Engineering PapersSearch

DOE OSTI · 2556780

Evidence of Completion of Milestone 4: Simulation Testbed Validated with Experimental Data

Abstract

Milestone 4 is given in the SOPO as being due in quarter 5 (ending 9/11/2020) and is described thus: Milestone 4: Enhanced Simulation Testbed Validated with Experimental Data (UM, Mathieu) Simulation testbed validated with data obtained from experimental testbed, specifically, nonlinear load behaviors and communication network issues observed in the experimental testbed will be modeled in the simulation testbed. The simulation testbed should accurately capture TCL real and reactive power consumption (including during extreme events associated with nonlinear behaviors and communication network failures) to within 5% RMSE error with respect to data obtained from the experimental testbed.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Mathieu, Johanna L. [Univ. of Michigan, Ann Arbor, MI (United States)], Geller, Drew Adam [Los Alamos National Laboratory (LANL), Los Alamos, NM (United States)] (ORCID:0000000180468495), Hiskens, Ian [Univ. of Michigan, Ann Arbor, MI (United States)], Nugroho, Sebastian [Univ. of Michigan, Ann Arbor, MI (United States)], Oyefeso, Oluwagbemileke [Univ. of Michigan, Ann Arbor, MI (United States)], Granitsas, Ioannis [Univ. of Michigan, Ann Arbor, MI (United States)], Callaway, Duncan S. [Univ. of Michigan, Ann Arbor, MI (United States)], Phanivong, Phillippe [Univ. of Michigan, Ann Arbor, MI (United States)], Hinson, Scott [Pecan Street Inc., Austin, TX (United States)], Mock, Stephen [Pecan Street Inc., Austin, TX (United States)], Harlow, Jill [Pecan Street Inc., Austin, TX (United States)], Jenkins, Rachel [Pecan Street Inc., Austin, TX (United States)]. 2025-04-08. Evidence of Completion of Milestone 4: Simulation Testbed Validated with Experimental Data. https://doi.org/10.2172/2556780

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

Fire Protection Design

The purpose of this project is to design the demolition and installation of a deluge valve swap from a DV-5 to a DV-5A valve.

99 GENERAL AND MISCELLANEOUS