Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “building management systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,351 records · Page 75

Artemis and Ethics Workshop Lessons Learned

As NASA lays out its Artemis activities, it expects to set precedents in spaceflight for decades to come. Artemis is a far more ambitious program than even Apollo, aimed at developing a sustained human presence on and around the lunar surface, in preparation for Mars exploration. As a result, considering ethical and social concerns in the discussion and design of Artemis is vital to ensuring the future worlds we create are ones where humanity collectively wants to live. By understanding how to reflect on these issues as NASA makes decisions related to Artemis, NASA can avoid unintended consequences stemming from cultural perceptions of human exploration of the solar system that may harm society. We recognize that a diverse range of groups need to be part of this conversation. There are many different views about the work that should happen in space. We recognize that NASA does not hold sole responsibility for determining the ethical path forward in space, as decisions made by commercial, international, and intergovernmental partners play a major role. Inclusive conversations help inform that work. Others have already argued that social scientists and engineers need to work together with inputs from stakeholders to design the future. To begin to answer this need, NASA’s Office of Technology, Policy, and Strategy (OTPS) hosted an Artemis and Ethics Workshop. This workshop was held in Washington, DC from April 12th-14th, 2023 and brought together invited experts in social science fields and NASA managers to discuss ethical, legal, and social aspects (ELSA) of Artemis and human exploration in general. The goal of the workshop was to discuss issues and build connections that NASA managers can consider across variety of ethical issues surrounding Artemis.

Katherine T McBrayer↗

Finalizing Transition to the New Data Center at BNL

Computational science, data management and analysis have been key factors in the success of Brookhaven National Laboratory's scientific programs at the Relativistic Heavy Ion Collider (RHIC), the National Synchrotron Light Source (NSLS-II), the Center for Functional Nanomaterials (CFN), and in biological, atmospheric, and energy systems science, Lattice Quantum Chromodynamics (LQCD) and Materials Science, as well as our participation in international research collaborations, such as the ATLAS Experiment at Europe's Large Hadron Collider (LHC) at CERN (Switzerland) and the Belle II Experiment at KEK (Japan). The construction of a new data center is an acknowledgement of the increasing demand for computing and storage services at BNL in the near term and enable the Lab to address the needs of the future experiments at the High-Luminosity LHC at CERN and the Electron-Ion Collider (EIC) at BNL in the long term. The Computing Facility Revitalization (CFR) project is aimed at repurposing the former National Synchrotron Light Source (NSLS-I) building as the new data center for BNL. The construction of the new data center was finished in 2021Q3, and it was delivered for production in early FY2022 for all collaborations supported by the Scientific Data and Computing Center (SDCC), including STAR, PHENIX and sPHENIX experiments at RHIC collider at BNL, the Belle II Experiment at KEK (Japan), and the Computational Science Initiative at BNL (CSI). This paper highlights the key mechanical, electrical, and networking components of the new data center in its final configuration as used in production since 2021Q4 and gives an overview for the extension of the central network systems into the new data center and the migration of a significant portion of IT load and services from the old data center to the new data center carried out in 20212023, with expected completion of the main phase of the gradual IT equipment replacement and migration from the old data center into the new one set to the end of FY2023 (Sep 30, 2023).

99 GENERAL AND MISCELLANEOUS↗

Cyber Conservative Operations

In an era of increasingly sophisticated and pervasive cyber threats, robust cyber resilience strategies are more critical than ever. This paper introduces the concept of Cyber Conservative Operations, a proactive approach designed to assist critical infrastructure owners and operators in managing risk and maintaining resilience in the face of imminent, yet not occurring, cyber events. By leveraging the principles of Cyber-Informed Engineering (CIE) and the energy sector’s practice of conservative operations, Cyber Conservative Operations offer a framework for planning and executing coordinated active defense and resilience-oriented actions ahead of cyber events. This approach aims to minimize the consequences of digitally-enabled hazards and ensure swift recovery from anticipated cyber threats. Cyber Conservative Operations enhance the ability of owners and operators to execute pre-planned defense and resilience actions, thereby reducing the impact of digitally-enabled hazards. These operations are crucial for addressing impacts that cannot be precisely quantified or forecasted and for preparing organizations for rapid recovery from imminent digital threats. The paper begins with a discussion of conservative operations as applied to the bulk power system (BPS), a current mechanism allowing BPS entities to enact defensive operating plans to mitigate impending grid unreliability. Building on this model, we present a concept for implementing cyber conservative operations at asset owner facilities. The paper concludes with two case studies of cyber conservative operations drawn from high-profile cyber events, illustrating the practical application and benefits of this proactive approach.

