Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “system operators”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,315 records · Page 73

Economic Evaluation of a Coupled Nuclear Power Plant and Hydrogen Production Facility: A Case Study

This study optimized the design sizes and operation of a power-to-hydrogen-to-power integrated energy system to allow a baseload power plant to operate flexibly in the energy market. In collaboration with a utility industry partner, the system, consisting of an electrolyzer, compressors, storage tank, and fuel cell, was optimized under conditions specific to the proposed project at the site of a nuclear power plant. The Design Integration and Synthesis Platform to Advance Tightly Coupled Hybrid Energy Systems (DISPATCHES) maximized net present value by optimizing sizing of components and dispatch decisions. Revenues included sale of electricity, capacity payments typical of the New York Independent System Operator, and the section 45V hydrogen production tax credit of the Inflation Reduction Act of 2022 (the tax credit was assumed to be available to legacy plants in the absence of clear guidance at present). Under default assumptions which excluded many capital expenditures, the base case optimized solution had a net present value of $\$$1.4 million over a 30 year lifetime, with a 0.365 MW fuel cell operating nearly continuously and 85% of revenues supplied by the hydrogen production tax credit (which was counted as a revenue regardless of profit, thus assuming credit monetization or offset of taxes within the larger firm was possible in all years). Beyond the base case, a sensitivity study elucidated drivers of the economics as capacity payment rate and hydrogen production tax credit rate vary. Additional sensitivity studies also extended results to variation of other, previously fixed parameters, including the fuel cell capital cost, and to imposition of further constraints. Optimization was also repeated for the default assumptions but recognizing tax credits upon use of hydrogen rather than upon its production, producing no change in the optimal solution. Most notably, capacity payments above $\$$15/kW-month drove optimal fuel cells multiple times larger than those with the default estimated capacity payment of $\$$2.5/kW-month (approaching 11 vs. 0.365 MW), and these larger fuel cells operated rarely (capacity factors of ~0.03). Furthermore, when the hydrogen production tax credit was provided for only 10 years, under the specific assumptions of this study (e.g., neither site preparation costs nor electrolyzer capital cost counted), the optimal solution avoided economic loss by ceasing system operation after the 10th year. Viewed broadly, this study demonstrated the capabilities of DISPATCHES, which can be user-adapted to serve other industrial case studies.

08 HYDROGEN↗

New High-Strength Ni-based Alloys for High Temperature Service in Liquid Fluoride Salt Environments

The ever-increasing demand for higher system thermal efficiency necessitates the operation of power generation cycles and heat conversion systems for chemical processes at progressively higher temperatures. As the system operating temperature increases, fewer and fewer materials are available with the required mechanical properties and environmental compatibility. This dearth of materials is particularly acute in structural applications at temperatures above 700°C in liquid Fluoride Salt Cooled High-Temperature Reactors (FHRs) and Concentrated Solar Power (CSP) systems where liquid fluoride and/or liquid chloride salts are used for their high thermal capacity and low thermal conductivity to store and transport heat. It has been shown that fluorides and chlorides can degrade the properties of the material used for storage and transport due to corrosive effects thus affecting the performance and lifetime characteristics. Thus, materials used for storage and transport for fluoride/chloride-salt must at the minimum have good compatibility with the salt by exhibiting low corrosion rates at the required temperatures. In addition, since many of the components will be subject to stresses in service, they need to have sufficient strength to resist plastic deformation, and the resistance to time dependent creep deformation at these temperatures, and stress levels. Achieving the combination of these properties required for higher temperatures is particularly challenging considering traditionally, the expected lifetime of some of the components used in these systems are from 30 years (CSP) to 80 years (FHRs). Although 316 stainless steel and associated redox corrosion reduction techniques are being considered for use in the first generational systems, use of 316SS is limited to operating temperatures up to ~ 650°C, thereby resulting in lower reactor efficiencies. Hastelloy ® N, developed at ORNL in the 1950s-60s for molten salt service is currently the leading candidate FHR structural alloy but has inadequate creep properties at high temperatures. Using a computationally-guided approach, Oak Ridge National Laboratory had developed new high strength alloys strengthened by γ’ precipitates (about 2X the strength of Hastelloy ® N) in small laboratory-scale heats that show good resistance to corrosion by fluorides and improved creep rupture life at temperatures up to 850°C (U.S. Patent Application No. 13/833,357 entitled “High Strength Alloys for High Temperature Service in Liquid-Salt Cooled Energy Systems”- granted U. S. Patent No. 9,540,714).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Design, Development and Testing Plan for Energy Efficiency Algorithms Related to Building-Integrated Cooling, Heating, and Power Systems

