Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Performance evaluation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,297 records · Page 72

Enhanced Component Performance Study: Motor-Operated Valves 1998-2020

This report presents an enhanced performance evaluation of motor-operated valves (MOVs) at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience failure reports from calendar year 1998 through 2020 as reported in the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS). The MOV failure modes considered are fail to open or close (FTOC), fail to operate or control (FTOP), and spurious operation (SO). The component reliability estimates and the reliability data are trended for the most recent 10-year period while yearly estimates for reliability are provided for the entire study period. The following increasing trend was identified for MOVs for the most recent 10-year period: • Low-demand MOV frequency of FTOC demands (demands per reactor year). The following increasing trends were identified for MOVs for the most recent 10-year period: • Low-demand MOV FTOC failure probability • Low-demand MOV frequency of FTOC events (failures per reactor year).

99 GENERAL AND MISCELLANEOUS↗

Enhanced Component Performance Study: Motor Operated Valves 1998–2022

This report presents an enhanced performance evaluation of motor-operated valves (MOVs) at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience failure reports from calendar year 1998 through 2022 as reported in the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS). The MOV failure modes considered are fail to open or close (FTOC), fail to operate or control (FTOP), and spurious operation (SO). The component reliability estimates and the reliability data are trended for the most recent 10-year period while yearly estimates for reliability are provided for the entire study period. The following increasing trend was identified for MOVs for the most recent 10-year period: • Low-demand MOV frequency of FTOC demands (demands per reactor year). The following decreasing trends were identified for MOVs for the most recent 10-year period: • Low-demand MOV FTOC failure probability • Low-demand MOV frequency of FTOC events (failures per reactor year).

99 GENERAL AND MISCELLANEOUS↗

Enhanced Component Performance Study: Motor Driven Pumps 1998-2024

This report presents an enhanced performance evaluation of motor-driven pumps (MDPs) at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience failure reports from calendar year 1998 through 2024 as reported in the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS). The MDP failure modes considered for standby systems are fail to start (FTS), fail to run (FTR) for one hour of operation (FTR=1H), FTR after one hour of operation (FTR>1H), and for normally running systems FTS and FTR. An eight-hour unreliability estimate is also calculated and trended. The component reliability estimates and the reliability data are trended for the most recent 10-year period while yearly estimates for reliability are provided for the entire study period.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Enhanced Component Performance Study: Turbine-Driven Pumps 1998-2024

This report presents an enhanced performance evaluation of turbine driven pumps (TDPs) at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience failure reports from calendar year 1998 through 2024 as reported in the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS). The TDP failure modes considered for standby systems are fail to start (FTS), fail to run (FTR) for one hour of operation (FTR=1H), FTR after one hour of operation (FTR>1H), and for normally running systems FTS and FTR. An eight hour unreliability estimate is also calculated and trended. The component reliability estimates and the reliability data are trended for the most recent 10 year period while yearly estimates for reliability are provided for the entire study period. No increasing trends were identified for TDPs for the most recent 10 year period.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

LANDSAT-4 MSS Geometric Correction: Methods and Results

An automated image registration system such as that developed for LANDSAT-4 can produce all of the information needed to verify and calibrate the software and to evaluate system performance. The on-line MSS archive generation process which upgrades systematic correction data to geodetic correction data is described as well as the control point library build subsystem which generates control point chips and support data for on-line upgrade of correction data. The system performance was evaluated for both temporal and geodetic registration. For temporal registration, 90% errors were computed to be .36 IFOV (instantaneous field of view) = 82.7 meters) cross track, and .29 IFOV along track. Also, for actual production runs monitored, the 90% errors were .29 IFOV cross track and .25 IFOV along track. The system specification is .3 IFOV, 90% of the time, both cross and along track. For geodetic registration performance, the model bias was measured by designating control points in the geodetically corrected imagery.

