Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Space launch”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,369 records · Page 76

Adaptive Independent Verification and Validation (IV&V) Reduces Risk of Software Impacting Safety in Artemis Missions

The National Aeronautics and Space Administration (NASA) is asking more of its human spaceflight programs than ever before through the collective Artemis Missions. The NASA Independent Verification and Validation (IV&V) Program contributes to NASA’s human spaceflight goals by providing IV&V services for NASA’s critical spacecraft and ground software. The IV&V Program is tasked with providing assurance from both individual and integrated mission software perspectives. The Artemis IV&V organization is actively supporting six distinct development efforts: Orion, the Space Launch System (SLS), Exploration Ground Systems (EGS), Mission Control Center (MCC), the Lunar Gateway, and the Human Landing System (HLS), representing a wide diversity of developer organizations, management structures, and development approaches. With much of this extremely complex flight and ground software being essential to human safety both on the ground and in space, Artemis IV&V is likewise challenged to provide more value-added assurance to future Artemis missions within a constrained budget. To meet this challenge, Artemis IV&V employs a variety of novel and evolving “Adaptive IV&V” approaches for planning and executing IV&V analysis to increase both the efficiency and effectiveness of the IV&V Program’s assurance activities, and to address the difficulties imposed by assuring software for a large, highly integrated, multi-mission enterprise managed and executed by physically and organizationally distinct programs. Instilling agile principles like iterative planning cycles, self-organizing teams, and regular retrospectives, into IV&V planning and execution has led to a more rapid turnaround of a minimum viable assurance product and allowed for increased alignment of assurance activities with development progress. Adopting an assurance case methodology has led to greater consistency and clearer communication of assurance design and provided a foundation for long-term maintenance of assurance plans, products, and results across missions. The IV&V-developed Assurance / Safety Case Analytical Network (A-SCAN) framework and tool has enabled the quantification and tracking of system/software risk and confidence. These confidence measures provide a means to repeatedly express the impact of planned and completed assurance work and the remaining residual risk. Applied as part of a “Follow-the-Risk” organizational ethos, this allows consistent rightsizing of analysis rigor and intensity commensurate with the perceived risk of defects, as well as appropriate targeting of the highest risk areas of the software to find safety issues before they can manifest. Finally, the development of the IV&V Advanced Risk Reduction Integrated Software Test and Operations Tri-program Lightweight Environment (ARRISTOTLE), an integrated software-only simulation of Orion, SLS, and EGS systems, has made it possible to independently test integrated pad and flight scenarios and inject faults to observe how the Artemis multi-program, mission software behaves in degraded modes and in response to hazards. These adaptive IV&V investments have enabled Artemis IV&V to become more efficient and effective in IV&V planning and execution and respond more readily to changes in the risk landscape, increasing the breadth and depth of risk reduction possible within the available resources. Residual risk tracking allows IV&V to communicate more effectively with stakeholders, both internal and external at all levels, and inform key decision-making personnel. This evolving assurance design approach provides IV&V surety that work is performed in the highest risk, most value-added areas of the software, to keep our astronauts and ground crews safe and ensure mission success.

Gerek A Whitman↗

Adaptive Independent Verification and Validation (IV&V) Reduces Risk of Software Impacting Safety in Artemis Missions

