Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “NEW JOBS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Onshore U.S. Carbon Pipeline Deployment: Siting, Safety, and Regulation

Carbon capture, utilization, and storage (CCUS) technology has significant potential to reduce greenhouse gas (GHG) emissions and mitigate the impact of climate change, particularly in hard to decarbonize industrial and commercial sectors. CCUS involves capturing carbon dioxide (CO 2 ) from industrial processes or power generation and utilizing it for other purposes, such as enhanced oil recovery (EOR), or storing the captured CO 2 underground. CCUS technology can reduce the environmental impact of continued fossil fuel use while smoothing the transition to a low-carbon economy. CCUS can create new economic opportunities, such as the development of new industries and job creation, and can enhance energy security by diversifying energy sources. For these reasons, enabling CCUS has become a key objective of the Biden-Harris administration’s clean energy policy and has received bipartisan support. Despite its environmental and economic potential, CCUS faces multiple barriers to widespread deployment. One of the main challenges is the high cost and technical difficulty of implementing and operating large-scale CCUS infrastructure. CCUS remains a relatively expensive way to reduce carbon emissions (e.g., compared to solar photovoltaic technology’s displacement of coal generation). Additionally, financial incentives and supportive policies like those enacted to support solar photovoltaic development, especially at the state level, are inconsistent or nonexistent, which can discourage investment in CCUS projects. There are also technical challenges associated with safe and secure underground CO 2 storage and the development of new carbon utilization technologies. Public opposition to various aspects of CCUS technologies, ranging from concerns that CCUS will extend reliance on fossil fuels to CCUS infrastructure being sited in disadvantaged communities, is a growing challenge. This paper focuses on another significant barrier to broad CCUS deployment: the need for considerable expansion of the dedicated land-based CO 2 pipeline network in the United States to meet CCUS goals and the unique regulatory challenges to its development. To reach carbon emissions targets in the United States by 2050, CCUS technology will need to be supported by tens of thousands of miles of CO 2 pipelines. Estimates range from a minimum of roughly 29,000 pipeline miles (according to a 2020 Great Plains Institute study) to 66,000 pipeline miles (as per a 2021 Princeton University–led study). As of October 2022, however, the U.S. Department of Transportation (U.S. DOT) reports fewer than 5,400 miles of U.S. pipelines carrying CO 2 . This deficit—and what it means for the prospect of moving substantially larger quantities of CO 2 from source to use or storage—threatens to stifle the development of CCUS projects and technologies identified as an important tool to meet emissions targets. The current regulatory landscape facing CO 2 pipeline development can best be described as uncertain. At the federal level, the U.S. DOT Pipeline and Hazardous Materials Safety Administration (PHMSA) oversees safety regulation of pipelines transporting hazardous materials, including CO 2 upon commencement of operation. However, PHMSA’s definition of CO 2 as “a fluid consisting of more than 90 percent CO 2 molecules compressed to a supercritical state” has not been updated since its 1991 addition to the Federal Register. Because CO 2 can be transported in a gaseous, liquid, or supercritical state (indeed, the physical state of CO 2 can fluctuate within a single pipeline due to environmental changes), doubts persist about the extent of PHMSA’s purview—and raise questions about what, if anything, states should do to address this apparent gap. PHMSA has begun a major revision of its existing rules, but the agency does not expect a first draft before 2024. Economic oversight of CO 2 pipelines is even less clear. The Federal Energy Regulatory Commission (FERC) and Surface Transportation Board (STB)—which regulate the rates of interstate oil/natural gas and non-energy pipelines, respectively—have both declined jurisdiction over interstate CO 2 pipelines. This presumably leaves economic regulation to state and/or local governments, but few if any states have the laws or resources in place to oversee just and reasonable rates. Further, the interstate nature of CO 2 pipeline development creates questions around how different states should align their rate-making decisions. Onshore U.S. Carbon Pipeline Deployment: Siting, Safety, and Regulation Currently, regulatory responsibilities regarding CO 2 pipeline siting and permitting fall to state and local governments. The variety of laws and regulations across the country, however, creates a maze of requirements for pipeline developers to navigate. To secure necessary permits, most states require pipeline companies to be “common carriers” that provide transport service to the public at uniform rates. However, the specific definition of that term varies. Some states require clear evidence that a pipeline services the public, while others automatically deem any pipeline company transporting energy products or hazardous materials to be a “common carrier”—with little consideration for accessibility to third parties. Other states have eschewed common-carrier terminology entirely, placing private and publicly accessible pipelines on equal footing. Much like the variation in common-carrier requirements, laws governing eminent domain authority to secure rights-of-way (ROW) to commence construction on a planned pipeline route differ by state. Several states have no laws or rules governing CO 2 pipelines. In addition to creating questions about whether long-standing rules for other pipelines (e.g., natural gas or petroleum products) apply to CO 2 , this policy vacuum leaves local governments as the sole authority over sections of pipe within their boundaries. With dozens of counties along a given route, the probability of inconsistent regulation of the same pipeline is significant. Even in states with CO 2 pipeline laws in place, local regulatory attempts to address rising concerns over pipeline routing and safety have triggered lawsuits by pipeline companies seeking to delimit areas of federal, state, and local government responsibility. Meanwhile, legislators across the country have introduced bills to restrict the application of eminent domain to CO 2 pipeline projects, which could threaten a key means of securing ROW that companies cannot secure through negotiation with landowners. Taken separately, any of these regulatory issues—the narrow federal definition of CO 2 , FERC’s and STB’s decisions that CO 2 pipelines are not within their jurisdiction, and the considerable variation in state and local governments’ laws regulating CO 2 pipeline technologies—are extremely difficult to resolve. Adding the required scale of CO 2 pipeline expansion and the currently identified narrow window of time in which to reach climate target goals, the task becomes even more difficult—and raises a host of urgent questions for regulators. How should CO 2 be defined in federal regulations to ensure consistent safety standards across the country? What is the potential impact radius of a CO 2 pipeline rupture, and how should that inform local emergency response? In the absence of centralized federal oversight, what should state legislatures do to increase alignment for interstate CO 2 pipeline projects? This paper intends to serve as a primer for regulators and stakeholders who seek to better understand the regulatory challenges and opportunities facing this critical infrastructure.

