Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “gravity assist”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Current trajectory options for a comet nucleus sample return mission

A summary of the current trajectory options available for the ESA comet nucleus sample return mission, Rosetta, is presented. These options include direct trajectories, delta-V-EGA trajectories using a Titan IV/Centaur launch vehicle with upgraded solid rocket motors, a trajectory involving a gravity assist of the earth (VEGA) prior to comet rendezvous, and one involving an additional gravity assist of the earth (VEEGA). Other propulsion options proposed and discussed are solar electric propulsion/ballistic trajectory modes and nuclear electric propulsion trajectory modes. Tables of performance data for each of these trajectory options are given.

Sauer, Carl G., Jr.↗

The Feasibility of a Galileo-Style Tour of the Uranian Satellites

Gravity-assist trajectories have been a key to outer Solar System exploration. In particular, the gravity-assist tour of the Jovian satellites has contributed significantly to the success of the Galileo mission. A comparison of the Jovian system to the Uranian system reveals that the two possess similar satellite/planet mass ratios. Tisserand graphs of the Uranian system also indicate the potential for tours at Uranus. In this paper. We devise tour strategies and design a prototypical tour of the Uranian satellites, proving that tours at Uranus are feasible.

Heaton, Andrew F.↗

Voyager mission description

The Voyager project, which involves the 1977 launch of two advanced three-axis attitude stabilized spacecraft for the exploration of the Jovian and Saturnian systems, as well as interplanetary space, is discussed. The missions include investigation of the gravitational fields, atmospheric dynamics and magnetospheres of Jupiter and Saturn, the atmospheres, surface composition and features of Titan, the Io flux tube, the Great Red Spot of Jupiter, and earth occultation by Saturn's rings. To reduce energy required to reach Saturn, gravity-assist swingbys of Jupiter will be employed; a continuation to Uranus by the second satellite may be implemented by reliance on gravity-assist at Saturn.

Kohlhase, C. E.↗

In-Flight Operation of the Dawn Ion Propulsion System - The First Nine Months

The Dawn mission, part of NASA's Discovery Program, has as its goal the scientific exploration of the two most massive main-belt asteroids, Vesta and Ceres. The Dawn spacecraft was launched from Cape Canaveral Air Force Station on September 27, 2007 on a Delta-II 7925H-9.5 (Delta-II Heavy) rocket that placed the 1218 kg spacecraft into an Earth-escape trajectory. On-board the spacecraft is an ion propulsion system (IPS) which will provide most of the delta-V needed for heliocentric transfer to Vesta, orbit capture at Vesta, transfer to Vesta science orbits, departure and escape from Vesta, heliocentric transfer to Ceres, orbit capture at Ceres, and transfer to Ceres science orbits. The Dawn ion engine design is based on the design validated on NASA's Deep Space 1 mission. However, because of the very substantial (11 km/s) delta-V requirements for this mission Dawn requires two engines to complete its mission objectives. The power processor units (PPU), digital control and interface units (DCIU) slice boards and the xenon control assembly (XCA) are also based on the DS1 design. The DCIUs and thrust gimbal assemblies (TGA) were developed at the Jet Propulsion Laboratory. The spacecraft was provided by Orbital Sciences Corporation, Sterling, Virginia, and the mission is managed by and operated from the Jet Propulsion Laboratory. Dawn partnered with Germany, Italy and Los Alamos National Laboratory for the science instruments. The mission is led by the principal investigator, Dr. Christopher Russell, from the University of California, Los Angeles. The first 80 days after launch were dedicated to the initial checkout of the spacecraft prior to the initiation of long-term thrusting for the heliocentric transfer to Vesta. The IPS hardware, consisting of three ion thrusters and TGAs, two PPUs and DCIUs, xenon feed system, and spacecraft control software, was investigated extensively. Thrust measurements, roll torque measurements, pointing capabilities, control characteristics, and thermal behavior of the spacecraft and IPS were carefully evaluated. The Dawn IPS fully met all its initial checkout performance objectives. Deterministic thrusting for cruise began on December 17, 2007. Over the subsequent approximately 330 days the IPS will be operated virtually continuously at full power thrusting (approximately 91 mN) leading to a Mars flyby in February 2009. The encounter with Mars provides a gravity assist for a plane change and is the only source of post-launch delta-V apart from the IPS. Following the Mars gravity assist IPS will be operated for approximately one year at full power and for 1.3 years at throttled power levels leading to rendezvous with Vesta in August of 2011. Following nine months of orbital operations with IPS providing the propulsion needed for orbit capture, science orbit transfer and orbit maintenance and Vesta escape, Dawn will transit to Ceres with an expected arrival date of February 2015. As of June 16, 2008 the ion thrusters on Dawn have operated for close to 3,846 hours and have delivered nearly 1 km/s of delta-V to the spacecraft. Dawn IPS operation has been almost flawless during the initial checkout and six months of cruise. This paper provides an overview of Dawn's mission objectives, mission and system design, and the results of the post-launch Dawn IPS mission operations through June 2008

