Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “tables”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,369 records · Page 76

Measurement of the inclusive jet cross section in pp collisions at sqrt(s)=2.76 TeV and comparison to the inclusive jet cross section at sqrt(s)=7 TeV using the ATLAS detector

CERN-LHC. This paper reports the measurement of inclusive jet cross sections in proton-proton collisions at a centre-of-mass energy of 2.76 TeV using a data sample of integrated luminosity of 0.20 pb-1 collected in 2011. Jets are identified using the anti-kt algorithm with two radius parameters (0.4 and 0.6). The cross sections are presented as a function of the jet transverse momentum and rapidity covering jets from 20-430 GeV in transverse momentum and |rapidity| < 4.4. The data are also compared with previous ATLAS 7 TeV cross sections as functions of PT and XT. The main tables below show the results correlated and uncorrelated systematic errors individually combined, as presented in the plots in the paper. The first table below gives access to the complete tables with the various sources of systematic error individually presented. Correlations over the rapidity bins and to the 7 TeV data are shown in table 1 of the paper and repeated below.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

DYNA3D/ParaDyn Regression Test Suite Inventory

The following table constitutes an initial assessment of feature coverage across the regression test suite used for DYNA3D and ParaDyn. It documents the regression test suite at the time of production release 10.1 in September 2010. The columns of the table represent groupings of functionalities, e.g., material models. Each problem in the test suite is represented by a row in the table. All features exercised by the problem are denoted by a check mark in the corresponding column. The definition of ''feature'' has not been subdivided to its smallest unit of user input, e.g., algorithmic parameters specific to a particular type of contact surface. This represents a judgment to provide code developers and users a reasonable impression of feature coverage without expanding the width of the table by several multiples. All regression testing is run in parallel, typically with eight processors. Many are strictly regression tests acting as a check that the codes continue to produce adequately repeatable results as development unfolds, compilers change and platforms are replaced. A subset of the tests represents true verification problems that have been checked against analytical or other benchmark solutions. Users are welcomed to submit documented problems for inclusion in the test suite, especially if they are heavily exercising, and dependent upon, features that are currently underrepresented.

42 ENGINEERING↗

The LIFE Laser Design in Context: A Comparison to the State-of-the-Art

The current point design for the LIFE laser leverages decades of solid-state laser development in order to achieve the performance and attributes required for inertial fusion energy. This document provides a brief comparison of the LIFE laser point design to other state-of-the-art solid-state lasers. Table I compares the attributes of the current LIFE laser point design to other systems. the state-of-the-art for single-shot performance at fusion-relevant beamline energies is exemplified by performance observed on the National Ignition Facility. The state-of-the-art for high average power is exemplified by the Northrup Grumman JHPSSL laser. Several items in Table I deal with the laser efficiency; a more detailed discussion of efficiency can be found in reference 5. The electrical-to-optical efficiency of the LIFE design exceeds that of reference 4 due to the availability of higher efficiency laser diode pumps (70% vs. {approx}50% used in reference 4). LIFE diode pumps are discussed in greater detail in reference 6. The 'beam steering' state of the art is represented by the deflection device that will be used in the LIFE laser, not a laser system. Inspection of Table I shows that most LIFE laser attributes have already been experimentally demonstrated. The two cases where the LIFE design is somewhat better than prior experimental work do not involve the development of new concepts: beamline power is increased simply by increasing aperture (as demonstrated by the power/aperture comparison in Table I), and efficiency increases are achieved by employing state-of-the-art diode pumps. In conclusion, the attributes anticipated for the LIFE laser are consistent with the demonstrated performance of existing solid-state lasers.

42 ENGINEERING↗

Result Summary for the Area 5 Radioactive Waste Management Site Performance Assessment Model Version 4.110

Results for Version 4.110 of the Area 5 Radioactive Waste Management Site (RWMS) performance assessment (PA) model are summarized. Version 4.110 includes the fiscal year (FY) 2010 inventory estimate, including a future inventory estimate. Version 4.110 was implemented in GoldSim 10.11(SP4). The following changes have been implemented since the last baseline model, Version 4.105: (1) Updated the inventory and disposal unit configurations with data through the end of FY 2010. (1) Implemented Federal Guidance Report 13 Supplemental CD dose conversion factors (U.S. Environmental Protection Agency, 1999). Version 4.110 PA results comply with air pathway and all-pathways annual total effective dose (TED) performance objectives (Tables 2 and 3, Figures 1 and 2). Air pathways results decrease moderately for all scenarios. The time of the maximum for the air pathway open rangeland scenario shifts from 1,000 to 100 years (y). All-pathways annual TED increases for all scenarios except the resident scenario. The maximum member of public all-pathways dose occurs at 1,000 y for the resident farmer scenario. The resident farmer dose was predominantly due to technetium-99 (Tc-99) (82 percent) and lead-210 (Pb-210) (13 percent). Pb-210 present at 1,000 y is produced predominantly by radioactive decay of uranium-234 (U-234) present at the time of disposal. All results for the postdrilling and intruder-agriculture scenarios comply with the performance objectives (Tables 4 and 5, Figures 3 and 4). The postdrilling intruder results are similar to Version 4.105 results. The intruder-agriculture results are similar to Version 4.105, except for the Pit 6 Radium Disposal Unit (RaDU). The intruder-agriculture result for the Shallow Land Burial (SLB) disposal units is a significant fraction of the performance objective and exceeds the performance objective at the 95th percentile. The intruder-agriculture dose is due predominantly to Tc-99 (75 percent) and U-238 (9.5 percent). The acute intruder scenario results comply with all performance objectives (Tables 6 and 7, Figures 5 and 6). The acute construction result for the SLB disposal units decreases significantly with this version. The maximum acute intruder dose occurs at 1,000 y for the SLB disposal units under the acute construction scenario. The acute intruder dose is caused by multiple radionuclides including U-238 (31 percent), Th-229 (28 percent), plutonium-239 (8.6 percent), U-233 (7.8 percent), and U-234 (6.7 percent). All results for radon-222 (Rn-222) flux density comply with the performance objective (Table 8, Figure 7). The mean Pit 13 RaDU flux density is close to the 0.74 Bq m{sup -2} s{sup -1} limit.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Description of Axial Detail for ROK Fuel

