Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “System Operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,315 records · Page 73

Design, Development and Testing Plan for Energy Efficiency Algorithms Related to Building-Integrated Cooling, Heating, and Power Systems

Building-integrated cooling, heating and power (CHP) systems are more efficient than conventional systems at providing local power and thermal energy, and favorable fuel prices are bound to spur their increased adoption. It is estimated that the total CHP technical potential in the commercial building sector is approximately 76 GW, but only a small fraction of it is actually deployed. Advanced control and monitoring systems that realize the full potential of these CHP systems can transform this capacity into an asset for both the owner and the grid and also accelerate the adoption of these systems in the building sector. However, to realize the full benefit of the CHP systems, we must ensure persistence of energy efficient operations. It has been demonstrated by several studies that as much as 30% of building energy use is wasted. Much of the waste results from the inability to anticipate load variations (design day vs. non-design day operations; diurnal variation of loads), identify improper operation, and efficiently operate, control and maintain building systems. Moreover, many buildings, even those with adequate control infrastructure, lack knowledgeable staff to operate and maintain energy systems. Operators of buildings with CHP systems will constantly need to make tradeoffs (economic dispatch) between onsite power generation and purchasing power, between onsite heat production from distributed generation versus heating/cooling from conventional systems, and different passive and active load management measures. Much of the inefficiency in the current building operations can be eliminated by use of automated performance monitoring (PM), real-time commissioning verification (CxV) and automated fault detection and diagnostic (AFDD) tools. Automation can help system operators make intelligent decisions. Remote and continuous monitoring of system conditions and performance will enable better management and integration of CHP with existing building systems. Continuous PM, real-time CxV and AFDD could alleviate burdens for operations staff, enhance operations and maintenance (O&M), and improve reliability of building and CHP systems. To address the O&M challenges and to provide a means to maximize the rate-of-return of building-integrated CHP systems, the Building Technologies Office (BTO) within the U.S. Department of Energy’s (DOE’s) Office of Energy Efficiency and Renewable Energy (EERE) initiated a project to design, develop, and field test a VOLTTRON™-based supervisory controller and associated open-source algorithms. These algorithms will ensure real-time optimal operation of a building-integrated CHP system, support electric grid reliability, and lead to achieving the goal of a clean, efficient, reliable and affordable next-generation integrated energy systems. This report lists the components for which PM, real-time CxV and AFDD algorithms will be developed, how the algorithms will be tested, and metrics that will be used to validate the algorithms and easy of deployment. Deployment of these algorithms in the field will result in savings reduction in energy consumption of between 10% and 20%.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Smarter building start – A distributed solution

A significant focus of research and new technologies for reducing energy use in buildings is on operating the systems more efficiently during the times when the systems are active. However, there is a large potential for energy savings in determining the periods when the systems should or should not be active. This scheduling aspect of operation is often overlooked even though relatively simple solutions can unlock substantial energy savings. In this paper we describe a smart building start (SBS) algorithm that considers multiple zones in a building to determine individual schedules for room controllers as well as the central systems based on solving a simple optimization problem. Application of the SBS algorithm to multiple interconnected systems enables a staggered start-up that minimizes peak loads and also ensures comfort is within a target range with minimal system run time. The SBS algorithm extends the capability of traditional optimal start and is designed to be simple to deploy and robust. Simulation results as well as results from tests in a real building with a VAV system are presented. The presented algorithm is applicable to any type of building with a zonal or multi-zone HVAC system. To function, it needs to be able to change setpoints in rooms and monitor room temperatures, as well as, if desired, turn the central system on or off.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

State-of-the-art short-term electricity market operation with solar generation: A review

With the accelerating penetration of solar energy in energy systems, market operations concerning the solar-associated intermittency are widely discussed. How to correctly model the solar generation in the market and solve the uncertainty-based operation problems call for solutions. Unlike other renewable resources, solar power can be more easily applied to the demand side through behind-the-meter installations in a distributed manner with significant future extensibility. The corresponding operational rules in the markets are largely being revised. Over the past two decades, with the development of deregulated power markets, numerous studies related to uncertainty-based market operations tend to transform the market from a deterministic and centralized framework to a stochastic and decentralized one. As the relevant literature is most recent, this paper reviews their contributions to electricity market operations with solar integration and underlines the research directions of this topic and ongoing industry practices. A thorough review of the electricity markets worldwide with solar energy is provided. A variety of proposed mathematical solutions to the problem are also addressed.

