Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “unreliability”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Enhanced Component Performance Study: Motor-Driven Pumps 1998–2012

This report presents an enhanced performance evaluation of motor-driven valves (MDPs) at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience failure reports from fiscal year 1998 through 2012 for the component reliability as reported in the Equipment Performance and Information Exchange (EPIX). The MDP failure modes considered for standby systems are failure to start, failure to run less than or equal to 1 hour, and failure to run more than 1 hour; for normally running systems, the failure modes considered are failure to start and failure to run. An 8 hr unreliability estimate is also calculated and trended. The component reliability estimates and the reliability data are trended for the most recent 10-year period while yearly estimates for reliability are provided for the entire active period. One statistically significant increasing trend was identified in the MDP results for standby MDP run hours per reactor critical year. Statistically significant decreasing trends were identified for unreliability (for standby and normally running systems) frequency of failure-to-start events for standby systems and failure probability for standby systems.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Enhanced Component Performance Study: Turbine-Driven Pumps 1998-2020

This report presents an enhanced performance evaluation of turbine-driven pumps (TDPs) at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience failure reports from calendar year 1998 through 2020 as reported in the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS). The TDP failure modes considered for standby systems are fail to start (FTS), fail to run (FTR) for one hour of operation (FTR≤1H), FTR after one hour of operation (FTR>1H), and for normally running systems FTS and FTR. An eight-hour unreliability estimate is also calculated and trended. The component reliability estimates and the reliability data are trended for the most recent 10-year period while yearly estimates for reliability are provided for the entire study period. No increasing trends were identified for TDPs for the most recent 10-year period: The following decreasing trends were identified for TDPs for the most recent 10-year period: • Standby TDP FTR>1H failure rate • Standby TDP unavailability • Standby MDP total unreliability (8-hour mission) • Standby TDP frequency of FTR>1H events (failures per reactor year) • Normally running TDP frequency of start demands (demands per reactor year) • Normally running TDP frequency of run hours (hours per reactor year).

99 GENERAL AND MISCELLANEOUS↗

Enhanced Component Performance Study: Motor-Driven Pumps 1998-2020

This report presents an enhanced performance evaluation of motor-driven pumps (MDPs) at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience failure reports from calendar year 1998 through 2020 as reported in the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS). The MDP failure modes considered for standby systems are fail to start (FTS), fail to run (FTR) for one hour of operation (FTR≤1H), FTR after one hour of operation (FTR>1H), and for normally running systems FTS and FTR. An eight-hour unreliability estimate is also calculated and trended. The component reliability estimates and the reliability data are trended for the most recent 10-year period while yearly estimates for reliability are provided for the entire study period. The following increasing trends were identified for MDPs for the most recent 10-year period: • Standby MDP frequency of start demands (demands per reactor year) • Standby MDP frequency of FTR≤1H hours (hours per reactor year) • Standby MDP frequency of FTR>1H hours • Normally running MDP frequency of run hours. The following decreasing trends were identified for MDPs for the most recent 10-year period: • Standby MDP FTR≤1H failure probability • Normally running MDP FTR failure rate • Standby MDP unavailability • Normally running MDP total unreliability (8-hour mission) • Standby MDP frequency of FTR≤1H events (failures per reactor year) • Normally running MDP frequency of FTR events.

99 GENERAL AND MISCELLANEOUS↗

Enhanced Component Performance Study: Turbine Driven Pumps 1998–2022

This report presents an enhanced performance evaluation of turbine driven pumps (TDPs) at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience failure reports from calendar year 1998 through 2022 as reported in the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS). The TDP failure modes considered for standby systems are fail to start (FTS), fail to run (FTR) for one hour of operation (FTR=1H), FTR after one hour of operation (FTR>1H), and for normally running systems FTS and FTR. An eight hour unreliability estimate is also calculated and trended. The component reliability estimates and the reliability data are trended for the most recent 10 year period while yearly estimates for reliability are provided for the entire study period. No increasing trends were identified for TDPs for the most recent 10 year period: The following decreasing trends were identified for TDPs for the most recent 10 year period: • Standby TDP FTR>1H failure rate • Normally running TDP FTR failure rate • Standby TDP unavailability • Standby MDP total unreliability (8-hour mission) • Standby TDP frequency of start demands (demands per reactor year) • Standby TDP frequency of FTR=1H hours (hours per reactor year) • Standby TDP frequency of FTR>1H events (failures per reactor year) • Normally running TDP frequency of start demands • Normally running TDP frequency of run hours • Normally running TDP frequency of FTR events.