For the purpose of NDA simulations of the ROK fuel assemblies, we have developed an axial burnup distribution to represent the pins themselves based on gamma scans of rods in the G23 assembly. For the purpose of modeling the G23 assembly (both at ORNL and LANL), the pin-by-pin burnup map as simulated by ROK is being assumed to represent the radial burnup distribution. However, both DA and NDA results indicate that this simulated estimate is not 100% correct. In particular, the burnup obtained from the axial gamma scan of 7 pins does not represent exactly the same 'average' pin burnup as the ROK simulation. Correction for this discrepancy is a goal of the well-characterized assembly task but will take time. For now, I have come up with a correlation for 26 axial points of the burnup as obtained by gamma scans of 7 different rods (C13, G01, G02, J11, K10, L02, and M04, neglecting K02 at this time) to the average burnup given by the simulation for each of the rods individually. The resulting fraction in each axial zone is then averaged for the 7 different rods so that it can represent every fuel pin in the assembly. The burnup in each of the 26 axial zones of rods in all ROK assemblies will then be directly adjusted using this fraction, which is given in Table 1. Note that the gamma scan data given by ROK for assembly G23 included a length of ~3686 mm, so the first 12 mm and the last 14 mm were ignored to give an actual rod length of ~366 cm. To represent assembly F02 in which no pin-by-pin burnup distribution is given by ROK, we must model it using infinitely-reflected geometry but can look at the effects of measuring in different axial zones by using intermediate burnup files (i.e. smaller burnups than 28 GWd/MTU) and determining which axial zone(s) each burnup represents. Details for assembly F02 are then given in Tables 2 and 3, which is given in Table 1 and has 44 total axial zones to represent the top meter in explicit detail in addition to the other 26 zones. Note that the MCNP files for F02 were created using the Monte Carlo burnup linkage code Monteburns, which saves MCNP input files with detailed compositions as a function of burnup. The 'intermediate burnup files' produced for F02 include a cooling time of 27 years. The axial location of 5 spacers was also included in the ROK F02 assembly in which each spacer contained a length of 3.81 cm. Note that due to the nature of Monteburns, which was run in a special fashion for this problem, the step number increments after the 27 year decay, so the second column of Table 2 refers to the step number that should be used in the Monteburns files.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Fuel assembly shaker and truck test simulation

This study continues the modeling support of the SNL shaker table task from 2013 and includes analysis of the SNL 2014 truck test campaign. Detailed finite element models of the fuel assembly surrogate used by SNL during testing form the basis of the modeling effort. Additional analysis was performed to characterize and filter the accelerometer data collected during the SNL testing. The detailed fuel assembly finite element model was modified to improve the performance and accuracy of the original surrogate fuel assembly model in an attempt to achieve a closer agreement with the low strains measured during testing. The revised model was used to recalculate the shaker table load response from the 2013 test campaign. As it happened, the results remained comparable to the values calculated with the original fuel assembly model. From this it is concluded that the original model was suitable for the task and the improvements to the model were not able to bring the calculated strain values down to the extremely low level recorded during testing. The model needs more precision to calculate strains that are so close to zero. The truck test load case had an even lower magnitude than the shaker table case. Strain gage data from the test was compared directly to locations on the model. Truck test strains were lower than the shaker table case, but the model achieved a better relative agreement of 100-200 microstrains (or 0.0001-0.0002 mm/mm). The truck test data included a number of accelerometers at various locations on the truck bed, surrogate basket, and surrogate fuel assembly. This set of accelerometers allowed an evaluation of the dynamics of the conveyance system used in testing. It was discovered that the dynamic load transference through the conveyance has a strong frequency-range dependency. This suggests that different conveyance configurations could behave differently and transmit different magnitudes of loads to the fuel even when traveling down the same road at the same speed. It is recommended that the SNL conveyance system used in testing be characterized through modal analysis and frequency response analysis to provide context and assist in the interpretation of the strain data that was collected during the truck test campaign.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Request for a Class 1 Permit Modification to the Los Alamos National Laboratory (LANL) Hazardous Waste Facility Permit, Attachment K EPA ID No. NM0890010515 (Rev. 1)

