Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Asset”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,333 records · Page 74

Powered By ERAD [Slides]

Energy Resilience Analysis for Distribution Power System (ERAD) is a free, open-source Python toolkit for estimating the energy and service impacts of hazards like earthquakes and flooding. It uses a graph-based approach to capture high resolution connectivity among the grid, critical services, and customers and rapidly compute household level metrics and aggregated statistics across large distribution systems. It uses asset fragility curves that relate hazard severity to survival probability for power system equipment including cables, transformers, substations, etc. The tool is designed to be modular and extensible, allowing it to interface with third-party hazard simulators and integrate into broader resilience analysis workflows. ERAD enables researchers, students, communities, distribution utilities, and other stakeholders to understand hazard impacts and evaluate the effectiveness of different programs to improve energy resilience. The webinar was hosted by NLR researcher Aadil Latif.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Large Power Transformer Supply Chain Gap Analysis and Domestic Content Strategies for Hydropower Rehabilitation: Supplemental Report

Large Power Transformers (LPTs) are indispensable to U.S. hydropower operations, serving as generator step-up (GSU) units that interconnect hydro facilities to the transmission grid. Yet the LPT supply chain faces mounting stress from aging infrastructure, limited domestic production, and long lead times. Currently, more than 80% of LPT demand is met through imports, with primary suppliers including Mexico, South Korea, Brazil, Austria, and Canada. Domestic manufacturers supply only about 20% of units, constrained by bottlenecks in high-grade Grain-Oriented Electrical Steel (GOES), copper conductors, bushings, and on-load tap changers (OLTCs). Hydropower rehabilitation projects in particular face additional challenges due to custom design requirements, remote siting, and regulatory needs around domestic content. Regional cost disparities, driven by transportation logistics, labor markets, and import price volatility, further exacerbate project risks. To address these vulnerabilities, coordinated action is required: strengthening domestic capacity for GOES and secondary components, developing near-site assembly hubs, and leveraging IRS domestic content safe harbors to incentivize U.S. manufacturing. This addendum refines the 2024 NREL Hydropower Supply Chain Gap Analysis by focusing specifically on critical issues related to LPT domestic manufacturing capacity and key considerations for hydropower developers and asset owners.

13 HYDRO ENERGY↗

NG-CT Peaker Upgrades with Bottoming Cycle: Preliminary Analysis

The National Energy Technology Laboratory (NETL) has conducted a preliminary analysis exploring a significant opportunity to increase the nation's power grid capacity and reliability. The study focuses on retrofitting under-utilized natural gas combustion turbines (NG-CTs), often called "peaker" plants, with a bottoming cycle to capture waste heat and generate additional electricity. This analysis shows that upgrading these existing assets could add approximately 26,250 MW of new power capacity across the United States. A detailed study of the PJM Interconnection, the nation's largest grid operator, confirmed the benefits of these upgrades. Key findings for the PJM region include: - A median increase in the plants' capacity factor by 17 percentage points. - A projected 36.2% median reduction in the levelized cost of electricity (LCOE) for the upgraded plants, with nearly 88% of them expected to break even. - An average reduction in the regional wholesale price of electricity by approximately 3.0% in the year 2030. - A significant boost to grid reliability, with a 46% reduction in projected Loss of Load Hours (LOLH). These findings suggest that retrofitting peaker plants is a promising and economically viable strategy to enhance grid performance, reduce electricity costs, and meet future demand without the challenges associated with building entirely new facilities.

bottoming cycle↗

Strategies for Flood Resilience and Grid Investment Among Iowa's Electric Distribution Utilities