Building-integrated cooling, heating and power (CHP) systems are more efficient than conventional systems at providing local power and thermal energy, and favorable fuel prices are bound to spur their increased adoption. It is estimated that the total CHP technical potential in the commercial building sector is approximately 76 GW, but only a small fraction of it is actually deployed. Advanced control and monitoring systems that realize the full potential of these CHP systems can transform this capacity into an asset for both the owner and the grid and also accelerate the adoption of these systems in the building sector. However, to realize the full benefit of the CHP systems, we must ensure persistence of energy efficient operations. It has been demonstrated by several studies that as much as 30% of building energy use is wasted. Much of the waste results from the inability to anticipate load variations (design day vs. non-design day operations; diurnal variation of loads), identify improper operation, and efficiently operate, control and maintain building systems. Moreover, many buildings, even those with adequate control infrastructure, lack knowledgeable staff to operate and maintain energy systems. Operators of buildings with CHP systems will constantly need to make tradeoffs (economic dispatch) between onsite power generation and purchasing power, between onsite heat production from distributed generation versus heating/cooling from conventional systems, and different passive and active load management measures. Much of the inefficiency in the current building operations can be eliminated by use of automated performance monitoring (PM), real-time commissioning verification (CxV) and automated fault detection and diagnostic (AFDD) tools. Automation can help system operators make intelligent decisions. Remote and continuous monitoring of system conditions and performance will enable better management and integration of CHP with existing building systems. Continuous PM, real-time CxV and AFDD could alleviate burdens for operations staff, enhance operations and maintenance (O&M), and improve reliability of building and CHP systems. To address the O&M challenges and to provide a means to maximize the rate-of-return of building-integrated CHP systems, the Building Technologies Office (BTO) within the U.S. Department of Energy’s (DOE’s) Office of Energy Efficiency and Renewable Energy (EERE) initiated a project to design, develop, and field test a VOLTTRON™-based supervisory controller and associated open-source algorithms. These algorithms will ensure real-time optimal operation of a building-integrated CHP system, support electric grid reliability, and lead to achieving the goal of a clean, efficient, reliable and affordable next-generation integrated energy systems. This report lists the components for which PM, real-time CxV and AFDD algorithms will be developed, how the algorithms will be tested, and metrics that will be used to validate the algorithms and easy of deployment. Deployment of these algorithms in the field will result in savings reduction in energy consumption of between 10% and 20%.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Smarter building start – A distributed solution

A significant focus of research and new technologies for reducing energy use in buildings is on operating the systems more efficiently during the times when the systems are active. However, there is a large potential for energy savings in determining the periods when the systems should or should not be active. This scheduling aspect of operation is often overlooked even though relatively simple solutions can unlock substantial energy savings. In this paper we describe a smart building start (SBS) algorithm that considers multiple zones in a building to determine individual schedules for room controllers as well as the central systems based on solving a simple optimization problem. Application of the SBS algorithm to multiple interconnected systems enables a staggered start-up that minimizes peak loads and also ensures comfort is within a target range with minimal system run time. The SBS algorithm extends the capability of traditional optimal start and is designed to be simple to deploy and robust. Simulation results as well as results from tests in a real building with a VAV system are presented. The presented algorithm is applicable to any type of building with a zonal or multi-zone HVAC system. To function, it needs to be able to change setpoints in rooms and monitor room temperatures, as well as, if desired, turn the central system on or off.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

