Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “distribution grid”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,333 records · Page 74

Simulation-Based Analysis of Feeder Operation with Different PV Smart Inverter Functions on an Actual Distribution System: Preprint

High penetration of photovoltaics (PV) in distribution feeders can cause problems, such as overvoltage, reverse power flow, and large net load changes. Traditional voltage regulation devices, such as capacitors and voltage regulators, can solve some of these problems but might have some delays. Today, smart inverters are gradually being used to provide voltage regulation and frequency support in distribution systems. Different smart inverter settings have been recommended in various rules and standards; however, the potential benefits and their impacts on distribution system operation are not well compared and studied. This paper presents a comparison of different smart inverter settings as applied to a distribution system. An actual feeder model from San Diego Gas & Electric Company is used to conduct the simulation. Additionally, a load disaggregation method is proposed to disaggregate the load and PV profile for each load location using advanced metering infrastructure net load measurements. Then, different smart inverter settings are applied to the PV systems in the feeder, and the simulation results are compared. The results show that the implementation of specific functions of smart inverters can reduce voltage exceedances, and the utility can determine the specific inverter setting based on its operational requirements.

distribution system↗

Virtual Battery Aggregator (Virtual Battery Aggregator for Distributed Energy Resource Management Systems)

Distributed energy resource management systems (DERMS) are being deployed in feeders with high distributed energy resource (DER) penetration to provide visibility of DERs and enable DER control strategies for grid operators. DERMS can support centralized grid controls by aggregating individual DER information into a single virtual DER model. This codebase creates algorithms for a DERMS platform that are able to aggregate a set of DERs that can be modeled as batteries, create a virtual battery model for centralized grid controls, and dispatch power setpoints to the individual DERs based on a desired virtual power setpoint received from the centralized grid control. It integrates with existing co-simulation frameworks and models for buildings, DERs, and distribution systems. While the DERMS is designed to work with batteries, it can be used with any DER that can be defined by a generalized battery model.

Blonsky, Michael↗

rmap: An R package to plot and compare tabular data on customizable maps across scenarios and time

`rmap` is an R package that allows users to easily plot tabular data (CSV or R data frames) on maps without any Geographic Information Systems (GIS) knowledge. Maps produced by `rmap` are `ggplot` objects and thus capitalize on the flexibility and advancements of the `ggplot2` package and all elements of each map are thus fully customizable. Additionally `rmap` automatically detects and produces comparison maps if the data has multiple scenarios or time periods as well as animations for time series data. Advanced users can load their own shapefiles if desired. `rmap` comes with a range of pre-built color palettes but users can also provide any `R` color palette or create their own as needed. Four different legend types are available to highlight different kinds of data distributions. The input spatial data can be both gridded or polygon data. `rmap` is desgined in particular for comparing spatial data across scenarios and time periods and comes preloaded with standard country, state, and basin maps as well as custom maps compatible with the Global Change Analysis Model (GCAM) spatial boundaries. `rmap` has a growing number of users and its products have been used in multiple multisector dynamics publications as well as a required dependency in other R packages such as `rfasst` and `metis`. `rmap's` automatic processing of tabular data using pre-built map selection, difference map calculations, faceting, and animations offers unique functionality which makes it a powerful and yet simple tool for users looking to explore multi-sector, multi-scenario data across space and time.

58 GEOSCIENCES↗

Evidence of Completion of Milestone 4: Simulation Testbed Validated with Experimental Data

Milestone 4 is given in the SOPO as being due in quarter 5 (ending 9/11/2020) and is described thus: Milestone 4: Enhanced Simulation Testbed Validated with Experimental Data (UM, Mathieu). Simulation testbed validated with data obtained from experimental testbed, specifically, nonlinear load behaviors and communication network issues observed in the experimental testbed will be modeled in the simulation testbed. The simulation testbed should accurately capture TCL real and reactive power consumption (including during extreme events associated with nonlinear behaviors and communication network failures) to within 5% RMSE error with respect to data obtained from the experimental testbed. The Tasks comprising the work to achieve Milestone 4 are outlined here.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Modeling Capabilities to Quantify the Benefits of DERMS (Cooperative Research and Development Final Report)