42 - ENGINEERING↗

STS-112/Atlantis/ISS 9A Pre-Launch - Launch On-Orbit - Landing - Crew Egress

The video starts with an introduction of the crew of Space Shuttle Atlantis on STS-112 at their customary pre-flight meal. The crew consists of Commander Jeffrey Ashby, Pilot Pam Melroy, and Mission Specialists David Wolf, Sandra Magnus, Piers Sellers, and Fyodor Yurchikhin. The crew is then shown during suit-up, while exiting the Operations and Checkout Building to board the Astrovan, and during ingress and seating. Launch views include: Beach Tracker, VAB, PAD-B, Tower-1, DLTR-3, Grandstand, Cocoa Beach DOAMS, Playalinda DOAMS, UCS-23, OTV-170, OTV-171, and External Tank Camera. On-orbit footage includes the Atlantis orbiter docking with the ISS (International Space Station). The video shows clips of extravehicluar activities (EVAs), and some of the tasks performed during the mission. Footage included shows the installation of the S1 Truss onto the ISS with the Space Station Remote Manipulator System (Canadarm 2), Canadarm 2 carrying the Ammonia Tank Assembly prior to connection, the checkout of the Thermal Radiator Rotary Joint, the soft docking of an S-Band antenna, and the deployment of the S1 Radiator. An onboard repair of the ISS humidity separator is also shown. Landing views include: VAB, Tower 1, Mid-Field, Runway South End, Runway North End, Tower-2, Cocoa Beach DOAMS, and PPOV. Kennedy Space Center managers greet the crew upon arrival, and Commander Ashby gives a brief speech while standing with his crew members.

Source record↗

Aggregate attack surface management for network discovery of operational technology

Interconnectivity has become a substratum of technology as the benefits of data-driven functionality are being realized in nearly all industries. Increased connectivity of Operational Technology (OT) exacerbates cyber risks because Industrial Control Systems (ICS) are becoming exposed to the Internet. These exposures are often done inadvertently through misconfigurations as additional network devices come online. Attack surface management (ASM) platforms can be used to identify vulnerabilities by performing external network discovery over the Internet using web spiders. These web spiders enable big data analytics of Internet of Things (IoT) devices as identifiable information of Internet-exposed equipment are archived in searchable databases that are made publicly available. There are a multitude of ASM service providers on the market. Here, this study was conducted to evaluate several commonly known tools to determine the aggregate attack surface of control systems. Queries were crafted by targeting commonly known manufacturers and communication protocols found in OT networks. Identified devices were that categorized based on technology types. Each query was replicated between several tools to target identical ICS equipment. Findings in this paper suggested a significant variance in the exposures discovered by each tool, but unique contributions were identified for each tool when a merged attack surface was derived. Therefore, all tools should be used in aggregate.

97 MATHEMATICS AND COMPUTING↗

WIPP Safety Significant Confinement Ventilation System (SSCVS) Quality Assurance Program - 20237

Construction and major equipment fabrication are underway for a new ventilation exhaust system at the Waste Isolation Pilot Plant (WIPP). The new system will provide continuous HEPA filtration of the exhaust from the WIPP underground while meeting the ventilation demands for expanded waste emplacement and mining operations over the next 40 years. The SSCVS project has proceeded with the awarding of CD-3A for Long Lead Procurements followed by CD-2/3 approval for the construction of the facilities. The SSCVS project team made the decision to increase the quality oversight throughout the complete project per the Project Quality Assurance Plan (PQAP) such that it can ensure the final products meet applicable NQA-1 requirements and general quality requirements, and that the project will proceed to operations without significant delays due to post installation quality concerns. The PQAP was established prior to approval of the project at the CD-2/3 milestone. The SSCVS project has 2 major long lead procurements which commenced with the awarding of CD-3A. These procurements include the HEPA filter housing assemblies and the Exhaust Fans. There are 22 HEPA filter assemblies for the SSCVS, which are designated Safety Significant for pressure boundary confinement, per the approved PDSA. The exhaust fans also have Safety Significant components to maintain the pressure confinement boundary. NWP made the decision to install resident Quality Inspectors at the fabrication facilities to ensure the documentation for each fabricated unit meets all the QA requirements as defined in the respective contract documents. For the construction of the SSCVS Salt Reduction Building (SRB) and New Filter Building (NFB), dedicated, on-site quality inspectors have been utilized to ensure that all work being performed will comply with quality requirements and the Special Inspections as defined in IBC-2015. At each stage of inspection, hold points are placed into the work packages to ensure NWP QA personnel are present to inspect and verify the installations are in accordance with the design specifications, codes and standards. With this level of oversight, NWP anticipates that the level of quality related issues, as seen on multiple other DOE complex site projects, will be avoided and that the commissioning, start-up and hot operations will progress in a timely fashion, as all documentation will be in place and approved prior to initiation of these activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Planetary Protection Bioburden Analysis Program