State-of-the-art short-term electricity market operation with solar generation: A review

With the accelerating penetration of solar energy in energy systems, market operations concerning the solar-associated intermittency are widely discussed. How to correctly model the solar generation in the market and solve the uncertainty-based operation problems call for solutions. Unlike other renewable resources, solar power can be more easily applied to the demand side through behind-the-meter installations in a distributed manner with significant future extensibility. The corresponding operational rules in the markets are largely being revised. Over the past two decades, with the development of deregulated power markets, numerous studies related to uncertainty-based market operations tend to transform the market from a deterministic and centralized framework to a stochastic and decentralized one. As the relevant literature is most recent, this paper reviews their contributions to electricity market operations with solar integration and underlines the research directions of this topic and ongoing industry practices. A thorough review of the electricity markets worldwide with solar energy is provided. A variety of proposed mathematical solutions to the problem are also addressed.

14 SOLAR ENERGY↗

Substation-Level Grid Topology Optimization Using Bus Splitting: Preprint

Operations of substation circuit breakers are of high significance for performing system maintenance and topology optimization. Bus splitting is one type of topology changes where the two bus-bars at a substation become electrically disconnected after certain actions of circuit breakers. As these events involve detailed substation modeling, they are not typically considered in power system routine operation and control. In this paper, an improved substation-level topology optimization is developed by expanding traditional line switching with breaker-level bus splitting, which can further reduce grid congestion and generation costs. A tight McCormick relaxation is proposed to reformulate the bi-linear terms in the resultant topology optimization model. Thus, a tractable mixed-integer linear program formulation is presented which can be efficiently solved for real-time control. Numerical studies on the IEEE 14-bus and 118-bus systems demonstrate the performance and economic benefits of the proposed topology optimization approach.

bus split↗

Introducing the 9500 Node Distribution Test System to Support Advanced Power Applications: An Operations-Focused Approach

The 9500 Node Test System is a representative section of distribution power system model developed as a part of the GridAPPS-D™ project, an effort funded by DOE as a part of the Grid Modernization Lab Consortium (GMLC) program. The test system was developed to fulfill a growing need to represent the rapidly evolving state of electric distribution systems by combining elements of legacy infrastructure systems, modern feeder topologies, and an anticipated future with smart grid technologies. It also provides a network model capable of supporting the simulation of operational scenarios such as the ones in a utility distribution control center. This test system allows the evaluation of the performance of advanced power applications in real-time, such as one that simulates the operations of an Advanced Distribution Management Systems (ADMS), Distributed Energy Resource Management Systems (DERMS), etc. in a Distribution control center. This model is an extension of the widely used IEEE 8500 Node Test Feeder and is currently being validated to become an IEEE test case to help increase adoption and widespread usage among both academia and industry. It is a full-size model representative of a section of a utility’s distribution system with multiple feeders fed from different substations. The model includes multiple distribution circuits, a sub-transmission system, multiple substations, behind the meter customer rooftop photovoltaics (PV), and multiple utility-scale distributed energy resources. To enable accurate simulations of operational scenarios, the 9500 Node Test System is designed to support procedure-based operations, with the ability to realistically demonstrate switching operations, feeder reconfiguration, adjustment of volt-var control equipment, dispatch of distributed generation, and response to planned and unplanned outages. The 9500 Node Test System includes three radial distribution feeders with 12.3 MVA of average load, consisting of both medium voltage and low voltage equipment each supplied by a different distribution substation. The three distribution feeders are connected to each other through Normally-Open switches which can be closed when needed to simulate restoration scenarios due to a fault. One feeder represents today’s grid with low penetration of customer-side renewables. The second represents a potential future grid with microgrids and 100% renewable penetration. The third has no customer generation resources, a district steam plant, and a utility-scale solar farm. The three diverse circuits were created to allow the simulation of both today’s situation as well as potential future scenarios. All three feeders have customers connected by low-voltage secondary triplex lines. This test system meets all requirements outlined in the report for creating a simulation environment that would enable discussion between key technical stakeholders as well as having the potential to accelerate operational application development and their subsequent testing and integration. The new model is a possible representation of what we believe the distribution grid may look like in the future: a high penetration of renewables, reconfigurable radial and mesh topology, numerous DERs, islanded microgrids, and significantly increased data and measurement density. The system supports both the solution of existing and newer algorithms but also enables the evaluation of applications in a realistic operational environment defined by task oriented procedural steps that represent the interaction between the control center operator and field personnel.