The following submittal has been prepared by the U.S. Department of Energy and Los Alamos National Security, LLC (collectively the Permittees) to request a modification to the November 2010 Los Alamos National Laboratory (LANL) Hazardous Waste Facility Permit (Permit). This modification has been prepared as a Class 1 permit modification requiring prior approval by the New Mexico Environment Department-Hazardous Waste Bureau (NMEDHWB) (also known as a Class 1 * permit modification) as described in the New Mexico Administrative Code, Title 20, Chapter 4, Part 1 (20.4.1.900 NMAC) [incorporating Code of Federal Regulations (CFR), Title 40 §§ 270.42 (a) ]. LANL's Environmental Protection Agency (EPA) identification number is EPA ID No. NM0890010515. The permit modification includes revisions to Table K-l , SWMUs (Solid Waste Management Units) and AOCs (Areas of Concern) Requiring Corrective Action, which is included in Permit Attachment K, Listings ofSWMUs and AOCs. The following summary describes the proposed modification and rationale behind the modification and contains a revised version of the relevant page of Table K-l incorporating the modification (Attachment 1). The Permittees request that the revised Table K-I be included in the Permit by the NMED-HWB upon approval of this permit modification request. Pits 38 (AOC 54-023) and 39 (AOC 54-024) were recently designated as areas of concern (AOCs) and shall be included in Table K-l of Attachment K, Listings ofSWMUs and AOCs.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Deep Dive Topic: Choosing between ablators

Recent data on implosions using identical hohlraums and very similar laser drives underscores the conundrum of making a clear choice of one ablator over another. Table I shows a comparison of Be and CH in a nominal length, gold, 575 μm-diameter, 1.6 mg/cc He gas-fill hohlraum while Table II shows a comparison of undoped HDC and CH in a +700 length, gold, 575 μm diameter, 1.6 mg/cc He gas fill hohlraum. As can be seen in the tables, the net integrated fusion performance of these ablators is the same to within error bars. In the case of the undoped HDC and CH ablators, the hot spot shapes of the implosions were nearly indistinguishable for the experiments listed in Table II.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

DYNA3D/ParaDyn Regression Test Suite Inventory

The following table constitutes an initial assessment of feature coverage across the regression test suite used for DYNA3D and ParaDyn. It documents the regression test suite at the time of preliminary release 16.1 in September 2016. The columns of the table represent groupings of functionalities, e.g., material models. Each problem in the test suite is represented by a row in the table. All features exercised by the problem are denoted by a check mark (√) in the corresponding column. The definition of “feature” has not been subdivided to its smallest unit of user input, e.g., algorithmic parameters specific to a particular type of contact surface. This represents a judgment to provide code developers and users a reasonable impression of feature coverage without expanding the width of the table by several multiples. All regression testing is run in parallel, typically with eight processors, except problems involving features only available in serial mode. Many are strictly regression tests acting as a check that the codes continue to produce adequately repeatable results as development unfolds; compilers change and platforms are replaced. A subset of the tests represents true verification problems that have been checked against analytical or other benchmark solutions. Users are welcomed to submit documented problems for inclusion in the test suite, especially if they are heavily exercising, and dependent upon, features that are currently underrepresented.

97 MATHEMATICS AND COMPUTING↗

Assessment of NHTSA’s Report “Relationships Between Fatality Risk, Mass, and Footprint in Model Year 2003-2010 Passenger Cars and LTVs”

NHTSA recently completed a logistic regression analysis updating its 2003, 2010, and 2012 studies of the relationship between vehicle mass and US fatality risk per vehicle mile traveled (VMT; Kahane 2010, Kahane 2012, Puckett 2016). The new study updates the 2012 analysis using FARS data from 2005 to 2011 for model year 2003 to 2010. Using the updated databases, NHTSA estimates that reducing vehicle mass by 100 pounds while holding footprint fixed would increase fatality risk per VMT by 1.49% for lighter-than-average cars and by 0.50% for heavierthan- average cars, but reduce risk by 0.10% for lighter-than-average light-duty trucks, by 0.71% for heavier-than-average light-duty trucks, and by 0.99% for CUVs/minivans. Using a jack knife method to estimate the statistical uncertainty of these point estimates, NHTSA finds that none of these estimates are statistically significant at the 95% confidence level; however, the 1.49% increase in risk associated with mass reduction in lighter-than-average cars, and the 0.71% and 0.99% decreases in risk associated with mass reduction in heavier-than-average light trucks and CUVs/minivans, are statistically significant at the 90% confidence interval. The effect of mass reduction on risk that NHTSA estimated in 2016 is more beneficial than in its 2012 study, particularly for light trucks and CUVs/minivans. The 2016 NHTSA analysis estimates that reducing vehicle footprint by one square foot while holding mass constant would increase fatality risk per VMT by 0.28% in cars, by 0.38% in light trucks, and by 1.18% in CUVs and minivans.This report replicates the 2016 NHTSA analysis, and reproduces their main results. This report uses the confidence intervals output by the logistic regression models, which are smaller than the intervals NHTSA estimated using a jack-knife technique that accounts for the sampling error in the FARS fatality and state crash data. In addition to reproducing the NHTSA results, this report also examines the NHTSA data in slightly different ways to get a deeper understanding of the relationship between vehicle weight, footprint, and safety. The results of the NHTSA baseline results, and these alternative analyses, are summarized in Table ES.1; statistically significant estimates, based on the confidence intervals output by the logistic regression models, are shown in red in the tables. We found that NHTSA’s reasonable assumption that all vehicles will have ESC installed by 2017 in its baseline regression model slightly increases the estimated increase in risk from mass reduction in cars, but substantially decreases the estimated increase in risk from footprint reduction in all three vehicle types (Alternative 1 in Table ES.1; explained in more detail in Section 2.1 of this report). This is because NHTSA projects ESC to substantially reduce the number of fatalities in rollovers and crashes with stationary objects, and mass reduction appears to reduce risk, while footprint reduction appears to increase risk, in these types of crashes, particularly in cars and CUVs/minivans. A single regression model including all crash types results in slightly different estimates of the relationship between decreasing mass and risk, as shown in Alternative 2 in Table ES.1.

