrupole, sextupole magnets, and the warm (drift) section of the EIC hadron storage ring. PyECLOUD is an EC simulation code developed by CERN. The code has been validated and used to study EC in the LHC, SPS, and PS. To eliminate EC buildup, the sources of electrons must be minimized. First, we will reduce the production of electrons due to residual gas ionization by specifying the maximum gas density, which requires a vacuum chamber with low electron-stimulated desorption (ESD) yields and a sufficient (preferably distributed) pumping speed. Second, we should reduce the secondary electrons with a lower secondary electron yield (SEY) material.

43 PARTICLE ACCELERATORS↗

Generator Interconnection Cost Analysis in the Southwest Power Pool (SPP) Territory

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data for 845 projects from interconnection studies for the Southwest Power Pool (SPP) Territory. The studies were performed between 2002 and 2023 and include all of the most refined cost estimates available. Project-level cost summary data are available for download on this page. We find: -Project-specific interconnection costs can differ widely. -Average interconnection costs are stable for projects that complete all interconnection studies but have escalated for those that withdraw. -Broader network upgrade costs are the primary driver of recent cost increases, especially for withdrawn projects. -Potential interconnection costs of all solar and wind requests have been greater than those of storage and natural gas projects. -Economies of scale exist for completed wind and solar projects but not for other fuel types or withdrawn projects. -Interconnection costs vary by location. Berkeley Lab publishes a series of short analytical papers of generator interconnection costs to the transmission system for MISO, PJM, SPP, ISO-NE and NYISO, which you can find at https://emp.lbl.gov/interconnection_costs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The Jefferson Lab Eta Factory (JEF) experiment

The Jefferson Lab Eta Factory (JEF) experiment is an upcoming experiment designed to run in Hall D at Jefferson Lab using an upgraded GlueX spectrometer to study various decays of the ? meson. The GlueX spectrometer consists of a ?2 Tesla solenoid magnet housing a liquid hydrogen target and drift chambers used for tracking charged particles and an array of lead glass blocks (the Forward Calorimeter (FCAL)) downstream of the magnet for detecting neutral particles. The decays of the ? meson can be used to measure the light quark mass ratio via the ???+???0 channel and allow access to higher-order terms in Chiral Perturbation Theory via the ???0?? channel. The decays can also be used to constrain new charge-conjugation violating/parity conserving (CVPC) reactions and to search for signatures of dark matter. In particular, the ???0?? channel can be used to search for lepto-phobic dark vector (B) bosons in the reaction ??B? (B??0?) or dark scalar (S) bosons in the reaction ???0S (S???). Studying the rare radiative decay channel ???0?? requires replacing the 4×4×45 cm3 lead glass blocks in the inner region of the FCAL with 2×2×20 cm3 lead tungstate crystals, which will provide twice better position and energy resolution. This talk will describe the JEF physics program and the upgrade to the FCAL.

Taylor, Simon↗

SAMPA Based Streaming Readout Data Acquisition Prototype

We have assembled a small-scale streaming data acquisition system based on the SAMPA front-end ASIC. The 32-channel SAMPA chip was designed for the high-luminosity upgrade of the ALICE Time Projection Chamber (TPC) detector at the CERN Large Hadron Collider. The goals of the prototype system are to determine if the SAMPA chip is appropriate for use in detector systems at Jefferson Lab, and to gain experience with the hardware and software required to deploy streaming data acquisition systems in nuclear physics experiments. The 800 channel system is composed of components used in the ALICE TPC data acquisition upgrade. Five front-end cards (FEC) support five SAMPA chips each. SAMPA data streams on an FEC are concentrated into two high-speed (4.48 Gb/s) serial data streams by a pair Gigabit Transceiver ASICs (GBTx). These ten streams (44.8 Gb/s) are transmitted from the FECs over fibers to a PCIe based readout unit. The FPGA engine on the readout unit compresses data for transmission to a server via 100 Gb ethernet. Components on the FECs are radiation tolerant. High data rates can be handled. The system is by design scalable and thus provides a functional prototype for high-rate streaming readout at Jefferson Lab and the future Electron Ion Collider. We have made fundamental measurements (noise, linearity, time resolution) on the SAMPA ASIC. We have also coupled the readout system to a small Gas Electron Multiplier (GEM) detector and have studied its response to cosmic rays. A beam test of the system is planned.