24 POWER TRANSMISSION AND DISTRIBUTION↗

LANSCE Facility Longevity Assessment

This LANSCE Facility Longevity Assessment examined 34 total systems critical to the operation of the LANSCE accelerator complex. These systems are primarily owned, operated, and maintained by AOT Division. Based on the criteria used in this assessment, there are 12 AOT Division systems that are potential high risk as related to longterm LANSCE operations. These systems may also impact the success of LAMP. Also summarized in this report are the facility activities planned over the next decade. These include general facility maintenance and infrastructure upgrades, as well as planned electrical system upgrades. The LANSCE Facility Operations (LFO) Division is responsible for this activity scope and budget planning. Most of the planned activities are general in nature and should have little impact on accelerator operations or LAMP activities as currently envisioned. However, close coordination with between AOT, LFO, and LAMP would be prudent. A next step should be to develop an actionable plan to address the high-risk systems. Potential criteria for developing such a plan could include: (1) Evaluating the global impact of the system (operations, program, safety, etc.), (2) Ranking by impact (ranked now by risk), (3) Estimating cost to implement the corrective actions (Is there already a plan or not?), and (4) Estimating the time required for corrective actions. An alternative could include integration of the assessment data into both the Asset Management System and the Maintenance Analytics Risk Register.

43 PARTICLE ACCELERATORS↗

Prediction of the Thermal Runaway Limit and Optimal Operation of Heat Transfer-Limited, Fixed-Bed Reactor Systems

Here, we derive a new prediction for thermal runaway starting from the alpha model for fixed-bed reactor systems. This method accounts for thermal resistance internal to the reactor tube and the radial temperature gradients that result. To showcase our method, we compare its predictions to other common criteria for thermal runaway using o-xylene oxidation as the example chemistry. Even in systems where internal heat transfer is negligible, the empirical practical design criterion for thermal runaway is inaccurate. For cases where internal heat transfer is relevant, our runaway limit is more stringent than limits derived from simpler 1-D models. To augment our work, we optimize the product yield with the thermal runaway constraint using orthogonal collocation. Using the alpha model, the results illustrate that the thermal runaway limit can be accurately determined using either numerical or analytical methods.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Advanced Sensor Deployment for Distribution System State Estimation and Fault Identification

Distribution systems are currently facing steep operational challenges as a result of the rapidly increasing integration of renewables and other distributed energy resources (DERs) at both the primary and secondary circuit levels. Distribution utilities and system operators have traditionally had some visibility of their primary circuits using low-frequency supervisory control and data acquisition systems, and they have had very poor if not zero visibility of the secondary circuits where the presence of DERs is constantly increasing. Therefore, this paper presents simulation studies to demonstrate the benefits of an advanced, high-fidelity sensor technology, called as the Meta-Alert System (MAS), developed by Electrical Grid Monitoring, Ltd. (EGM), on the distribution grid. First, a reliable model of the EGM sensors is developed, and then two use cases, distribution system state estimation (DSSE) and fault identification are simulated to evaluate the performance of the MAS technology. Simulation results on the Electric Power Research Institute J1 feeder demonstrate that the MAS can effectively participate in system-level DSSE programs and can detect and locate faults faster than traditional distribution protection schemes.

distribution system↗

Convex Relaxations of Maximal Load Delivery for Multi-Contingency Analysis of Joint Electric Power and Natural Gas Transmission Networks

