Engineering Papers⌕ Search

DOE OSTI · 1894880

Enhanced Component Performance Study: Motor-Driven Pumps 1998-2020

Abstract

This report presents an enhanced performance evaluation of motor-driven pumps (MDPs) at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience failure reports from calendar year 1998 through 2020 as reported in the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS). The MDP failure modes considered for standby systems are fail to start (FTS), fail to run (FTR) for one hour of operation (FTR≤1H), FTR after one hour of operation (FTR>1H), and for normally running systems FTS and FTR. An eight-hour unreliability estimate is also calculated and trended. The component reliability estimates and the reliability data are trended for the most recent 10-year period while yearly estimates for reliability are provided for the entire study period. The following increasing trends were identified for MDPs for the most recent 10-year period: • Standby MDP frequency of start demands (demands per reactor year) • Standby MDP frequency of FTR≤1H hours (hours per reactor year) • Standby MDP frequency of FTR>1H hours • Normally running MDP frequency of run hours. The following decreasing trends were identified for MDPs for the most recent 10-year period: • Standby MDP FTR≤1H failure probability • Normally running MDP FTR failure rate • Standby MDP unavailability • Normally running MDP total unreliability (8-hour mission) • Standby MDP frequency of FTR≤1H events (failures per reactor year) • Normally running MDP frequency of FTR events.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Ma, Zhegang. 2022-03-01. Enhanced Component Performance Study: Motor-Driven Pumps 1998-2020. https://doi.org/10.2172/1894880

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

Fire Protection Design

The purpose of this project is to design the demolition and installation of a deluge valve swap from a DV-5 to a DV-5A valve.

99 GENERAL AND MISCELLANEOUS↗