42 ENGINEERING↗

1366 Project Silicon: Reclaiming US Silicon PV Leadership

1366 Technologies’ Project Silicon addresses two of the major goals of the DOE’s PV Manufacturing Initiative Part 2 program: 1) How to reclaim a strong silicon PV manufacturing presence and; 2) How to lower the levelized cost of electricity (“LCOE”) for solar to $0.05-$0.07/kWh, enabling wide-scale U.S. market adoption. To achieve these two goals, US companies must commercialize disruptive, high-value technologies that are capable of rapid scaling, defensible from foreign competition, and suited for US manufacturing. These are the aims of 1366 Technologies Direct Wafer ™ process. The research conducted during Project Silicon led to the first industrial scaling of 1366’s Direct Wafer™ process – an innovative, US-friendly (efficient, low-labor content) manufacturing process that destroys the main cost barrier limiting silicon PV cost-reductions: the 35-year-old grand challenge of making quality wafers (40% of the cost of modules) without the cost and waste of sawing. The SunPath program made it possible for 1366 Technologies to build its demonstration factory, a key and critical step in the Company’s evolution. The demonstration factory allowed 1366 to build every step of the process flow at production size, eliminating potential risk and ensuring the success of the Company’s subsequent scaling for a 1 GW factory to be constructed in Western New York in 2016 and 2017. Moreover, the commercial viability of the Direct Wafer process and its resulting wafers were established as 1366 formed key strategic partnerships, gained entry into the $8B/year multi-Si wafer market, and installed modules featuring Direct Wafer products – the veritable proving grounds for the technology. The program also contributed to the development of three Generation 3 Direct Wafer furnaces. These furnaces are the platform for copying intelligently and preparing our supply chain – large-scale expansion will not require a bigger machine but more machines. SunPath filled the crucial development step between the original research effort in Lexington and the GW factory scheduled to be online before the end of the decade. At the conclusion of the project, it is clear that the Direct Wafer™ technology will have a dramatic impact on the entire silicon photovoltaic supply chain by effectively doubling existing silicon capacity (by reducing silicon usage by 50%) and reducing supply chain capital costs by 35%. The technology, when fully-scaled in the US, will also lead to significant job growth, with the eventual creation of 1,000 jobs in Western New York.

14 SOLAR ENERGY↗

Critical parameters in the faculty application process: A data-driven analysis

We report the process of applying for science and engineering faculty positions requires a significant time investment for both the applicant and hiring committees. Applicants face the daunting task of sifting through a seemingly endless amount of information related to crafting their application packages in preparation for a review process that is inherently highly subjective. Furthermore, while scientific supervisors are often the most valuable resource during this stage of career development, many years may have passed since they went through this process themselves, and they may not have experience with recent developments in the application process. Because expectations and job responsibilities of new faculty members are rapidly evolving, certain guidelines are often not clearly specified, and it is therefore becoming difficult for applicants to most effectively prepare their application documents. Without access to adequate information and assistance, early-career researchers in particular can be placed at a significant disadvantage in the hiring process. Several recent articles can help prospective applicants in materials science and engineering land a faculty position,1,2,3 but there is nevertheless a need for clarification on expectations for different aspects of the faculty application materials.