Brooks, J.↗

Geothermal Power Systems Analysis: Outcome of Industry Stakeholders Workshop: Preprint

Geothermal cost and performance evaluation implemented via technoeconomic assessment (TEA) modeling is critical for the Department of Energy (DOE) and other geothermal industry stakeholders in assessing the current state of geothermal technologies and to identify existing hurdles to commercially viable geothermal development. The Geothermal Electricity Technology Evaluation Model (GETEM) is a major TEA tool used in estimating the economic feasibility and levelized cost of energy (LCOE) of conventional hydrothermal systems and enhanced geothermal systems (EGS). Since 2021, GETEM has been transitioning from an intricate spreadsheet model to a user-friendly tool within the System Advisor Model (SAM) developed by the National Renewable Energy Laboratory (NREL). Apart from enabling an expanded visibility of the geothermal model among other renewable resources, having GETEM in SAM has the advantage of simulation automation, better usability, updates tracking, active user inputs/feedback, and extended financial modeling. GETEM is used in developing supply curves for the Annual Technology Baseline (ATB). The ATB data are inputs to the Renewable Energy Potential (reV) and the Regional Energy Deployment System (ReEDS) models. The geothermal module in NREL’s reV model assesses the geothermal energy potential in the conterminous United States by defining the geospatial intersection of geothermal resources with existing grid infrastructure within the constraint of land use characteristics. The ReEDS model is a capacity expansion model used for simulating the long-term build-out and operation of the US generation and transmission system based on current energy costs and policies. To ensure enhanced representation of current industry trends in our model transitions and development, we organized a two-day virtual workshop to elicit geothermal industry stakeholder input and recommendations on our current approaches and assumptions on technoeconomic, resource assessment, and deployment scenarios modeling of geothermal technologies. Participants included developers, operators, investors, regulatory agencies, system modelers, national laboratory researchers, consultants, and other stakeholders. In this workshop, we gained stakeholder insights on current geothermal plant performance (i.e., capacity factors), updated drilling costs and learning curves, and next generation technologies such as closed loop and superhot rock geothermal. Other outcomes from this workshop and its impact on future geothermal development feasibility, resource availability, and capacity expansion studies are compiled and discussed.

Annual Technology Baseline↗

Geothermal Power Systems Analysis: Outcome of Industry Stakeholders Workshop

Geothermal cost and performance evaluation implemented via techno-economic assessment (TEA) modeling is critical for the U.S. Department of Energy (DOE) and other geothermal industry stakeholders in assessing the current state of geothermal technologies and to identify existing hurdles to commercially viable geothermal development. The Geothermal Electricity Technology Evaluation Model (GETEM) is a major TEA tool used in estimating the economic feasibility and levelized cost of energy (LCOE) of conventional hydrothermal systems and enhanced geothermal systems (EGS). Since 2021, GETEM has been transitioning from an intricate spreadsheet model to a user-friendly tool within the System Advisor Model (SAM) developed by the National Renewable Energy Laboratory (NREL). Apart from enabling an expanded visibility of the geothermal model among other renewable resources, having GETEM in SAM has the advantage of simulation automation, better usability, updates tracking, active user inputs/feedback, and extended financial modeling. GETEM is used in developing supply curves for NREL's Annual Technology Baseline (ATB), which provides inputs to the Renewable Energy Potential (reV) and the Regional Energy Deployment System (ReEDS) models. The geothermal module in NREL's reV model assesses the geothermal energy potential in the conterminous United States by defining the geospatial intersection of geothermal resources with existing grid infrastructure within the constraint of land use characteristics. The ReEDS model is a capacity expansion model used for simulating the long-term build-out and operation of the U.S. generation and transmission system based on current energy costs and policies. To ensure enhanced representation of current industry trends in our model transitions and development, we organized a two-day virtual workshop to elicit geothermal industry stakeholder input and recommendations on our current approaches and assumptions on techno-economic, resource assessment, and deployment scenarios modeling of geothermal technologies. Participants included developers, operators, investors, regulatory agencies, system modelers, national laboratory researchers, consultants, and other stakeholders. In this workshop, we gained stakeholder insights on current geothermal plant performance (i.e., capacity factors), updated drilling costs and learning curves, and next-generation technologies such as closed-loop and superhot rock geothermal. Other outcomes from this workshop and its impact on future geothermal development feasibility, resource availability, and capacity expansion studies are compiled and discussed.

annual technology baseline↗

Enhanced Component Performance Study: Air Operated Valves 1998–2022

This report presents an enhanced performance evaluation of air operated valves (AOVs) at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience failure reports from calendar year 1998 through 2022 as reported in the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS). The AOV failure modes considered are fail to open or close (FTOC), fail to operate or control (FTOP), and spurious operation (SO). The component reliability estimates and the reliability data are trended for the most recent 10 year period while yearly estimates for reliability are provided for the entire study period. The following increasing trends were identified for AOVs for the most recent 10 year period: • Low demand AOV frequency of FTOC demands (demands per reactor year) • High demand AOV frequency of FTOC demands. The following decreasing trends were identified for AOVs for the most recent 10 year period: • Low demand AOV FTOC failure probability • Low demand AOV FTOP failure rate • Low demand AOV frequency of FTOC events (failures per reactor year) • Low demand AOV frequency of FTOP events.