The funds-in under the CRADA will fund a team of National Renewable Energy Laboratory (NREL) researchers to participate in Energy I-Corps (formerly known as Lab-Corps). Energy I-Corps pairs teams of researchers with industry mentors for an intensive two-month training where the researchers define technology value propositions, conduct customer discovery interviews, and develop viable market pathways for their technologies. FedIMPACT, LLC and its affiliate IP Group, Inc., will evaluate the work completed at Energy I-Corps to determine whether it would like to pursue further commercialization and development of related technologies and background intellectual property.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Flexible Service Contracting for Risk Management within Integrated Transmission and Distribution Systems

The general objective of our project has been to investigate the ability of Independent Distribution System Operators (IDSOs), functioning as linkage agents for Integrated Transmission and Distribution (ITD) systems, to facilitate the flexible availability and usage of reserve in support of ITD system operations. This general objective is in accordance with Order 2222 of the U.S. Federal Energy Regulatory Commission (FERC), titled “Participation of Distributed Energy Resource Aggregations in Markets Operated by Regional Transmission Organizations and Independent System Operators”. The Final Rule for FERC Order 2222 was issued on September 17, 2020. The primary contribution of our project is that we have formulated an innovative energy management Transactive Energy Design (TES) approach for ITD systems that provides promising support for our project objective. Specifically, we have developed a new type of IDSO-managed TES design for distribution system operations, as well as new types of swing contracts permitting IDSOs to participate in transmission system operations as providers of reserve harnessed from distribution system resources in return for appropriate compensation. Together, these design elements constitute a scalable market-based approach facilitating efficient reserve procurement for ITD system operations from a fuller range of power resources. The efficacy of our approach has been demonstrated by means of detailed conceptual analyses as well as test case simulations. To implement the latter, we have developed the ITD TES Platform V2.0, a computational platform that permits the modeling and software implementation of ITD system operations over time. The Electric Reliability Council of Texas (ERCOT) energy region has been used as the empirical anchor for the development of this platform. Our conceptual and test-case work has been reported in a Wiley/IEEE Press book, two refereed book chapters, and seven refereed journal articles. The key components comprising the ITD TES Platform V2.0 have been released as documented open-source software at online GitHub repositories.

24 POWER TRANSMISSION AND DISTRIBUTION↗

HIPPO – A Software Platform for Electricity Market Research and Development

The goal of this project is to provide Regional transmission organizations (RTOs) and independent system operators (ISOs) a market design and prototyping software, High-Performance Power-Grid Optimization (HIPPO), that they can evaluate electricity market design options, calculate market planning strategies and operational performance. With the high standards and strict reliability requirements for operating power systems, impacts of new technologies need to be fully investigated prior to any consideration for adoption. A market design and prototyping software tool which can be used to prototype electricity market design options, to calculate market planning strategies and operational performance with high precision, and to investigate the impacts for integrating future power grid technologies will be valuable to RTOs/ISOs who operate power systems, to vendors like GE and ABB who provide the market solvers, and to market participants and researchers who are actively doing market research. HIPPO is a such tool that can be used to improve the current market operations and provide capabilities for rigorous forward-looking design and prototyping of next-generation energy markets. HIPPO has a high-resolution model for the day-ahead SCUC, which was validated with MISO and GE-Grid Solutions. HIPPO is built with parallel and distributed computing capabilities and can be executed in both multi-thread and high-performance computing (HPC) settings. This capability provides fast solution speed necessary to handle the larger and more complex SCUC problems of real-world cases and the potentially growing size and complexity of future scenarios. In addition, HIPPO has a concurrent optimizer (CO) which manages multiple algorithm executions simultaneously and leverages the advantages from different algorithms. This structure provides flexibility to better benchmark competing approaches. Highly accurate market model, fast solution technologies and flexible model and algorithm control are the features which will make HIPPO an extensible platform for developing and testing multiple approaches to meet a wide range of future market needs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

DLR Calculation Engine Interoperability Profile: A Project for the TOGETs Task Force