36 MATERIALS SCIENCE↗

Hardening of DOE UQ Codes for Ultra-Deep Proactive Geosteering in Oilfield Service

The primary objective of this project was to harden the DOE uncertainty quantification (UQ) code to solve the inverse problem for the geosteering service in the oilfield drilling and exploration. The primary focus is to verify the feasibility of using QUESO to solve geosteering inverse problems through statistical inversion. QUESO is a software library developed by QUEST, a DOE's Scientific Discovery through Advanced Computing (SciDAC) institute. In the process of drilling a borehole, geosteering is the act of adjusting the well trajectory on the fly to reach the geological targets or to keep the wellbore within desired formation. Geosteering inversion is to infer underground formation structure using measurements such as azimuthal resistivity logging data. The geosteering process relies on the real-time reconstruction of the subsurface earth model, and a robust and efficient inversion algorithm is always necessary to satisfy the job requirement. The new generation of azimuthal resistivity geosteering tool is capable of detecting multiple formation boundaries 20-100 ft away, and the corresponding geosteering inversion problem can be very challenging as many parameters need to be inverted within such a large depth of investigation. The success of the project will support US energy security by helping to advance subsurface modeling and characterization technologies in oilfield applications. An effective subsurface inversion algorithm and the implementation as a software package will promote the usage of ultra-deep azimuthal resistivity measurements, which can help well placement in complicated underground environments, reduce costs and risks of drilling, and increase oil and gas production. It will help medium and small size independent service companies and tool manufactures to enter the more advanced and lucrative directional drilling area. In addition, by hardening the QUESO code and building a transparent interface for easy manipulation of the QUESO functions, we provide a user-friendly tool for a larger scientific and industry communities that rely heavily on modeling and simulation tools for forecasting, parameter studies, design, and decision making. These are all activities that can strongly benefit from meaningful representations of modeling uncertainty supported by our product.

58 GEOSCIENCES↗

The Promethian Exchange: Bringing Expert Tools and Diagnostic Experience to Operations

Operators need a variety of diagnostic tools in order to make their lives easier. Sometimes it becomes necessary to add or improve the suite of diagnostics in order to do new or different jobs, or to improve upon existing methods in one's accelerator. This talk will attempt to outline various methods by which specific diagnostic improvements have been achieved in the CEBAF accelerator at Jefferson lab and abstract methods of process which can be applied to any lab/setting.

McCaughan, Michael↗

Process-Information Display Panel For Welder's Visor

Head-up display (HUD) unit mounted in welder's visor or helmet provides process information in real time. Display enables welder to gain greater awareness of effects of welding while controlling welding process in usual way(s) by use of foot pedal, voice command, and/or manipulation of welding torch. Possible to avoid need for every new welder on job to solve same problems solved by other welders. Graphical display presented to welder, adjacent to normal field of view through visor. Beneficial in supporting and enhancing continued practice of manual arc welding. Valuable in industries that invest millions of technician-hours each year in manual arc welding for variety of products.

Russell, Carolyn↗

Three Insights About Change

Managers need to develop credibility, and need to base it upon new managerial accomplishments rather than previous ones. New and exciting jobs in management are challenging, but can lead to personal growth. Personnel who are afraid of potential negative consequences resulting from administrative changes are a hindrance to projects. An approval-seeking management style almost always fails.

Little, Terry↗

Computer Reader for the Blind

Optacon II uses the same basic technique of converting printed information into a tactile image as did Optacon. Optacon II can also be connected directly to a personal computer, which opens up a new range of job opportunities for the blind. Optacon II is not limited to reading printed words, it can convert any graphic image viewed by the camera. Optacon II demands extensive training for blind operators. TSI provides 60-hour training courses at its Mountain View headquarters and at training centers around the world. TeleSensory discontinued production of the Optacon as of December 1996.

Source record↗

DEVELOP’s Approach to Experiential Learning

The NASA DEVELOP Program addresses environmental decision making needs and geoscience workforce development through 10-week feasibility studies that apply Earth observations to environmental issues at hand. The program builds capacity to use geospatial information in both its participants (students, recent graduates, early career professionals, and transitioning career professionals) and partner organizations (federal agencies, state & local governments, non-profits, and private industry). This is accomplished through a structured project execution model that provides opportunities for participants to have autonomy, learn “on the job,” and gain new skillsets for working with remote sensing data. A pipeline of leadership positions enhances opportunities for individuals engaged in the program to get hands-on experience conducting data analyses, communicating their work, leading technical projects, and building their knowledge bank of Earth-observing satellite capabilities. These skillsets and knowledge are then transferred to partners through the projects. This panel contribution will introduce the DEVELOP model, highlight experiences of participants, and share the program’s insights into good practices for effective experiential learning.