ABBOTT, David↗

American Homeowner Perceptions and Choices for Energy Efficiency: Summary of Technology Adoption – Census Division Level

In 2020 a nationwide survey of homeowners was conducted to determine what energy efficiency upgrades homeowners had made to their homes and which ones they would make in the near future. The survey also included results on respondent financials about energy efficiency home upgrades/retrofits and perceptions of the value of energy efficiency/who should support improving the energy efficiency of the residential sector. The Department of Energy’s goal for this survey is to inform ongoing work in the residential energy efficiency research portfolio on the human dimensions of residential energy systems transformation. In addition, DOE envisions this work supports efforts by industry, non-profits, and other government partners in informing programming, customer discovery, and policy writ large. This report provides a general summary of the nationwide results as they pertain to the following three issues: (1) how much did respondents indicate spending on energy efficiency-related home upgrades, (2) what upgrades/improvements had they made to their homes, and (3) which upgrades/improvements do they believe have the most significant impact on energy efficiency. The results provided are segmented by census division as specific regions demonstrated unique preferences for energy efficiency and willingness to expend family resources to achieve those goals. As such, the goal of this report is not to analyze the data nor draw cross-cutting conclusions but to serve as a resource for any groups interested in reviewing national trends about residential energy efficiency.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Dark Matter and Track Triggering with the CMS Experiment (Final Report)

This report summarizes the progress from DOE Early Career Award entitled “Dark Matter and Track Triggering with the CMS Experiment”. The first major goal of the project was to establish a sensitive Dark Matter (DM) search program for the CMS experiment in Run-2 of the LHC. Two related strategies were developed to accomplish this goal. First, we designed and executed searches for DM produced in association with heavy flavor quark pairs, top/anti-top (ttbar) and bottom/anti-bottom (bbbar). In addition, we sought to maximize the power of Run-2 DM searches through the development of a statistical combination of all major search channels within a consistent theoretical framework. The results of these aspects of the project are detailed in Section 1. The second major goal of the project was to develop a real-time “Level-1” tracking trigger system for the high-luminosity LHC (HL-LHC) CMS upgrade. Charged particle tracking in the first stage of the CMS trigger will be crucial for surviving the high-pileup environment expected at the HL-LHC. The L1 tracking trigger must process all front-end hit data sent from the inner Tracker and will have just 4us to output track primitives to the downstream L1 trigger without data loss. Our development of the CMS tracking trigger is described in Section 2. The team supported by the award is given in Section 3. The project resulted in 10 peer reviewed publications, a graduate student thesis, and contributions to the CMS Phase-2 Tracker Technical Design Report, as is detailed in Section 4. Our development work for the CMS tracking trigger has been integrated in the backend system architecture for the Tracker upgrade.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Development of a Pre-Combustion CO 2 Capture Process Using High-Temperature PBI Hollow-Fiber Membranes

The overall objective of this project was to evaluate the advantages of transformational polybenzimidazole (PBI) polymer hollow-fiber membrane (HFM)-based, carbon dioxide (CO 2 ) capture and purification technology at bench-scale using an actual coal-derived syngas stream from a coal gasification facility. The project was carried out over two budget periods. The technical objectives in Budget Period 1 (BP1) included preparing HFs and modules and upgrading the available skid for field testing. The technical objectives for BP2 were to field-test the skid unit with actual coal-derived syngas from an oxygen-blown gasifier to obtain performance data, update the Techno-Economic Analysis (TEA) that would assist with future process scale-up, and provide information on the design of a small pilot-scale test unit. The goal was to advance the PBI-HFM CO 2 capture and gas separation system for pre-combustion applications beyond second-generation economic performance predictions and make progress toward meeting overall fossil energy performance goals of CO 2 capture with 95% CO 2 purity at a cost of electricity (COE) 30% less than baseline capture approaches. The research program was designed with progressive technical tasks leading to both dynamic and steady-state testing of the PBI-HFM skid with actual coal-derived syngas. The work plan was to: (1) fabricate sufficient Generation-2 (GEN-2) fibers for module fabrication; (2) upgrade the fiber skid to accommodate large fiber modules for bench-scale field testing; (3) conduct dynamic and steady-state testing with coal-derived syngas from an oxygen-blown gasifier and obtain system performance data; (4) perform a TEA and environmental, health, and safety (EH&S) assessment; (5) update the State-Point Data Table, Technology Gap Analysis (TGA), and Technology Maturation Plan (TMP); (6) uninstall and return the test skid to the Recipient’s facilities; and (7) submit a Final Report that describes the results and analysis of the project research effort.