This program is a Microsoft Access program that performed statistical analysis of the colony counts from assays performed on the Mars Science Laboratory (MSL) spacecraft to determine the bioburden density, 3-sigma biodensity, and the total bioburdens required for the MSL prelaunch reports. It also contains numerous tools that report the data in various ways to simplify the reports required. The program performs all the calculations directly in the MS Access program. Prior to this development, the data was exported to large Excel files that had to be cut and pasted to provide the desired results. The program contains a main menu and a number of submenus. Analyses can be performed by using either all the assays, or only the accountable assays that will be used in the final analysis. There are three options on the first menu: either calculate using (1) the old MER (Mars Exploration Rover) statistics, (2) the MSL statistics for all the assays, or This software implements penetration limit equations for common micrometeoroid and orbital debris (MMOD) shield configurations, windows, and thermal protection systems. Allowable MMOD risk is formulated in terms of the probability of penetration (PNP) of the spacecraft pressure hull. For calculating the risk, spacecraft geometry models, mission profiles, debris environment models, and penetration limit equations for installed shielding configurations are required. Risk assessment software such as NASA's BUMPERII is used to calculate mission PNP; however, they are unsuitable for use in shield design and preliminary analysis studies. The software defines a single equation for the design and performance evaluation of common MMOD shielding configurations, windows, and thermal protection systems, along with a description of their validity range and guidelines for their application. Recommendations are based on preliminary reviews of fundamental assumptions, and accuracy in predicting experimental impact test results. The software is programmed in Visual Basic for Applications for installation as a simple add-in for Microsoft Excel. The user is directed to a graphical user interface (GUI) that requires user inputs and provides solutions directly in Microsoft Excel workbooks. This work was done by Shannon Ryan of the USRA Lunar and Planetary Institute for Johnson Space Center. Further information is contained in a TSP (see page 1). MSC- 24582-1 Micrometeoroid and Orbital Debris (MMOD) Shield Ballistic Limit Analysis Program Lyndon B. Johnson Space Center, Houston, Texas Commercially, because it is so generic, Enigma can be used for almost any project that requires engineering visualization, model building, or animation. Models in Enigma can be exported to many other formats for use in other applications as well. Educationally, Enigma is being used to allow university students to visualize robotic algorithms in a simulation mode before using them with actual hardware. This work was done by David Shores and Sharon P. Goza of Johnson Space Center; Cheyenne McKeegan, Rick Easley, Janet Way, and Shonn Everett of MEI Technologies; Mark Manning of PTI; and Mark Guerra, Ray Kraesig, and William Leu of Tietronix Software, Inc. For further information, contact the JSC Innovation Partnerships Office at (281) 483-3809. MSC-24211-1 Spitzer Telemetry Processing System NASA's Jet Propulsion Laboratory, Pasadena, California The Spitzer Telemetry Processing System (SirtfTlmProc) was designed to address objectives of JPL's Multi-mission Image Processing Lab (MIPL) in processing spacecraft telemetry and distributing the resulting data to the science community. To minimize costs and maximize operability, the software design focused on automated error recovery, performance, and information management. The system processes telemetry from the Spitzer spacecraft and delivers Level 0 products to the Spitzer Science Center. SirtfTlmProc is a unique system with automated error notification and recovery, with a real-time continuous service that can go quiescent after periods of inactivity. The software can process 2 GB of telemetry and deliver Level 0 science products to the end user in four hours. It provides analysis tools so the operator can manage the system and troubleshoot problems. It automates telemetry processing in order to reduce staffing costs. This work was done by Alice Stanboli, Elmain M. Martinez, and James M. McAuley of Caltech for NASA's Jet Propulsion Laboratory. For more information, contact iaoffice @jpl.nasa.gov. This software is available for commercial licensing. Please contact Dan Broderick at Daniel.F. Broderick@jpl.nasa.gov. Refer to NPO-47803. NASA Tech Briefs, September 2013 29 This rapid response computer program predicts Orbiter Wing Leading Edge (WLE) damage caused by ice or foam impact during a Space Shuttle launch (Program "IMPACT2"). The program was developed after the Columbia accident in order to assess quickly WLE damage due to ice, foam, or metal impact (if any) during a Shuttle launch. IMPACT2 simulates an impact event in a few minutes for foam impactors, and in seconds for ice and metal impactors. The damage criterion is derived from results obtained from one sophisticated commercial program, which requires hours to carry out simulations of the same impact events. The program was designed to run much faster than the commercial program with prediction of projectile threshold velocities within 10 to 15% of commercial-program values. The mathematical model involves coupling of Orbiter wing normal modes of vibration to nonlinear or linear springmass models. IMPACT2 solves nonlinear or linear impact problems using classical normal modes of vibration of a target, and nonlinear/ linear time-domain equations for the projectile. Impact loads and stresses developed in the target are computed as functions of time. This model is novel because of its speed of execution. A typical model of foam, or other projectile characterized by material nonlinearities, impacting an RCC panel is executed in minutes instead of hours needed by the commercial programs. Target damage due to impact can be assessed quickly, provided that target vibration modes and allowable stress are known. This work was done by Robert Clark, Jr., Paul Cotter, and Constantine Michalopoulos of The Boeing Company for Johnson Space Center. For further information, contact the JSC Innovation Partnerships Office at (281) 483-3809. MSC-24988-1 Wing Leading Edge RCC Rapid Response Damage Prediction Tool (IMPACT2) Lyndon B. Johnson Space Center, Houston, Texas (3) the MSL statistics for only the accountable assays. Other options on the main menu include a data editing form and utility programs that produce various reports requested by the microbiologists and the project, and tools to generate the groupings for the final analyses. The analyses can be carried out in three ways: Each assay can be treated separately, the assays can be collectively treated for the whole zone as a group, or the assays can be collected in groups designated by the JPL Planetary Protection Manager. The latter approach was used to generate the final report because assays on the same equipment or similar equipment can be assumed to have been exposed to the same environment and cleaning. Thus, the statistics are improved by having a larger population, thereby reducing the standard deviation by the square root of N. For each method mentioned above, three reports are available. The first is a detailed report including all the data. This version was very useful in verifying the calculations. The second is a brief report that is similar to the full detailed report, but does not print out the data. The third is a grand total and summary report in which each assay requires only one line. For the first and second reports, most of the calculations are performed in the report section itself. For the third, all the calculations are performed directly in the query bound to the report. All the numerical results were verified by comparing them with Excel templates, then exporting the data from the Planetary Protection Analysis program to Excel.