99 GENERAL AND MISCELLANEOUS↗

Advanced Semi-Supervised Learning with Uncertainty Estimation for Phase Identification in Distribution Systems

The integration of advanced metering infrastructure (AMI) into power distribution networks generates valuable data for tasks such as phase identification; however, the limited and unreliable availability of labeled data in the form of customer phase connectivity presents challenges. To address this issue, we propose a semi-supervised learning (SSL) framework that effectively leverages labeled and unlabeled data. Our approach incorporates self-training, label spreading, and Bayesian neural networks (BNNs) to enhance phase identification with AMI data. Our method uses an ensemble of multilayer perceptron classifiers in a self-training setup, iteratively adding high-confidence pseudo-labels to improve robustness. We also apply label spread to propagate labels based on data similarity, which enhances generalization across diverse distributions. In addition, we employ a BNNs with uncertainty estimation, boosting confidence in predictions and reducing phase identification errors. In our case study, we achieved approximately 98% +/- 0.08 accuracy with uncertainty using minimal and unreliable labeled data from a real U.S. utility, Duquesne Light Company. Our SSL approach, combined with uncertainty estimation, provides an efficient solution for phase identification in AMI data, ultimately improving the reliability of smart grid applications.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Advanced Semi-Supervised Learning With Uncertainty Estimation for Phase Identification in Distribution Systems

The integration of advanced metering infrastructure (AMI) into power distribution networks generates valuable data for tasks such as phase identification; however, the limited and unreliable availability of labeled data in the form of customer phase connectivity presents challenges. To address this issue, we propose a semi-supervised learning (SSL) framework that effectively leverages labeled and unlabeled data. Our approach incorporates self-training, label spreading, and Bayesian neural networks (BNNs) to enhance phase identification with AMI data. Our method uses an ensemble of multilayer perceptron classifiers in a self-training setup, iteratively adding high-confidence pseudo-labels to improve robustness. We also apply label spread to propagate labels based on data similarity, which enhances generalization across diverse distributions. In addition, we employ a BNNs with uncertainty estimation, boosting confidence in predictions and reducing phase identification errors. In our case study, we achieved approximately 98% +/- 0.08 accuracy with uncertainty using minimal and unreliable labeled data from a real U.S. utility, Duquesne Light Company. Our SSL approach, combined with uncertainty estimation, provides an efficient solution for phase identification in AMI data, ultimately improving the reliability of smart grid applications.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Audit Report, "Fire Protection Deficiencies at Los Alamos National Laboratory"