03 NATURAL GAS↗

LANSCE Facility Longevity Assessment

This LANSCE Facility Longevity Assessment examined 34 total systems critical to the operation of the LANSCE accelerator complex. These systems are primarily owned, operated, and maintained by AOT Division. Based on the criteria used in this assessment, there are 12 AOT Division systems that are potential high risk as related to longterm LANSCE operations. These systems may also impact the success of LAMP. Also summarized in this report are the facility activities planned over the next decade. These include general facility maintenance and infrastructure upgrades, as well as planned electrical system upgrades. The LANSCE Facility Operations (LFO) Division is responsible for this activity scope and budget planning. Most of the planned activities are general in nature and should have little impact on accelerator operations or LAMP activities as currently envisioned. However, close coordination with between AOT, LFO, and LAMP would be prudent. A next step should be to develop an actionable plan to address the high-risk systems. Potential criteria for developing such a plan could include: (1) Evaluating the global impact of the system (operations, program, safety, etc.), (2) Ranking by impact (ranked now by risk), (3) Estimating cost to implement the corrective actions (Is there already a plan or not?), and (4) Estimating the time required for corrective actions. An alternative could include integration of the assessment data into both the Asset Management System and the Maintenance Analytics Risk Register.

43 PARTICLE ACCELERATORS↗

Final Technical Report

Statement of the problem or situation that is being addressed in your application. The DOE and its national laboratories developed the Home Energy Score™ (HES) to encourage homeowners to improve their energy performance, lower costs and to share energy information through the MLS listing, appraisal, and financing channels. While the HES is an instrumental tool, it is currently underutilized and consists of technical, structural and sector barriers which need to be addressed in order to scale and many energy efficiency contractors are understandably overwhelmed by the added time and effort and lack of incentive to sell and deliver deep retrofit projects while simultaneously meeting the DOE HES program requirements; consequently, contractors may decide to forgo participation. Home Energy Rating System (HERS) Raters have the opportunity to play the critical Assessor role in producing a Home Energy Score (HES); this role has immense potential but currently is unfulfilled. Lastly, while utilities are interested in their customer base achieving greater energy efficiency, especially to help offset growing residential loads in states like California that are accelerating electrification, utilities do not have access to the market actors who are on the front line of influence to homeowners or review and approve their permits: HERS Raters, assessors, contractors and building departments. General statement of how this problem is being addressed: ConSol will integrate the Home Energy Score™ (HES) to its State of California, approved home energy rating services (HERS) platform (CHEERS) to develop a single tool for contractors nationwide to assess, record and install recommended cost, energy, and emissions saving measures to the 140 million single-family homes throughout the U.S. and 14 million homes in California (CHEERS+HES). The CHEERS high fidelity energy code permitting data will be integrated with HES for simple, accurate, easy-to-use home energy estimation and analysis and will directly gain access to the retrofit and renovations markets with the same upgraded platform. This innovative project will assist the utilities in supporting existing homes in their jurisdictions with HES and develop measures to improve energy efficiency and reduce emissions. How is this problem being addressed? What is the overall project approach? In effort to expand the Home Energy Score™ (HES) by increasing the use of aggregable home energy asset data, ConSol proposes to integrate the DOE HES via Application Programming Interface (API) to its State of California approved home energy rating services platform (CHEERS). Once the CHEERS platform and HES are integrated (CHEERS+HES), this enhanced platform will be instantly available and actively deployed via Phase 1 pilot to HERS Raters, assessors and contractors in California to market-test the solution, understand the rate of adoption and identify opportunities for improvement prior to scaling nationally. The CHEERS high fidelity energy code permitting data will be integrated with HES for simple, accurate, easy-to-use home energy estimation and analysis and will directly gain access to the retrofit and renovations markets with the same upgraded platform. This innovative project will assist the building industry and homeowners with an easy-to-use assessment if energy and carbon impacts of existing homes, and assist the utilities in supporting existing homes in their jurisdictions with HES to improve energy efficiency and reduce emissions. What is to be done in Phase I? During Phase I of this proposed project, ConSol will (1) design software architecture that links CHEERS to the Home Energy ScoreTM via API, (2) solicit partnership from one or more California utilities for a regional pilot, (3) test the new software with its HERS Raters and contractor network in the partnership utility jurisdiction, (4) launch a pilot version of the newly developed software with HERS Raters and contractors in the utility territory, and (5) explore California’s GoGreen energy efficiency homeowner lending program in parallel with the pilot. Commercial Applications and Other Benefits. Summarize the future applications or public benefits if the project is carried over into Phase II or Phase III and beyond. The CHEERS+HES commercialized product will be ready for national market scale following a successful Phase 1 performance. The CHEERS+HES adoption is estimated to reach a 5% adoption growth rate versus the 110,000 baseline, starting in Year 1 after Phase I completion, and continuing each year. As a direct benefit to the DOE, CHEERS will set a goal of 100,000 Home Energy Score assessments for existing home alterations within the first 10 years following Phase 1 performance. The technical benefits of this proposed project include the harmonized, automated, and seamless integration of the DOE HES into the widely used and market leading California energy registry, CHEERS. The social benefits include the aggregate energy, cost and GHG savings by allowing the broader public streamlined access to the CHEERS+HES measurement and the energy efficiency recommended measures that may result. Key Words: Home Energy ScoreTM (HES); Application Programming Interface (API); Home Energy Rating Services (HERS); HERS Raters; contractors; assessors; existing homes, energy asset data; cost, energy, and emissions saving measures; energy code (Title 24) compliance; document repository; utilities; pilot; newly developed software; energy efficiency; homeowner. Summary for Members of Congress: The DOE Home Energy Score™ (HES) is a tool to encourage homeowners to improve their energy performance, lower costs and share energy information but is underutilized and consists of barriers which need to be addressed in order to scale. In effort to expand the HES, CHEERS, Inc. will integrate the HES to its State of California, approved home energy rating services (HERS) platform (CHEERS) to develop a single tool for contractors nationwide to assess, record and install recommended cost, energy, and emissions saving measures to the 140 million single-family homes throughout the U.S. and 14 million homes in California.