33 ADVANCED PROPULSION SYSTEMS↗

2015 Advanced Site Investigation and Monitoring Report Riverton, Wyoming, Processing Site September 2016

The U.S. Department of Energy conducted initial groundwater characterization of the Riverton, Wyoming, Processing Site in the 1990s. The characterization culminated in a Site Observational Work Plan in 1998 that recommended a natural flushing compliance strategy. Results of verification monitoring indicated that natural flushing was generally progressing as expected until June 2010, when significant increases in contaminant concentrations were measured in several monitoring wells downgradient of the site after the area flooded. In response to the unexpected results following the flood, an enhanced characterization of the surficial aquifer was conducted in 2012, which included installation of 103 boreholes along nine transects with a Geoprobe, collection of 103 water samples and 65 soil samples, laboratory tests on the soil samples, and additional groundwater modeling. This advanced site investigation report summarizes additional investigation in 2015 through the use of backhoe trenching, sonic drilling, multilevel monitoring wells, direct-push drilling, and temporary well points to collect soil and groundwater samples. Additional surface water measurements were made included the installation of a stilling well and the measurement of stream elevation along the Wind River to approximate upgradient groundwater heads. Groundwater sampling included the addition of geochemical constituents and isotopes that have not been sampled in the past to better understand post-flood conditions and the possibility of additional or ongoing contaminant sources. This sampling was performed to (1) better define the contaminant plumes, (2) verify the occurrence of persistent secondary contaminant sources, (3) better understand the reason for the contaminant spikes after a 2010 flood, and (4) assess contaminant plume stagnation near the Little Wind River. This report provides data analyses and interpretations for the 2015 site investigation that addresses these issues and provides recommendations for future efforts. Observations from trenches and sonic drilling indicate the general lithology of the shallow, unconsolidated sediments consists of a silt zone at the surface that ranges from 2.5 to 4.8 feet below ground surface, underlain by sand and gravel, underlain by the top of the weathered bedrock (Wind River Formation). Soil data from trenches and sonic drilling indicate (1) elevated concentrations of several constituents in the silt zone, likely due to the formation of evaporites, (2) uranium is the only measured element that appears to be concentrated in the silt over the groundwater contaminant plume, (3) in the former tailings impoundment area, there may be a thin unsaturated zone with elevated uranium in the native material just below the fill, (4) in the former tailings impoundment area, slightly higher uranium concentrations occur in the underlying saturated sand and gravel, and (5) several bedrock samples have a unique geochemical signature, generally related to a higher silt content. Assessment of groundwater flow included measuring river elevations along the Wind River and installing the temporary well points adjacent to the Little Wind River that provided additional data points to refine contours for water table elevations. These data confirm past interpretations of groundwater flow to the southeast across the site toward the Little Wind River. Hydraulic head elevations between paired surficial and semiconfined aquifer wells indicate variable vertical gradients across the site with the potential for upward and downward flow. Additional direct-push drilling and groundwater sampling confirmed the contaminant plume configuration, but it also revealed a low-sulfate-concentration zone at the edge of the former tailings impoundment. Temporary well points provided better definition of plume concentrations at the bank of the Little Wind River, and data from these wells indicate plume discharge to the river. Additional sampling in an area southwest of the plume that had elevated uranium groundwater concentrations in the past did not have any uranium concentrations above the U.S. Environmental Protection Agency maximum concentration limit for uranium. Results from multilevel monitoring wells indicate some geochemical differences with depth, but overall concentrations are similar to those in nearby conventional monitoring wells in the long-term monitoring program. Geochemistry data from these multilevel monitoring wells confirm the general increase in contaminant concentrations toward the river and toward the plume centerline for chloride, sulfate, and uranium but highlight geochemical controls on calcium. Iron data indicate slightly reducing conditions, especially near water table and bedrock surfaces, with more oxidizing conditions in the middle of the sand and gravel. Uranium activity ratios (234U/238U) confirm the uranium plume in the surficial aquifer as being mill related, and the area to the southwest outside the plume as natural, non-mill related. In the semiconfined aquifer, evidence of aquifer connection and impacts from the mill is inconclusive. Values of δD and δ 18 O suggest water is derived from different sources and tritium data confirm that the semiconfined aquifer water is generally older than the surficial aquifer water. However, these data do indicate some groundwater communication from the surficial aquifer into the semiconfined aquifer, which resulted in δD and δ 18 O and tritium values in the semiconfined aquifer that are more similar to those in the surficial aquifer. Values of δ 34 S sulfate in the semiconfined aquifer combined with sulfate concentrations indicate the potential for some mill- related sulfate in the semiconfined aquifer, albeit limited to an area near and beneath the former tailings impoundment. Uranium and molybdenum concentrations in the semiconfined