Beaudet, Robert A.↗

GOOML - Finding Optimization Opportunities for Geothermal Operations: Preprint

Geothermal Operational Optimization with Machine Learning (GOOML) is a transferable and extensible component-based geothermal asset modeling framework that considers complex steamfield relationships and identifies optimization prospects using a data-driven approach. We have used this framework to develop digital twins that provide steamfield operators with an operational environment to analyze and understand historical and forecasted power production, explore new steamfield configuration possibilities, and seek optimal asset management for real world applications. The GOOML modeling software is built on a generic component-based systems framework that allows for both historical and forecast analysis. A GOOML model can perform historical data-assimilation using first-principal thermodynamics to create a meaningful data model. Historical production data can then be coupled with a forecast framework to train machine-learning models of steamfield components to predict future outputs. This modeling environment enables digital exploration of steamfield design configurations and operational scenarios. GOOML digital twins have been developed for steamfields in New Zealand and the United States representing differing power generation and field conditions. These digital twins have been validated by comparing hindcast predictions against historical production data. Reinforcement learning experiments were conducted to demonstrate the ability to programmatically explore the operations space using machine learning agents. Our initial results are compelling; two to five percent increases in annual energy production were demonstrated by the GOOML models with no additional infrastructure build required. GOOML offers a new approach to geothermal operations by applying state-of-the-art machine learning algorithms, comprehensive data analytics, and interaction with digital twins. Through application of these tools, operators will realize greater availability and higher net generation which will increase the cost effectiveness of geothermal energy projects.

access↗

Bill Savings vs. Backup Power: Evaluating operational tradeoffs for home solar+storage systems [Slides]

Adoption of residential solar photovoltaic+energy storage systems (PVESS) is driven by both bill savings opportunities and customer demand for backup power. Prior work by this team (Gorman et al., 2022; Gorman et al., 2023) explored PVESS backup power capabilities during long-duration power interruptions (e.g., due to severe weather events), when customers are assumed to be able to anticipate the event and charge their batteries in advance. In many cases, however, power interruptions are unpredictable (and often relatively short); for those types of events, a customer will typically set its battery to maintain some minimum capacity in reserve in case of an interruption, which reduces the capacity available for managing utility bills. This study evaluates this operational tradeoff to help customers and installers configure backup reserve settings, and to inform decision-making more generally about the customer value of backup power services compared to utility bill savings. This study utilizes Berkeley Lab’s PRESTO tool to produce stochastic simulations of (predominantly short-duration) power interruption events, and builds on an earlier case-study demonstrating PVESS backup performance during short-duration interruptions (Baik et al., 2023).

14 SOLAR ENERGY↗

Thermal characterization of the build chamber in electron beam melting

Electron beam powder bed fusion, commonly termed electron beam melting (EBM), offers great versatility in multiple-part processes and can produce high quality as-built components due to low residual stresses. The EBM process is complex and requires careful thermal management, including uniform and consistent preheating of the powder bed, in order to ensure quality and consistency of the product. However, most of the simulations in the literature focus on the selective melting stage of the process. As of today, optimal conditions for initial pre-heating temperatures are only available for specific materials. Thus, in order to extend the EBM technology to other desired build materials, a much better understanding of the pre-heating stages is required. In this work, numerical and experimental approaches are combined in order to investigate the effects and sensitivities of heat removal from the build plate during EBM pre-heating stages. For this purpose, a carefully reconstructed numerical model of the build chamber of an ARCAM Q20 + machine is developed. It includes all main parts of the chamber and all relevant heat transfer mechanisms, whereas special attention is paid to radiation heat exchange between various bodies. In order to validate the model, dedicated experiments are performed, in which a system of thermocouples is installed in the build chamber, allowing direct measurement of the local temperatures of the start-plate and heat shields. A good agreement between the simulation and experimental findings is achieved, leading to a better understanding of the thermal processes characteristic to the pre-heating stages. This basic analysis is followed by a representative pre-heating case, where a powder bed is also considered. The energy required to obtain the desired pre-heating temperatures is evaluated, and the role of the powder bed in heat transfer within the chamber is assessed. The pre-heating stage, simulated in the present work, is supposed to create proper conditions for sintering and consequent melting of the powder, which are highly dependent on the local temperatures and heat transfer features. Thus, the findings of the reported work present a step towards a better understanding of the thermal processes that characterize EBM. The reported model can be further used to provide realistic boundary condition inputs for other meso- or macro-scale models as a function of time and geometry. The model can serve also for verification of machine settings, i.e., jump-safe and melt-safe ones which actually provide desired preheat, and for development of settings for new powders.