99 GENERAL AND MISCELLANEOUS↗

A Practical Comparison of Data-Driven Prognostics Methods for Energy Systems

This study explores data-driven prognostics for nuclear power plant (NPP) condensers, focusing on tube fouling. We utilized the Asherah nuclear power plant simulator (ANS) to compare four methods: Random Forest (RF), Support Vector Regressor (SVR), Fully Connected Neural Network (FCNN), and Long Short-Term Memory Neural Network (LSTM). By simulating various fouling scenarios in the ANS, we generated data with different degradation rates under transient operations. The models were trained and tested on these data, with performance evaluated visually and numerically including uncertainty assessment. The LSTM model excelled, exhibiting minimal prediction noise and the most accurate remaining useful life estimates across all degradation levels. Its ability to capture long-term dependencies and produce cleaner outputs makes it a strong candidate, although accurate training data across the entire component lifespan are crucial. The RF model emerged as a robust alternative, providing reliable predictions with high confidence. The FCNN and SVR models, while less effective overall, showed potential under specific conditions. FCNN offers a less complex alternative to LSTM and might benefit from larger datasets. SVR excels in precision when the quality of the training data is high. Furthermore, this study highlights the operational benefits of advanced prognostics in the energy sector and emphasizes the need for further research in NPP condenser health management through real-life experiments.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Package Performance Study: A Historical Perspective and Planning for a Path Forward

The topic of spent nuclear fuel (SNF) transportation often draws public attention and concerns regarding safety, and with large-scale shipping campaigns expected in the future, public interest is anticipated to substantially increase. In 1999, the U.S. Nuclear Regulatory Commission (NRC) began an initiative called the Package Performance Study (PPS) that initially focused on SNF transportation cask responses to severe transportation accidents. A public participation approach was to be used to help guide the scope and parameters of the study, which was also to consider using full-scale physical testing of a SNF transportation cask, where appropriate. In 2010, the NRC decided not to go forward with physical testing as proposed. In 2006, the National Academy of Sciences (NAS) conducted a study on SNF and high-level radioactive waste transportation in the United States. The NAS study recommended that full-scale cask testing, as well as other accepted methodologies, continue to be used as part of the package performance evaluation. In 2012, the Blue Ribbon Commission on America’s Nuclear Future (BRC) recommended conducting the PPS with a full-scale rail transportation cask for the purpose of building public trust and confidence in the safety of SNF transport. In 2021, the U.S. Department of Energy (DOE) restarted a consent-based siting process, focusing on how to site federal facilities for the interim consolidated storage of SNF using a consent-based approach. Large-scale SNF transportation would be necessary for any such interim storage facility. As the planning activities begin for future large-scale shipping campaigns, the DOE is considering options for conducting a DOE-led PPS to help build public trust and confidence in the transportation of SNF. Therefore, the DOE is gathering information related to the previous NRC-led PPS efforts, as well as applicable international experience with the testing of SNF packages. This paper discusses previous NRC efforts, as well as the current status of a DOE-led PPS, which is in the early planning stages.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Planetary Protection Bioburden Analysis Program