Garner, Charles E.↗

The role of invariant manifolds in lowthrust trajectory design (part III)

This paper is the third in a series to explore the role of invariant manifolds in the design of low thrust trajectories. In previous papers, we analyzed an impulsive thrust resonant gravity assist flyby trajectory to capture into Europa orbit using the invariant manifolds of unstable resonant periodic orbits and libration orbits. The energy savings provided by the gravity assist may be interpreted dynamically as the result of a finite number of intersecting invariant manifolds. In this paper we demonstrate that the same dynamics is at work for low thrust trajectories with resonant flybys and low energy capture. However, in this case, the flybys and capture are effected by continuous families of intersecting invariant manifolds.

low thrust trajectories↗

Solar system exploration in the 1990's and beyond

Exploration of Venus by Magellan and Pioneer Venus continues. Additionally, Galileo's Venus-earth-earth gravity assist trajectory to Jupiter has already provided targets of opportunity at Venus and at earth. Additional opportunities exist during the October 29, 1991, flyby of the asteroid Gaspra, the second earth gravity assist on December 8, 1992, and the flyby of the asteroid Ida on October 18, 1993. A fully successful mission through entry of the Jupiter atmospheric probe is anticipated in 1995/1996. The buildup of the Mars Observer spacecraft for a September 1992 launch is accelerating, and the development of the CRAF spacecraft and the orbiter for the NASA-ESA Cassini mission to Saturn is proceeding. Strategic plans to continue this ambitious program include early initiation of a phased program to detect other planetary systems; start of a program of low-cost, near-earth missions beginning with a near-earth asteroid rendezvous; continuation of moon-Mars exploration using sequentially launched single experiment Lunar Scouts and clusters of small landers to build up a Mars network of 16 stations; and finally, start of a major mission late in the century to explore Neptune and/or Pluto.

Huntress, Wesley T., Jr.↗

ARTEMIS: The First Mission to the Lunar Libration Orbits

The ARTEMIS mission will be the first to navigate to and perform stationkeeping operations around the Earth-Moon L1 and L2 Lagrangian points. The NASA Goddard Space Flight Center (GSFC) has previous mission experience flying in the Sun-Earth L1 (SOHO, ACE, WIND, ISEE-3) and L2 regimes (WMAP) and have maintained these spacecraft in libration point orbits by performing regular orbit stationkeeping maneuvers. The ARTEMIS mission will build on these experiences, but stationkeeping in Earth-Moon libration orbits presents new challenges since the libration point orbit period is on the order of two weeks rather than six months. As a result, stationkeeping maneuvers to maintain the Lissajous orbit will need to be performed frequently, and the orbit determination solutions between maneuvers will need to be quite accurate. The ARTEMIS mission is a collaborative effort between NASA GSFC, the University of California at Berkeley (UCB), and the Jet Propulsion Laboratory (JPL). The ARTEMIS mission is part of the THEMIS extended mission. ARTEMIS comprises two of the five THEMIS spacecraft that will be maneuvered from near-Earth orbits into lunar libration orbits using a sequence of designed orbital maneuvers and Moon & Earth gravity assists. In July 2009, a series of orbit-raising maneuvers began the proper orbit phasing of the two spacecraft for the first lunar flybys. Over subsequent months, additional propulsive maneuvers and gravity assists will be performed to move each spacecraft though the Sun-Earth weak stability regions and eventually into Earth-Moon libration point orbits. We will present the overall orbit designs for the two ARTEMIS spacecraft and provide analysis results of the 3/4-body dynamics, and the sensitivities of the trajectory design to both · maneuver errors and orbit determination errors. We will present results from the. initial orbit-raising maneuvers.

