Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “power asset utilization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

National Ignition Facility. Facility and Infrastructure Systems Maintenance Plan

Ensuring the reliability of the NIF, including its support systems, laser systems, target diagnostic systems, and utilities, is essential to the availability of the NIF in its support of NNSA missions. NIF is a key capability in the DOE Stockpile Stewardship Program and supports high energy physics experiments for nuclear weapons, energy, and astrophysics applications. High system reliability provides opportunities for shots and scientific discoveries with opportunities to enhance and upgrade capabilities. This Maintenance Plan (MP) identifies the policies and procedures used to perform and support asset management of the NIF Facility and Infrastructure Systems (FInS), NIF Lasers & Alignment (LASE), NIF Target Experimental Operations (TOPS), NIF Target Area Science and Engineering (TASE), and NIF&PS Control Systems (NCS). The FInS systems include the facility, HVAC, contamination control, beampath, and Line Replaceable Units (LRUs) as well as utilities which create the beampath environments, such as vacuum, argon, or clean dry air. The LASE systems are Programmatic systems which include laser diagnostics, alignment, power conditioning, pulsed power, and input laser systems. The TOPS and TASE systems are also Programmatic systems which include target and diagnostic delivery systems and positioners, many different insertable and fixed target diagnostics, and cryogenic and target gas fill systems. Finally, the NCS systems include both software and hardware for industrial and shot operation control systems. Policies governing administrative and operational practices related to maintenance of FInS, LASE, TOPS, TASE, and NCS systems are described in this plan. In addition, the plan provides processes and procedures for managing, tracking, and documenting the work. This document, the NIF Operations Management Plan, NIF-5020544 (Ref. 1), and NIF Shot Operations Plan, NIF-5018506 (Ref. 2), together satisfy the requirements of the Conduct of Operations. Duties, responsibilities, and reporting requirements of the various positions associated with FInS, LASE, and TOPS maintenance are detailed in this plan. The FInS systems include both Real Property systems with asset management requirements specified in DOE Order 430.1C (Ref. 3) and Programmatic systems. In addition, for FInS, there is a list of the System Level Maintenance Plans (SLMPs) in NIF-1007419198 (Ref. 4) which provide the system descriptions and maintenance plan and schedule. In addition, the list includes the Reliability Centered Maintenance (RCM) and Experience Centered Maintenance (ECM) evaluations that have been performed for applicable FInS systems as well as reliability criticality per Section 3.5. The -AM version of the NIF Maintenance Plan focuses on the reliability program for FInS, LASE, TOPS, TASE, and NCS within the context of the overall NIF Reliability, Availability, and Maintainability (RAM) program and incorporates changes since the -AL version from August 2011 and has been updated to be fully consistent with the updates to Ref. 1. It also includes asset management considerations, updates to the Work Order (WO) process within the NIF Computerized Maintenance Management System (CMMS) which is EAM infor® System Maintenance and Reliability Tracking (SMaRT) (Ref. 5), and updates to metrics and key performance indicators (KPIs).

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A Community Guide to Regulatory Barriers Affecting Microgrids (Reports 1-3)

In response to growing risks of power outages from extreme weather and aging infrastructure, communities are increasingly exploring the potential of microgrids to provide reliable energy access. Microgrids offer promising solutions to meet this challenge but face a complex landscape of non-technical barriers, particularly regulations concerning the provision and distribution of energy. Most existing legal and regulatory frameworks were designed for a centralized, one-way power system, and are often poorly suited to handle systems that independently balance distributed energy resources with local load. This three-part report series provides a strategic analysis of existing regulatory and legal factors affecting microgrid deployments to help non-technical community leaders and decision-makers better understand the feasibility of a microgrid in their community. -Report No. 1: Foundational Issues Facing Microgrids details the universal policy barriers all microgrids face, including utility interconnection processes, rate structures, and local permitting. -Report No. 2: Single Property Microgrids outlines how direct asset ownership and operating behind-the-meter can bypass some regulatory oversight, using the Blue Lake Rancheria microgrid as a case study. -Report No. 3: Multi-Property Microgrids tackles the complex challenges of crossing public rights-of-way and navigating utility franchise rights, highlighting the Coventry microgrid project. The series equips decision-makers with phased frameworks to navigate financial and regulatory complexities, engage effectively with local utilities and Authorities Having Jurisdiction (AHJs), and structure successful microgrid projects.