aquifer are below groundwater standards in all wells. However, the elevated molybdenum concentrations at one semiconfined aquifer well underneath the former tailings impoundment suggests a mill- derived source for the uranium and molybdenum in that well. It is possible that aquifer cross- communication occurred when the tailings impoundment was active and created a higher head. Current cross-communication appears unlikely given the large differences in tritium values and an upward hydraulic head at this location. Nine domestic wells are located within the institutional control boundary (eight in the confined aquifer and one in the semiconfined aquifer). Uranium and molybdenum concentrations in all samples collected from these wells were one or two orders of magnitude below the groundwater standards. Surface water flow in the Little Wind River in September 2015 was low compared to historical averages for that time of year. As a result, the uranium concentration measured in the Little Wind River was at a historical maximum at the sampling location upstream of the site. However, the impact of uranium discharge from the groundwater plume into the Little Wind River was not measureable. Elevated sulfate concentrations were observed in an outfall ditch related to an active sulfuric acid plant. Uranium concentrations in the oxbow lake remain at concentrations above the groundwater standard. Plume contaminant concentrations had returned to levels found prior to the 2010 flood by the end of 2015. However, these concentrations still exceed model predictions for natural flushing, and the current data indicate that natural flushing to achieve remediation goals within the 100-year time period is not likely, especially with the high potential for additional floods in the update to the conceptual site model (CSM), soil data indicate additional contaminant sources, specifically uranium, in evaporites within the silt layer over the uranium plume and in naturally reduced zones (NRZs). Additional zones of slightly elevated uranium concentration are in the native sediments just above the water table but below the fill layer in the former tailings impoundment area. This area also has slightly elevated uranium in the sand and gravel below the water table. Mass balance calculations indicate that small amounts of dissolution in any of these zones with increased uranium in the solid phase can produce groundwater uranium concentrations above the groundwater standard and could account for the post-flood uranium spike. The additional uranium near the former tailings impoundment provides a mechanism for a continuing source for the uranium plume that was not considered in earlier natural flushing models. In addition, uranium released from the silt layer or the NRZs seasonally and during flooding may add uranium to the groundwater plume near the Little Wind River. These mechanisms provide a possible explanation for plume persistence, along with spikes in concentrations during floods, that creates the current plume configuration. Additional updates to the CSM include (1) chloride flushes more rapidly than uranium beneath the former mill site, (2) chloride in the silt layer provides a scenario in which chloride cannot be used as a conservative tracer (especially in areas prone to flooding), (3) uranium concentrations with depth can be variable (especially below NRZs), and (4) calcite and gypsum solubility limits appear to provide important geochemical controls on groundwater geochemistry. The conclusion of this study provides several recommendations for additional work to refine the CSM and continue assessment of the natural flushing compliance strategy. Recommendations for additional work include targeted soil and groundwater sampling to assess geochemical conditions, distribution of contaminants, and groundwater/surface water interaction; additional column tests to provide data for geochemical modeling; and development of an updated groundwater flow model, which will be used in conjunction with a geochemical model to assess the viability of the natural flushing compliance strategy.

2015 Monitoring Riverton, WY↗

Reduced-Order Model for Leakage Through an Open Wellbore from the Reservoir due to Carbon Dioxide Injection

Potential CO 2 leakage through existing open wellbores is one of the most significant hazards that need to be addressed in geologic carbon sequestration (GCS) projects. In the framework of the National Risk Assessment Partnership (NRAP) which requires fast computations for uncertainty analysis, rigorous simulation of the coupled wellbore-reservoir system is not practical. We have developed a 7,200-point look-up table reduced-order model (ROM) for estimating the potential leakage rate up open wellbores in response to CO 2 injection nearby. The ROM is based on coupled simulations using T2Well/ECO2H which was run repeatedly for representative conditions relevant to NRAP to create a look-up table response-surface ROM. The ROM applies to a wellbore that fully penetrates a 20-m thick reservoir that is used for CO 2 storage. The radially symmetric reservoir is assumed to have initially uniform pressure, temperature, gas saturation, and brine salinity, and it is assumed these conditions are held constant at the far-field boundary (100 m away from the wellbore). In such a system, the leakage can quickly reach quasi-steady state. The ROM table can be used to estimate both the free-phase CO 2 and brine leakage rates through an open well as a function of wellbore and reservoir conditions. Results show that injection-induced pressure and reservoir gas saturation play important roles in controlling leakage. Caution must be used in the application of this ROM because well leakage is formally transient and the ROM lookup table was populated using quasi-steady simulation output after 1000 time steps which may correspond to different physical times for the various parameter combinations of the coupled wellbore-reservoir system.