Flooding poses a growing threat to Iowa's electric distribution system, yet utilities face significant data and modeling challenges in planning effective resilience investments. This report provides a foundational assessment of how distribution utilities in Iowa, investor-owned, municipal, and cooperative, approach resilience planning, with a focus on flood risk. It combines hazard characterization, review of state and utility practices, and application of NLR's Energy Resilience Analysis for Distribution Systems (ERAD) and Capacity Expansion Decision Support for Distribution Networks (CADET) tools. Using FEMA floodplains, Iowa Flood Center depth grids, and utility infrastructure data, the analysis quantifies asset exposure, simulates outage risks, and evaluates resilience strategies such as pole hardening, undergrounding, and substation protection. Results indicate that while feeder-level upgrades provide incremental benefits, the most significant reductions in outage risk are achieved through targeted substation interventions. The report highlights key data gaps, such as limited elevation data and fragility functions, and underscores the need for probability-weighted investment frameworks to address both frequent and catastrophic flood events. These insights aim to support utilities, state agencies, and federal partners in prioritizing resilience investments that safeguard Iowa's electric grid against future flooding.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Large Load Impacts to Distribution System Hosting Capacity

This work examined the impact of large loads on utility distribution system models using the Sandia-developed open-source software DREAMS. It was shown that hosting capacity varies with location and changes after any asset is added to, or removed from, a system. Despite the tested models having similar rated voltages and other characteristics, their thermal and voltage constrained hosting capacity varied over 2 MW. The addition of a 3-phase balanced constant power large load with power factor of 1.0 exhibited non-linear reductions to all voltage constrained hosting capacities. The reductions to thermal constrained hosting capacity from a load with similar characteristics was more linear, related to the size of the added load, and did not impact all model buses. Co-located capacitors were shown to accommodate demand that was beyond the baseline voltage constrained hosting capacity limits, however, the costs and benefits from this approach were found to not be 1:1 and required additional available thermal capacity.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Chemically Enabled CO 2 -Enhanced Oil Recovery in Multi-Porosity, Hydrothermally Altered Carbonates in the Southern Michigan Basin (Final Technical Report)

This is the Final Technical Report for the project "Chemically Enabled CO 2 -Enhanced Oil Recovery in Multi-Porosity, Hydrothermally Altered Carbonates in the Southern Michigan Basin." Over the course of six years of collaboration between Battelle and project partners, all stated objectives of the program have been completed, including full geological characterization of the TBR trend (See companion report for Task2), laboratory and modeling experiments to determine the optimum composition and design of CO 2 -EOR operations in the TBR trend, execution of a field test of chemically-enhanced CO 2 in a TBR well, and integration of the data and learnings gathered during these efforts into a full-trend development plan. Detailed reporting on these activities, their outcomes, and implications for trend-wide development is provided in the report. This report and encompassed data will provide TBR field operators with detailed information on what worked, what did not work, and how to proceed with production optimization of their TBR assets using chemically-enhanced CO 2 -EOR. CO 2 -EOR is a relatively well understood and broadly implemented strategy for increasing incremental production across the oil and gas industry, but its application has been primarily focused on reservoirs with limited heterogeneity. The intention of this project was show first that the same physical mechanisms that improve recovery factors in homogeneous reservoirs (namely wettability alteration, viscosity alteration, oil swelling, and mobility control) are at play in heterogeneous reservoirs. This was proven by the project’s laboratory studies and dynamic simulations, with the potential exception of mobility control, which needs further study. The second intention was to demonstrate via direct field testing that CO 2 -EOR can work in a strongly heterogeneous reservoir. While the field test strategy implemented during this project did not succeed in producing oil, data gathered during the test sheds light on what may work for field operators who try chemically-enhanced CO 2 -EOR within their own reservoirs, significantly reducing the level of uncertainty carried by first-of-a-kind commercial efforts that could (and should) follow this test. Simultaneously, the project has identified several large-volume ethanol plants and other sources of CO 2 emissions in the region and provided a handrail that CO 2 emitters and field operators can leverage to capture, transport, and inject that CO 2 into their fields. This project has also shown that, in many cases, the economics of CO 2 -EOR in the TBR are attractive. And finally, by completing a project of this scope in the southern Michigan Basin, the project has contributed to the knowledge base and operational experience of field operators, state regulatory agencies, local service companies, and state universities, with CO 2 -EOR projects which should allow follow-on projects to proceed safely and efficiently.