Application Programming Interface (API)↗

Development and Performance of RFD Crab Cavity Prototypes for HL-LHC AUP

The US will be contributing to the HL-LHC upgrade at CERN with the fabrication and qualification of RFD crabbing cavities in the framework of the HL-LHC Accelerator Upgrade Project (AUP) managed by Fermilab. AUP received Critical Decision 3 (CD-3) approval by DOE in December 2020 launching the project into the production phase. The electro-magnetic design of the cavity was inherited from the LHC Accelerator Research Program (LARP) but needed to be revised to meet new project requirements and to prevent issues encountered during beam tests performed at CERN in the R&D phase. Two prototype cavities were manufactured in industry and cold tested. Challenges specific to the RFD cavity were the stringent interface tolerances, the pole symmetry, and the higher-order-mode impedance spectrum. Chemical pro-cessing and heat treatments were performed initially at FNAL/ANL and are now being transferred to industry for the production phase. HOM dampers are manufactured and validated by JLAB. A summary of cold test results with and without HOM dampers is presented.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

C1Po2D-04: Cryogenic Testing of the First HL-LHC Q1/Q3 Cryo-Assembly at

In early 2023, Fermilab is conducting horizontal cryogenic testing of the first Q1/Q3 Cryo-Assembly for the high-luminosity LHC upgrade (HL-LHC). The Cryo-Assembly was installed on the upgraded Fermilab horizontal test stand previously used for testing the LHC inner triplet quadrupoles. The cryogenic process requirements of this test include controlled cool-down and warm-up with a 100 K maximum temperature differential between the two ends of the cold mass, operation of a 1.3 bar, 1.9 K bath of subcooled superfluid helium during power testing and magnetic measurements, and operation at pressure up to 18 bar with full helium recovery after a quench.