54 ENVIRONMENTAL SCIENCES↗

E Tunnel Wastewater Disposal System Quarterly Monitoring Report Nevada National Security Site, Nevada Water Pollution Control Permit NEV 96021, Third Quarter 2018

This report includes the results of the E Tunnel Wastewater Disposal System (ETDS) inspections and monitoring for July, August, and September 2018. Monitoring and sampling activities were performed in accordance with the requirements of Water Pollution Control Permit NEV 96021, Revision 1, effective October 1, 2013. Monthly monitoring was conducted on July 16, August 13, and September 13, 2018. Operating personnel measured the instantaneous flow rate (see Table 1), log hydrogen ion activity (pH), temperature, and specific conductance of the discharge water (see Table 2). Monthly inspections also included an assessment of the general condition of the berms, including ponding (the water levels relative to the overflow pipes); any tunneling or burrowing into the berms; soil conditions on and around the berms, including erosion or sloughing of the interior or exterior slopes of the berms; seeps at the toe of the berms; the presence of any deep-rooting botanicals on the berms; and the physical condition of fencing (see Tables 3 through 7). Monthly rainfall quantities are presented in Table 8.

54 ENVIRONMENTAL SCIENCES↗

RELAP-7 Application and Enhancement for FLEX Strategies and ATF Behavior under Extended Loss of AC Power Conditions

This report summarizes the results of a three-year research project sponsored by the U.S. Department of Energy (DOE) Nuclear Energy University Program (NEUP) to enhance and apply the RELAP-7 code by adding and improving several important components (e.g., a mechanistic Reactor Core Isolation Cooling (RCIC) system model) for thermal hydraulic studies of LWRs under ELAP conditions and evaluating the time available for transition to portable FLEX equipment. The project team included University of Massachusetts–Lowell, The Ohio State University, Texas A&M University, Idaho National Laboratory and Oak Ridge National Laboratory. In the Fukushima accident, it was found that the RCIC system played a crucial role in delaying core meltdown by almost three days in Fukushima Daiichi Unit 2, because of self-regulated operation of the steam driven RCIC turbine-pump injection system. Steam flow in the convergent-divergent nozzles of the RCIC Terry turbine is two-phase non-equilibrium transonic flow with homogenous nucleation condensation. To more accurately predict the dynamic process and behavior of the transonic compressible steam flow, a one-dimensional transient two-phase analytical model is presented. A simplified four-fluid model was employed in the present work with the consideration of four separate fluid fields: vapor, liquid film, entrained droplets and condensed droplets. The mass, momentum and energy interactions between the fluids were considered and modeled. An extended seven-equation non-equilibrium critical flow model was developed to obtain the critical pressure and velocities of each phase at the nozzle throat. To predict the wetness in the divergent section, a mechanistic nucleation condensation model was integrated in the nozzle analysis model, considering the generation and consequent growth of droplets. The governing differential equations on a staggered grid were discretized using the second-order Lax-Wendroff scheme with a flux limiter, and the Semi-Implicit Method for Pressure-Linked Equation (SIMPLE) algorithm was employed to solve the discrete linear system. To demonstrate the predictability and reliability of the physical models and the numerical method proposed in the present work, three representative nozzles were modeled and simulated. The results show good agreement with the available experimental data, even for condensation shock. Then, the 1D nozzle model was employed to obtain nozzle flow tables of the Terry turbine nozzle for different working pressures which can cover the operation pressure range of the RCIC system. A mechanistic RCIC turbine-pump system model was developed and implemented in the system code TRACE to simulate dynamic responses of the RCIC system under Beyond Design Basis Accident (BDBA) conditions. The turbine-pump governing equations are based on the control volume approach of the angular momentum balance. The physics based mechanistic RCIC model was developed using the TRACE control system components (i.e., signal variables, control blocks, and tables), and incorporated into a TRACE boiling water reactor (BWR) model. The TRACE model in this report has a detailed nodalization of the reactor pressure vessel (RPV), and all of the major flow paths and system components, including the safety relief valves (SRVs) and the containment suppression pool and drywell. Based on the nozzle flow tables generated from the 1D nozzle model developed, the turbine drive torque can be calculated from table lookup. Since the detailed specifications of the RCIC pump are unavailable, the homologous curves for a Bingham pump were used in the current pump component. A station black-out (SBO) accident test problem was selected to demonstrate the TRACE RCIC model. The short-term SBO simulations were performed for two cladding materials: Zircaloy and FeCrAl, to demonstrate the effect of the accident tolerant fuel cladding on fuel heat-up under BDBA accident conditions. The wetwell plays a vital safety role in SBO and other BWR accident scenarios in that it can reduce containment pressure and supply additional core make-up water. The suppression pool temperature distribution has a very large impact on both RPV and containment pressure. Thus, another novel contribution of the project comes mainly from an improved, systems-level wetwell model which can capture buoyancy-induced thermal stratification effects due to steam injection and condensation. A two-zone stratified wetwell model has been implemented in RELAP-7 and some results from that model are presented. This wetwell model is capable of simulating thermal stratification due to a low steam mass injection rate. With a low mass flow rate, the model assumes that all the steam condenses within the pipe and the resulting plume can be approximated with a purely buoyant, heat-source driven model. The wetwell model developed with these assumptions is adequate to simulate slow transients such as extended SBO transients.