36 MATERIALS SCIENCE↗

NASA’s Space Launch System Stands Ready on Doorstep of Maiden Voyage Launch and Progress Made to Future Missions

NASA and its partners made significant progress towards the Artemis I launch in 2022. The integrated Space Launch System (SLS)vehicleand Orion spacecraft were first rolled out of the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center (KSC) in March. SLS is a super heavy-lift vehicle to send large, strategic payloads to the Moon, Mars, and beyond. It isthebackbone of the Artemis human lunar exploration program. Rollout transported the vehicle to Launch Pad 39B for a series of tests, including the wet dress rehearsal (WDR). Multiple attempts were required to complete WDR, each building on the one before. Following the WDR campaign, NASA teams refined hardware and launch procedures, and the vehicle was prepared for its first launch attempt scheduled for August 29. Challenges with the weather and hardware resulted in a scrub on the 29th, and the second attempt was set for Sept. 3. A hydrogen leak on the tail service mast umbilical forced a scrub. NASA teams completed repairs and testing on the vehicle on Launch Pad 39B to preserve a launch attempt at the end of September. Managers chose to return the vehicle to the VAB to protect it fromthe threat of Hurricane Ian. Within the VAB, NASA further inspected and prepared SLS for selected November windows. In addition to progress to the Artemis I mission, significant progress was made on the Artemis II and Artemis III rockets. Progress was also made towards on the Block 1B and Block 2 variants, beginning on the fourth and ninth flight, respectively. Both variants will provide significant improvements in both launch mass and mission flexibility to multiple destinations. This paper will discuss Artemis I vehicle integration, testing, and available results from the launch campaign to date.

Bruce Askins↗

Nuclear Physics Network Requirements Review (Final Report)

The Energy Sciences Network (ESnet) is the high-performance network user facility for the US Department of Energy (DOE) Office of Science (SC) and delivers highly reliable data transport capabilities optimized for the requirements of data-intensive science. In essence, ESnet is the circulatory system that enables the DOE science mission by connecting all its laboratories and facilities in the US and abroad. ESnet is funded and stewarded by the Advanced Scientific Computing Research (ASCR) program and managed and operated by the Scientific Networking Division at Lawrence Berkeley National Laboratory (LBNL). ESnet is widely regarded as a global leader in the research and education networking community. ESnet interconnects DOE national laboratories, user facilities, and major experiments so that scientists can use remote instruments and computing resources as well as share data with collaborators, transfer large datasets, and access distributed data repositories. ESnet is specifically built to provide Between July 2023 and October 2023, ESnet and the Nuclear Physics program (NP) of the DOE SC organized an ESnet requirements review of NP-supported activities. Preparation for these events included identification of key stakeholders: program and facility management, research groups, and technology providers. Each stakeholder group was asked to prepare formal case study documents about its relationship to the NP program to build a complete understanding of the current, near-term, and long-term status, expectations, and processes that will support the science going forward.

