Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “System Testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,369 records · Page 76

Update on the Current R&D Activity in the U.S.

This presentation is to fulfil DOE commitment to GIF VHTR Materials PMB. Notched creep rupture testing: Weldment V-notch specimen test finished. 800C 60MPa, 15,716 hour rupture life. Two double V-notch specimen tests have finished. Crack growth tests: System modification was required for creep and creep-fatigue testing, Epsilon 3548COD Extensometer has been ordered, to allow load-line displacement measurements, to be paired with direct current potential drop already used to measure crack length, Sample redesigned in accordance to ASTM E2760 and E1457 to allow for both creep and creep-fatigue crack growth rate testing. Alloy 800H Weldments (1/2) and Alloy 800H Weldments (2/2), Variable Fatigue Testing, and Multi=axial Stress Relaxation. Continue work to finish 800H model, examine ?universal? constitutive model form.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Satellite baseband processor test performance summary

A satellite baseband processor (BBP) has been developed for the NASA Lewis 30/20 GHz Satellite Communications Program. The BBP design, reported elsewhere, has been implemented in a proof-of-concept (POC) model. The results of the laboratory system tests of the POC are summarized. Bit error rate test results are presented for the FDM/TDMA communication system operating at 27.5, 110, and 550 Mbps over a variety of operating conditions. The results clearly demonstrate the applicability of baseband processing to future high capacity satellite communication system concepts. A brief description of the system concept, its function, and the role of the baseband processor are presented. The test conditions and means of simulation are also described. The methods of test evaluation and their significance in a system context are given.

Shaneyfelt, J. T.↗

Optical digital techniques

Optical interface losses between transmitter-to-fiber interface, connector-to-connector interface, and fiber-to-receiver interface were studied. System effects such as pulse dispersion, risetimes of the sources and detectors, type of fibers used, output power of the sources, and detector sensitivity were considered. Data bus systems such as TEE, Star, and Hybrid were analyzed. The matter of single fiber versus bundle technologies for future avionics systems was considered. The existing data bus system on Space Shuttle was examined and an optical analog was derived for a fiber bundle system, along with the associated power margin. System tests were performed on a feasibility model of a 9-port Star data bus system including BER, star losses, connector losses, etc. The same system was subjected to EMI between the range of 200 Hz to 10 GHz at 20V/m levels. A lightning test was also performed which simulated the conditions similar to those on Space Shuttle. The data bus system was found to be EMI and lightning hard. It is concluded that an optical data bus system is feasible for shuttle orbiter type vehicles.

Source record↗

Environmental control system for cryogenic testing of tensile specimens

Environmental control system uses a special coil to permit the tensile testing of specimens which may be subjected to temperatures anywhere between liquid nitrogen and room temperature. The test specimen zone is surrounded by the coil which permits the selective flooding of the specimen with warm or cold gas.

Vandergrift, E. F.↗

SDO FlatSat Facility

The goal of the Solar Dynamics Observatory (SDO) is to understand and, ideally, predict the solar variations that influence life and society. It's instruments will measure the properties of the Sun and will take hifh definition images of the Sun every few seconds, all day every day. The FlatSat is a high fidelity electrical and functional representation of the SDO spacecraft bus. It is a high fidelity test bed for Integration & Test (I & T), flight software, and flight operations. For I & T purposes FlatSat will be a driver to development and dry run electrical integration procedures, STOL test procedures, page displays, and the command and telemetry database. FlatSat will also serve as a platform for flight software acceptance and systems testing for the flight software system component including the spacecraft main processors, power supply electronics, attitude control electronic, gimbal control electrons and the S-band communications card. FlatSat will also benefit the flight operations team through post-launch flight software code and table update development and verification and verification of new and updated flight operations products. This document highlights the benefits of FlatSat; describes the building of FlatSat; provides FlatSat facility requirements, access roles and responsibilities; and, and discusses FlatSat mechanical and electrical integration and functional testing.

Amason, David L.↗

Tests Of A Differential Global Positioning System

Paper describes validation tests of global positioning system (GPS) for low-flying helicopters. Configured as differential GPS, in which components in both aircraft and ground station compute position errors relative to known location using satellite navigational data. Corrections computed from differences between computed and measured ranges to four satellites being tracked by receiver in both aircraft and ground systems. Tests conducted to determine whether equipment and computer programs of system operated correctly and consistently.