Rabehl, R.↗

An Integrated Framework for Risk Assessment of Safety-related Digital Instrumentation and Control Systems in Nuclear Power Plants: Methodology Refinement and Exploration

This report documents activities performed by Idaho National Laboratory (INL) during Fiscal Year (FY) 2023 for the U.S. Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program, Risk Informed Systems Analysis (RISA) Pathway, digital instrumentation and control (DI&C) risk assessment project. In FY 2019, the RISA Pathway initiated a project to develop a risk assessment strategy for delivering a technical basis to support effective, and secure DI&C technologies for digital upgrades/designs. A risk assessment-informed framework was proposed for this strategy, which aims to (1) provide a best-estimate, risk informed capability to quantitatively estimate the safety margin obtained from plant modernization, especially for safety-related DI&C systems, (2) support and supplement existing risk informed DI&C design guides by providing quantitative risk information and evidence, (3) offer a capability of design architecture evaluation of various DI&C systems, (4) assure the long-term safety and reliability of safety-related DI&C systems, and (5) reduce uncertainty in costs and support integration of DI&C systems in the plant. To achieve these technical goals, the LWRS-developed framework provides a means to address relevant technical issues by: (1) defining a risk informed analysis process for DI&C upgrade that integrates hazard analysis, reliability analysis, and consequence analysis, (2) applying risk informed tools to address common cause failures (CCFs) and quantify corresponding failure probabilities for DI&C technologies, particularly software CCFs, (3) evaluating the impact of digital failures at the component level, system level, and plant level, and (4) providing insights and suggestions on designs to manage the risks, thus to support the development and deployment of advanced DI&C technologies in nuclear power plants (NPPs). Adding diversity within a system or components is the primary means to eliminate and mitigate CCFs, but diversity also increases system complexity and may not address all sources of systematic failures. Optimization of diversity and redundancy applications for the safety-critical DI&C systems remains a challenge. To deal with the technical issues in addressing potential software CCFs in safety-related DI&C systems of NPPs and supporting relevant design optimization, the proposed framework provides: (a) A best-estimate, risk informed capability to address new technical digital issues quantitatively, focusing on software CCFs in safety-related DI&C systems of NPPs; (b) A common and a modularized platform for DI&C designers, software developers, cybersecurity analysts, and plant engineers to predict and prevent risk in the early design stage of DI&C systems; (c) Technical bases and risk informed insights to assist users address the risk informed alternatives for evaluation of CCFs in safety-related DI&C systems of NPPs; and (d) A risk informed tool that offers a capability of design architecture evaluation of various DI&C systems to support system design decisions in diversity and redundancy applications. The research and development efforts of this project in FY 2023 are focused on refining current methods on software CCF modeling and estimation and exploring additional innovative approaches to risk assessment of DI&C systems to enable a more comprehensive and complete assessment of various safety-related DI&C design architectures. The primary audience of this report are DI&C designers, engineers, and probabilistic risk assessment (PRA) practitioners. This includes stakeholders, such as the nuclear utilities and regulators who consider the deployment and upgrade of DI&C systems, DI&C software developers and reviewers, and cybersecurity specialists. It should be noted that all the analyses are performed for the demonstration of the methodology, not for the evaluation of an actual digital control system. Results are obtained based on limited design information and testing data.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

AUP first Pre-series Cold Mass Installation into the Cryostat

For the Hi-Lumi LHC Upgrade (HL-LHC) new high field and large-aperture quadrupole magnets for the low-beta inner triplets (Q1, Q2, Q3) are being built. These new quadrupole magnets are based on Nb3Sn superconducting technology. As part of the US-HiLumi Accelerator Upgrade Project (AUP) ten Cryostat Assemblies (LQXFA) for Q1 and Q3 replacement will be built, tested and delivered to CERN. The first of the LQXFA was assembled and tested at Fermi National Accelerator Laboratory (FNAL) during the fall of 2022 and spring 2023. We will present the integration work of the Cold Mass assembly into the Cryostat Kit provided by CERN. Each Cold Mass contains two trained MQXFA magnets of ~ 5 m length installed in a stainless-steel helium pressure vessel. The Cold Mass will be surrounded by cryostat shields, piping, and vacuum vessel. We will discuss the metrology survey results and present the LQXFA measurements prior testing at the Fermilab Magnet Test facility and lessons learned.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

LA100 Equity Strategies. Chapter 6: Universal Access to Safe and Comfortable Home Temperatures