This program is a Microsoft Access program that performed statistical analysis of the colony counts from assays performed on the Mars Science Laboratory (MSL) spacecraft to determine the bioburden density, 3-sigma biodensity, and the total bioburdens required for the MSL prelaunch reports. It also contains numerous tools that report the data in various ways to simplify the reports required. The program performs all the calculations directly in the MS Access program. Prior to this development, the data was exported to large Excel files that had to be cut and pasted to provide the desired results. The program contains a main menu and a number of submenus. Analyses can be performed by using either all the assays, or only the accountable assays that will be used in the final analysis. There are three options on the first menu: either calculate using (1) the old MER (Mars Exploration Rover) statistics, (2) the MSL statistics for all the assays, or This software implements penetration limit equations for common micrometeoroid and orbital debris (MMOD) shield configurations, windows, and thermal protection systems. Allowable MMOD risk is formulated in terms of the probability of penetration (PNP) of the spacecraft pressure hull. For calculating the risk, spacecraft geometry models, mission profiles, debris environment models, and penetration limit equations for installed shielding configurations are required. Risk assessment software such as NASA's BUMPERII is used to calculate mission PNP; however, they are unsuitable for use in shield design and preliminary analysis studies. The software defines a single equation for the design and performance evaluation of common MMOD shielding configurations, windows, and thermal protection systems, along with a description of their validity range and guidelines for their application. Recommendations are based on preliminary reviews of fundamental assumptions, and accuracy in predicting experimental impact test results. The software is programmed in Visual Basic for Applications for installation as a simple add-in for Microsoft Excel. The user is directed to a graphical user interface (GUI) that requires user inputs and provides solutions directly in Microsoft Excel workbooks. This work was done by Shannon Ryan of the USRA Lunar and Planetary Institute for Johnson Space Center. Further information is contained in a TSP (see page 1). MSC- 24582-1 Micrometeoroid and Orbital Debris (MMOD) Shield Ballistic Limit Analysis Program Lyndon B. Johnson Space Center, Houston, Texas Commercially, because it is so generic, Enigma can be used for almost any project that requires engineering visualization, model building, or animation. Models in Enigma can be exported to many other formats for use in other applications as well. Educationally, Enigma is being used to allow university students to visualize robotic algorithms in a simulation mode before using them with actual hardware. This work was done by David Shores and Sharon P. Goza of Johnson Space Center; Cheyenne McKeegan, Rick Easley, Janet Way, and Shonn Everett of MEI Technologies; Mark Manning of PTI; and Mark Guerra, Ray Kraesig, and William Leu of Tietronix Software, Inc. For further information, contact the JSC Innovation Partnerships Office at (281) 483-3809. MSC-24211-1 Spitzer Telemetry Processing System NASA's Jet Propulsion Laboratory, Pasadena, California The Spitzer Telemetry Processing System (SirtfTlmProc) was designed to address objectives of JPL's Multi-mission Image Processing Lab (MIPL) in processing spacecraft telemetry and distributing the resulting data to the science community. To minimize costs and maximize operability, the software design focused on automated error recovery, performance, and information management. The system processes telemetry from the Spitzer spacecraft and delivers Level 0 products to the Spitzer Science Center. SirtfTlmProc is a unique system with automated error notification and recovery, with a real-time continuous service that can go quiescent after periods of inactivity. The software can process 2 GB of telemetry and deliver Level 0 science products to the end user in four hours. It provides analysis tools so the operator can manage the system and troubleshoot problems. It automates telemetry processing in order to reduce staffing costs. This work was done by Alice Stanboli, Elmain M. Martinez, and James M. McAuley of Caltech for NASA's Jet Propulsion Laboratory. For more information, contact iaoffice @jpl.nasa.gov. This software is available for commercial licensing. Please contact Dan Broderick at Daniel.F. Broderick@jpl.nasa.gov. Refer to NPO-47803. NASA Tech Briefs, September 2013 29 This rapid response computer program predicts Orbiter Wing Leading Edge (WLE) damage caused by ice or foam impact during a Space Shuttle launch (Program "IMPACT2"). The program was developed after the Columbia accident in order to assess quickly WLE damage due to ice, foam, or metal impact (if any) during a Shuttle launch. IMPACT2 simulates an impact event in a few minutes for foam impactors, and in seconds for ice and metal impactors. The damage criterion is derived from results obtained from one sophisticated commercial program, which requires hours to carry out simulations of the same impact events. The program was designed to run much faster than the commercial program with prediction of projectile threshold velocities within 10 to 15% of commercial-program values. The mathematical model involves coupling of Orbiter wing normal modes of vibration to nonlinear or linear springmass models. IMPACT2 solves nonlinear or linear impact problems using classical normal modes of vibration of a target, and nonlinear/ linear time-domain equations for the projectile. Impact loads and stresses developed in the target are computed as functions of time. This model is novel because of its speed of execution. A typical model of foam, or other projectile characterized by material nonlinearities, impacting an RCC panel is executed in minutes instead of hours needed by the commercial programs. Target damage due to impact can be assessed quickly, provided that target vibration modes and allowable stress are known. This work was done by Robert Clark, Jr., Paul Cotter, and Constantine Michalopoulos of The Boeing Company for Johnson Space Center. For further information, contact the JSC Innovation Partnerships Office at (281) 483-3809. MSC-24988-1 Wing Leading Edge RCC Rapid Response Damage Prediction Tool (IMPACT2) Lyndon B. Johnson Space Center, Houston, Texas (3) the MSL statistics for only the accountable assays. Other options on the main menu include a data editing form and utility programs that produce various reports requested by the microbiologists and the project, and tools to generate the groupings for the final analyses. The analyses can be carried out in three ways: Each assay can be treated separately, the assays can be collectively treated for the whole zone as a group, or the assays can be collected in groups designated by the JPL Planetary Protection Manager. The latter approach was used to generate the final report because assays on the same equipment or similar equipment can be assumed to have been exposed to the same environment and cleaning. Thus, the statistics are improved by having a larger population, thereby reducing the standard deviation by the square root of N. For each method mentioned above, three reports are available. The first is a detailed report including all the data. This version was very useful in verifying the calculations. The second is a brief report that is similar to the full detailed report, but does not print out the data. The third is a grand total and summary report in which each assay requires only one line. For the first and second reports, most of the calculations are performed in the report section itself. For the third, all the calculations are performed directly in the query bound to the report. All the numerical results were verified by comparing them with Excel templates, then exporting the data from the Planetary Protection Analysis program to Excel.