Edwards, F. G.↗

Shuttle orbiter Ku-band radar/communications system design evaluation. Deliverable test equipment evaluation

The Ku-band test equipment, known as the Deliverable System Test equipment (DSTE), is reviewed and evaluated. The DSTE is semiautomated and computer programs were generated for 14 communication mode tests and 17 radar mode tests. The 31 test modules provide a good cross section of tests with which to exercise the Ku-band system; however, it is very limited when being used to verify Ku-band system performance. More detailed test descriptions are needed, and a major area of concern is the DSTE sell-off procedure which is inadequate.

Maronde, R. G.↗

Flat-plate collector research area: Silicon material task

Silane decomposition in a fluidized-bed reactor (FBR) process development unit (PDU) to make semiconductor-grade Si is reviewed. The PDU was modified by installation of a new heating system to provide the required temperature profile and better control, and testing was resumed. A process for making trichlorosilane by the hydrochlorination of metallurgical-grade Si and silicon tetrachloride is reported. Fabrication and installation of the test system employing a new 2-in.-dia reactor was completed. A process that converts trichlorosilane to dichlorosilane (DCS), which is reduced by hydrogen to make Si by a chemical vapor deposition step in a Siemens-type reactor is described. Testing of the DCS PDU integraled with Si deposition reactors continued. Experiments in a 2-in.-dia reactor to define the operating window and to investigate the Si deposition kinetics were completed.

Lutwack, R.↗

Black-Starting Microgrids Using Inverter-Based Distributed Energy Resources

Recent trends in power systems show increasing deployment of inverter-based distributed energy resources (DERs) at the distribution level. Efforts have also been made to use inverter-based DERs for system restoration of critical sections of distribution feeders. In the past few years, there has been active consideration of using local grid-forming (GFM) DERs, which can form their own voltage and frequency, to black-start microgrids instead of waiting for the bulk system for supply restoration. However, using current-limited inverter-based DERs for black-start operations with high inrush currents can pose some technical challenges. This paper presents detailed electromagnetic transient studies on a digital real-time simulator to assess the operational feasibility of using local inverter-based GFM DERs for microgrid black-start operations as a bottom-up approach instead of a top-down approach where the substation is used to restore critical sections of the feeder. The paper presents key modeling details for distribution system components for studying GFM DER-based microgrid black-start operations. The paper presents simulation results comparing different black-start approaches using GFM DERs for two test systems: i) a simple test microgrid and ii) a real-world utility microgrid currently being designed and deployed by Holy Cross Energy in Colorado.

black start↗

NASA's Space Launch System Moves into Testing and Integration

NASA's Space Launch System (SLS) has moved from design and manufacturing into testing and integration for its first flight as early as December 2019. In 2017, the NASA/industry team completed manufacturing of all major structural elements for the launch vehicle for Exploration Mission-I (EM-1 ). That work included shipping the first major flight hardware element to the launch site. The team processed all four RS-25 engines for stage integration, cast all 10 booster flight motor segments, and manufactured all five major sections of the core stage. The program also completed major structural work on the B-2 test stand at Stennis Space Center, which will be used for the core stage "green run" test; delivered the core stage and engine simulators used for training; and much of the transportation equipment for the core stage. Engineers completed structural testing on the upper stage/payload section of the vehicle as well as the engine section test article. In 2018, the program will deliver the Orion Stage Adapter (OSA) to Exploration Ground Systems (EGS) at KSC and send the test articles for the core stage liquid hydrogen tank, liquid oxygen tank, and intertank to NASA's Marshall Space Flight center for structural testing. Additionally, workers will begin the challenging process of integrating the major sections of the 212-foot EM-1 core stage. This work is focused on the initial Block 1 variant of SLS, capable of launching more than 70 metric tons (t) to low Earth orbit (LEO). However, work concurrently is underway on the Block lB variant, which will enable 105 t to LEO and more than 37t to trans-lunar injection (TLI). Block lB will be the workhorse vehicle of NASA's lunar exploration plans. As the needs of the nation's deep space exploration program grow, SLS performance is designed to evolve to a payload mass of 130 t to LEO and up to 45t to TLI. The advantages of this mass - as well as volume- are critical to the entire exploration architecture for deep space exploration. They translate to greater capability, greater infrastructure and operational simplicity, less overall mission risk, and opportunities to accomplish unprecedented exploration and discovery. This paper will discuss SLS progress to date and planned future work.