02 PETROLEUM↗

Community Resilience Through Rapid Restoration Leveraging Distributed Energy Resources (DERs) and Low-Cost Sensors

Equitable and automated bottoms-up power restoration following an extreme event will be demonstrated at a site in Puerto Rico. To do so, the team will develop enhanced grid situational awareness techniques integrating behind-the-meter (BTM) distributed energy resources (DER) discovery, impedance sweeping based outage boundary detection, and feasible restoration path identification algorithms. Resilience metric will be developed and incorporated along with situational awareness information in a distributed Model Predictive Control (MPC)-based restoration optimization algorithm to control and mobilize grid assets. These algorithms will be validated through power hardware-in-the-loop experiments and ultimately, a site demonstration to show that outage recovery time and total recovered load could be improved by >20% over the baseline.

24 POWER TRANSMISSION AND DISTRIBUTION↗

RFID-Enabled Tamper-Indicating Seal

Tamper-indicating seals protect sensitive materials, valuable equipment, and critical shipments. Most conventional seals must be checked through manual visual inspection and do not provide a digital record of their condition. Some attempts to remove, alter, or bypass a seal may also leave little visible damage, making tampering difficult to identify during routine inspections. Los Alamos National Laboratory has developed a smart tamper-indicating seal that converts even subtle tampering into a persistent digital record. The seal communicates its identity and status wirelessly through standard radio-frequency identification (RFID) readers, giving organizations a faster, more reliable way to verify that an asset has remained secure.

99 GENERAL AND MISCELLANEOUS↗

Energy Adequacy Studies: Nodal vs Zonal and Ramp-Rate Representation

This work investigates limitations in current energy adequacy studies, particularly concerning the representation of grid complexities. We highlight how traditional zonal modeling approaches, which simplify large geographic areas and generator capabilities, can mask critical transmission constraints and localized resource shortfalls. By analyzing nodal versus zonal pricing differences and the empirical distribution of generator ramp-rates, we demonstrate that these simplified assumptions may misrepresent system flexibility and deliverability. Our findings underscore the need for more granular, nodal-level analyses and data-driven characterizations of generation assets to provide a more accurate and robust assessment of energy reliability and adequacy, ultimately supporting a more resilient and efficient energy infrastructure.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Potential of Data Center Controls in Grid Services

The rapid proliferation of large data centers brings both challenges and opportunities for grid reliability. The data center resources and their potential flexibility have the potential to contribute resources to grid operations. Through capabilities like energy shifting and resource coordination, data centers can help reduce their net demand on the transmission network, as well as provide additional grid services to support reliable operation on the grid. While transient and long-term grid planning and operations are the scenarios that draw most attention, the quasi-steady state timeseries (QSTS) operation of data centers and grid bring interesting scenarios that can help evaluate the data center controls to aid grid services. This work is focused on modeling data centers for QSTS applications – incorporating the AI data center load profiles and building on the PNNL digital twin model for the thermal management loads to enable simulation studies to reveal the impact of data center controls on grid performance. This includes the integration of a QSTS battery and natural gas generator model to incorporate local resource impacts to the system. The simulation study is performed with a modified IEEE 24-Bus transmission system. Scenarios are focused on evaluating the data center load impacts on the transmission system and leveraging both data center and local generation controls to mitigate those impacts and provide additional grid services. The data center controls revealed the ability to contribute to two main kinds of grid services: preventing congestion on a weak grid by coordinating the data center resources with the collocated BESS and onsite generation; and the ability to help the grid operations during stressed times of operation like during a contingency. Leveraging these and other capabilities has the potential to help data centers become grid responsive assets, aiding in both their integration into the power system and grid reliability.