This document contains a detailed interoperability profile outlining how the components of the CIM can be used to implement DLR in support of the two use cases identified in the Use Case Document. An interoperability profile is defined by the Smart Electric Power Alliance (SEPA) as a document that “specifies standards-based requirements for interfaces or applications that are accepted by the user-community, testing authorities, and other stakeholders. It specifies configuration options within a standard’s requirements sufficient to deliver the desired level of interoperability and functionality.” To that end, this document is not in itself a standard, nor has it been approved by any formal body. Rather, it is an example of how to implement the CIM standard and has been reviewed by industry, including transmission operators and DLR vendors.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Cybersecurity for Clean Energy Resources [Slides]

This presentation provides motivation for research in clean energy cybersecurity and highlights INL projects and capabilities to address clean energy cybersecurity needs. The projects are broken down by device level, plant level, utility level, regulation level, and implementation. This introduction to INL capabilities creates opportunity for further conversations around how cohort members can improve their own organizational security postures.

14 SOLAR ENERGY↗

Grid Resilience Plans: State Requirements, Utility Practices, and Utility Plan Template

As of June 2024, 14 states and one city require jurisdictional electric utilities to file resilience plans. Drawing on these requirements and filed plans, this report offers a standard template that states and utilities can consider to improve utility filings for grid resilience plans, either as part of a distribution system plan or as a separate filing. Key elements include a vulnerability assessment, description of proposed resilience programs, and projected costs and rate impacts. While many of these requirements and plans focus on extreme weather hazards, the template also can be used to address additional threats, including cyber and physical attacks and seismic events.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Hourly dynamic line ratings for existing transmission across the contiguous United States (preliminary results) [Slides]

The thermal rating of a transmission line depends on the rate at which heat generated by current flow through the line can be dissipated into the environment by convective and radiative cooling, keeping the conductor below a maximum operating temperature. Static or seasonal line ratings assume nearly-worst-case weather conditions (high ambient air temperature, high solar irradiance, and low wind speed), resulting in a low risk of "overrating" a line (i.e., allowing more current to flow than the line is designed for) but a high fraction of time when the line is "underrated" (i.e., able to flow more current while staying below the maximum temperature). Dynamic transmission line ratings (DLR) use real-time measurements of weather conditions, line sag, or line temperature to determine the thermal rating of transmission lines at hourly or higher time resolution, allowing for increased ratings during some (cold, windy, and/or dark) periods and correcting for overrating during other (hot, calm, and/or sunny) periods. Many studies have explored the benefits of DLR, but typically for small collections of transmission lines under a limited sample of weather conditions, leaving open the question of how widely applicable the benefits of DLR might be over diverse geographies and weather conditions. Here, we combine geospatial data on tens of thousands of transmission line routes across the contiguous United States with high-resolution hourly historical weather data for 2007-2013 to estimate the impact of DLR and other weather-adjusted rating systems. We compare static and dynamic line ratings to intermediate ratings adjusted by ambient temperature, day/night irradiance, clear-sky irradiance, and/or measured irradiance, illustrating the benefits of incorporating progressively more detailed weather data into the calculated line ratings. Moving from nighttime-adjusted ratings to clear-sky-adjusted ratings provides more benefit than moving from clear-sky-adjusted ratings to measured-irradiance-adjusted ratings. Depending on the assumed static windspeed for irradiance-adjusted-ratings, DLR either corrects for overrated hours or provides substantially increased ratings in the majority of hours on the majority of lines.

14 SOLAR ENERGY↗

Evidence of Completion of Milestone 3: Experimental Testbed

Construction and deployment of the experimental testbed encountered scheduling delays, and completion was subsequently further delayed by curtailment of LANL operations due to the COVID-19 pandemic. Between March and October, LANL was in a state of “Limited Operations” such that only certain “mission-critical” work was performed with approximately 25% on-site staffing. In spite of this, much of the lab space preparation was executed and the five initial model house” units were constructed and installed during this period. Still, the pace of construction was impacted by difficulty in coordinating personnel and minimizing contact between workers. Currently, LANL is in the mode of “Normal Operations with Maximum Telework,” which continues to limit the availability of on-site personnel. Nevertheless, Milestone 3 is now complete. This document describes the experiment as it is deployed and provides status for each task for this milestone.