Woodward, Mark↗

Touring the satellites of Saturn

A set of possible options is being considered for the next mission to Saturn after the Voyager flybys. Many of these options will include a Saturn orbiter which will provide detailed investigations of the atmosphere, magnetosphere, ring system and satellites of Saturn. The feasibility of designing Saturnian satellite tours which satisfy the science objectives and are consistent with mission requirements and constraints is explored. An orbiter mission is possible through using gravity assist trajectories to target the spacecraft from one satellite encounter to the next. A challenge in designing trajectories to encounter all the satellites is that Titan is the only massive satellite available for gravity assist. Two reference tours are presented illustrating different strategies to achieve the science objectives.

Diehl, R. E.↗

Orbital acrobatics in the Sun-Earth-Moon system

Unconventional trajectory techniques for space missions in the Sun-Earth-Moon system, including libration-point orbits, gravity-assist maneuvers, and Earth-return trajectories are reviewed. The ISEE-3/ICE flight experience is used to illustrate the utility of libration-point orbits called halo-orbits. Five lunar gravity-assist maneuvers used by the ISEE-3/ICE spacecraft are discussed. The final lunar swingby sent the spacecraft into a heliocentric trajectory that will eventually intercept Comet Giacobini-Zinner. As an example of the Earth-return trajectory concept, a proposed mission that includes flybys of three comets and two asteroids is described.

Farquhar, Robert W.↗

The Maneuver Planning Process for the Microwave Anisotropy Probe (MAP) Mission

The Microwave Anisotropy Probe (MAP) was successfully launched from Kennedy Space Center's Eastern Range on June 30, 2001. MAP will measure the cosmic microwave background as a follow up to NASA's Cosmic Background Explorer (COBE) mission from the early 1990's. MAP will take advantage of its mission orbit about the Sun-Earth/Moon L2 Lagrangian point to produce results with higher resolution, sensitivity, and accuracy than COBE. A strategy comprising highly eccentric phasing loops with a lunar gravity assist was utilized to provide a zero-cost insertion into a lissajous orbit about L2. Maneuvers were executed at the phasing loop perigees to correct for launch vehicle errors and to target the lunar gravity assist so that a suitable orbit at L2 was achieved. This paper will discuss the maneuver planning process for designing, verifying, and executing MAP's maneuvers. A discussion of the tools and how they interacted will also be included. The maneuver planning process was iterative and crossed several disciplines, including trajectory design, attitude control, propulsion, power, thermal, communications, and ground planning. Several commercial, off-the-shelf (COTS) packages were used to design the maneuvers. STK/Astrogator was used as the trajectory design tool. All maneuvers were designed in Astrogator to ensure that the Moon was met at the correct time and orientation to provide the energy needed to achieve an orbit about L2. The Mathworks Matlab product was used to develop a tool for generating command quaternions. The command quaternion table (CQT) was used to drive the attitude during the perigee maneuvers. The MatrixX toolset, originally written by Integrated Systems, Inc., now distributed by Mathworks, was used to create HiFi, a high fidelity simulator of the MAP attitude control system. HiFi was used to test the CQT and to make sure that all attitude requirements were met during the maneuver. In addition, all ACS data plotting and output were generated in MatrixX. A final test used FlatSat, a real-time hardware-in-the-loop simulator, which used identical MAP flight code to simulate operations on the spacecraft. Simulations in FlatSat allowed the MAP team to verify maneuver commands, timing, and spacecraft configuration before the commands were sent up to the spacecraft for execution. The MAP maneuver team successfully pieced together all of these COTS tools for designing MAP's maneuvers and MAP is now collecting data at L2.