24 POWER TRANSMISSION AND DISTRIBUTION↗

DSO+T: Expanded Study Results DSO+T Study: Volume 5

The Distribution System Operator with Transactive (DSO+T) study investigates the engineering and economic performance of a transactive energy retail market coordinating a high penetration of customer-side flexible energy assets. The study seeks to answer whether such an implementation is cost effective for customers, recovers sufficient revenue for DSOs, and is equally applicable and beneficial to a range of flexible asset types, renewable generation scenarios, and market assumptions. This report volume provides a detailed set of results for the DSO+T study extending results presented in Volumes 1, 2, and 4. The engineering and economic performance of the transactive energy scheme is presented for two separate flexible asset deployments: flexible loads (HVAC units and residential water heaters) and behind-the-meter batteries. The results of each transactive case are compared to a business-as-usual case. These cases are subject to two different renewable generation scenarios, a moderate renewable generation scenario, representative of current levels of renewable generation deployment, and a future high renewables scenario, including the increased deployment of rooftop solar photovoltaic and electric vehicles. The transactive coordination scheme is shown to produce effective and stable control and decrease peak loads 9–15%. The resulting annual demand flexibility provides net economic savings of $3.3–5.0B per year for a region the size of Texas. Detailed analysis shows that net benefits were seen for a range of distribution system operator, customer, and flexible asset types. Both participating customer (with transactive flexible assets) and nonparticipating customers (with nonflexible assets) see reductions in annual utility bills and net annual energy expenses in the range of 10–16%.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Economically Viable Intermediate to Long Duration Hydrogen Energy Storage Solutions for Fossil Fueled Assets

This report was prepared as an account of work sponsored by the Office of Fossil Energy and Carbon Management of U.S. Department of Energy under Funding Opportunity Announcement Number DE-FOA-0002332 “Energy Storage for Fossil Power Generation”. The work aimed to explore and advance an innovative hydrogen energy storage system – the synergistically integrated hydrogen energy storage system (SIHES) – that has the following characteristics: • Compatible with existing or new coal and gas fuel electricity generation units, • best suited for intermediate to long duration energy storage, from 12 hours to weeks even months, and • capable of storing energy at the utility scale – hundreds of MWh to GWh energy storage with power output level in tens to hundreds of MW. Preliminary front-end engineering design (Pre-FEED) studies was carried out to develop and refine a site-specific SIHES as peaking power generation units (so named as HyPeaker) as the first market entry point, to demonstrate both the technical feasibility and the economic viability to integrate the HyPeaker “within the fence” of a fossil power plant. This specific site was TVA’s Johnsonville Combustion Turbine Plant. The HyPeaker was designed and engineered to integrate with a 60MW aeroderivative gas turbine unit already available at TVA’s Johnsonville site. This site-specific HyPeaker consists of an alkaline electrolyzer to produce hydrogen from CO 2 free electricity sources, an innovative low-cost high-pressure hydrogen storage system (Big-Ton) and the aero gas turbine to generate electricity using blend of hydrogen and natural gas. A holistic system level technoeconomic analysis tool specific to HyPeaker was developed to optimize the engineering design of the Johnsonville site-specific HyPeaker for cost and performance. The optimal design and specification of the Johnsonville site-specific HyPeaker are the following: • Alkaline electrolyzer: 3MW • Big-Ton storage vessel: 11,000kg H 2 at 3000psi. • 4-stage diaphragm hydrogen compressor: 55kg-H 2 /hr from 150psi to 3000psi. The HyPeaker is designed to provide sufficient hydrogen for 90% continuous operation of the HyPeaker. All major components have design life of 30 years. The capex of HyPeaker is estimated at $\$$7.1M. This included $\$$1.5M for the electrolyzer, $\$$5.6M for the storage vessel and compressor. The cost of aero gas turbine was included as it is already available at the site. Key findings are: • HyPeaker can be designed, manufactured, installed and integrated with the fossil power plants, with sub-systems and components commercially available on the market today, even when it is scaled up to an order of magnitude larger than the one at the Johnsonville site. HyPeaker is a technologically viable solution to cover a wide range of energy storage duration needs, from daily peaking operation to seasonal shifting for fossil fueled assets. • The cost advantage of SCCV based Big-Ton H 2 storage vessel made it possible to “oversize” the H 2 storage subsystem to achieve overall system level cost optimization. The benefits are two-fold. First, it allows to significantly reduce the capacity and cost of electrolyzer by spreading H 2 production over a much longer period of time when the fuel cost for electricity production is low. Second, it allows to balance the hydrogen production and usage shift over weeks to months to meet the peak demands. As such, the capital cost of HyPeaker system using the Big-Ton was less than half of the cost of a system with today’s steel tube based H 2 storage system. The HyPeaker has even better cost advantage Li-ion battery based energy storage system. The estimated capital cost of Li-Ion battery system would be at $\$$38M, under the same projected 20-year electricity generation profile of the Johnsonville site. This is over 5 times more expensive than the HyPeaker system. • Since industry scale energy storage systems do not have 100% energy conversion and storage efficiency, energy storage systems using fossil fuel generated electricity would increase the CO 2 emission. This is particularly the case for HyPeaker due to its low round trip efficiency. Therefore, a more sensible solution would be to the excessive or curtailed electricity from CO 2 emission free sources such as solar farms, wind farms or nuclear power plants, to produce hydrogen, and integrate them with the HyPeaker. Electricity from TVA’s nuclear power plants was used for the Johnsonville HyPeaker. • The economic viability of HyPeaker is expected to be further improved when global supply chains are taken into consideration. For the same Johnsonville site specific HyPeaker, the capex would be reduced to ~$\$$3.6M from ~$\$$7.1M, and the added LCOE is reduced to ~$\$$85/MWh. With the bipartisan Infrastructure Investment and Jobs Act, the cost of domestically produced HyPeaker sub-systems would be at the level of today’s global suppliers. Since the peaking units generally operate at peak usage period, thereby demanding higher price, the projected $\$$85/MWh LCOE would be within the realm of financial viability for utility operators.