42 ENGINEERING↗

Characterization and CST Batch Contact Equilibrium Testing of Modified Tank 9H Process Supernate Samples in Support of TCCR

The Tank Closure Cesium Removal (TCCR) system uses ion exchange columns filled with crystalline silicotitanate (CST) media to process radioactive waste solutions for the removal of ¹³⁷Cs. TCCR currently focuses on dissolving Savannah River Site (SRS) radioactive tank waste (primarily sodium saltcake solids) within Tank 10H followed by at-tank ion exchange column treatment. Two supernate batches from Tank 10H have been processed through the TCCR unit and processing of a third batch is expected soon. After processing of this supernate batch, plans are to replace the CST columns and process dissolved salt solution from Tank 9H through Tank 10H and then through the new CST columns installed in the TCCR unit. The new columns are expected to contain either a media similar to an archived CST batch (IE-911) or the R9120-B CST media used in the current TCCR columns (the two materials are fundamentally the same; just different specifications, product names, and preconditioning steps). Samples of Tank 9H dissolved saltcake were received at the Savannah River National Laboratory (SRNL) and characterized. The Tank 9H supernate contained a high sodium concentration (~9.6 M Na⁺) and will require dilution to near 6 M [Na⁺] prior to processing through the TCCR unit. The cesium concentration in Tank 9H is currently significantly higher than was observed with Tank 10H. Three dilutions of the Tank 9H supernate were conducted to mimic possible dilutions that could be conducted in the tank farm prior to TCCR processing using inhibited water, sodium hydroxide, and sodium nitrate solutions. Dilution #1 was prepared by diluting the Tank 9H supernate by a factor of 1.6 with inhibited water, Dilution #2 was prepared by diluting the Tank 9H supernate by a factor of 3.7 with a mixed sodium hydroxide/sodium nitrate diluent, and Dilution #3 was prepared by also diluting by a factor of 3.7 but with sodium hydroxide only. All three dilutions have similar Na⁺ concentrations (~6 M), but Dilutions #2 and #3 contain significantly less cesium. Major and key minor components of the diluted Tank 9H supernate samples are provided in Table ES-1. Batch contact equilibrium tests were conducted with the Tank 9H dilutions and the two different CST media batches being considered for use in the new TCCR columns. Results are summarized in Table ES-2 and compared to ZAM model predictions. The highest cesium distribution coefficient and percent removal were observed with Dilution #3. IE-911 CST (an archived CST media batch) was more effective at removing cesium than the more recently prepared R9120-B CST media, though both media samples removed >88% of the cesium and the differences may not be statistically different considering the overall uncertainty. Based on the results, maximum cesium loadings were calculated for each CST media type and Tank 9H dilution. In general, maximum cesium loadings from dilutions of this supernate batch are quite high (approaching 0.1 mmol total Cs⁺/g CST for Dilution #1). The highest calculated maximum ¹³⁷Cs loading for the Tank 9H dilutions using the ZAM model with input of the tank compositions and batch contact results was 207 Ci/kg CST (Dilution #1 with IE-911 CST). In all cases, higher maximum cesium loading values were predicted for IE-911 CST versus R9120-B, although the differences varied considerably between the dilutions. The maximum loading value for IE-911 CST with Tank 9H Dilution #1 was only 7% higher than the maximum loading for R9120-B. The maximum loading value for IE-911 CST with Dilution #3 was 24% higher than the maximum loading for R9120-B. Dilution #2 was intermediate between these values. Note that these maximum loading values are the theoretical calculated values, and actual operating conditions will cause differences. A CST binder dilution (correction) factor near 0.7 (relative to pure powder CST) was required for each batch contact test with IE-911 engineered CST using the three Tank 9H dilutions. Correction factors calculated for R9120-B CST ranged from 0.56 to 0.66 for the three dilutions. Following the batch contact tests, the CST samples were isolated from the Tank 9H solution, washed, dried, and digested in acid following established procedures. The analysis results are provided in Table ES-3. Total cesium loading values determined by CST digestion were similar to the calculated loading values based on solution analysis (Table ES-2) for all samples. In addition, the CST was observed to load calcium (R9120-B sample only), iron, strontium, lead, uranium, and plutonium after contact with the waste supernate, as has been observed previously.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ESGF project plan for ramping down development activities and transition the project and data to a new team