The National Aeronautics and Space Administration (NASA) is asking more of its human spaceflight programs than ever before through the collective Artemis Missions. The NASA Independent Verification and Validation (IV&V) Program contributes to NASA’s human spaceflight goals by providing IV&V services for NASA’s critical spacecraft and ground software. The IV&V Program is tasked with providing assurance from both individual and integrated mission software perspectives. The Artemis IV&V organization is actively supporting six distinct development efforts: Orion, the Space Launch System (SLS), Exploration Ground Systems (EGS), Mission Control Center (MCC), the Lunar Gateway, and the Human Landing System (HLS), representing a wide diversity of developer organizations, management structures, and development approaches. With much of this extremely complex flight and ground software being essential to human safety both on the ground and in space, Artemis IV&V is likewise challenged to provide more value-added assurance to future Artemis missions within a constrained budget. To meet this challenge, Artemis IV&V employs a variety of novel and evolving “Adaptive IV&V” approaches for planning and executing IV&V analysis to increase both the efficiency and effectiveness of the IV&V Program’s assurance activities, and to address the difficulties imposed by assuring software for a large, highly integrated, multi-mission enterprise managed and executed by physically and organizationally distinct programs. Instilling agile principles like iterative planning cycles, self-organizing teams, and regular retrospectives, into IV&V planning and execution has led to a more rapid turnaround of a minimum viable assurance product and allowed for increased alignment of assurance activities with development progress. Adopting an assurance case methodology has led to greater consistency and clearer communication of assurance design and provided a foundation for long-term maintenance of assurance plans, products, and results across missions. The IV&V-developed Assurance / Safety Case Analytical Network (A-SCAN) framework and tool has enabled the quantification and tracking of system/software risk and confidence. These confidence measures provide a means to repeatedly express the impact of planned and completed assurance work and the remaining residual risk. Applied as part of a “Follow-the-Risk” organizational ethos, this allows consistent rightsizing of analysis rigor and intensity commensurate with the perceived risk of defects, as well as appropriate targeting of the highest risk areas of the software to find safety issues before they can manifest. Finally, the development of the IV&V Advanced Risk Reduction Integrated Software Test and Operations Tri-program Lightweight Environment (ARRISTOTLE), an integrated software-only simulation of Orion, SLS, and EGS systems, has made it possible to independently test integrated pad and flight scenarios and inject faults to observe how the Artemis multi-program, mission software behaves in degraded modes and in response to hazards. These adaptive IV&V investments have enabled Artemis IV&V to become more efficient and effective in IV&V planning and execution and respond more readily to changes in the risk landscape, increasing the breadth and depth of risk reduction possible within the available resources. Residual risk tracking allows IV&V to communicate more effectively with stakeholders, both internal and external at all levels, and inform key decision-making personnel. This evolving assurance design approach provides IV&V surety that work is performed in the highest risk, most value-added areas of the software, to keep our astronauts and ground crews safe and ensure mission success.

Gerek Whitman↗

Unsteady Pressure Acquisition on the 1.75% Scale SLS Block 1B Cargo Liftoff Configuration

Time-varying pressure on the core of the Space Launch System (SLS) Block 1B Cargo vehicle was acquired using instrumentation typically used for steady, time averaged pressure. Resono Pressure Systems, Inc. in partnership with the University of Wyoming have developed a unique hardware and software system for measuring unsteady pressure, which was implemented in a large-scale wind tunnel test through a nonreimbursable Space Act Agreement with NASA. The technique was applied to 12 pressure ports on the 1.75% scale SLS wind tunnel model. Tubing lengths of approximately 14 inches separated the pressure transducer module from the pressure taps on the model surface, and surface-mount validation sensors (Kulites) were installed in close proximity to 5 of the 12 pressure ports. Up to about 500 Hz, the frequency response of pressure fluctuations agreed to within 1 dB of amplitude and 10° of phase difference compared to the simultaneously-acquired surface-mount transducers. Sample results using the reconstructed pressure from the full azimuthal ring of taps are presented.

unsteady pressure↗

Operational Issues in the Development of a Cost-Effective Reusable LOX/LH2 Engine

The NASA Space Launch Initiative (SLI) was initiated in early 2001 to conduct technology development and to reduce the business and technical risk associated with developing the next-generation reusable launch system. In the field of main propulsion, two LOXLH2 rocket engine systems, the Pratt & Whitney / Aerojet Joint Venture (JV) COBRA and the Rocketdyne RS-83, were funded to develop a safe, economical, and reusable propulsion system. Given that a large-thrust reusable rocket engine program had not been started in the U.S. since 1971, with the Space Shuttle Main Engine (SSME), this provided an opportunity to build on the experience developed on the SSME system, while exploiting advances in technology that had occurred in the intervening 30 years. One facet of engine development that was identified as being especially vital in order to produce an optimal system was in the areas of operability and maintainability. In order to achieve the high levels of performance required by the Space Shuttle, the SSME system is highly complex with very tight tolerances and detailed requirements. Over the lifetime of the SSME program, the engine has required a high level of manpower to support the performance of inspections, maintenance (scheduled and unscheduled) and operations (prelaunch and post-flight). As a consequence, the labor- intensive needs of the SSME provide a significant impact to the overall cost efficiency of the Space Transportation System (STS). One of the strategic goals of the SLI is to reduce cost by requiring the engine(s) to be easier (Le. less expensive) to operate and maintain. The most effective means of accomplishing this goal is to infuse the operability and maintainability features into the engine design from the start. This paper discusses some of the operational issues relevant to a reusable LOx/LH2 main engine, and the means by which their impact is mitigated in the design phase.