08 HYDROGEN↗

Medium-Duty Delivery Truck Integrated Bidirectional Wireless Power Transfer System With Grid and Stationary Energy Storage System Connectivity

Electric vehicles (EVs) can provide power to the grid or buildings similar to distributed energy resources (DER) for energy balancing applications or optimizing the operation of the microgrids in harmony with the other DER assets. This article presents the operating modes of a bidirectional wireless power transfer (WPT) system designed for a medium-duty package delivery vehicle. The WPT system designed for this study can transfer 20 kW of power across 11 in of air gap using custom-designed double-D (DD) couplers with LCC–LCC tuning networks. The proposed system utilizes a 480-V three-phase grid connection, a plug-in hybrid delivery truck with bidirectional WPT, and a stationary energy storage system (SESS) that can be connected to the primary-side dc link. Due to the differences in primary and secondary dc bus voltages, and considering the voltage of the SESS, asymmetric voltage gains were used in the system. Sensitivity analyses of this system with respect to these voltage levels are presented. Five different operating modes of the grid, SESS, and the EV battery are investigated with experimental results. Control algorithms are described for grid-to-vehicle (G2V) and vehicle-to-grid (V2G) operating modes. A bidirectional WPT system is operated with a power factor of 0.99 on the grid side in every operating mode. The EV battery was charged with 20.3 kW with an overall efficiency of 93.02% in the G2V operating mode. Finally, in the V2G operating mode, the WPT system provided 12.82 kW of power back to the grid with an overall efficiency of 89.08%.

25 ENERGY STORAGE↗

HPC Digital Twins for Evaluating Scheduling Policies, Incentive Structures and their Impact on Power and Cooling

Schedulers are critical for optimal resource utilization in high-performance computing. Traditional methods to evaluate sched- ulers are limited to post-deployment analysis, or simulators, which do not model associated infrastructure. In this work, we present the first-of-its-kind integration of scheduling and digital twins in HPC. This enables what-if studies to understand the impact of parameter configurations and scheduling decisions on the physical assets, even before deployment, or regarching changes not easily realizable in production. We (1) provide the first digital twin framework extended with scheduling capabilities, (2) integrate various top-tier HPC systems given their publicly available datasets, (3) implement extensions to integrate external scheduling simulators. Finally, we show how to (4) implement and evaluate incentive structures, as- well-as (5) evaluate machine learning based scheduling, in such novel digital-twin based meta-framework to prototype scheduling. Our work enables what-if scenarios of HPC systems to evaluate sustainability, and the impact on the simulated system.