97 MATHEMATICS AND COMPUTING↗

Monitoring Airspace Complexity and Determining Contributing Factors

The national airspace has evolved over many years to accommodate increased traffic demand [1] while simultaneously maintaining one of the safest forms of transportation [2], [3]. One of the reasons for this success is the ability of the system and the operators to adapt and accommodate to situations that routinely disrupt optimal operations. These situations may include: adverse weather, delays, early arrivals, equipment outages, and other factors that are outside the operators ability to control. These factors can lead to states where automation is unable to properly handle these issues and therefore air traffic controllers and pilots have to intervene, ultimately increasing communication between operators resulting in higher workload. As controller workload increases to handle sub-optimal operating conditions this can be viewed as an increase in complexity. The reasoning for this is because humans are now required to make tactical decisions in response to external factors, resulting in a departure from the strategic plan where operations would be more efficiently managed. Human operators control airspace complexity under rigid regulations that are constantly changing. The airspace is divided into sectors and the number of aircraft assigned to each controller is limited for safe handling. There has been past work that devised airspace complexity metrics in commercial aviation and related these metrics to controller workload (e.g., [4],[5]). The upper bounds on the system load are pre-determined. Such bounds on complexity make for a safe system, but the system cannot scale and adapt to autonomous, dense, and heterogeneous traffic, including the many types of Unmanned Aerial Vehicles (UAVs) envisioned to be added to the operations. We hypothesize that, as traffic density and heterogeneity grow, and other key metrics change, there will be phase transitions at which the way traffic should be managed changes significantly [6]. We offer a method for in-time detection of contributing factors that lead to phase transitions, characterized by increased complexity. To the best of our knowledge, there is no tool similar to our proposed effort that identifies such contributing factors or precursor patterns. To define the scope we are proposing to measure complexity from the viewpoint of the Terminal Radar Approach Control Facilities (TRACON) controller’s perspective. In particular we are analyzing arrivals into KSFO. With safety as the top concern for airspace operators, it is important to recognize that as density and heterogeneity grow, the focus of the system will change. Times of the day when the airspace has low density and heterogeneity, the flights will follow more efficient paths where the aircraft move on established routes that are more or less directly to the destination. However, when density and heterogeneity increases, the system will begin changing focus to avoiding conflicts and collisions and route the flights in a more flexible way. Higher flexibility requires more communication and coordination between controllers and pilots which the current automation is unable to handle. This paper proposes a novel approach that monitors airspace complexity at multiple scales, uses a Machine Learning-based tool that predicts when operations will transition to a regime of greater complexity, and identifies actions that can reduce the complexity while still maintaining efficient and safe operations. We demonstrate our proposed approach using data from multiple complementary sources. This includes, but is not limited to: historical aircraft surveillance data from NASA’s Sherlock Data Warehouse [7], METAR weather data, and airport configuration data from Aviation System Performance Metrics (ASPM). The surveillance data flight paths are sampled at a variable sample rate — increasing as the aircraft approaches the airport. This is due to how Sherlock manages flight track stitching between different radar facilities which have different sampling rates. The weather and performance data are logged at defined intervals throughout the day at a courser refresh rate. In addition to the logged data and metrics, we leverage pre-defined Standard Terminal Arrival Routes (STARs) procedures to characterize the path of each flight. Each flight files for one of these routes in the flight plan well before entering the terminal airspace, and approximately follows the route until it leaves the STAR, typically on the final fix of a runway transition. However, most flights do not always fly the full STAR procedure to completion [8], but the majority do adhere to the fixes within the common route of the procedure. Our approach leverages fixes in the common route of each of the STARs to build a reference path to the airport. This allows us to characterize the flight paths in what we are defining as the “maneuvering area” (the airspace between the STAR and before the flight is lined up on the runway’s final approach) to determine how off nominal the flights are to calculate its complexity score. Determining airspace complexity is a concept that does not have a concrete answer. In designing this metric, we consider what increases the workload for the air traffic controllers. Consequently more specialized vectoring maneuvers results in higher workload. Accordingly, we start with a theory: each flight has a direct path it takes from the STAR’s common route to the final approach’s outer marker fix for the flight’s landing runway. It is important to note that the direct path is only used as a reference. If the majority of the flights have a large consistent offset as compared to other routes it does not necessarily mean that those flights have higher complexity. We are merely building a distribution based on this direct path for that particular STAR and runway pair to determine the normal mode of operations for that route. Flights that are in the upper tail of these distributions will result in higher complexity scores and flights that fly in the median will represent the normal mode of operations and therefore will have lower complexity scores. Since flights following each STAR route take different paths to the airport, we have a different distribution for each STAR route and therefore can model these distributions to compute a complexity score from their respective normalized distributions. To evaluate the effectiveness of our proposed airspace complexity metric we will compare against an established approach based on trajectory clustering [9]. This unsupervised learning technique consists of the following steps: (1) identify the general maneuvering areas (waypoints) by performing $\kappa$-means or DBSCAN clustering on locations where aircraft frequently turn based on the surveillance radar track data, (2) map flight trajectories onto sequences of waypoints, and (3) cluster the sequences based on their common subsequences. From a high-level perspective, this baseline model learns nominal operations in the airspace through the sequence of waypoints that are representative of where aircraft change direction and defines deviations from the nominal operations as “complex.” Therefore, more deviations from the nominal operations correspond to higher complexity values. For our validation, we re-implemented this technique and tune model hyper-parameters to correctly detect waypoints for the arrival traffic into the San Francisco bay area. We will compute the complexity measure over a one-year period using our proposed technique as well as the baseline. Our validation will be based on each technique’s ability to detect a set of undesirable outcomes (e.g., go-arounds, holding patterns, average time in the airspace, etc.). Since our current complexity metric is derived from the offset from the direct reference path, it’s important to understand what causes these offsets. In many of the flights with high offset distance, flights performing holding patterns and S turns can be observed. These maneuvering tactics are utilized to add distance between the aircraft and the destination runway to prevent multiple flights from having conflicting arrival times. In order to predict a rise in complexity (or the precursor to complexity), it’s necessary to be able to identify these potential conflicts (which in turn, result in higher offsets). To do this, we define a “representative flight” for each STAR route and runway pair. This flight is approximately the path the flight would take if there was a clear path with no other flights in the airspace — including the time remaining to the airport. We first identify the flights for a given STAR runway pair using the offset to the reference path distributions that fall between the 44-55 percentiles. This yields the flights that conform to the most normal mode of operation. Each of these flights is partitioned based on the percent complete from the entry point into the maneuvering areas from 0\% – 100\% complete. Then for each percent “bin”, we take the median value of the flight’s latitude/longitude coordinates, airspeed, and (non causal) time remaining to the airport to construct a lookup table for each percent complete bin on a given route. As a flight enters the maneuvering area, we can find the estimated arrival time of a flight to the airport by finding the closest point to the representative path’s percent complete bin (relative to the flight’s current position at any snapshot in the airspace) and therefore retrieve the corresponding remaining time left on the “representative path”. We assume that the flight will follow the representative path to completion when deriving these estimates. We can then compare these estimated arrival times against other flights for the same snapshot in time to identify potential conflicts. If more flights are estimated to arrive within a tolerance window than there are runways available, then we have a potential conflict. We can use this derived measure along with other factors expected to add disruption to the operation such as weather and runway configuration changes as an input to machine learning tools to detect precursors that increases in our complexity measure. This novel method will assist in uncovering insights into the contributing factors that lead to increased complexity that may allow for in-time responses to avoid reaching a high complexity state in the airspace.