Recent increases in gas-fired power generation have engendered increased interdependencies between natural gas and power transmission systems. These interdependencies have amplified existing vulnerabilities in gas and power grids, where disruptions can require the curtailment of load in one or both systems. Although typically operated independently, coordination of these systems during severe disruptions can allow for targeted delivery to lifeline services, including gas delivery for residential heating and power delivery for critical facilities. To address the challenge of estimating maximum joint network capacities under such disruptions, we consider the task of determining feasible steady-state operating points for severely damaged systems while ensuring the maximal delivery of gas and power loads simultaneously, represented mathematically as the nonconvex joint Maximal Load Delivery (MLD) problem. To increase its tractability, we present a mixed-integer convex relaxation of the MLD problem. Then, to demonstrate the relaxation’s effectiveness in determining bounds on network capacities, exact and relaxed MLD formulations are compared across various multi-contingency scenarios on nine joint networks ranging in size from 25 to 1191 nodes. The relaxation-based methodology is observed to accurately and efficiently estimate the impacts of severe joint network disruptions, often converging to the relaxed MLD problem’s globally optimal solution within ten seconds.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Climate-Induced Tradeoffs in Planning and Operating Costs of a Regional Electricity System

Electricity grid planners design the system in order to supply electricity to end users reliably and affordably. Climate change threatens both objectives through potentially compounding supply- and demand-side climate-induced impacts. Uncertainty surrounds each of these future potential impacts. Given long planning horizons, system planners must weigh investment costs against operational costs under this uncertainty. Here, we developed a comprehensive and coherent integrated modeling framework combining physically-based models with cost-minimizing optimization models in the power system. We applied this modeling framework to analyze potential tradeoffs in planning and operating costs in the power grid due to climate change in the Southeast U.S. in 2050. We find that planning decisions that do not account for climate-induced impacts would result in a substantial increase in social costs associated with loss of load. These social costs are a result of under-investment in new capacity and capacity deratings of thermal generators when we included climate change impacts in the operation stage. Finally, these results highlight the importance of including climate change effects in the planning process.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Clean Grid Vision: A U.S. Perspective - Chapter 2. Distribution Issues and Tools

The continued growth in distributed energy resources is fundamentally changing the way the distribution system is operated and planned. Additionally, an increasing number of grid issues are being regularly experienced by distribution engineers within an increasing number of utilities. Fortunately, these fundamental changes and increasingly regular issues are being addressed via continual improvements in existing distribution system modeling tools—for both tools used by industry and researchers—and via novel modeling methods, which are combining transmission and distribution system modeling to investigate new, often complex, system interactions at the transmission/distribution power system interface. As DERs continue to increase more and more utilities, regulators, and developers are finding usable solutions in the deployment of smart inverters with ever more capable functionalities. This increase in functionality is welcome but comes at the cost of more complex analysis when determining what specific settings should be used for an individual interconnection. With more time, experience, and likely the further development of advanced analysis tools, even higher levels of DER integration will result in a reliable, resilient, low-cost, and safely operating grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Persistent DynAMICS

Persistent DynAMICS is a lightweight software platform that enables distributed sensing systems to operate as a unified, responsive network. It integrates with existing sensors, data systems, and processing tools as an overlay, without requiring hardware replacement or increasing user burden. As data is collected, the system identifies situations that require additional attention and directs selected sensors to gather more information. For example, if a sensor detects an unusual condition along a pipeline, the system can task nearby sensors or different sensing modalities to confirm the event and focus data collection where it is needed. To support this, the platform forms temporary groups of sensors that work together to address specific objectives. Once complete, these groups are dissolved and resources are reassigned as needed. Communication is handled through an integrated messaging framework with client and server components, enabling reliable operation and data continuity even in low-bandwidth or intermittent connectivity environments.