Mesarch, Michael A.↗

The Maneuver Planning Process for the Microwave Anisotropy Probe (MAP) Mission

The Microwave Anisotropy Probe (MAP) mission utilized a strategy combining highly eccentric phasing loops with a lunar gravity assist to provide a zero-cost insertion into a Lissajous orbit about the Sun-Earth/Moon L2 point. Maneuvers were executed at the phasing loop perigees to correct for launch vehicle errors and to target the lunar gravity assist so that a suitable orbit at L2 was achieved. This paper will discuss the maneuver planning process for designing, verifying, and executing MAP's maneuvers. This paper will also describe how commercial off-the-shelf (COTS) tools were used to execute these tasks and produce a command sequence ready for upload to the spacecraft. These COTS tools included Satellite Tool Kit, MATLAB, and Matrix-X.

Mesarch, Michael A.↗

Ballistic trajectories

The only ballistic trajectory mode feasible for a close solar probe or for an orbit inclined approximately 90 degrees to the ecliptic is the Jupiter gravity assisted mode. A comparison of the trajectories of the Solar Polar and the Solar Probe Mission for 1983 launches is shown. The geometry of the solar encounter phase is practically the same for the 4.3 year orbit achieved by a Jupiter gravity assist and for a one year orbit. Data describing the geometry of an orbit with perihelion at 4 solar radii and aphelion at Jupiter are listed. The range of apparent directions of the solar wind if it is flowing radially outward from the Sun with a speed of either 150 or 300 km/sec is shown. The minimum sun-earth-probe angle during the solar encounter as a function of the earth-node angle and the orbital inclination is also shown. If the inclination is 60 degrees or more, the minimum SEP angle is not greatly different from the 90 degree value.

Bender, D. F.↗

Preliminary design for a proposed Saturn mission with a second Galileo spacecraft

A study has been performed to assess the feasibility of using a second Galileo spacecraft for a Titan-probe/Saturn-orbiter mission that would be launched on a Shuttle/Centaur in the early 1990s. The interplanetary transfer is accomplished by means of a Delta-V earth-gravity-assist trajectory with a 3-year flight time from launch to earth flyby. Just prior to arrival at Saturn, the Titan probe is released, and the orbiter is used to relay data from the probe back to earth as it performs a close gravity-assist flyby of Titan. The orbiter then conducts a satellite tour containing multiple encounters with Saturn's satellites. Discussed in detail are the optimal trajectory design, Saturn approach trajectory design (Titan flyby, probe relay, and initial orbit selection), satellite tour design, and mission performance.

D'Amario, Louis A.↗

ARTEMIS Mission Overview: From Concept to Operations

ARTEMIS (Acceleration, Reconnection, Turbulence and Electrodynamics of the Moon's Interaction with the Sun) repurposed two spacecraft to extend their useful science (Angelopoulos, 2010) by moving them via lunar gravity assists from elliptical Earth orbits to L1 and L2 Earth-Moon libration orbits and then to lunar orbits by exploiting the Earth-Moon-Sun dynamical environment. This paper describes the complete design from conceptual plans using weak stability transfer options and lunar gravity assist to the implementation and operational support of the Earth-Moon libration and lunar orbits. The two spacecraft of the ARTEMIS mission will have just entered lunar orbit at this paper's presentation.