This document summarizes the current software development activities carried by the ESGF team with planned delivery dates before the transition of the project to a new team. The work we started on the publishing, search and retrieval, and the backend for indexing and data management that can be deployed using Kubernetes are planned to be delivered within the next three months; however, this assumes that the current team members will continue to work on the project. The activities are listed in Table 1 by priority and in case we lose team members, development of lower priority tasks can be paused and passed to the new team with its current status. Team members can be re-assigned based on their availability and transition work needed. Table 2 below describe activities necessary to help project transition to the new team. Deadlines for these activities are before October 1 st of 2022 or the completion of a successful transition. Support during the transition period assumes that we will have 3 key ESGF members and the ESGF PI supported at the 50% level or less for the duration of the transition. The level of support is an estimate, and it depends on several factors that cannot be decided at this time. The total cost of the proposed work and support activities for fiscal year 2021 is $1,270K with $230K carry over to fiscal year 2022. The cost for the support work listed in Table 2 is the sum of the two rows “HW support” and “project support, maintenance, and transition efforts”, colored blue, in Table1 which adds up to $720K. This cost is included in the $1,270K cost in table 1.

97 MATHEMATICS AND COMPUTING↗

SECARB-USA: Data Quality Methodology

SECARB-USA Deliverable 4.2.1 utilizes the outputs from the Needs Assessment (Subtask 2.1) to develop a data quality methodology. Many types of data are needed to evaluate a site for technical and financial viability. Several inventories of data types have been produced (for example NETL, 2010). The objective here is to organize the data types so that the needs met are specified. From this cross index (Table 1 in the Appendix), it will be possible in future tasks to (1) determine, on a site-specific basis, how much of each data type is required at each stage of a project to meet the need, and conversely (2) to further specify and define the data collection methods applied such that the data are tailored to fit that need. Derivative tables can then be developed to semi-quantitively evaluate the extent to which need is critical for early go/no-go decision points, or if it is more important than average, requiring faster or larger capitalization and spend to meet the need. In an additional step, the current availability of data for a site can be semi-quantitively assessed. From the table of data criticality and the table of data availability, site-specific cost for meeting the data needs can be determined, and allow a pre-permit spend estimated for a portfolio of projects.

54 ENVIRONMENTAL SCIENCES↗

Electrical Resistivity Tomography Monitoring of In Situ Soil Flushing at the Hanford 100-K East Area: 100KE Soil Flushing Monitoring

Former operations in the 100-KE Area at the Hanford Site resulted in vadose zone hexavalent chromium that provides a source of groundwater contamination. Previous efforts to remediate vadose zone chromium involved excavation and offsite treatment of contaminated soils. Although much of the chromium was removed, contamination still exists in native soil between the water table and the bottom of the pit, which has since been backfilled. In-situ soil flushing was tested at the 100-KE Area to accelerate the removal of the remaining hexavalent chromium in the vadose zone. Soil flushing works by applying clean flush water at the surface, which mobilizes and transports chromium as it migrates downward to the water table. Once the chromium reaches the water table, it is hydraulically contained, extracted, and treated through pump and treat operations. The efficacy of soil flushing is directly related to the volume of clean water that infiltrates through contaminated soils. Therefore, performance monitoring requires and understanding of flush water migration through the vadose zone. It is challenging to comprehensively assess soil flushing performance via borehole access due to the limited volume of investigation afforded by a given wellbore. As an alternative, 3D time-lapse electrical resistivity tomography (ERT) was tested as a method of monitoring the distribution of flush water over time within the vadose zone. ERT is a method of imaging the bulk electrical conductivity of the subsurface, which is highly dependent on water saturation levels in unconsolidated and unsaturated sediments. Thus, the timing and location of changes in bulk conductivity caused by soil flushing can be used to infer flush water migration pathways. In this report we present results of 3D time-lapse ERT imaging during two separate soil flushing campaigns conducted during the spring and summer months of 2022 and 2023. Results show generally that: 1) Pit backfill materials appear to nominally have larger permeability than native soils. Consequently, the boundary between pit backfill and native soil had a significant impact on flush water migration, causing some flush water to migrate along the pit boundary to the bottom of the pit. 2) Non-uniform flows, likely caused by variations in hydrogeologic properties, developed in the pit backfill materials, resulting in uneven flush water distribution on the southern margin of the soil flushing zone. 3) Redistribution of water at the interface between backfill materials and Hanford formation materials likely facilitated elevated and uniform distribution of flush water within native soils beneath the deeper parts of the pit boundary beneath the center of the flush zone, which presumably overlie soils with elevated chromium contamination. These areas appear to have been infiltrated by higher volumes of flush water than the northern and southern margins of the flush zone. 4) In comparison to 2022, high flush water application rates significantly improved flush water distribution throughout the target flushing zone. 5) Imaging resolution was limited to a depth of approximate 20 meters below the land surface, due primarily to limitations on the lateral extent of the surface ERT array. The ~10 m region of the vadose zone between approximately 130 meters elevation and the water table at approximately 120 meters elevation was unresolved.

100 Area↗