power grid simulation↗

Technoeconomic Studies for the Rorex Creek Pumped Storage Hydro Project: An Evaluation of New Pumped Storage Hydro in the Tennessee Valley Authority System

This report evaluates the economic viability of the proposed 1,200 MW, 23,365 MWh Rorex Creek Pumped Storage Hydro (PSH) plant that would be located near Pisgah, Alabama. In addressing this question, this study has developed processes, models and data that better value PSH from a utility perspective, more specifically a vertically integrated utility, enabling optimal PSH design and deployment. This study is designed to enhance TVA’s toolset in making PSH investment decisions and contribute to the design of a more cost-effective, stable future grid. These techniques can then be applied to a broader range of assets and utilities.

Cohen, Stuart↗

POWER ELECTRONICS GRID TIED SYSTEM FINAL REPORT

Across the country, electric utilities are grappling with the persistent hurdles of integrating Distributed Energy Resources (DERs). Managing these assets safely and effectively is a complex endeavor, complicated by varying ownership structures, management philosophies, and the diversity of the technologies themselves. Consequently, the industry has seen a proliferation of bespoke system designs, control strategies, and communication frameworks—forcing utilities to spend significant time and resources developing one-off integration solutions. This project addressed these integration hurdles through a scalable demonstration of intelligent devices designed to coordinate and control diverse resources in low-voltage applications. This concept minimized the need for complex integration by transforming the separate DERs into a dispatchable virtual power plant (VPP) with integrated resiliency functions (called a Node). By collaborating with a utility partner, the project focused on developing rapidly implementable use cases that bridged the gap between theoretical control and real-world deployment

99 GENERAL AND MISCELLANEOUS↗

Hydropower Energy Storage Capacity (HESC) Dataset

The Hydropower Energy Storage Capacity (HESC) Dataset catalogs characteristics that are relevant to evaluating reservoir storage and estimates of energy storage capacity based on varying levels of detail. Hydropower dams and reservoirs were included based on information from the National Inventory of Dams (NID; USACE, 2021) and Global Reservoir and Dam (GRanD v1.3) and Existing Hydropower Assets datasets. These data provide a foundation for understanding available resources at existing hydropower facilities and their potential to provide storage of energy and more flexible generation. Estimates of energy storage capacity include: • Level 1 – nominal energy storage capacity based on maximum storage capacities and hydraulic head • Level 2 – nominal energy storage capacity based on historical models or observations of reservoir volume and hydraulic head. These estimates are provided based on capacity from the entire historical period as well as monthly values. • Level 3 – modeled energy generation based on volume-elevation relationships, historical storage, observed/modeled inflows, and hydraulic capacity of turbines and calculated both as overall and on a monthly basis. • Level 4 – modeled energy generation incorporating information from Level 3 and operational constraints. For facilities where installed capacity is known, there are also estimates for discharge duration (the length of time when a facility could provide generation at a given capacity).

13 HYDRO ENERGY↗

Hydropower Infrastructure - LAkes, Reservoirs, and RIvers (HILARRI)

HILARRI is a database of links between major datasets of operational hydropower dams and powerplants (National Inventory of Dams (2019), Global Reservoir and Dam Database (GRanD v1.3), Existing Hydropower Assets (EHA 2020), and inland water bodies (NHDPlusV2 river network, NHD water bodies, NHD Watershed Boundary Dataset, HydroLAKES).

13 HYDRO ENERGY↗

Hydropower Infrastructure - LAkes, Reservoirs, and RIvers (HILARRI), V2

HILARRI Version 2 is a database of links between major datasets of operational hydropower dams and powerplants (National Inventory of Dams (2021), Global Reservoir and Dam Database (GRanD v1.3), Existing Hydropower Assets (EHA 2022), and inland water bodies (NHDPlusV2 river network, NHD water bodies, NHD Watershed Boundary Dataset, HydroLAKES).