Folta, David↗

Robotic Planetary Science Missions Enabled with Small NTR Engine/Stage Technologies

The high specific impulse (Isp) and engine thrust-to-weight ratio of liquid hydrogen (LH2)-cooled nuclear thermal rocket (NTR) engines makes them ideal for upper stage applications to difficult robotic planetary science missions. A small 15 thousand pound force (klbf) NTR engine using a uranium-zirconium-niobium 'ternary carbide' fuel (Isp approximately 960 seconds at approximately 3025K) developed in the Commonwealth of Independent States (CIS) is examined and its use on an expendable injection stage is shown to provide major increases in payload delivered to the outer planets (Saturn, Uranus, Neptune and Pluto). Using a single 'Titan IV-class' launch vehicle, with a lift capability to low Earth orbit (LEO) of approximately 20 metric tons (t), an expendable NTR upper stage can inject two Pluto 'Fast Flyby' spacecraft (PFF/SC) plus support equipment-combined mass of approximately 508 kg--on high energy, '6.5-9.2 year' direct trajectory missions to Pluto. A conventional chemical propulsion mission would use a liquid oxygen (LOX)/LH2 'Centaur' upper stage and two solid rocket 'kick motors' to inject a single PFF/SC on the same Titan IV launch vehicle. For follow on Pluto missions, the NTR injection stage would utilize a Jupiter 'gravity assist' (JGA) maneuver to launch a LOX/liquid methane (CH4) capture stage (Isp approximately 375 seconds) and a Pluto 'orbiter' spacecraft weighing between approximately 167-312 kg. With chemical propulsion, a Pluto orbiter mission is not a viable option because c inadequate delivered mass. Using a 'standardized' NTR injection stage and the same single Titan IV launch scenario, 'direct flight' (no gravity assist) orbiter missions to Saturn, Uranus and Neptune are also enabled with transit times of 2.3, 6.6, and 12.6 years, respectively. Injected mass includes a storable, nitrogen tetroxide/monomethyl hydrazine (N2O4/MMH) capture stage (Isp approximately 330 seconds) and orbiter payloads 340 to 820% larger than that achievable using a LOX/LH2-fueled injection stage. The paper discusses NTR technology and mission characteristics, shows NTR stage and payload accommodations within the 26.2 m long Titan IV payload fairing, and discusses NTR stage performance as a function of assumed cryogenic tank technology.

Borowski, Stanley K.↗

Exploring the outer planets

Initial, current and planned United States projects for the spacecraft exploration of the outer planets of the solar system are presented. Initial plans were developed in the mid-1960's for the exploration of the outer planets by utilizing the gravity-assist technique during a fortuitous alignment of the outer planets in the Grand Tour Project, however although state-of-the-art space technology could have supported the project, it was considered too expensive, therefore politically infeasible. Subsequently, the Pioneer Project was undertaken to explore the asteroid belt and the environment around Jupiter and the Voyager Project was undertaken to send two spacecraft to fly by Jupiter and utilize its gravity assist to reach Saturn. The successful Pioneer 10 and 11 missions have provided important information on the effects of the asteroid belt and the severe radiation environment around Jupiter, and Voyager 1 has collected information about Jupiter, its magnetic fields and radiation zones, and its satellites. Project Galileo is intended to be launched in January 1982 to conduct an intensive investigation of Jupiter, its satellites and immediate environment and a Saturn Orbiter dual probe mission and a Uranus orbiter are also under consideration.

Parks, R. J.↗

NEXT Ion Propulsion System Configurations and Performance for Saturn System Exploration

The successes of the Cassini/Huygens mission have heightened interest to return to the Saturn system with focused robotic missions. The desire for a sustained presence at Titan, through a dedicated orbiter and in-situ vehicle, either a lander or aerobot, has resulted in definition of a Titan Explorer flagship mission as a high priority in the Solar System Exploration Roadmap. The discovery of active water vapor plumes erupting from the tiger stripes on the moon Enceladus has drawn the attention of the space science community. The NASA's Evolutionary Xenon Thruster (NEXT) ion propulsion system is well suited to future missions to the Saturn system. NEXT is used within the inner solar system, in combination with a Venus or Earth gravity assist, to establish a fast transfer to the Saturn system. The NEXT system elements are accommodated in a separable Solar Electric Propulsion (SEP) module, or are integrated into the main spacecraft bus, depending on the mission architecture and performance requirements. This paper defines a range of NEXT system configurations, from two to four thrusters, and the Saturn system performance capability provided. Delivered mass is assessed parametrically over total trip time to Saturn. Launch vehicle options, gravity assist options, and input power level are addressed to determine performance sensitivities. A simple two-thruster NEXT system, launched on an Atlas 551, can deliver a spacecraft mass of over 2400 kg on a transfer to Saturn. Similarly, a four-thruster system, launched on a Delta 4050 Heavy, delivers more than 4000 kg spacecraft mass. A SEP module conceptual design, for a two thruster string, 17 kW solar array, configuration is characterized.