14 SOLAR ENERGY↗

Substation-Level Grid Topology Optimization Using Bus Splitting: Preprint

Operations of substation circuit breakers are of high significance for performing system maintenance and topology optimization. Bus splitting is one type of topology changes where the two bus-bars at a substation become electrically disconnected after certain actions of circuit breakers. As these events involve detailed substation modeling, they are not typically considered in power system routine operation and control. In this paper, an improved substation-level topology optimization is developed by expanding traditional line switching with breaker-level bus splitting, which can further reduce grid congestion and generation costs. A tight McCormick relaxation is proposed to reformulate the bi-linear terms in the resultant topology optimization model. Thus, a tractable mixed-integer linear program formulation is presented which can be efficiently solved for real-time control. Numerical studies on the IEEE 14-bus and 118-bus systems demonstrate the performance and economic benefits of the proposed topology optimization approach.

bus split↗

Introducing the 9500 Node Distribution Test System to Support Advanced Power Applications: An Operations-Focused Approach

The 9500 Node Test System is a representative section of distribution power system model developed as a part of the GridAPPS-D™ project, an effort funded by DOE as a part of the Grid Modernization Lab Consortium (GMLC) program. The test system was developed to fulfill a growing need to represent the rapidly evolving state of electric distribution systems by combining elements of legacy infrastructure systems, modern feeder topologies, and an anticipated future with smart grid technologies. It also provides a network model capable of supporting the simulation of operational scenarios such as the ones in a utility distribution control center. This test system allows the evaluation of the performance of advanced power applications in real-time, such as one that simulates the operations of an Advanced Distribution Management Systems (ADMS), Distributed Energy Resource Management Systems (DERMS), etc. in a Distribution control center. This model is an extension of the widely used IEEE 8500 Node Test Feeder and is currently being validated to become an IEEE test case to help increase adoption and widespread usage among both academia and industry. It is a full-size model representative of a section of a utility’s distribution system with multiple feeders fed from different substations. The model includes multiple distribution circuits, a sub-transmission system, multiple substations, behind the meter customer rooftop photovoltaics (PV), and multiple utility-scale distributed energy resources. To enable accurate simulations of operational scenarios, the 9500 Node Test System is designed to support procedure-based operations, with the ability to realistically demonstrate switching operations, feeder reconfiguration, adjustment of volt-var control equipment, dispatch of distributed generation, and response to planned and unplanned outages. The 9500 Node Test System includes three radial distribution feeders with 12.3 MVA of average load, consisting of both medium voltage and low voltage equipment each supplied by a different distribution substation. The three distribution feeders are connected to each other through Normally-Open switches which can be closed when needed to simulate restoration scenarios due to a fault. One feeder represents today’s grid with low penetration of customer-side renewables. The second represents a potential future grid with microgrids and 100% renewable penetration. The third has no customer generation resources, a district steam plant, and a utility-scale solar farm. The three diverse circuits were created to allow the simulation of both today’s situation as well as potential future scenarios. All three feeders have customers connected by low-voltage secondary triplex lines. This test system meets all requirements outlined in the report for creating a simulation environment that would enable discussion between key technical stakeholders as well as having the potential to accelerate operational application development and their subsequent testing and integration. The new model is a possible representation of what we believe the distribution grid may look like in the future: a high penetration of renewables, reconfigurable radial and mesh topology, numerous DERs, islanded microgrids, and significantly increased data and measurement density. The system supports both the solution of existing and newer algorithms but also enables the evaluation of applications in a realistic operational environment defined by task oriented procedural steps that represent the interaction between the control center operator and field personnel.