The Department of Energy's Los Alamos National Laboratory (Los Alamos) maintains some of the Nation's most important national security assets, including nuclear materials. Many of Los Alamos' facilities are located in close proximity to one another, are occupied by large numbers of contract and Federal employees, and support activities ranging from nuclear weapons design to science-related activities. Safeguarding against fires, regardless of origin, is essential to protecting employees, surrounding communities, and national security assets. On June 1, 2006, Los Alamos National Security, LLC (LANS), became the managing and operating contractor for Los Alamos, under contract with the Department's National Nuclear Security Administration (NNSA). In preparation for assuming its management responsibilities at Los Alamos, LANS conducted walk-downs of the Laboratory's facilities to identify pre-existing deficiencies that could give rise to liability, obligation, loss or damage. The walk-downs, which identified 812 pre-existing fire protection deficiencies, were conducted by subject matter professionals, including fire protection experts. While the Los Alamos Site Office has overall responsibility for the effectiveness of the fire protection program, LANS, as the Laboratory's operating contractor, has a major, day-to-day role in minimizing fire-related risks. The issue of fire protection at Los Alamos is more than theoretical. In May 2000, the 'Cerro Grande' fire burned about 43,000 acres, including 7,700 acres of Laboratory property. Due to the risk posed by fire to the Laboratory's facilities, workforce, and surrounding communities, we initiated this audit to determine whether pre-existing fire protection deficiencies had been addressed. Our review disclosed that LANS had not resolved many of the fire protection deficiencies that had been identified in early 2006: (1) Of the 296 pre-existing deficiencies we selected for audit, 174 (59 percent) had not been corrected; and, (2) A substantial portion of the uncorrected deficiencies, 86 (49 percent) were considered by the walk-down teams to be significant enough to warrant compensatory actions until the deficiency was corrected or was tracked to closure through implementation of corrective actions. Further, we found that 32 of the significant deficiencies had been closed by the previous Los Alamos contractor, prior to LANS assuming responsibility for operation of the Laboratory, even though the deficiencies had not been corrected. A fire protection expert provided technical support during the audit. As an example of uncorrected problems, LANS had not resolved, by performing periodic tests, a deficiency identified in 2006 regarding a kitchen hood fire suppression system in a facility located within the Los Alamos Neutron Science Center. Such systems are required to be tested twice a year by the National Fire Protection Association standard, a standard that had been adopted by Department of Energy under DOE Order 420.1B. Yet, in 2006, the LANS walk-down team recognized that this system had not been inspected since May 2004 and noted that deficient suppression systems could result in significantly high levels of property damage and loss. After we brought this issue to management's attention on February 6, 2009, LANS officials stated that the Laboratory would correct this deficiency. As with the problems involving the fire suppression system, we observed that LANS had not always corrected life safety deficiencies involving building exits at one of its primary facilities. This included providing a secondary emergency exit for a building with occupants on multiple floor levels. LANS had removed personnel from the third floor and improved the sprinkler system of the facility, but it had still not provided a secondary exit for personnel on the second floor by the time we completed our review. NNSA has since stated that this fire protection issue will be completely addressed by relocating personnel from the second floor. Perhaps most serious, our testing revealed that a number of deficiencies were formally closed even though actual corrective action had not been completed. Notably, we observed that action had not been taken to resolve a recommendation to replace a fire alarm panel found to be unreliable. After the walk-down was conducted but prior to contract transition, the former contractor closed the recommendation in its action tracking database even though the panel had not been replaced. The walk-down team had categorized the fire alarm system as requiring replacement since it had been modified many times, was old and obsolete, and had very limited available spare parts. In fact, the walk-down team concluded that the panel 'must be considered to be unreliable and should have a very high priority for replacement'.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Neural correspondence to spectrum of environmental uncertainty in multiple-cue probability judgment system with time delay

Despite state-of-the-art technologies like artificial intelligence, human judgment is critically essential in cooperative systems, such as the multi-agent system (MAS), which collect information among agents based on multiple-cue judgment. Human agents can prevent impaired situational awareness of automated agents by confirming situations under environmental uncertainty. System error caused by uncertainty can result in an unreliable system environment, and this environment affects the human agent, resulting in non-optimal decision-making in MAS. Thus, it is necessary to know how human behavior is changed to capture system reliability under uncertainty. Another issue affecting MAS is time delay, which can delay agent information transfer, resulting in low performance and instability. However, it is difficult to find studies on the influence of time delay on human agents. This study is about understanding the human decision-making process under a specific system reliability environment by uncertainty with time delay. We used concepts of expected and unexpected uncertainty to implement reliability of the system usage environment with three types of time delay conditions: no time delay, regular time delay, and irregular time delay conditions. We used electroencephalogram (EEG) for human cognitive neural mechanisms in multiple-cue judgment systems to understand human decision-making. In the reliability of system usage environment, the unreliable system environment significantly creates less memory load by less utilization of system rules for decision-making. In terms of time delay, delayed information delivery does not significantly affect memory load for decision-making.