Ballard, Richard O.↗

Design Process of Flight Vehicle Structures for a Common Bulkhead and an MPCV Spacecraft Adapter

Design and manufacturing space flight vehicle structures is a skillset that has grown considerably at NASA during that last several years. Beginning with the Ares program and followed by the Space Launch System (SLS); in‐house designs were produced for both the Upper Stage and the SLS Multipurpose crew vehicle (MPCV) spacecraft adapter. Specifically, critical design review (CDR) level analysis and flight production drawing were produced for the above mentioned hardware. In particular, the experience of this in‐house design work led to increased manufacturing infrastructure for both Marshal Space Flight Center (MSFC) and Michoud Assembly Facility (MAF), improved skillsets in both analysis and design, and hands on experience in building and testing (MSA) full scale hardware. The hardware design and development processes from initiation to CDR and finally flight; resulted in many challenges and experiences that produced valuable lessons. This paper builds on these experiences of NASA in recent years on designing and fabricating flight hardware and examines the design/development processes used, as well as the challenges and lessons learned, i.e. from the initial design, loads estimation and mass constraints to structural optimization/affordability to release of production drawing to hardware manufacturing. While there are many documented design processes which a design engineer can follow, these unique experiences can offer insight into designing hardware in current program environments and present solutions to many of the challenges experienced by the engineering team.

Aggarwal, Pravin↗

The Initial Atmospheric Transport (IAT) Code: Description and Validation

The Initial Atmospheric Transport (IAT) computer code was developed at Sandia National Laboratories as part of their nuclear launch accident consequences analysis suite of computer codes. The purpose of IAT is to predict the initial puff/plume rise resulting from either a solid rocket propellant or liquid rocket fuel fire. The code generates initial conditions for subsequent atmospheric transport calculations. The Initial Atmospheric Transfer (IAT) code has been compared to two data sets which are appropriate to the design space of space launch accident analyses. The primary model uncertainties are the entrainment coefficients for the extended Taylor model. The Titan 34D accident (1986) was used to calibrate these entrainment settings for a prototypic liquid propellant accident while the recent Johns Hopkins University Applied Physics Laboratory (JHU/APL, or simply APL) large propellant block tests (2012) were used to calibrate the entrainment settings for prototypic solid propellant accidents. North American Meteorology (NAM )formatted weather data profiles are used by IAT to determine the local buoyancy force balance. The IAT comparisons for the APL solid propellant tests illustrate the sensitivity of the plume elevation to the weather profiles; that is, the weather profile is a dominant factor in determining the plume elevation. The IAT code performed remarkably well and is considered validated for neutral weather conditions.

97 MATHEMATICS AND COMPUTING↗

Assessment of the State-of-the-Art in the Design and Manufacturing of Large Composite Structure

This viewgraph presentation gives an assessment of the state-of-the-art in the design and manufacturing of large component structures, including details on the use of continuous fiber reinforced polymer matrix composites (CFRP) in commercial and military aircraft and in space launch vehicles. Project risk mitigation plans must include a building-block test approach to structural design development, manufacturing process scale-up development tests, and pre-flight ground tests to verify structural integrity. The potential benefits of composite structures justifies NASA's investment in developing the technology. Advanced composite structures technology is enabling to virtually every Aero-Space Technology Enterprise Goal.