Maiterth, Matthias [ORNL] (ORCID:000000018698460X)↗

AGGREGATE: dAta-driven modelinG preservinG contRollable dEr for outaGe mAnagemenT and rEsiliency (Final Report)

The AGGREGATE project team successfully developed and validated various modules for outage management. Brief summaries of each module are provided to showcase their strength for outage management and restoration for a distribution system with a high penetration of connected distribution energy resources (DERs). In recent years, inverter-based DERs have been widely deployed in distribution system. A most of behind-the-meter (BTM) solar power generation is not visible to the utility. The data-driven DER and load estimation modules are using machine learning (ML) and artificial intelligence (AI) to manage this issue, which provides an opportunity for distribution system operators (DSOs) to operate systems and make decisions in real-time for a distribution system with a high penetration of DERs deployed. Also, the estimated DER and true load can be further leveraged in network aggregation and cold-load pick up estimation for reducing the computing complexity and providing for fast restoration. After load demand and DER power generations have been estimated, the information will support topology and state estimation (SE). The topology estimation module demonstrated the viability of mixed integer linear programming (MILP) formulation to estimate the most likely operational radial topology and outage sections using power flow measurements, historical/estimated load and DERs data and smart meter ping measurements. Formulation includes continuous (power flow, load and DERs data) and binary measurements (smart meter ping measurements) in a single formulation. Errors in continuous data and binary data are modeled as normal distribution and Bernoulli distribution, respectively. In the future distribution grid, the power injection from controllable DERs will be essential for efficient and resilient grid operation. However, determining the optimal DER injections and restoration actions is dependent on knowledge of the system states. State estimation (SE), already the cornerstone of transmission energy management systems, will become commonplace in distribution management systems as more measurements become available from deployment of automated metering infrastructure (AMI). Observability analysis is the first step in SE, as it determines the sufficiency of the available measurements for accurately estimating the current system states. A new type of pseudo-measurement called a Correlational Measurement (CM) is introduced in this module, to enhance the observability of the system to enable more accurate SE. CMs encapsulate knowledge of correlation between demand patterns for similar classes of loads as well as injection patterns for same-technology renewable DERs. During grid contingency scenarios, DERs have been traditionally disconnected, without any fault ride-through capabilities. However, with new regulations and better technology, it is feasible for these resources to contribute to the grid’s restoration after an adverse event and hence enhance resilience. The controllability module proposes a two-step restoration scheme for the power system restoration process by leveraging additional degrees of freedom in power electronics interfaced DERs for mitigating voltage problems. In a resilience mode without the utility system, the distribution grid relies on DERs to serve critical load. In such a severe event with multiple faults on the distribution feeders, actuation of various protective devices (PDs) divides the distribution system into electrical islands. The undetected actuated PDs due to fault current contributions from DERs can delay the restoration process, thereby reducing the system resilience. The Advanced Outage Management (AOM) and the Advanced Feeder Restoration (AFR) modules developed in this project provide improved system resilience with multiple DERs. AOM identifies the faulted sections and actuated PDs in a distribution system with DERs by incorporating smart meter data. The most credible outage scenario including fault locations, PD actuations, and fault indicator (FI) failures is identified by a set of binary integer linear programming incorporating hypotheses. The AFR module serves to restore a distribution system with available energy resources taking into consideration the availability of utility sources and DERs. By partitioning the system into islands, critical load will be served with the available generation resources within islands based on the solution of a MILP. When the utility systems become available, the optimal path will be determined by a spanning tree search algorithm that reconnects these islands back to substations and restores the remaining load. The transmission and distribution (T&D) co-simulation module was used to validate the effect of a control action performed on the distribution side assets as it propagates to the transmission side. This ensures that the control action performed results in a feasible operating point on both the transmission and the distribution system. In addition to validation, the team used the T&D co-simulation module to demonstrate how distribution system assets can be used to mitigate issues on the transmission system. Specifically, the team demonstrated that appropriate switching operations on the distribution side can alleviate the line overload condition on the transmission side without causing new operational constraint violations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Demonstrating the data center as a flexible grid asset using a C-HIL setup

