LANSCE Facility Longevity Assessment
Abstract
This LANSCE Facility Longevity Assessment examined 34 total systems critical to the operation of the LANSCE accelerator complex. These systems are primarily owned, operated, and maintained by AOT Division. Based on the criteria used in this assessment, there are 12 AOT Division systems that are potential high risk as related to longterm LANSCE operations. These systems may also impact the success of LAMP. Also summarized in this report are the facility activities planned over the next decade. These include general facility maintenance and infrastructure upgrades, as well as planned electrical system upgrades. The LANSCE Facility Operations (LFO) Division is responsible for this activity scope and budget planning. Most of the planned activities are general in nature and should have little impact on accelerator operations or LAMP activities as currently envisioned. However, close coordination with between AOT, LFO, and LAMP would be prudent. A next step should be to develop an actionable plan to address the high-risk systems. Potential criteria for developing such a plan could include: (1) Evaluating the global impact of the system (operations, program, safety, etc.), (2) Ranking by impact (ranked now by risk), (3) Estimating cost to implement the corrective actions (Is there already a plan or not?), and (4) Estimating the time required for corrective actions. An alternative could include integration of the assessment data into both the Asset Management System and the Maintenance Analytics Risk Register.
Explore related subjects
Keep this discovery
Explore connections, maps & timelines
Garnett, Robert William. 2023-06-26. LANSCE Facility Longevity Assessment. https://doi.org/10.2172/1987381
Cite the original work for its findings. Save a collection to share your selection of sources.