Harris, C. E.↗

PEG Enhancement for EM1 and EM2+ Missions

NASA is currently building the Space Launch System (SLS) Block-1 launch vehicle for the Exploration Mission 1 (EM-1) test flight. The next evolution of SLS, the Block-1B Exploration Mission 2 (EM-2), is currently being designed. The Block-1 and Block-1B vehicles will use the Powered Explicit Guidance (PEG) algorithm. Due to the relatively low thrust-to-weight ratio of the Exploration Upper Stage (EUS), certain enhancements to the Block-1 PEG algorithm are needed to perform Block-1B missions. In order to accommodate mission design for EM-2 and beyond, PEG has been significantly improved since its use on the Space Shuttle program. The current version of PEG has the ability to switch to different targets during Core Stage (CS) or EUS flight, and can automatically reconfigure for a single Engine Out (EO) scenario, loss of communication with the Launch Abort System (LAS), and Inertial Navigation System (INS) failure. The Thrust Factor (TF) algorithm uses measured state information in addition to a priori parameters, providing PEG with an improved estimate of propulsion information. This provides robustness against unknown or undetected engine failures. A loft parameter input allows LAS jettison while maximizing payload mass. The current PEG algorithm is now able to handle various classes of missions with burn arcs much longer than were seen in the shuttle program. These missions include targeting a circular LEO orbit with a low-thrust, long-burn-duration upper stage, targeting a highly eccentric Trans-Lunar Injection (TLI) orbit, targeting a disposal orbit using the low-thrust Reaction Control System (RCS), and targeting a hyperbolic orbit. This paper will describe the design and implementation of the TF algorithm, the strategy to handle EO in various flight regimes, algorithms to cover off-nominal conditions, and other enhancements to the Block-1 PEG algorithm. This paper illustrates challenges posed by the Block-1B vehicle, and results show that the improved PEG algorithm is capable for use on the SLS Block 1-B vehicle as part of the Guidance, Navigation, and Control System.

Von der Porten, Paul↗

Airbreathing engines for space shuttle

The requirements imposed on the airbreathing engines by the shuttle mission and some results from engine design studies are discussed. In particular, some of the engine system weight study results are presented, potential problem areas and required engine modifications are identified, and testing requirements for a development and qualification program are discussed. The engines of interest for the shuttle are engines that are currently being developed for other applicatons. The potential problems, engine modifications, and testing requirements result primarily from the new environments associated with launch, space residence, and reentry.

Glassman, A. J.↗

Airbreathing engines for Space Shuttle.

The requirements imposed on the airbreathing engines by the shuttle mission and some results from engine design studies are discussed. In particular some of the engine system weight study results are presented, potential problem areas and required engine modifications are identified, and testing requirements for a development and qualification program are discussed. The engines of interest for the shuttle are engines that are currently being developed for other applications. The potential problems, engine modifications, and testing requirements result primarily from the new environments associated with launch, space residence, and reentry.

Glassman, A. J.↗

Airbreathing engines for space shuttle.

The requirements imposed on the airbreathing engines by the shuttle mission and some results from engine design studies are discussed. In particular, some of the engine system weight study results are presented, potential problem areas and required engine modifications are identified, and testing requirements for a development and qualification program are discussed. The engines of interest for the shuttle are engines that are currently being developed for other applications. The potential problems, engine modifications, and testing requirements result primarily from the new environments associated with launch, space residence, and reentry.

Glassman, A. J.↗

Autonomous Mission Manager for Rendezvous, Inspection and Mating

To meet cost and safety objectives, space missions that involve proximity operations between two vehicles require a high level of autonomy to successfully complete their missions. The need for autonomy is primarily driven by the need to conduct complex operations outside of communication windows, and the communication time delays inherent in space missions. Autonomy also supports the goals of both NASA and the DOD to make space operations more routine, and lower operational costs by reducing the requirement for ground personnel. NASA and the DoD have several programs underway that require a much higher level of autonomy for space vehicles. NASA's Space Launch Initiative (SLI) program has ambitious goals of reducing costs by a factor or 10 and improving safety by a factor of 100. DARPA has recently begun its Orbital Express to demonstrate key technologies to make satellite servicing routine. The Air Force's XSS-ll program is developing a protoflight demonstration of an autonomous satellite inspector. A common element in space operations for many NASA and DOD missions is the ability to rendezvous, inspect anclJor dock with another spacecraft. For DARPA, this is required to service or refuel military satellites. For the Air Force, this is required to inspect un-cooperative resident space objects. For NASA, this is needed to meet the primary SLI design reference mission of International Space Station re-supply. A common aspect for each of these programs is an Autonomous Mission Manager that provides highly autonomous planning, execution and monitoring of the rendezvous, inspection and docking operations. This paper provides an overview of the Autonomous Mission Manager (AMM) design being incorporated into many of these technology programs. This AMM provides a highly scalable level of autonomous operations, ranging from automatic execution of ground-derived plans to highly autonomous onboard planning to meet ground developed mission goals. The AMM provides the capability to automatically execute the plans and monitor the system performance. In the event of system dispersions or failures the AMM can modify plans or abort to assure overall system safety. This paper describes the design and functionality of Draper's AMM framework, presents concept of operations associated with the use of the AMM, and outlines the relevant features of the flight demonstrations.