cognitive process↗

Improved evidence-based genome-scale metabolic models for maize leaf, embryo, and endosperm

There is a growing demand for genome-scale metabolic reconstructions for plants, fueled by the need to understand the metabolic basis of crop yield and by progress in genome and transcriptome sequencing. Methods are also required to enable the interpretation of plant transcriptome data to study how cellular metabolic activity varies under different growth conditions or even within different organs, tissues, and developmental stages. Such methods depend extensively on the accuracy with which genes have been mapped to the biochemical reactions in the plant metabolic pathways. Errors in these mappings lead to metabolic reconstructions with an inflated number of reactions and possible generation of unreliable metabolic phenotype predictions. Here we introduce a new evidence-based genome-scale metabolic reconstruction of maize, with significant improvements in the quality of the gene-reaction associations included within our model. We also present a new approach for applying our model to predict active metabolic genes based on transcriptome data. This method includes a minimal set of reactions associated with low expression genes to enable activity of a maximum number of reactions associated with high expression genes. We apply this method to construct an organ-specific model for the maize leaf, and tissue specific models for maize embryo and endosperm cells. We validate our models using fluxomics data for the endosperm and embryo, demonstrating an improved capacity of our models to fit the available fluxomics data. All models are publicly available via the DOE Systems Biology Knowledgebase and PlantSEED, and our new method is generally applicable for analysis transcript profiles from any plant, paving the way for further in silico studies with a wide variety of plant genomes.

flux balance analysis↗

Design and Evaluation of Sensor Housing for Boundary Layer Profiling Using Multirotors

Traditional configurations for mounting Temperature–Humidity (TH) sensors on multirotor Unmanned Aerial Systems (UASs) often suffer from insufficient radiation shielding, exposure to mixed and turbulent air from propellers, and inconsistent aspiration while situated in the wake of the UAS. Descent profiles using traditional methods are unreliable (when compared to an ascent profile) due to the turbulent mixing of air by the UAS while descending into that flow field. Consequently, atmospheric boundary layer profiles that rely on such configurations are bias-prone and unreliable in certain flight patterns (such as descent). This article describes and evaluates a novel sensor housing designed to shield airborne sensors from artificial heat sources and artificial wet-bulbing while pulling air from outside the rotor wash influence. The housing is mounted above the propellers to exploit the rotor-induced pressure deficits that passively induce a high-speed laminar airflow to aspirate the sensor consistently. Our design is modular, accommodates a variety of other sensors, and would be compatible with a wide range of commercially available multirotors. Extensive flight tests conducted at altitudes up to 500 m Above Ground Level (AGL) show that the housing facilitates reliable measurements of the boundary layer phenomena and is invariant in orientation to the ambient wind, even at high vertical/horizontal speeds (up to 5 m/s) for the UAS. A low standard deviation of errors shows a good agreement between the ascent and descent profiles and proves our unique design is reliable for various UAS missions.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Application of Artificial Neural Networks to Reliable Nuclear Data for Nonproliferation Modeling and Simulation

Detection and identification of special nuclear materials (SNMs) are an essential part of the US nonproliferation effort. Modern cutting-edge SNM detection methodologies rely more and more on modeling and simulation techniques. Experiments with radiological samples in realistic configurations, is the ultimate tool that establishes the minimum detection limits of SNMs in a host of different geometries. Modern modeling and simulation approaches have the potential to significantly reduce the number of experiments with radioactive sources needed to determine these detection limits and reduce the financial barrier to SNM detection. Unreliable nuclear data is one of the principal causes of uncertainty in modeling and simulating nuclear systems. In particular, nuclear cross sections introduce a significant uncertainty in the nuclear data. The goal of this research is to develop a methodology that will autonomously extract the correct nuclear resonance characteristics of experimental data in a reliable way, a task previously left to expert judgement. Accurate nuclear data will in turn allow contemporary modeling and simulation to become far more reliable, de-escalating the extent of experimental testing. Modeling and simulation techniques reduce the use and distribution of radiological sources, while at the same time increase the reliability of the currently used methods for the detection and identification of SNMs.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Stellar coronae - What can be predicted with minimum flux models?