24 POWER TRANSMISSION AND DISTRIBUTION↗

LANSCE Facility Longevity Assessment

This LANSCE Facility Longevity Assessment examined 34 total systems critical to the operation of the LANSCE accelerator complex. These systems are primarily owned, operated, and maintained by AOT Division. Based on the criteria used in this assessment, there are 12 AOT Division systems that are potential high risk as related to longterm LANSCE operations. These systems may also impact the success of LAMP. Also summarized in this report are the facility activities planned over the next decade. These include general facility maintenance and infrastructure upgrades, as well as planned electrical system upgrades. The LANSCE Facility Operations (LFO) Division is responsible for this activity scope and budget planning. Most of the planned activities are general in nature and should have little impact on accelerator operations or LAMP activities as currently envisioned. However, close coordination with between AOT, LFO, and LAMP would be prudent. A next step should be to develop an actionable plan to address the high-risk systems. Potential criteria for developing such a plan could include: (1) Evaluating the global impact of the system (operations, program, safety, etc.), (2) Ranking by impact (ranked now by risk), (3) Estimating cost to implement the corrective actions (Is there already a plan or not?), and (4) Estimating the time required for corrective actions. An alternative could include integration of the assessment data into both the Asset Management System and the Maintenance Analytics Risk Register.

43 PARTICLE ACCELERATORS↗

Prediction of the Thermal Runaway Limit and Optimal Operation of Heat Transfer-Limited, Fixed-Bed Reactor Systems

Here, we derive a new prediction for thermal runaway starting from the alpha model for fixed-bed reactor systems. This method accounts for thermal resistance internal to the reactor tube and the radial temperature gradients that result. To showcase our method, we compare its predictions to other common criteria for thermal runaway using o-xylene oxidation as the example chemistry. Even in systems where internal heat transfer is negligible, the empirical practical design criterion for thermal runaway is inaccurate. For cases where internal heat transfer is relevant, our runaway limit is more stringent than limits derived from simpler 1-D models. To augment our work, we optimize the product yield with the thermal runaway constraint using orthogonal collocation. Using the alpha model, the results illustrate that the thermal runaway limit can be accurately determined using either numerical or analytical methods.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Advanced Sensor Deployment for Distribution System State Estimation and Fault Identification

Distribution systems are currently facing steep operational challenges as a result of the rapidly increasing integration of renewables and other distributed energy resources (DERs) at both the primary and secondary circuit levels. Distribution utilities and system operators have traditionally had some visibility of their primary circuits using low-frequency supervisory control and data acquisition systems, and they have had very poor if not zero visibility of the secondary circuits where the presence of DERs is constantly increasing. Therefore, this paper presents simulation studies to demonstrate the benefits of an advanced, high-fidelity sensor technology, called as the Meta-Alert System (MAS), developed by Electrical Grid Monitoring, Ltd. (EGM), on the distribution grid. First, a reliable model of the EGM sensors is developed, and then two use cases, distribution system state estimation (DSSE) and fault identification are simulated to evaluate the performance of the MAS technology. Simulation results on the Electric Power Research Institute J1 feeder demonstrate that the MAS can effectively participate in system-level DSSE programs and can detect and locate faults faster than traditional distribution protection schemes.

distribution system↗

Convex Relaxations of Maximal Load Delivery for Multi-Contingency Analysis of Joint Electric Power and Natural Gas Transmission Networks

Recent increases in gas-fired power generation have engendered increased interdependencies between natural gas and power transmission systems. These interdependencies have amplified existing vulnerabilities in gas and power grids, where disruptions can require the curtailment of load in one or both systems. Although typically operated independently, coordination of these systems during severe disruptions can allow for targeted delivery to lifeline services, including gas delivery for residential heating and power delivery for critical facilities. To address the challenge of estimating maximum joint network capacities under such disruptions, we consider the task of determining feasible steady-state operating points for severely damaged systems while ensuring the maximal delivery of gas and power loads simultaneously, represented mathematically as the nonconvex joint Maximal Load Delivery (MLD) problem. To increase its tractability, we present a mixed-integer convex relaxation of the MLD problem. Then, to demonstrate the relaxation’s effectiveness in determining bounds on network capacities, exact and relaxed MLD formulations are compared across various multi-contingency scenarios on nine joint networks ranging in size from 25 to 1191 nodes. The relaxation-based methodology is observed to accurately and efficiently estimate the impacts of severe joint network disruptions, often converging to the relaxed MLD problem’s globally optimal solution within ten seconds.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Climate-Induced Tradeoffs in Planning and Operating Costs of a Regional Electricity System