Zimpfer, Douglas J.↗

Launch Availability Analysis for the Artemis Program

On March 26, 2019, Vice President Pence stated that the policy of the Trump administration and the United States of America is to return American astronauts to the Moon within the next five years i.e., by 2024. Since that time, NASA has begun the process of developing concepts of operations and launch campaign options to achieve that goal as well as to provide a sustainable human presence on the Moon. Whereas the Apollo program utilized one Saturn V rocket to carry out a single lunar landing mission of short duration, NASA’s preliminary plans for the Artemis Program call for a combination of medium lift class rockets along with the heavy lift Space Launch System (SLS)to achieve a lunar landing by 2024 as well as subsequent missions. This paper describes how discrete event simulation is used to model the launch campaigns and provide metrics on launch availability and mission duration for each element being launched. Possible methods for improving launch availability are presented.

Grant Cates↗

The Orion Pad Abort 1 (PA-1) Flight Test: A Propulsion Success

This poster provides a concise overview of the highly successful Orion Pad Abort 1 (PA-1) flight test, and the three rocket motors that contributed to this success. The primary purpose of the Orion PA-1 flight was to help certify the Orion Launch Abort System (LAS), which can be utilized in the unlikely event of an emergency on the launchpad or during mission vehicle ascent. The PA-1 test was the first fully integrated flight test of the Orion LAS, one of the primary systems within the Orion Multi-Purpose Crew Vehicle (MPCV). The Orion MPCV is part of the architecture within the Space Launch System (SLS), which is being designed to transport astronauts beyond low-Earth orbit for future exploration missions. Had the Orion PA-1 flight abort occurred during launch preparations for a real human spaceflight mission, the PA-1 LAS would have saved the lives of the crew. The PA-1 flight test was largely successful due to the three solid rocket motors of the LAS: the Attitude Control Motor (ACM); the Jettison Motor (JM); and the Abort Motor (AM). All three rocket motors successfully performed their required functions during the Orion PA-1 flight test, flown on May 6, 2010 at the White Sands Missile Range in New Mexico, culminating in a successful demonstration of an abort capability from the launchpad.

JM↗

Thermal Protection System P50 Cork Environments and Response due to Radiative Heating

Space Launch System (SLS) experienced deflagration of the acreage of the Core Stage base heat shield during the Green Run hot-fire test campaigns and Artemis I flight. The burning products from the base heat shield during Green Run hot-fire test operation led to concerns in aerothermal environments and thermal protection system (TPS) performance prior to Artemis I flight. This work documents a highly controlled ground test within the NASA Marshall Space Flight Center’s Nonmetallic Materials Branch thermal vacuum chamber (TVC) and investigates the P50 cork heat transfer environments and thermal protection system (TPS) response due to sensitivity changes in radiative heat rates, ambient pressure, air entrainment mass flow rates, test gas and TPS sample types. An SLS ascent ambient pressure profile was also simulated within the TVC facility. This test data enabled the efforts toward the Artemis I SLS post-flight reconstruction and initial assessment of flight TPS performance. A ground test program was developed to gain an in-depth understanding of the cork combustion dynamics and TPS response due to the SLS launch vehicle flight ascent environments.

thermal protection system↗

Model Assisted Probability of Detection for NASA Space Missions

Model assisted probability of detection (MAPOD) uses data from simulations to improve a traditional probability of detection (POD) study. This could include extending the parameter space to reduce uncertainty or substituting experimental data with simulated data to reduce the time and cost of a POD study. In the past MAPOD was difficult due to limited computational resources, but recent innovations in simulation tools and high-performance computing have made this type of high-degree-of-freedom modeling possible, and complex structures have made it necessary. This presentation will summarize the work done by the computational nondestructive evaluation (CNDE) specialists within the Nondestructive Evaluation Sciences branch at NASA Langley Research Center (LaRC) to complete a MAPOD study for phased array ultrasound testing (PAUT) of a friction stir welding (FSW) method to be used on Space Launch System (SLS) structures. The three critical needs for a MAPOD study are a validated and verified model of the inspection technique for the structure being inspected, some experimental POD data, and an uncertainty model for both the model and the experimental data. PAUT was simulated using Extende CIVA’s UT module. The model was validated using laboratory inspection data from NASA Marshall Space Flight Center (MSFC) for a Hit/Miss POD for FSW in 2219-T87 aluminum panels representative of those used in the SLS. This model was then used to simulate flaw sizes that were originally omitted from the original POD study. The results of this new MAPOD study will be presented along with a discussion of the methods and processes used to analyze the original data, selected simulation parameters, and development of the uncertainty model used for the statistical analysis. The goal of this effort is not just to improve the POD study but to demonstrate the value of MAPOD and provide a roadmap for application of MAPOD on future projects.