complexity↗

Current Status of the Synroc Waste Treatment Facility - 20263

Construction of the Synroc Waste Treatment Facility is well underway at ANSTO. This plant has been designed to treat intermediate level liquid waste arising from the production of Mo-99 within the newly constructed ANSTO Nuclear Medicine (ANM) precinct [1]. The facility utilises ANSTO Synroc technology that has been tailored to the chemical, physical, and radiological properties of the waste. The result is a highly durable wasteform with a significant reduction in the final volume of the treated waste. This paper presents the construction status of the Synroc Waste Treatment Facility and the status of the associated technology maturation plan. Construction of the building is scheduled for completion in late 2020 followed by process installation and commissioning. A key component of the technology maturation plan has been the construction of an Inactive Engineering Demonstrator [2]. This has aided in the mitigation of risks with respect to technology selection, process integration, and process nuclearisation. Furthermore, the demonstration facility has provided an environment for the design and development of the instrumentation and control philosophy resulting in a seamlessly integrated plant control system. Successful demonstration of the technology by the inactive engineering demonstrator has significantly reduced the associated risks. Details of the Synroc Waste Treatment Facility project progress will also be presented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

It Takes More than Technology

The technology required to develop and manage a production metacenter or grid environment is an important ingredient in such a project. However, this technology may neither be the most difficult piece of the puzzle nor the one demanding the most patience and perseverance. This paper touches on the technical underpinnings of the collaborative effort that resulted in a production metacenter joining two cooperating IBM SPs, one at NASA Ames Research Center (ARC) and the other at NASA Langley Research Center (LaRC). The discussion then focuses on the problems attributable to differing environments, both physical and cultural, even though both sites were part of the same agency. The approach for the Phase I NASA Metacenter was centralized with most decisions made by the NAS Division at Ames. Also discussed is the distributed approach to resolving the even greater difficulties encountered in the multi-agency effort to modify NASA's technology to build a similar metacenter in the Department of Defense. The DoD Metacenter joins two DoD Major Shared Resource Centers (MSRCs), the Aeronautical Systems Center (ASC) MSRC at Wright-Patterson Air Force Base and the U.S. Army Engineer Research and Development Center (ERDC) MSRC. The final discussion focuses on similar problems that have arisen at NASA with the NASA Information Power Grid.

Hultquist, Mary↗

NASA's J-2X Engine Builds on the Apollo Program for Lunar Return Missions

In January 2006, NASA streamlined its U.S. Vision for Space Exploration hardware development approach for replacing the Space Shuttle after it is retired in 2010. The revised CLV upper stage will use the J-2X engine, a derivative of NASA s Apollo Program Saturn V s S-II and S-IVB main propulsion, which will also serve as the Earth Departure Stage (EDS) engine. This paper gives details of how the J- 2X engine effort mitigates risk by building on the Apollo Program and other lessons learned to deliver a human-rated engine that is on an aggressive development schedule, with first demonstration flight in 2010 and human test flights in 2012. It is well documented that propulsion is historically a high-risk area. NASA s risk reduction strategy for the J-2X engine design, development, test, and evaluation is to build upon heritage hardware and apply valuable experience gained from past development efforts. In addition, NASA and its industry partner, Rocketdyne, which originally built the J-2, have tapped into their extensive databases and are applying lessons conveyed firsthand by Apollo-era veterans of America s first round of Moon missions in the 1960s and 1970s. NASA s development approach for the J-2X engine includes early requirements definition and management; designing-in lessons learned from the 5-2 heritage programs; initiating long-lead procurement items before Preliminary Desi& Review; incorporating design features for anticipated EDS requirements; identifying facilities for sea-level and altitude testing; and starting ground support equipment and logistics planning at an early stage. Other risk reduction strategies include utilizing a proven gas generator cycle with recent development experience; utilizing existing turbomachinery ; applying current and recent main combustion chamber (Integrated Powerhead Demonstrator) and channel wall nozzle (COBRA) advances; and performing rigorous development, qualification, and certification testing of the engine system, with a philosophy of "test what you fly, and fly what you test". These and other active risk management strategies are in place to deliver the J-2X engine for LEO and lunar return missions as outlined in the U.S. Vision for Space Exploration.