Capacity Building↗

Returning to the Moon: NASA's Artemis Missions

With Artemis missions, NASA will establish the first long-term presence on the Moon. NASA’s goal is to land the first woman on the Moon and return them safely to Earth. The exploration and settlement on Moon will enable the next giant leap - sending the first astronauts to Mars. During the next era of human exploration, we will discover life-saving, Earth-changing science and technology along the way. Artemis missions will enable a growing lunar economy by fueling new industries, supporting job growth, and furthering the demand for a skilled workforce. In her seminar, Dr. Agrawal will provide an overview of the Artemis program, its different elements and a brief description of some of the technical advancements that have been made to enable the first Artemis 1 flight. She will then provide an overview of the Orion program whose charter is to multiple spacecraft for Artemis missions and discuss the ongoing activities at NASA Ames in support of Orion and Artemis programs.

Artemis↗

Returning to the Moon: NASA's Artemis Missions

With Artemis missions, NASA will establish the first long-term presence on the Moon. NASA’s goal is to land the first woman on the Moon and return them safely to Earth. The exploration and settlement on Moon will enable the next giant leap - sending the first astronauts to Mars. During the next era of human exploration, we will discover life-saving, Earth-changing science and technology along the way. Artemis missions will enable a growing lunar economy by fueling new industries, supporting job growth, and furthering the demand for a skilled workforce. In her seminar, Dr. Agrawal will provide an overview of the Artemis program, its different elements and a brief description of some of the technical advancements that have been made to enable the first Artemis 1 flight. She will then provide an overview of the Orion program whose charter is to multiple spacecraft for Artemis missions and discuss the ongoing activities at NASA Ames in support of Orion and Artemis programs.

Artemis↗

PNNL Aviation Biofuels

Commercial airplanes really don’t have the option to move away from liquid fuels. Because of this, biofuels present an opportunity to create new clean energy jobs by developing technologies that deliver stable, long term fuel options. The Department of Energy’s Pacific Northwest National Laboratory is working with industrial partners on processes to convert biomass to aviation fuels.

09 BIOMASS FUELS↗

The Importance of Chemical Research to the U.S. Economy

Chemistry plays a pivotal role in the strength of the U.S. economy and the advancement of humankind. Chemists' achievements include life-saving pharmaceuticals, advanced energy solutions, improved agricultural productivity, and novel materials used in products from clothing to electronic devices. The many sectors reliant on the U.S. chemical economy account for about 25% of the U.S. GDP and support 4.1 million U.S. jobs. However, a new and evolving chemistry landscape requires changes with regard to funding, training, and a focus on integrating sustainability into manufacturing, product usage, and product disposal. This report identifies strategies and options for research investments that will support U.S. leadership while considering environmental sustainability and developing a diverse chemical economy workforce with equitable opportunities for all chemistry talent. The report recommends that funding agencies and philanthropic organizations who support the chemical sciences fund as large a breadth of fundamental research projects as possible. Chemical industry and their partners at universities, scientific research institutions, and national laboratories should align the objectives of fundamental research to directly assist with new practices toward environmental stewardship, sustainability, and clean energy. Additionally, the report recommends that funding agencies make substantial investment toward education research to enable innovative ways of teaching about emerging concepts, tools and technologies.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Recovery Act : Heterogeneous Feed Biorefinery Project

To overcome the hurdles associated with introducing a new technology, Enerkem applied to the US DOE for grant assistance with its Pontotoc, Mississippi, biorefinery under the DOE’s Demonstration of Integrated Biorefinery Operations FOA. Consistent with Enerkem’s strategic approach, the project proposed uses post sorted municipal solid waste blended with other forest residue. The proposed biorefinery is to be located within the boundaries of a working landfill, thus simplifying many aspects of environmental permitting while also reducing feedstock acquisition and transportation costs. An economic impact analysis was conducted using an adaptation of the US Department of Energy’s JEDI (Jobs and Economic Development Impact) model for an ethanol-producing biorefinery. The JEDI model, which does not have a thermochemical processing option, had to be configured to reflect a biomass feedstock and was thus adapted by Enerkem to account for the unique feedstock requirements and operations of the Project. According to this model, development, construction, and 2 years of operation of the biorefinery require an investment of approximately $140 million. Also, a construction period of 18 months will create significant direct and indirect employment. Indirect employment includes steel manufacturers, construction materials manufacturers, material shipping, equipment manufacturers and fabrication, etc. During the construction phase of the Project, 210 total jobs are expected to be created, including 145 direct jobs and 72 indirect or induced jobs. During the operating period, 131 jobs would be created, 95 of which are direct. It is anticipated that the project will create at least 10 new jobs (included in the above figures and in addition to the JEDI data) in the sorting and recycling sector, since the project will require operations in sorting MSW since valuable ferrous, nonferrous and recyclable plastic materials will be sorted from MSW as part of the process that isolates MSW-derived biomass.