Elizabeth Gregory↗

Model Assisted Probability of Detection for NASA Space Missions

Model assisted probability of detection (MAPOD) uses data from simulations to improve a traditional probability of detection (POD) study. This could include extending the parameter space to reduce uncertainty or substituting experimental data with simulated data to reduce the time and cost of a POD study. In the past MAPOD was difficult due to limited computational resources, but recent innovations in simulation tools and high-performance computing have made this type of high-degree-of-freedom modelling possible, and complex structures have made it necessary. This presentation will summarize the work done by the computational nondestructive evaluation (CNDE) group at NASA Langley Research Center (LaRC) to complete a MAPOD study for phased array ultrasound testing (PAUT) of a friction stir welding (FSW) method to be used on Space Launch System (SLS) structures. The three critical needs for a MAPOD study are a validated and verified model of the inspection technique for the structure being inspected, some experimental POD data, and an uncertainty model for both the model and the experimental data. PAUT was simulated using Extende CIVA’s UT module. The model was validated using laboratory inspection data from NASA Marshall Space Flight Center (MSFC) for a Hit/Miss POD for FSW in 2219-T87 aluminum panels representative of those used in the SLS. This model was then used to simulate flaw sizes that were originally omitted from the original POD study. The results of this new MAPOD study will be presented along with a discussion of the methods and processes used to analyze the original data, selected simulation parameters, and development of the uncertainty model used for the statistical analysis. The goal of this effort is not just to improve the POD study but to demonstrate the value of MAPOD and provide a roadmap for application of MAPOD on future projects.

Elizabeth Gregory↗

Core Stage TVC Systems Engineering Challenges in Reusing Heritage Hardware

The Space Launch System (SLS) Core Stage (CS) Thrust Vector Control (TVC) system is comprised of 8 mechanical feedback Shuttle heritage Type III TVC actuators and four RS-25 engines, each attached to a Shuttle heritage gimbal block/bearing. Two actuators are used to move each engine in two planes perpendicular to one another (i.e., pitch and yaw). The TVC system design leverages hardware from the Space Shuttle program as well as new hardware designed specifically for the Core Stage. The Space Shuttle heritage hardware directly reused on SLS includes the Orbiter TVC hydraulic servo-actuators (with two slight design modifications), the Orbiter hydraulic circulation pumps, the Orbiter gimbal block/bearing, and the Solid Rocket Booster hydraulic pumps. The Core Auxiliary Power Unit (CAPU) is derived from the Orbiter Auxiliary Power Unit (APU). The Orbiter and Solid Rocket Booster APU turbines are powered by hot gas produced by catalyzed hydrazine decomposition. On the SLS Core Stage, the CAPU turbine is spun using cold gas tapped-off from the RS-25 to CS liquid hydrogen autogenous pressurization line. While direct reuse or slight modification of existing hardware may seem to be a triple-win for a program in cost, schedule, and technical risk mitigation, those benefits can only be realized when its degree of application in a new system is carefully and thoughtfully managed. The heritage hardware reuse should be prescribed within the heritage design capability and reuse environments must lie within the envelope of heritage qualification testing. Despite the significant test and flight experience of the Shuttle heritage hardware components, successful integration with the newly designed CS TVC components and incorporation into the stage design proved to be a challenge which required re-qualification of the heritage hardware as well as thorough integrated testing to support flight certification. Examples of the challenges that were overcome include: re-qualifying heritage hardware to survive new shock and vibration environments, certifying performance of extensively modified heritage hardware, regenerating design insight due to lack of available heritage vendor data, showing compliance to modern structural design standards, translation of heritage requirements for analog avionics to modern digital avionics, and interfacing heritage mechanical hardware with newly designed avionics. This paper is the second installment in a seven-paper series surveying the design, engineering, test validation, and flight performance of the Core Stage Thrust Vector Control system. This paper will discuss several engineering challenges encountered during the development process for SLS CS TVC and how they were successfully overcome to reach flight readiness.

Thrust Vector Control↗