Increasing data center demand is outpacing grid infrastructure development. Artificial intelligence workloads and hyperscale cloud growth are creating unprecedented demand for power, while traditional grid expansion faces multiyear development timelines. Verrus is developing an innovative datacenter solution for this challenge, data centers that act as active grid-supportive assets rather than passive loads. Our approach integrates a novel grid-aware power flow management system with battery energy storage systems(BESS) into a microgrid-controlled, medium-voltage power distribution architecture that delivers critical capabilities, such as: * Fast response to grid disturbances such over/ under voltage or over/ under frequency * Demand flexibility that can service requests from the utility within 10 s * Uninterrupted transition to islanded operation during grid outages * Continuous uptime assurance for compute loads while maintaining all customer service level agreements. Through Verrus' strategic partnership with the National Renewable Energy Laboratory (NREL), these capabilities were validated using NREL's Advanced Research on Integrated Energy Systems (ARIES) virtual emulation environment to model a 70-MW grid-interactive data center. This paper outlines the design, methodology, and results of this emulated deployment, demonstrating that data centers can provide both critical load resilience and ancillary grid support without compromising uptime requirements. Specifically, we present a digital real time simulation of a 70 MW data center integrated with a physical microgrid controller, and demonstrate the data center response in the event of a grid voltage and frequency event, utility demand response request and utility outage.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Feedback from International Decommissioning Planning Projects - 20269

Decommissioning of Nuclear Power Plants is an increasing reality in many countries with nuclear power. Already many years before final shutdown, planning of the decommissioning work is usually started in order to understand for example the costs, waste volume capacity and licensing work needed. In many countries it is required to have a final decommissioning plan before any decommissioning work is allowed to start. Westinghouse has been involved in international decommissioning planning for more than 30 years, where the first 20 years was mostly funding and preliminary plans due to that decommissioning was many years away. However, as many more plants are now moving into decommissioning, the focus has shifted to final decommissioning plans with budgets instead of funding plans, strategic decisions instead of choices, waste volume specifications instead of estimates and a defined approach instead of what ifs. Westinghouse has developed a methodology based on the planning and execution of many decommissioning projects in Europe, America and Asia. That international experience and understanding helps the customers to adopt a systematic planning process where strategy development is done with the end state in mind, where the goals are clearly outlined and the starting point described. The process and steps to reach the desired end state need to be clearly defined and all options/alternatives evaluated from a cost/benefit point of view. This is followed by a thorough and quantitative risk analysis in order to give solid recommendations and credible conclusions. One important feedback has been that real decommissioning experience from reference projects is invaluable for an efficient and timely progress in order not to spend unnecessary time and effort on understanding the barriers and links between different activities in decommissioning. Skilled project managers or engineers can drive the project forward, but without decommissioning experience previously gained, valuable lessons learned are not used and the same mistakes can be made again. Many utilities have invested in knowledge transfer from other decommissioning projects through site visits, exchange programs and supplier meetings, which is a valuable asset and way of implementing lessons learned from performed decommissioning projects into the planning process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ComEd Climate Risk and Adaptation Outlook, Phase 1: Temperature, Heat Index, and Average Wind

This Climate Risk and Adaptation Outlook report presents the research and findings of a joint venture between Commonwealth Edison (ComEd) and Argonne National Laboratory (Argonne) to evaluate future climate risks to ComEd’s infrastructure and operations. ComEd recognizes that its position as the state of Illinois’ largest electric utility, serving roughly 70% of the state’s population, underscores the importance for communities across Illinois to consider climate risk as they plan for future conditions. Climate impacts, such as more severe heatwaves or more frequent flood events, can disrupt the generation, transmission, and distribution of electricity and create public health challenges. Taking a proactive approach to adapt to climate risks will help ensure that ComEd continues to serve its growing customer-base reliably and efficiently. This Climate Risk and Adaptation Outlook serves as an important first step to inform ComEd’s grid planning efforts, but Argonne and ComEd recognize that additional research beyond this report will be necessary to characterize future climate conditions more comprehensively throughout northern Illinois, to assess their impacts to grid assets and system operations, and to index effective adaptation options at an asset-level.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Dynamic Building Load Control to Facilitate High Penetration of Solar Photovoltaic Generation (Final Technical Report)