Benson, Scott W.↗

In-Flight Operation of the Dawn Ion Propulsion System: Status at One Year from the Vesta Rendezvous

The Dawn mission, part of NASA's Discovery Program, has as its goal the scientific exploration of the two most massive main-belt asteroids, Vesta and Ceres. The Dawn spacecraft was launched from Cape Canaveral Air Force Station on September 27, 2007 on a Delta-II 7925H-9.5 (Delta-II Heavy) rocket that placed the 1218 kg spacecraft into an Earth-escape trajectory. On-board the spacecraft is an ion propulsion system (IPS) developed at the Jet Propulsion Laboratory which will provide most of the delta V needed for heliocentric transfer to Vesta, orbit capture at Vesta, transfer among Vesta science orbits, departure and escape from Vesta, heliocentric transfer to Ceres, orbit capture at Ceres, and transfer among Ceres science orbits. The Dawn ion thruster [I thought we only called it a thruster. Both terms are used in the paper, but I think a replacement of every occurrence of "engine" with "thruster" would be clearer.] design is based on the design validated on NASA's Deep Space 1 (DS1) mission. However, because of the very substantial (11 km/s) delta V requirements for this mission Dawn requires two engines to complete its mission objectives. The power processor units (PPU), digital control and interface units (DCIU) slice boards and the xenon control assembly (XCA) are derivatives of the components used on DS1. The DCIUs and thrust gimbal assemblies (TGA) were developed at the Jet Propulsion Laboratory. The spacecraft was provided by Orbital Sciences Corporation, Sterling, Virginia, and the mission is managed by and operated from the Jet Propulsion Laboratory. Dawn partnered with Germany, Italy and Los Alamos National Laboratory for the science instruments. The mission is led by the principal investigator, Dr. Christopher Russell, from the University of California, Los Angeles. The first 80 days after launch were dedicated to the initial checkout of the spacecraft followed by cruise to Mars. Cruise thrusting leading to a Mars gravity assist began on December 17, 2007 and was successfully concluded as planned on October 31, 2008. During this time period the Dawn IPS was operated mostly at full power for approximately 6500 hours, consumed 71.7 kg of xenon and delivered approximately 1.8 km/s of delta V to the spacecraft. The thrusting to Mars was followed by a coasting period of approximately 3.5 months that included a Mars flyby in February of 2009. The Mars flyby provided a gravity assist (MGA) for a plane change and approximately 1 km/s of heliocentric energy increase and is the only part of the mission following launch in which a needed velocity change is not accomplished by the IPS. During the coast period IPS was operated for a trajectory correction maneuver and for engineering tests but was not operated for primary propulsion. Closest approach to Mars occurred as planned on February 17, 2009 and was followed by another coasting period of just under 4 months in duration. During this last coasting phase IPS was operated only for routine maintenance activities and for system engineering tests. Deterministic thrusting for heliocentric transfer to Vesta resumed on June 8, 2009. Since resumption of cruise to Vesta IPS has been operated at throttled power levels, most of the time at full power, and with a duty cycle of approximately 93%, leading to an arrival at Vesta in July of 2011 and arrival at Ceres in February 2015. This paper provides an overview of Dawn's mission objectives and the results of Dawn IPS mission operations through one year from the spacecraft's rendezvous with Vesta.

Garner, Charles E.↗