Engineering PapersSearch

NASA NTRS · 20200003109

Launch Availability Analysis for the Artemis Program

Abstract

On March 26, 2019, Vice President Pence stated that the policy of the Trump administration and the United States of America is to return American astronauts to the Moon within the next five years i.e., by 2024. Since that time, NASA has begun the process of developing concepts of operations and launch campaign options to achieve that goal as well as to provide a sustainable human presence on the Moon. Whereas the Apollo program utilized one Saturn V rocket to carry out a single lunar landing mission of short duration, NASA’s preliminary plans for the Artemis Program call for a combination of medium lift class rockets along with the heavy lift Space Launch System (SLS)to achieve a lunar landing by 2024 as well as subsequent missions. This paper describes how discrete event simulation is used to model the launch campaigns and provide metrics on launch availability and mission duration for each element being launched. Possible methods for improving launch availability are presented.

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Grant Cates, Doug Coley, Kandyce Goodliff, William Cirillo, Chel Stromgren. Launch Availability Analysis for the Artemis Program. https://ntrs.nasa.gov/citations/20200003109

Cite the original work for its findings. Save a collection to share your selection of sources.