Beaudet, Robert A.↗

Enhanced Component Performance Study: Motor-Operated Valves 1998-2024

This report presents an enhanced performance evaluation of motor-operated valves (MOVs) at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience failure reports from calendar year 1998 through 2024 as reported in the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS). The MOV failure modes considered are fail to open or close (FTOC), fail to operate or control (FTOP), and spurious operation (SO). The component reliability estimates and the reliability data are trended for the most recent 10-year period while yearly estimates for reliability are provided for the entire study period. The following increasing trend was identified for MOVs for the most recent 10-year period: • Low-demand MOV frequency of FTOC demands (demands per reactor year). The following decreasing trends were identified for MOVs for the most recent 10-year period: • Low-demand MOV FTOC failure probability • High-demand MOV SO failure rate • Low-demand MOV frequency of FTOC events (failures per reactor year) • High-demand MOV frequency of SO events (failures per reactor year).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Enhanced Component Performance Study: Turbine Driven Pumps 1998–2022

This report presents an enhanced performance evaluation of turbine driven pumps (TDPs) at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience failure reports from calendar year 1998 through 2022 as reported in the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS). The TDP failure modes considered for standby systems are fail to start (FTS), fail to run (FTR) for one hour of operation (FTR=1H), FTR after one hour of operation (FTR>1H), and for normally running systems FTS and FTR. An eight hour unreliability estimate is also calculated and trended. The component reliability estimates and the reliability data are trended for the most recent 10 year period while yearly estimates for reliability are provided for the entire study period. No increasing trends were identified for TDPs for the most recent 10 year period: The following decreasing trends were identified for TDPs for the most recent 10 year period: • Standby TDP FTR>1H failure rate • Normally running TDP FTR failure rate • Standby TDP unavailability • Standby MDP total unreliability (8-hour mission) • Standby TDP frequency of start demands (demands per reactor year) • Standby TDP frequency of FTR=1H hours (hours per reactor year) • Standby TDP frequency of FTR>1H events (failures per reactor year) • Normally running TDP frequency of start demands • Normally running TDP frequency of run hours • Normally running TDP frequency of FTR events.

99 GENERAL AND MISCELLANEOUS↗

Enhanced Component Performance Study: Motor-Driven Pumps 1998-2020

This report presents an enhanced performance evaluation of motor-driven pumps (MDPs) at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience failure reports from calendar year 1998 through 2020 as reported in the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS). The MDP failure modes considered for standby systems are fail to start (FTS), fail to run (FTR) for one hour of operation (FTR≤1H), FTR after one hour of operation (FTR>1H), and for normally running systems FTS and FTR. An eight-hour unreliability estimate is also calculated and trended. The component reliability estimates and the reliability data are trended for the most recent 10-year period while yearly estimates for reliability are provided for the entire study period. The following increasing trends were identified for MDPs for the most recent 10-year period: • Standby MDP frequency of start demands (demands per reactor year) • Standby MDP frequency of FTR≤1H hours (hours per reactor year) • Standby MDP frequency of FTR>1H hours • Normally running MDP frequency of run hours. The following decreasing trends were identified for MDPs for the most recent 10-year period: • Standby MDP FTR≤1H failure probability • Normally running MDP FTR failure rate • Standby MDP unavailability • Normally running MDP total unreliability (8-hour mission) • Standby MDP frequency of FTR≤1H events (failures per reactor year) • Normally running MDP frequency of FTR events.