Solar photovoltaic (PV) resources are the most common form of distributed generation in residential and commercial customer premises within electric distribution networks. A higher penetration of PV generation in distribution circuits will impose challenges on maintaining service voltages within the range of industry standards, power quality, and power flow. Buildings consume 74% of the electricity produced in the United States, and a significant portion of the building load is dispatchable, making them responsive to electrical grid needs. Oak Ridge National Laboratory—in collaboration with Southern Company; the University of Tennessee, Knoxville; and the Georgia Institute of Technology—is examining the PV integration issues in distribution-level electrical grids and developing integrated demand-side control and communication systems to enable responsive loads. The proposed responsive loads mechanism performs renewable generation following to increase the penetration of solar PV within each feeder. The specific objectives of this project are to (1) examine distribution-level PV integration scenarios to understand requirements, (2) undertake an end-to-end simulation-based design of a distributed control strategy of loads geographically near the PV generation asset to minimize the effect on the distribution feeder, (3) deploy and demonstrate the control technology developed in partnership with utilities, and (4) perform a scalability analysis at the utility scale. This 3-year integrated project aims to develop, demonstrate, and validate demand-side control technology to enable increased the penetration of renewables while mitigating challenges that arise due to their intermittency. Activities in Budget Period (BP) 1 focused on a literature review and the formal design of a control system for integrating local distribution with generation and loads. The team used modeling and simulation to evaluate the impact of varying buildings loads, variable PV generation, and power flow dynamics on the distribution circuit. The dynamic models developed in BP 1 were used in BP 2 to develop a model-based control design and a test bed. The test bed has enabled the simulation-based testing and comparison of different control designs and formulations applied to different configurations of the distribution grid, PVs, and building loads. The control approaches developed in BP 2 were implemented in BP 3 in the form of hardware deployed at the Central Baptist Church (CBC) in Knoxville, Tennessee, for testing and evaluation. The outcome of this project was the development and demonstration of open-source, low-cost, low-touch sensing and control retrofits to distributed PV generation and building loads that, in a coordinated fashion, provide the load-shaping response needed to integrate high levels of renewable penetration. This research addresses the target metrics by dynamically controlling a load with solar generation variability to minimize the extent of two-way power flow, enhance reliability, facilitate high PV penetration (>100% of peak load in a line segment), and generate scalable software and hardware solutions adaptable to any penetration levels. The research and development activities are focused and designed to be impactful within the relevant 2020 targets time frame.An accurate open-source integration simulation framework for end-to-end control design was developed and deployed at the CBC facility for testing and evaluation. This final report provides a detailed review of the technical results achieved during this 3-year integrated project. A novel spectral analysis of PV data is demonstrated to derive the requirements of the control design. A detailed simulation-based analysis of PV integration at increasing penetration levels is presented using 1 year of PV data to demonstrate the impact on the distribution circuits. Two different control strategies were developed and demonstrated via simulation to track variable PV generation with adaptive load dispatch. The report concludes with a summary of accomplishments and recommendations for a path forward.

14 SOLAR ENERGY↗

Optimal hybrid power plants for electric vehicle charging demand

Transmission constraints, increasing motivations to decarbonize, and concerns over peak electric vehicle (EV) load impacts on local grids have driven electric customers to consider behind-the-meter, hybrid power plant generation and storage at the distributed-grid level for EV charging. In this study, we develop capabilities to optimize hybrid power plant component capacities for EV charging. We then demonstrate these capabilities in a case study for Boulder, Colorado, using public EV charging data as well as wind and solar resource data. Our results show system designs that balance the cost of energy with load-meeting and peak shaving performance. Within the case study, systems designed for wind, solar photovoltaic (PV), and storage resulted in lower cost of energy than those optimized for PV and storage only. This indicates that in areas where wind resource exists, hybrid power plants that include wind, PV, and battery assets can better meet EV charging loads (including peak loads that are prone to overloading local grids) than PV and battery assets alone. Future work to address limitations in this paper include extending cost modeling to include performance losses (e.g., based on operations or weather) and charging station costs to estimate levelized cost of charging, and quantifying uncertainty and error in our aggregation methods for estimating EV charging loads at the hourly timescale.