Electricity grid planners design the system in order to supply electricity to end users reliably and affordably. Climate change threatens both objectives through potentially compounding supply- and demand-side climate-induced impacts. Uncertainty surrounds each of these future potential impacts. Given long planning horizons, system planners must weigh investment costs against operational costs under this uncertainty. Here, we developed a comprehensive and coherent integrated modeling framework combining physically-based models with cost-minimizing optimization models in the power system. We applied this modeling framework to analyze potential tradeoffs in planning and operating costs in the power grid due to climate change in the Southeast U.S. in 2050. We find that planning decisions that do not account for climate-induced impacts would result in a substantial increase in social costs associated with loss of load. These social costs are a result of under-investment in new capacity and capacity deratings of thermal generators when we included climate change impacts in the operation stage. Finally, these results highlight the importance of including climate change effects in the planning process.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Clean Grid Vision: A U.S. Perspective - Chapter 2. Distribution Issues and Tools

The continued growth in distributed energy resources is fundamentally changing the way the distribution system is operated and planned. Additionally, an increasing number of grid issues are being regularly experienced by distribution engineers within an increasing number of utilities. Fortunately, these fundamental changes and increasingly regular issues are being addressed via continual improvements in existing distribution system modeling tools—for both tools used by industry and researchers—and via novel modeling methods, which are combining transmission and distribution system modeling to investigate new, often complex, system interactions at the transmission/distribution power system interface. As DERs continue to increase more and more utilities, regulators, and developers are finding usable solutions in the deployment of smart inverters with ever more capable functionalities. This increase in functionality is welcome but comes at the cost of more complex analysis when determining what specific settings should be used for an individual interconnection. With more time, experience, and likely the further development of advanced analysis tools, even higher levels of DER integration will result in a reliable, resilient, low-cost, and safely operating grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Persistent DynAMICS

Persistent DynAMICS is a lightweight software platform that enables distributed sensing systems to operate as a unified, responsive network. It integrates with existing sensors, data systems, and processing tools as an overlay, without requiring hardware replacement or increasing user burden. As data is collected, the system identifies situations that require additional attention and directs selected sensors to gather more information. For example, if a sensor detects an unusual condition along a pipeline, the system can task nearby sensors or different sensing modalities to confirm the event and focus data collection where it is needed. To support this, the platform forms temporary groups of sensors that work together to address specific objectives. Once complete, these groups are dissolved and resources are reassigned as needed. Communication is handled through an integrated messaging framework with client and server components, enabling reliable operation and data continuity even in low-bandwidth or intermittent connectivity environments.

97 MATHEMATICS AND COMPUTING↗

Hydropower Scheduling Toolchains: Comparing Experiences in Brazil, Norway, and USA and Implications for Synergistic Research

While hydropower scheduling is a well-defined problem, there are institutional differences that need to be identified to promote constructive and synergistic research. We study how established toolchains of computer models are organized to assist operational hydropower scheduling in Brazil, Norway, and the United States’ Colorado River System (CRS). These three systems have vast hydropower resources, with numerous, geographically widespread, and complex reservoir systems. Although the underlying objective of hydropower scheduling is essentially the same, the systems are operated in different market contexts and with different alternative uses of water, where the stakeholders’ objectives clearly differ. This in turn leads to different approaches when it comes to the scope, organization, and use of models for operational hydropower scheduling and the information flow between the models. Here, we describe these hydropower scheduling toolchains, identify the similarities and differences, and shed light on the original ideas that motivated their creation. We then discuss the need to improve and extend the current toolchains and the opportunities to synergistic research that embrace those contextual differences.