99 GENERAL AND MISCELLANEOUS↗

Follow-on cable coupling lightning test, volume 1

A redesigned solid rocket motor test article was subjected to simulated lightning strikes. This test was performed to evaluate the effects of lightning strike to the redesigned motor and Space Transportation System. The purpose of the test was to evaluate the performance of systems tunnel design changes when subjected to the lightning discharges. The goal of the design changes was to reduce lightning induced coupling to cables within the systems tunnel. The test article was subjected to several different amounts and kinds of discharges. Changes in coupling levels detected during the tests are recorded. The dominant mode of coupling appears to be caused by the diffusion of the magnetic fields through the system tunnel covers. The results from bond strap integrity testing showed that 16 of 18 bond straps survived. Design change evaluations showed that coupling reduction ranged from 0 to 36 decibels for each type of cable. The type of cable has less effect on coupling than does strike location and strike levels. Recommendations for design changes are made.

Danforth, Richard↗

Enhanced Component Performance Study: Air-Operated Valves 1998–2020

This report presents an enhanced performance evaluation of air-operated valves (AOVs) at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience failure reports from calendar year 1998 through 2020 as reported in the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS). The AOV failure modes considered are failure-to-open/close (FTOC), failure to operate or control (FTOP), and spurious operation (SO). The component reliability estimates and the reliability data are trended for the most recent 10-year period while yearly estimates for reliability are provided for the entire study period. The following trends were identified for the most recent 10-year period: o Extremely statistically significant increasing trend for the frequency of FTOC demands (demands per reactor year) for low-demand (= 20 demands per year) AOVs o Extremely statistically significant increasing trend for the frequency of FTOC demands for high-demand (> 20 demands per year) AOVs o Highly statistically significant decreasing trend for the failure rate of FTOP for low-demand AOVs o Highly statistically significant decreasing trend for the frequency of FTOP events (failures per reactor year) for low-demand AOVs o Statistically significant decreasing trend for the failure rate of SO for low-demand AOVs o Statistically significant decreasing trend for the frequency of SO events (failures per reactor year) for low-demand AOVs.

99 GENERAL AND MISCELLANEOUS↗

Enhanced Component Performance Study: Motor Driven Pumps 1998–2022

This report presents an enhanced performance evaluation of motor-driven pumps (MDPs) at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience failure reports from calendar year 1998 through 2022 as reported in the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS). The MDP failure modes considered for standby systems are fail to start (FTS), fail to run (FTR) for one hour of operation (FTR=1H), FTR after one hour of operation (FTR>1H), and for normally running systems FTS and FTR. An eight-hour unreliability estimate is also calculated and trended. The component reliability estimates and the reliability data are trended for the most recent 10-year period while yearly estimates for reliability are provided for the entire study period. The following increasing trends were identified for MDPs for the most recent 10-year period: (1) Standby MDP frequency of start demands (demands per reactor year), (2) Standby MDP frequency of FTR=1H hours (hours per reactor year), (3) Standby MDP frequency of FTR>1H hours, and (4) Normally running MDP frequency of run hours. The following decreasing trends were identified for MDPs for the most recent 10-year period: (1) Standby MDP FTR=1H failure probability, (2) Normally running MDP FTR failure rate, (3) Standby MDP unavailability, (4) Standby MDP total unreliability (8-hour mission), and (5) Normally running MDP total unreliability (8-hour mission).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Resource Recovery and Environmental Protection in Wyoming’s Greater Green River Basin Using Selective Nanostructured Membranes (Final Report)