In order to determine the possible errors of various minimum flux corona (MFC) predictions, MFC models are compared with a grid of detailed coronal models covering a range of two orders of magnitude in coronal heating and damping length values. The MFC concept is totally unreliable in the prediction of mass loss and the relative importance of various kinds of energy losses, and MFC predictions for the mass loss rate and energy losses due to stellar wind can be wrong by many orders of magnitude. It is suggested that for future applications, the unreliable MFC formulas should be replaced by a grid of related models accounting for the coronal dependence on damping length, such as the models underlying the present study.

Hammer, R.↗

A hierarchical approach to reliability modeling of fault-tolerant systems

A methodology for performing fault tolerant system reliability analysis is presented. The method decomposes a system into its subsystems, evaluates vent rates derived from the subsystem's conditional state probability vector and incorporates those results into a hierarchical Markov model of the system. This is done in a manner that addresses failure sequence dependence associated with the system's redundancy management strategy. The method is derived for application to a specific system definition. Results are presented that compare the hierarchical model's unreliability prediction to that of a more complicated tandard Markov model of the system. The results for the example given indicate that the hierarchical method predicts system unreliability to a desirable level of accuracy while achieving significant computational savings relative to component level Markov model of the system.

Gossman, W. E.↗

A high performance totally ordered multicast protocol

This paper presents the Reliable Multicast Protocol (RMP). RMP provides a totally ordered, reliable, atomic multicast service on top of an unreliable multicast datagram service such as IP Multicasting. RMP is fully and symmetrically distributed so that no site bears un undue portion of the communication load. RMP provides a wide range of guarantees, from unreliable delivery to totally ordered delivery, to K-resilient, majority resilient, and totally resilient atomic delivery. These QoS guarantees are selectable on a per packet basis. RMP provides many communication options, including virtual synchrony, a publisher/subscriber model of message delivery, an implicit naming service, mutually exclusive handlers for messages, and mutually exclusive locks. It has commonly been held that a large performance penalty must be paid in order to implement total ordering -- RMP discounts this. On SparcStation 10's on a 1250 KB/sec Ethernet, RMP provides totally ordered packet delivery to one destination at 842 KB/sec throughput and with 3.1 ms packet latency. The performance stays roughly constant independent of the number of destinations. For two or more destinations on a LAN, RMP provides higher throughput than any protocol that does not use multicast or broadcast.

Montgomery, Todd↗

Design, Implementation, and Verification of the Reliable Multicast Protocol

This document describes the Reliable Multicast Protocol (RMP) design, first implementation, and formal verification. RMP provides a totally ordered, reliable, atomic multicast service on top of an unreliable multicast datagram service. RMP is fully and symmetrically distributed so that no site bears an undue portion of the communications load. RMP provides a wide range of guarantees, from unreliable delivery to totally ordered delivery, to K-resilient, majority resilient, and totally resilient atomic delivery. These guarantees are selectable on a per message basis. RMP provides many communication options, including virtual synchrony, a publisher/subscriber model of message delivery, a client/server model of delivery, mutually exclusive handlers for messages, and mutually exclusive locks. It has been commonly believed that total ordering of messages can only be achieved at great performance expense. RMP discounts this. The first implementation of RMP has been shown to provide high throughput performance on Local Area Networks (LAN). For two or more destinations a single LAN, RMP provides higher throughput than any other protocol that does not use multicast or broadcast technology. The design, implementation, and verification activities of RMP have occurred concurrently. This has allowed the verification to maintain a high fidelity between design model, implementation model, and the verification model. The restrictions of implementation have influenced the design earlier than in normal sequential approaches. The protocol as a whole has matured smoother by the inclusion of several different perspectives into the product development.