13 HYDRO ENERGY↗

Sub-system self-consistency in coupled cluster theory

Here, in this article, we provide numerical evidence indicating that the single-reference coupled-cluster (CC) energies can be calculated alternatively to their copybook definition. We demonstrate that the CC energy can be reconstructed by diagonalizing the effective Hamiltonians describing correlated sub-systems of the many-body system. In the extreme case, we provide numerical evidence that the CC energy can be reproduced through the diagonalization of the effective Hamiltonian describing sub-system composed of a single electron. These properties of the CC formalism can be exploited to design protocols to define effective interactions in sub-systems used as probes to calculate the energy of the entire system and introduce a new type of self-consistency for approximate CC approaches.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

On the Existence of Steady-State Solutions to the Equations Governing Fluid Flow in Networks

The steady-state solution of fluid flow in pipeline infrastructure networks driven by junction/node potentials is a crucial ingredient in various decision-support tools for system design and operation. While the nonlinear system is known to have a unique solution (when one exists), the absence of a definite result on the existence of solutions hobbles the development of computational algorithms, for it is not possible to distinguish between algorithm failure and non-existence of a solution. In this letter, we show that for any fluid whose equation of state is a scaled monomial, a unique solution exists for such nonlinear systems if the term solution is interpreted in terms of potentials and flows rather than pressures and flows. However, for gases following the CNGA equation of state, while the question of existence remains open, we construct an alternative system that always has a unique solution and show that the solution to this system is a good approximant of the true solution. Further, the existence result for flow of natural gas in networks also applies to other fluid flow networks such as water distribution networks or networks that transport carbon dioxide in carbon capture and sequestration. Most importantly, our result enables correct diagnosis of algorithmic failure, problem stiffness, and non-convergence in computational algorithms.

42 ENGINEERING↗

An Iterative Response-Surface-Based Approach for Chance-Constrained AC Optimal Power Flow Considering Dependent Uncertainty

A modern power system is characterized by a stochastic variation of the loads and an increasing penetration of renewable energy generation, which results in large uncertainties in its states. These uncertainties bring formidable challenges to the power system planning and operation process. To address these challenges, we propose a cost-effective, iterative response-surface-based approach for the chance-constrained AC optimal power-flow problem that aims to ensure the secure operation of the power systems considering dependent uncertainties. Starting from a stochastic-sampling-based framework, we first utilize the copula theory to simulate the dependence among multivariate uncertain inputs. Then, to reduce the prohibitive computational time required in the traditional Monte-Carlo method, we propose, instead of using the original complicated power-system model, to rely on a polynomial-chaos-based response surface. This response surface allows us to efficiently evaluate the time-consuming power-system model at arbitrary distributed sampled values with a negligible computational cost. This further enables us to efficiently conduct an online stochastic testing for the system states that not only screens out the statistical active constraints, but also assists in a better design of the tightened bounds without using any Gaussian or symmetric assumption. Finally, an iterative procedure is executed to fine-tune the optimal solution that better satisfies a predefined probability. The simulations conducted in multiple test systems demonstrate the excellent performance of the proposed method.

24 POWER TRANSMISSION AND DISTRIBUTION↗

RAMSeS: Rapid Analysis of Mission Software Systems

Over the past few decades, software has become ubiquitous as it has been integrated into nearly every aspect of society, including household appliances, consumer electronics, industrial control systems, public utilities, government operations, and military systems. Consequently, many critical national security questions can no longer be answered convincingly without understanding software, including its purpose, its capabilities, its flaws, its communication, or how it processes and stores data. As software continues to become larger, more complex, and more widespread, our ability to answer important mission questions and reason about software in a timely way is falling behind. Today, to achieve such understanding of third-party software, we rely predominantly on the ability of reverse engineering experts to manually answer each particular mission question for every software system of interest. This approach often requires heroic human effort that nevertheless fails to meet current mission needs and will never scale to meet future needs. The result is an emerging crisis: a massive and expanding gap between the national security need to answer mission questions about software and our ability to do so. Sandia National Laboratories has established the Rapid Analysis of Mission Software Systems (RAMSeS) effort, a collaborative long-term effort aimed at dramatically improving our nation’s ability to answer mission questions about third-party software by growing an ecosystem of tools that augment the human reverse engineer through automation, interoperability, and reuse. Focusing on static analysis of binary programs, we are attempting to identify reusable software analysis components that advance our ability to reason about software, to automate useful aspects of the software analysis process, and to integrate new methodologies and capabilities into a working ecosystem of tools and experts. We aim to integrate existing tools where possible, adapt tools when modest modifications will enable them to interoperate, and implement missing capability when necessary. Although we do hope to automate a growing set of analysis tasks, we will approach this goal incrementally by assisting the human in an ever-widening range of tasks.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Non-Fouling, Low Cost Electrolytic Coagulation & Disinfection for Treating Flowback and Produced Water for Reuse