14 SOLAR ENERGY↗

Optimization of Energy Storage System Economics and Controls by Incorporating Battery Degradation Costs in REopt

The use of stationary electrochemical energy storage systems utilizing lithium-ion batteries has increased rapidly as the production scale and price for lithium-ion batteries has decreased. These energy storage systems are crucial for maintaining grid resiliency, especially for grids operating with high penetration of renewable energy generation assets or for with a variety of distributed energy generation and storage systems. One challenging factor for the development of battery energy storage systems is estimating the proper sizing, in terms of both power and energy, that minimizes total costs over the lifetime of the systems; this calculation is difficult in simple cases, where a battery is costed independently, but is extremely challenging when building loads and electrical generation by photovoltaic resources are also considered. REopt is a techoeconomic optimization tool developed by NREL to address these challenges. Previously, battery degradation has been priced by simply assuming a 10-year replacement schedule for battery systems. However, this does not account for varying degradation trends observed across real-world batteries, or allow for batteries to be operated in a degradation-aware manner that optimizes battery dispatch based on operating costs. This work incorporates a battery life model into REopt. This battery life model is simple, so that it may be solvable within the constrains of a mixed-integer linear optimization problem, but is fit to accelerated aging data recorded in the lab. To achieve the best possible accuracy for lifetime estimates given these constraints, parameters for the battery life model in REopt are estimated by fitting 20-year simulations of battery life after identifying state-space battery degradation model from accelerated aging data. Comparisons of battery life predicted in REopt and from the state-space battery degradation model to ensure validity of lifetime estimates made by REopt. Battery life and cost is optimized by controlling three decision to minimize system life cost: battery sizing, daily state-of-charge, and daily energy-throughput. The cost of battery degradation as a function of these control variables is then estimated assuming two possible maintenance strategies: replacement, where the entire battery system is replaced if cell reach an end-of-life capacity threshold; and augmentation, which establishes a fund to pay for continual purchase of new batteries to maintain the initial energy capacity of the system. These two strategies offer conservative (for replacement) and optimistic (for augmentation) bounds for total system cost. The degradation cost incurred by these strategies is then used to control battery dispatch decisions, operating the battery in a degradation-aware manner that maximizes battery lifetime while also providing energy when favorable. Because the mixed-integer linear program has perfect foresight of future energy needs, batteries with degradation costs are always operated using 'just-in-time' charging, which is unrealistic, as no energy is left in the storage system to perform other energy services or to serve as emergency back-up power. To combat this, an inequality constraint on the average annual state-of-charge is imposed, and the sensitivity of system cost to average stored energy, e.g., the cost of system resiliency, can be quantified. Analysis of results has several conclusions, for instance, oversizing of battery storage systems is not a cost burden when battery storage is an optimal solution, as any additional battery capacity can simply be utilized to avoid costs of purchasing energy from a utility.

battery↗

Large Load Impacts to Distribution System Hosting Capacity

This work examined the impact of large loads on utility distribution system models using the Sandia-developed open-source software DREAMS. It was shown that hosting capacity varies with location and changes after any asset is added to, or removed from, a system. Despite the tested models having similar rated voltages and other characteristics, their thermal and voltage constrained hosting capacity varied over 2 MW. The addition of a 3-phase balanced constant power large load with power factor of 1.0 exhibited non-linear reductions to all voltage constrained hosting capacities. The reductions to thermal constrained hosting capacity from a load with similar characteristics was more linear, related to the size of the added load, and did not impact all model buses. Co-located capacitors were shown to accommodate demand that was beyond the baseline voltage constrained hosting capacity limits, however, the costs and benefits from this approach were found to not be 1:1 and required additional available thermal capacity.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Conservation Voltage Reduction with Distributed Energy Resource Management System, Grid-Edge, and Legacy Devices