Snoddy, Jimmy R.↗

Peak load reduction and load shaping in HVAC and refrigeration systems in commercial buildings by using a novel lightweight dynamic priority-based control strategy

Reducing peak power demand in a building can reduce electricity expenses for the building owner and contribute to the efficiency and reliability of the electrical power grid. For the building owner, reduced expenses come from the reduction or elimination of peak power charges on electricity bills. For the power system operator, reducing peak power demand leads to a more predictable load profile and reduces stress on the electric grid system. Herein we present a computationally inexpensive, dynamic, and retrofit-deployable control strategy to effect peak load reduction and load shaping. The effectiveness of the control strategy is examined in a simulation with 80 air-conditioning units and 40 refrigeration units. The results show that a peak demand reduction of 60 kW can be achieved relative to peak demand in a typical set point–based approach. The proposed strategy was deployed in a gymnasium building with four rooftop HVAC units, where it showed over 15% peak demand (kW) reduction savings while maintaining or lowering energy consumption (in kilowatt-hours) relative to the set point–based thermostat controls.

24 POWER TRANSMISSION AND DISTRIBUTION↗

FEED Study of CarbonCapture Inc DAC and CarbonCure Utilization Technologies Using United States Steel’s Gary Works Plant Waste Heat (Final Report)

The University of Illinois at Urbana-Champaign (UIUC) led this project to produce a front-end engineering design (FEED) study of an advanced Direct Air Capture and Utilization System (DACUS) system that can remove a minimum of 5,000 tonnes/yr net of carbon dioxide from air (based on cradle-to-gate LCA) and utilizing the CO 2 to produce low carbon intensity ready mix concrete. The designed system, if built, would be larger than any currently existing Direct Air Capture (DAC) collector in the U.S. Such carbon capture technologies are critical to meeting the goals of the DOE’s program to accelerate climate-critical technology. In addition to the power sector, industrial facilities for the manufacture of steel and cement/concrete are among the major sources of anthropogenic CO 2 . DAC is a promising new technology for reducing CO 2 , a potent greenhouse gas, in the atmosphere but is expensive, in part due to the energy required to adsorb and desorb captured CO 2 during cycles. By integrating CarbonCapture Inc. (CCI) DAC modules at United States Steel's Gary Works (USS) and utilizing the site's waste heat, energy, and location this project evaluates the feasibility of utilizing the captured CO 2 and the logistics of transportation. CarbonCapture Inc. has developed an innovative DAC system using novel adsorbents to cost-effectively capture CO 2 . The captured, liquified gas will be trucked to ready-mix concrete plants within the region, the closest of which is approximately 3.5 miles away, where CarbonCure will inject it into concrete during the mixing process at the facilities. The carbon dioxide reacts with concrete, mineralizing into calcium carbonate (CaCO 3 ), permanently locking the greenhouse gas into the matrix of the building material. This FEED study demonstrated a full CO 2 value chain for DACUS from industrial facilities. It also provided a means for Visage Energy Corp. (Visage) to assess the impact of this holistic approach on job creation, regional economic impact, and environmental justice. The project team also included Sargent & Lundy (S&L) to provide the constructability review and costing of the integration of the DAC with the steel plant. Ecotek Engineering USA, LLC designed the outside battery limit (OSBL) infrastructure to connect the DAC and the plant. Activities performed during the project included: (1) Project Management Plan; (2) Technology Maturation Plan (TMP); (3) Initial Workforce Readiness Plan; (4) Workforce Readiness Plan; (5) Front-End Engineering Design (FEED) Study; (6) Project Design Basis; (7) Hazards and Operability (HAZOP) Study; (8) Constructability Review; (9) Project Cost Assessment; (10) Logistics Analysis of CO 2 Transportation to the Utilization Site; (11) Business Case Analysis; (12) Life Cycle Analysis (LCA); (13) Environmental Health and Safety (EH&S) Analysis; (14) Environmental Justice Analysis; and (15) Economic Revitalization and Job Creation Outcomes Analysis. This report provides a summary of the outcomes and results of the project, which was performed between Oct. 1, 2022, through Sept. 30, 2024.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