Produced water (PW) represents a sizable waste stream that is co-generated with oil and natural gas production. In 2021 Wyoming ranked 8th and 9th, respectively in domestic oil and natural gas production. In 2017 Wyoming ranked as the 4th highest generator of PW in the U.S, accounting for 7% of the total volume generated. In the context of being the 3rd most arid state in the U.S., the value of water reuse becomes obvious. PW reuse, and resource recovery, in any form requires some level of treatment to remove particulates, residual (free, dispersed) hydrocarbons, organics, and salts. The level of treatment depends on the requirements of the reuse, or resource recovery, application. PW management systems in Wyoming employ in order of volume of PW managed the following management strategies: reinjection for enhanced oil recovery, surface discharge, deep well injection, evaporation ponds (impoundments), and commercial management/treatment. Complicating treatment efforts are the relatively high concentrations of organics (natural and synthetic), dispersed/free hydrocarbons, benzene-toluene-ethylbenzene, and xylenes (BTEX) compounds, biologicals, salts, and minerals. Hydrocarbons (dispersed/dissolved crude oils) and BTEX compounds, as well as synthetic organics, present economic and environmental concerns. The former represents lost revenue, while the latter results in negative environmental impacts like emissions from surface impoundments. The overall objective of this proposal was to synthesize superhydrophilic/oleophobic and superhydrophobic/oleophilic membranes for selectively concentrating and then separating BTEX compounds and oil and grease (O&G) from PW originating from the Greater Green River Basin (GGRB) in Wyoming. Three specific research aims were pursued to accomplish this overall objective. This final report details the development of the superhydrophobic and superhydrophilic membranes, as well as the design of the membrane module prototypes specifically. The technoeconomic assessment is separately reported in another document. 1. Aim #1 – Material optimization and performance evaluation of superhydrophilic/oleophobic and superhydrophobic/oleophilic membranes made by electrospinning/spraying. 2. Aim #2 – Design and construction of cross-flow membrane modules for selectively concentrating and then separating BTEX/oil from GGRB produced water. 3. Aim #3 – Techno-economic assessment of BTEX/oil recovery, and clean water production, using superhydrophilic/oleophobic and superhydrophobic/oleophilic membrane separation for GGRB PW. Superhydrophobic membranes were synthesized by electrospinning poly(vinylidene fluoride-co-hexafluoropropylene) (PVDF-HFP) nanofibers onto polyester (PET) substrates and electrospraying nano-carbon black/PVDF-HFP onto the nanofibrous layer. These membranes were characterized by high (>8000 liters per square meter per hour per bar (LMH/bar)) permeance values for pure hydrocarbon phases and a high hydrocarbon selectivity (>96%) when treating GGRB PW. All results were obtained when operating the membrane in a crossflow configuration representative of actual field operating conditions. Solvent/oil properties, specifically viscosity and total surface energy/tension, affected permeance across the membrane, which resulted in light mineral oil (394 LMH/bar) and o-xylene (1834 LMH/bar) being characterized by lower permeance values in the pure phase tests. Mixed phase fluxes between 40 to 80 LMH were obtained for the PW when operating the membrane at a feed pressure of 0.3 bar. Flux decreased as the mixed phase concentration in the feed decreased pointing to the importance of maximizing the collision efficiency between the emulsion and the membrane surface and maximizing the emulsion concentration in the feed and the turbulence within the feed channel. These tests demonstrated that the superhydrophobic membranes developed here are a viable hydrocarbon recovery method for GGRB PWs and should be pursued for testing in pilot-scale trials. Superhydrophilic membranes were successfully synthesized via electrospinning/spraying using polyacrylonitrile (PAN) nanofibers as a base nanofibrous matrix. Integration of polyaniline (PANI) into the nanofibrous matrix produced a superior membrane, for water filtration applications, relative to PAN alone and reduced graphene oxide (RGO) when integrated into the nanofibrous matrix. This conclusion was based on the PANI-PAN resistance to flux loss (fouling) when treating model solvent/oil solutions representative of GGRB PWs and field collected PW from the GGRB. The synthesized PAN membranes outperformed a commercially available PAN membrane designed for oil/water separation. This finding indicates that the surface chemical and physical characteristics of the electrospun membranes presents improved properties for filtration of challenging waters like GGRB PWs. The electrospun membranes therefore show promise overall as a substitute for conventionally polymerized membranes in PW treatment applications. The PANI-PAN membrane specifically presents superior performance characteristics for concentration O&G prior to treatment by the hydrocarbon recovery membrane and producing high-quality filtrate for reuse and/or additional treatment (desalination).

02 PETROLEUM↗