Distribution utilities use conservation voltage reduction (CVR) to obtain energy savings and lower peak demand by reducing bus voltages. Traditionally, the CVR is accomplished by controlling the legacy assets such as load tap changers, voltage regulators, and capacitor banks. The deployment of the advanced distribution management system (ADMS) and distributed energy resource management system (DERMS) enables the integration of distributed energy resources into the distribution networks and provide the grid services including CVR. This paper studies the coordinated operation of an ADMS and a DERMS in achieving CVR and voltage regulation. A commercial ADMS uses legacy devices and Edge-of-Network Grid Optimization (ENGO) devices to obtain energy savings through CVR. A prototype DERMS dispatches the photovoltaic smart inverters based on real-time optimal power low to ensure voltage regulation across the feeder. The results show that the coordinated operation of ADMS and DERMS is effective in achieving CVR and voltage regulation. Specifically, energy savings of up to 4.7% are observed in the real utility distribution system used in this study.

advanced distribution management system↗

Conservation Voltage Reduction with Distributed Energy Resource Management System, Grid-Edge, and Legacy Devices: Preprint

Distribution utilities use conservation voltage reduction (CVR) to obtain energy savings and lower peak demand by reducing bus voltages. Traditionally, the CVR is accomplished by controlling the legacy assets such as load tap changers, voltage regulators, and capacitor banks. The deployment of the advanced distribution management system (ADMS) and distributed energy resource management system (DERMS) enables the integration of distributed energy resources into the distribution networks and provide the grid services including CVR. This paper studies the coordinated operation of an ADMS and a DERMS in achieving CVR and voltage regulation. A commercial ADMS uses legacy devices and Edge-of-Network Grid Optimization (ENGO) devices to obtain energy savings through CVR. A prototype DERMS dispatches the photovoltaic smart inverters based on real-time optimal power low to ensure voltage regulation across the feeder. The results show that the coordinated operation of ADMS and DERMS is effective in achieving CVR and voltage regulation. Specifically, energy savings of up to 4.7% are observed in the real utility distribution system used in this study.

advanced distribution management system↗

Conservation Voltage Reduction with Distributed Energy Resource Management System, Grid-Edge, and Legacy Devices

Distribution utilities use conservation voltage reduction (CVR) to obtain energy savings and lower peak demand by reducing bus voltages. Traditionally, the CVR is accomplished by controlling the legacy assets such as load tap changers, voltage regulators, and capacitor banks. The deployment of the advanced distribution management system (ADMS) and distributed energy resource management system (DERMS) enables the integration of distributed energy resources into the distribution networks and provide the grid services including CVR. This paper studies the coordinated operation of an ADMS and a DERMS in achieving CVR and voltage regulation. A commercial ADMS uses legacy devices and Edge-of-Network Grid Optimization (ENGO) devices to obtain energy savings through CVR. A prototype DERMS dispatches the photovoltaic smart inverters based on real-time optimal power low to ensure voltage regulation across the feeder. The results show that the coordinated operation of ADMS and DERMS is effective in achieving CVR and voltage regulation. Specifically, energy savings of up to 4.7% are observed in the real utility distribution system used in this study.

advanced distribution management system↗

Conservation Voltage Reduction with Distributed Energy Resource Management System, Grid-Edge, and Legacy Devices

Distribution utilities use conservation voltage reduction (CVR) to obtain energy savings and lower peak demand by reducing bus voltages. Traditionally, the CVR is accomplished by controlling the legacy assets such as load tap changers, voltage regulators, and capacitor banks. The deployment of the advanced distribution management system (ADMS) and distributed energy resource management system (DERMS) enables the integration of distributed energy resources into the distribution networks and provide the grid services including CVR. This paper studies the coordinated operation of an ADMS and a DERMS in achieving CVR and voltage regulation. A commercial ADMS uses legacy devices and Edge-of-Network Grid Optimization (ENGO) devices to obtain energy savings through CVR. A prototype DERMS dispatches the photovoltaic smart inverters based on real-time optimal power low to ensure voltage regulation across the feeder. The results show that the coordinated operation of ADMS and DERMS is effective in achieving CVR and voltage regulation. Specifically, energy savings of up to 4.7% are observed in the real utility distribution system used in this study.

advanced distribution management system↗