13 HYDRO ENERGY↗

Hydropower Infrastructure – LAkes, Reservoirs, and RIvers (HILARRI)

HILARRI is a database of links between major datasets of operational hydropower dams and powerplants, and inland water bodies. These connections are critical for conducting large-scale analysis of hydropower infrastructure and their associated natural and engineered water systems. Features include: – Dams from the National Inventory of Dams (2024) and the Global Reservoir and Dam Database (GRanD v1.3) – Hydropower plants from the Existing Hydropower Assets dataset (EHA 2024) These hydropower infrastructure features are linked to several major datasets that provide hydrologic and hydraulic information relevant for analysis of hydropower systems that includes the integral water resources. That information comes from: – Products from the National Hydrography Dataset (NHD) – NHDPlusV2 Medium Resolution river network flowlines, – NHD waterbodies (limited to lakes and reservoirs), – NHD Watershed Boundary Dataset (HUC12-level for the Conterminous United States (CONUS)) – NHD High Resolution waterbodies – HydroLAKES water bodies (lakes and reservoirs) – LAGOS-US lakes and reservoirs – EPA National Lakes Assessment (2007, 2012, 2017, and 2022) – The Reservoir Sedimentation Database (RESSED) Unique identifiers are used to facilitate joining to the original full datasets. For example, characteristics of NHD flowlines such as estimated average flow rate can be joined from the NHDPlusV2 dataset to a dam or power plant listed in HILARRI based on the ID field, “COMID”, that is common to both datasets. HILARRI only includes basic information about identifiers, location, and data quality or usage notes. It does not contain the attributes or time series data associated with these sites. The HILARRI dataset incorporates information from several datasets to facilitate more effective and accurate analysis of hydropower infrastructure and their associated waterbodies. For example, dams were checked against the most recent American Rivers Dam Removal Database to identify and flag facilities that may no longer exist. Additionally, dams that are listed multiple times in the NID are identified and flagged to avoid double-counting when analyzing and summarizing information. Other quality flags include certainty of operational hydropower (i.e., if one or more datasets indicates hydropower at a particular location), whether an associated water body is accurate or composed of multiple polygons, or whether there is a known issue with reported characteristics in one of the underlying datasets. These additional data flags are designed to increase confidence in data usage for individual to large-scale analyses.

13 HYDRO ENERGY↗

Hydropower Capacity Factor Trends & Analytics for the United States

This data repository contains all code, input data, and data generated for Turner et al. (2024)—“Hydropower capacity factors trending down in the United States”. File descriptions: – hydro-cf-trends-inputs.zip: Full set of input data used in this study, organized for direct entry into “/data” directory of hydro-cf-trends data processing pipeline. – hydro-cf-trends.zip: Full data processing pipeline, coded using the R {targets} framework. This is a snapshot release (v1.0) of the code repository stored at https://code.ornl.gov/turnersw/hydro-cf-trends/. – hydro-cf-trends-results.zip: Provides all dam level results required to reproduce results and graphics in Turner et al. (2024). Dams are identified by the “complxID” (root of the hydropower plant ID in the Existing Hydropower Assets Database, inherited from HILARRI). Results include: • dam_CF_trends.csv: Table of long-term trends in annualized capacity factors for 610 dams and modeled annualized capacity factors for 362 modeled dams (naturalized and assimilated flows). • dam_annualized_CF_gen.csv: Annualized time series of the following variables for each of 610 hydropower dams with nameplate > 5MW – Reported nameplate capacity (MW) – Implied maximum annual generation (MWh) – Reported net generation (MWh) – Computed annual capacity factor – Modeled annual capacity factor (362 modeled plants only)

13 HYDRO ENERGY↗

The Interactive Hydropower Generation Map

This interactive map shows the spatial distribution and temporal trends of net generation for hydropower facilities in the U.S., as included in the Existing Hydropower Assets (EHA) Net Generation Plant Database.

Schmidt, Erik [Oak Ridge National Laboratory (ORNL↗