97 MATHEMATICS AND COMPUTING↗

Hydropower Scheduling Toolchains: Comparing Experiences in Brazil, Norway, and USA and Implications for Synergistic Research

While hydropower scheduling is a well-defined problem, there are institutional differences that need to be identified to promote constructive and synergistic research. We study how established toolchains of computer models are organized to assist operational hydropower scheduling in Brazil, Norway, and the United States’ Colorado River System (CRS). These three systems have vast hydropower resources, with numerous, geographically widespread, and complex reservoir systems. Although the underlying objective of hydropower scheduling is essentially the same, the systems are operated in different market contexts and with different alternative uses of water, where the stakeholders’ objectives clearly differ. This in turn leads to different approaches when it comes to the scope, organization, and use of models for operational hydropower scheduling and the information flow between the models. Here, we describe these hydropower scheduling toolchains, identify the similarities and differences, and shed light on the original ideas that motivated their creation. We then discuss the need to improve and extend the current toolchains and the opportunities to synergistic research that embrace those contextual differences.

13 HYDRO ENERGY↗

Sub-system self-consistency in coupled cluster theory

Here, in this article, we provide numerical evidence indicating that the single-reference coupled-cluster (CC) energies can be calculated alternatively to their copybook definition. We demonstrate that the CC energy can be reconstructed by diagonalizing the effective Hamiltonians describing correlated sub-systems of the many-body system. In the extreme case, we provide numerical evidence that the CC energy can be reproduced through the diagonalization of the effective Hamiltonian describing sub-system composed of a single electron. These properties of the CC formalism can be exploited to design protocols to define effective interactions in sub-systems used as probes to calculate the energy of the entire system and introduce a new type of self-consistency for approximate CC approaches.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

On the Existence of Steady-State Solutions to the Equations Governing Fluid Flow in Networks

The steady-state solution of fluid flow in pipeline infrastructure networks driven by junction/node potentials is a crucial ingredient in various decision-support tools for system design and operation. While the nonlinear system is known to have a unique solution (when one exists), the absence of a definite result on the existence of solutions hobbles the development of computational algorithms, for it is not possible to distinguish between algorithm failure and non-existence of a solution. In this letter, we show that for any fluid whose equation of state is a scaled monomial, a unique solution exists for such nonlinear systems if the term solution is interpreted in terms of potentials and flows rather than pressures and flows. However, for gases following the CNGA equation of state, while the question of existence remains open, we construct an alternative system that always has a unique solution and show that the solution to this system is a good approximant of the true solution. Further, the existence result for flow of natural gas in networks also applies to other fluid flow networks such as water distribution networks or networks that transport carbon dioxide in carbon capture and sequestration. Most importantly, our result enables correct diagnosis of algorithmic failure, problem stiffness, and non-convergence in computational algorithms.

42 ENGINEERING↗

An Iterative Response-Surface-Based Approach for Chance-Constrained AC Optimal Power Flow Considering Dependent Uncertainty

A modern power system is characterized by a stochastic variation of the loads and an increasing penetration of renewable energy generation, which results in large uncertainties in its states. These uncertainties bring formidable challenges to the power system planning and operation process. To address these challenges, we propose a cost-effective, iterative response-surface-based approach for the chance-constrained AC optimal power-flow problem that aims to ensure the secure operation of the power systems considering dependent uncertainties. Starting from a stochastic-sampling-based framework, we first utilize the copula theory to simulate the dependence among multivariate uncertain inputs. Then, to reduce the prohibitive computational time required in the traditional Monte-Carlo method, we propose, instead of using the original complicated power-system model, to rely on a polynomial-chaos-based response surface. This response surface allows us to efficiently evaluate the time-consuming power-system model at arbitrary distributed sampled values with a negligible computational cost. This further enables us to efficiently conduct an online stochastic testing for the system states that not only screens out the statistical active constraints, but also assists in a better design of the tightened bounds without using any Gaussian or symmetric assumption. Finally, an iterative procedure is executed to fine-tune the optimal solution that better satisfies a predefined probability. The simulations conducted in multiple test systems demonstrate the excellent performance of the proposed method.

24 POWER TRANSMISSION AND DISTRIBUTION↗