99 GENERAL AND MISCELLANEOUS↗

Evidence of Completion of Milestone 4: Simulation Testbed Validated with Experimental Data

Milestone 4 is given in the SOPO as being due in quarter 5 (ending 9/11/2020) and is described thus: Milestone 4: Enhanced Simulation Testbed Validated with Experimental Data (UM, Mathieu) Simulation testbed validated with data obtained from experimental testbed, specifically, nonlinear load behaviors and communication network issues observed in the experimental testbed will be modeled in the simulation testbed. The simulation testbed should accurately capture TCL real and reactive power consumption (including during extreme events associated with nonlinear behaviors and communication network failures) to within 5% RMSE error with respect to data obtained from the experimental testbed.

99 GENERAL AND MISCELLANEOUS↗

Regulatory and Technical Challenges and Barriers to Adoption of Distributed Wind Energy in Agricultural Settings

Distributed wind (DW) energy development can benefit agricultural landowners through the possibility of improved resilience of electrical service from onsite generation and associated economic benefits. DW development currently faces technical and regulatory challenges related to interconnection of projects with distribution or transmission equipment on the main electrical grid. A review was conducted of barriers to adoption for agricultural DW projects and potential roles of various stakeholders in addressing them. One major barrier is that the unique characteristics of wind energy generation such as its variability and intermittency, may require upgrades for the whole power line, which can lead to prohibitive cost burdens on individual interconnection customers. Another barrier is compliance with federal, state, or utility-level regulations that require technology-agnostic, industry-standard equipment that is often not technically realistic for DW projects. DW developers, grid infrastructure owner-operators, regulators, and standards publishers can work together to address these challenges and facilitate DW development.

17 WIND ENERGY↗

Regional Energy Hardware Innovation Accelerator

E4 Carolinas, Inc., along with the Joules Accelerator and Savannah River National Laboratory received a grant from the DOE Office of Technology Commercialization as part of its Energy Program for Innovation Clusters (EPIC) program to develop a Regional Energy Hardware Innovation Accelerator. The project objective was to create a regional energy hardware cluster innovation and accelerator ecosystem (Accelerator) to enhance commercialization opportunities for U.S. energy startups (Ventures) and Corporate Ventures (a new venture originating within an established company).

24 POWER TRANSMISSION AND DISTRIBUTION↗

Integration of Open-Source URBANopt and Dragonfly Energy Modeling Capabilities into Practitioner Workflows for District-Scale Planning and Design

High-performance districts and communities offer opportunities for reducing energy use, emissions, and costs, and can be instrumental in helping cities achieve their climate goals. The design of such communities requires identification of opportunities early on and their re-evaluation throughout the planning process. There is a need for energy modeling tools that connect 3D Computer-Aided Design (CAD) platforms to simulation engines, enabling detailed energy analysis of districts within the workflows and tools used by practitioners. This paper introduces the Dragonfly and URBANoptTM combined toolset that supports the creation of urban models from a range of geometry formats typically used by designers and planners, and provides an integrated pathway to simulate district-scale energy systems. The toolset is piloted by a global architecture and master planning firm to evaluate several key urban-scale technical questions for the design of a district in Chicago. The findings indicate that, while energy savings can be achieved through traditional architectural studies and enhancements to individual building efficiency, the modeling toolset helps identify additional savings and insights that can be achieved when considering district-scale energy systems. Finally, this study demonstrates how the Dragonfly/URBANopt toolset can integrate with master planning workflows, thereby enabling an iterative performance-based design process.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A Review on Artificial Intelligence (AI) for Stability Assessment: Preprint

Artificial intelligence provides a convenient route for power grid stability assessment. Compared with simulation-based approaches, artificial intelligence can potentially save time on model development and numerical computation in stability assessment. This paper first reviewed existing literature on using artificial intelligence for power grid stability assessment. Then a machine-leaning-based tool is presented and developed to assess power grid transient stability, frequency stability, and small-signal stability. Test results verified the accuracy and effectiveness of the artificial intelligence tool for power grid stability assessment.

artificial intelligence↗