Montgomery, Todd L.↗

Capillary-Driven Heat Transfer Experiment: Keeping It Cool in Space

Capillary-pumped loops (CPL's) are devices that are used to transport heat from one location to another--specifically to transfer heat away from something. In low-gravity applications, such as satellites (and possibly the International Space Station), CPL's are used to transfer heat from electrical devices to space radiators. This is accomplished by evaporating one liquid surface on the hot side of the CPL and condensing the vapor produced onto another liquid surface on the cold side. Capillary action, the phenomenon that causes paper towels to absorb spilled liquids, is used to "pump" the liquid back to the evaporating liquid surface (hot side) to complete the "loop." CPL's require no power to operate and can transfer heat over distances as large as 30 ft or more. Their reliance upon evaporation and condensation to transfer heat makes them much more economical in terms of weight than conventional heat transfer systems. Unfortunately, they have proven to be unreliable in space operations, and the explanation for this unreliability has been elusive. The Capillary-Driven Heat Transfer (CHT) experiment is investigating the fundamental fluid physics phenomena thought to be responsible for the failure of CPL's in low-gravity operations. If the failure mechanism can be identified, then appropriate design modifications can be developed to make capillary phase-change heat-transport devices a more viable option in space applications. CHT was conducted onboard the Space Shuttle Columbia during the first Microgravity Science Laboratory (MSL-1) mission, STS-94, which flew from July 1 to 17, 1997. The CHT glovebox investigation, which was conceived by Dr. Kevin Hallinan and Jeffrey Allen of the University of Dayton, focused on studying the dynamics associated with the heating and cooling at the evaporating meniscus within a capillary phase-change device in a low-gravity environment. The CHT experimental hardware was designed by a small team of engineers from Aerospace Design & Fabrication (ADF), the NASA Lewis Research Center, and the University of Dayton. The hardware consisted of two experiment modules that each contained an instrumented test loop (idealized capillary-pumped loop), a base unit for power conversion and backlighting, a display unit with 15 LED's (light-emitting diodes) to display temperatures, pressure, heater power, and time, a control unit to select heaters and heater settings, a cooling fan, and associated cables.

Lekan, Jack F.↗

Shuttle Payload Ground Command and Control: An Experiment Implementation Combustion Module-2 Software Development, STS-107

This presentation covers the design of a command and control architecture developed by the author for the Combustion Module-2 microgravity experiment, which flew aboard the STS-107 Shuttle mission, The design was implemented to satisfy a hybrid network that utilized TCP/IP for both the onboard segment and ground segment, with an intermediary unreliable transport for the space to ground segment. With the infusion of Internet networking technologies into Space Shuttle, Space Station, and spacecraft avionics systems, comes the need for robust methodologies for ground command and control. Considerations of high bit error links, and unreliable transport over intermittent links must be considered in such systems. Internet protocols applied to these systems, coupled with the appropriate application layer protections, can provide adequate communication architectures for command and control. However, there are inherent limitations and additional complexities added by the use of Internet protocols that must be considered during the design. This presentation will discuss the rationale for the: framework and protocol algorithms developed by the author. A summary of design considerations, implantation issues, and learned lessons will be will be presented. A summary of mission results using this communications architecture will be presented. Additionally, areas of further needed investigation will be identified.

Carek, David Andrew↗

A Black-Scholes Approach to Satisfying the Demand in a Failure-Prone Manufacturing System

The goal of this paper is to use a financial model and a hedging strategy in a systems application. In particular, the classical Black-Scholes model, which was developed in 1973 to find the fair price of a financial contract, is adapted to satisfy an uncertain demand in a manufacturing system when one of two production machines is unreliable. This financial model together with a hedging strategy are used to develop a closed formula for the production strategies of each machine. The strategy guarantees that the uncertain demand will be met in probability at the final time of the production process. It is assumed that the production efficiency of the unreliable machine can be modeled as a continuous-time stochastic process. Two simple examples illustrate the result.

Chavez-Fuentes, Jorge R.↗