Executive Summary This Final Report is composed of two major sections. The first section presents experimental results obtained in the laboratory during Budget Period 1. The second section presents results from the field test conducted during Budget Period 2. Laboratory Results This research investigated a novel electrochemical process for producing a ferric iron coagulant for use in treating flowback and produced water from hydraulic fracturing and oil production operations. The treatment system improves the effectiveness and lowers the cost of coagulation processes using Fe3+ as the coagulant. The electrolytic coagulant generation (ECG) system uses an electrochemical cell to produce acid and base from oilfield brine solutions. The acid is used to dissolve scrap iron to provide a Fe3+ coagulating agent. The base is used to neutralize the treated water. Compared to conventional electrocoagulation (EC), the main advantage of the ECG system is an order of magnitude lower cost for the source of iron. The second advantage over conventional EC is that it can deliver Fe3+ doses greater than 1 mM, since it is not limited by the amount of dissolved oxygen in the water required to oxidize ferrous to ferric iron. The capital costs for conventional EC and the ECG system are similar, but the operational costs for the ECG system are an order of magnitude lower than conventional EC. The combined costs for iron and electrical energy for treating 1 m3 of FPW with 1 mM Fe3+ is estimated to be $0.87 for conventional EC, and $0.087 for the ECG system. The estimated all-in cost for treating FPW with a 2 mM Fe3+ dose is $0.73/m3 ($0.12/bbl). Field Test Results The field test was conducted at the Paul Foster Central Tank Battery (CTB) in Lea County, New Mexico from November 10, 2022 through December 15, 2022. The feed water to the system was produced water from the Tatanka 1H formation. After approximately two weeks of testing, the initial batch of produced water had been treated and no untreated produced water was available. Thus, after this time, the feed water to the system consisted of previously treated water (i.e., recycled water). The recycled water had nearly all colloidal particles removed, and had a much lower alkalinity due to precipitation of carbonate minerals during the first pass through the system. Although the recycled water was not an ideal test solution due to its low particulate concentrations, its lower alkalinity did allow us to identify the main problem with the treatment system. The main problem with the treatment system was caused by the high alkalinity of the initial feed water (5.4 meq/L) that consumed a significant fraction of the electrochemically generated acid. This resulted in pH values exiting the iron contact tank that were too high to dissolve enough iron to effectively treat the produced water. Tests performed with recycled water with lower alkalinity did not have this issue, and dissolved iron concentrations greater than 20 mM could be achieved. One consistent observation was that effluent water from the iron contact tank was always free of particulates, even when fed with circumneutral solutions. This suggests that there is no need to dissolve high concentrations of iron if all the water to be treated is passed through the scrap iron canister. In this case, dissolved O2 and hypochlorous acid can promote sufficient iron corrosion to provide an effective coagulating agent – even in neutral pH water. This solves the problem resulting from highly alkaline produced water. Modifications to the design of the treatment system were made based on the field test results. These modifications will add minimal additional cost, and were tested in bench-scale laboratory experiments. In short-term testing, the modified treatment process was able to remove colloidal FeS particulates to levels below detection. Long-term, steady state testing will be required to determine whether the modified process is suitable for commercial treatment systems.

54 ENVIRONMENTAL SCIENCES↗