Honeycutt, John↗

Integration of Automated Systems (IAS) Flight Test - Hazard Perception & Avoidance (HPA) Results

The Integration of Automated Systems (IAS) flight test series concluded in October 2023 in support of NASA's Advanced Air Mobility (AAM) project. These flights include crewed, test (i.e., ownship) and traffic (i.e., intruder) aircraft that flew with unique technologies onboard. The presentation includes overviews of the flight tet itself and the specific results that pertain to the Hazard Perception and Avoidance (HPA) technical areas. HPA tested the FAA's Airborne Collision Avoidance System X (ACAS X), a next-generation collision avoidance tool developed to support different aircraft types and operations. The rotorcraft variant, ACAS Xr, is designed to accommodate existing helicopter platforms and in-development, vertical takeoff and landing (VTOL) concepts, which are critical to the emerging AAM concept of operations. Two configurations of ACAS Xr were examined: Collision Avoidance System (CAS, similar to the Traffic Collision Avoidance System [TCAS] II) and Detect and Avoid (DAA, previously developed to provide added situational awareness for remote pilots). Additionally, this system was flown in cruise and low-speed flight regimes as well as within en-route and (emulated), structured (i.e., dense/urban), and terminal airspaces. Results include the types of alerts generated by ACAS Xr across the different configurations, the distances at which the alerts were generated, response times, manuever sizes, miss distances, and general comments from pilots. Key takeaways and next steps are also provided.

detect and avoid↗

Aerodynamic results of a support system interference effects test conducted at NASA/LaRC UPWT using an 0.015-scale model of the configuration 140A/B SSV orbiter (0A20B)

An experimental aerodynamic investigation was conducted to determine the interference effects of a wind tunnel support system. The test article was a 0.015 scale model of the space shuttle orbiter. The primary objective of the test was to determine the extent that aerodynamic simulation of the space shuttle orbiter is affected by base mounting the model, without nozzles, on a straight sting. Two support systems were tested. The characteristics of the support systems are described. Data from the tests are presented in the form of graphs and tables.

Campbell, J. H., II↗

Phase III integrated water recovery testing at MSFC - Design, plans, and protocols

A series of tests is being conducted at the NASA Marshall Space Flight Center (MSFC) to evaluate the performance of a closed-loop water recovery system. Testing will be conducted at various levels of integration and loop-closure, culminating in complete closure of the water system with man-in-the-loop. This paper summarizes the test goals and objectives as well as the system design, plans, and protocols which have been established.

Bagdigian, Robert M.↗

Comparison of A-SMGCS Requirements with Observed Performance of an Integrated Airport CNS System

The International Civil Aviation Organization (ICAO) has recently drafted a reference document describing the operational requirements for Advanced Surface Movement Guidance and Control Systems (A-SMGCS). During the summer of 1997, NASA, the FAA, industry, and academia partners demonstrated a holistic system approach that has the potential to meet many of the proposed A-SMGCS requirements. An assessment of the field tested system and data resulting from the field testing is presented to determine its compliance with A-SMGCS requirements. In those areas where compliance was not demonstrated, a recommendation is presented suggesting further research or a modification of the system architecture.

Young, Steven D.↗

Design and test of a high power electromechanical actuator for thrust vector control

NASA-Marshall is involved in the development of electromechanical actuators (EMA) for thrust-vector control (TVC) system testing and implementation in spacecraft control/gimballing systems, with a view to the replacement of hydraulic hardware. TVC system control is furnished by solid state controllers and power supplies; a pair of resolvers supply position feedback to the controller for precise positioning. Performance comparisons between EMA and hydraulic TVC systems are performed.

Cowan, J. R.↗

Adaptive finite differencing in high accuracy electronic structure calculations

Abstract A multi-order Adaptive Finite Differencing (AFD) method is developed for the kinetic energy operator in real-space, grid-based electronic structure codes. It uses atomic pseudo orbitals produced by the corresponding pseudopotential codes to optimize the standard finite difference (SFD) operators for improved precision. Results are presented for a variety of test systems and Bravais lattice types, including the well-known Δ test for 71 elements in the periodic table, the Mott insulator NiO, and borax decahydrate, which contains covalent, ionic, and hydrogen bonds. The tests show that an 8th-order AFD operator leads to the same average Δ value as that achieved by plane-wave codes and is typically far more accurate and has a much lower computational cost than a 12th-order SFD operator. The scalability of real-space electronic calculations is demonstrated for a 2016-atom NiO cell, for which the computational time decreases nearly linearly when scaled from 18 to 144 CPU-GPU nodes.

Briggs, E. L. (ORCID:0000000343983492)↗