The LA100 Equity Strategies project integrates community guidance with robust research, modeling, and analysis to identify strategy options that can increase equitable outcomes in Los Angeles' clean energy transition. This chapter focuses on housing weatherization and cooling technologies as means to increase access to safe and comfortable home temperatures. Lack of cooling access and use can have severe health impacts on building occupants during heat waves. Specifically, NREL developed and used a residential building stock model to simulate the energy use of 50,000 dwellings representing the diversity of housing types, appliances, climate zones, and household incomes across Los Angeles. We compared a baseline scenario with seven upgrade scenarios. Five scenarios cooled the entire household and featured cooling systems at varying efficiency levels with various improvements to the envelope, roof, and shading, and two scenarios cooled a single room in a household with no prior cooling using either a room air-conditioning or a heat pump system. For each scenario, we evaluated impacts on utility bills, payback periods, and changes in energy burdens, as well as ability to achieve safe and comfortable temperatures. We also examined the effects of building types (multifamily vs. single-family) on indoor air temperatures. Based on the results of modeling, analysis, and community guidance, we identified six short-term and two long-term strategies for improving access to building envelope upgrades and cooling strategies that could save lives and maintain safe home temperatures for Los Angeles' low-income households during heat waves. Research was guided by input from the community engagement process, and associated equity strategies are presented in alignment with that guidance.

air conditioning↗

Thermal Hydraulic Experimental Test Article - Fiscal Year 2023 (Final Report)

The Thermal Hydraulic Experimental Test Article (THETA) is a facility that is used to develop sodium components and instrumentation as well as acquire experimental data for validation of reactor thermal hydraulic and safety analysis codes. The facility simulates nominal conditions as well as protected/unprotected loss of flow accidents in a sodium-cooled fast reactor (SFR). High fidelity distributed temperature profiles of the developed flow field may be acquired with Rayleigh backscatter based optical fiber temperature sensors. The facility was designed in partnership with systems code experts to tailor the experiment to ensure the most relevant and highest quality data for code validation. THETA is comprised of a traditional primary coolant and secondary coolant system. The primary system is submerged in the pool of sodium and consists of a pump, electrically heated core, intermediate heat exchanger, and connected piping and thermal barriers (redan). The secondary system, located outside of the sodium pool, consists of a pump, sodium to air heat exchanger, and connected piping and valves. To date a test matrix has been completed utilizing the primary system of THETA. These tests, along with computational fluid dynamics and systems code models, determined the heat transfer across the core barrel and intermediate heat exchanger outlet was too great to effectively represent scaled thermal hydraulic phenomena of a liquid metal cooled reactor. Therefore, a significant effort was made to remove the primary system from the METL 28” test vessel #4 and clean the residual sodium from the primary system to facilitate upgrades. Thermal insulation was then incorporated in the core barrel and intermediate heat exchanger outlets. The primary system was then replaced, and a series of tests were performed to assess the performance of the thermal insulation. With primary system testing and upgrades complete, the secondary system could then be brought online. The tube side of the shell-and-tube intermediate heat exchanger was installed onto the primary system flange to begin installing the secondary system. The support structure for the secondary system was then erected on the METL mezzanine alongside the THETA primary system to facilitate installation of the secondary system components (sodium-to-air heat exchanger, flowmeter and pump). The piping and expansion tank were welded into the secondary system. Non-destructive examination of the secondary system welds was completed in order to satisfy ASME B31.3 pipe code for class M process fluids. The heating system and insulation were then added to prepare the system to be filled with sodium. The ancillary electrical equipment was installed which included the pump control box, blower VFD, pipe heater control system, etc. The secondary system will be filled, and a test matrix will be completed in early FY2024.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Communications Plan for the Radiochemical Processing Laboratory Life Extension Plan

The Radiochemical Processing Laboratory Life Extension Plan (RPL-ELP) is a collection of independent projects that enable the life extensions of the Radiochemical Processing Laboratory to provide continuous, safe, and secure research operations in support of Department of Energy missions. The ELP includes facility infrastructure upgrades, laboratory and equipment upgrades, and increased research capacity through conversion of existing spaces to the current Pacific Northwest National Laboratory (PNNL) standards. This communications plan is a living document that outlines the goals, target audiences and objectives, key messages, communications opportunities, and tactics for those communications products. This plan will help to make sure communications are coordinated and consistent. Periodically, PNNL will review the communications plan to make sure it addresses current needs of the RPL-ELP.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

Residential Facade Retrofits Modeling: Results and Documentation

Utilizing NREL's ResStock analysis tool and datasets, we performed an economic analysis for various facade upgrade combinations and strategies. This analysis considers the combined life-cycle cost of re-siding and window and insulation upgrades including both home value impacts and recurring bill savings estimates from a ResStock analysis, for varying years of home ownership.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