09 BIOMASS FUELS↗

Job Management Requirements for NAS Parallel Systems and Clusters

A job management system is a critical component of a production supercomputing environment, permitting oversubscribed resources to be shared fairly and efficiently. Job management systems that were originally designed for traditional vector supercomputers are not appropriate for the distributed-memory parallel supercomputers that are becoming increasingly important in the high performance computing industry. Newer job management systems offer new functionality but do not solve fundamental problems. We address some of the main issues in resource allocation and job scheduling we have encountered on two parallel computers - a 160-node IBM SP2 and a cluster of 20 high performance workstations located at the Numerical Aerodynamic Simulation facility. We describe the requirements for resource allocation and job management that are necessary to provide a production supercomputing environment on these machines, prioritizing according to difficulty and importance, and advocating a return to fundamental issues.

Saphir, William↗

I/O-aware bandwidth allocation for petascale computing systems

In the Big Data era, the gap between the storage performance and an appli- cation's I/O requirement is increasing. I/O congestion caused by concurrent storage accesses from multiple applications is inevitable and severely harms the performance. Conventional approaches either focus on optimizing an ap- plication's access pattern individually or handle I/O requests on a low-level storage layer without any knowledge from the upper-level applications. In this paper, we present a novel I/O-aware bandwidth allocation framework to coordinate ongoing I/O requests on petascale computing systems. The motivation behind this innovation is that the resource management system has a holistic view of both the system state and jobs' activities and can dy- namically control the jobs' status or allocate resource on the y during their execution. We treat a job's I/O requests as periodical subjobs within its lifecycle and transform the I/O congestion issue into a classical scheduling problem. Based on this model, we propose a bandwidth management mech- anism as an extension to the existing scheduling system. We design several bandwidth allocation policies with different optimization objectives either on user-oriented metrics or system performance. We conduct extensive trace- based simulations using real job traces and I/O traces from a production IBM Blue Gene/Q system at Argonne National Laboratory. Experimental results demonstrate that our new design can improve job performance by more than 30%, as well as increasing system performance.

I/O congestion↗

Audit Report on "The Department of Energy's American Recovery and Reinvestment Act -- Florida State Energy Program"

The Department of Energy's Office of Energy Efficiency and Renewable Energy (EERE) provides grants to states, territories, and the District of Columbia to support their energy priorities through the State Energy Program (SEP). The SEP provides Federal financial assistance to carry out energy efficiency and renewable energy projects that meet each state's unique energy needs while also addressing national goals such as energy security. Federal funding is based on a grant formula that takes into account population and energy consumption. The SEP emphasizes the state's role as the decision maker and administrator for the program. The American Recovery and Reinvestment Act of 2009 (Recovery Act) expanded the SEP, authorizing $3.1 billion in grants. Based on existing grant formulas and after reviewing state-level plans, EERE made awards to states. The State of Florida's Energy Office (Florida) was allocated $126 million - a 90-fold increase over Florida's average annual SEP grant of $1.4 million. Per the Recovery Act, this funding must be obligated by September 30, 2010, and spent by April 30, 2012. As of March 10, 2010, Florida had expended $13.2 million of the SEP Recovery Act funds. Florida planned to use its grant funds to undertake activities that would preserve and create jobs; save energy; increase renewable energy sources; and, reduce greenhouse gas emissions. To accomplish Recovery Act objectives, states could either fund new or expand existing projects. As a condition of the awards, EERE required states to develop and implement sound internal controls over the use of Recovery Act funds. Based on the significant increase in funding from the Recovery Act, we initiated this review to determine whether Florida had internal controls in place to provide assurance that the goals of the SEP and Recovery Act will be met and accomplished efficiently and effectively. We identified weaknesses in the implementation of SEP Recovery Act projects that have adversely impacted Florida's ability to meet the goals of the SEP and the Recovery Act. Specifically: (1) Florida used about $8.3 million to pay for activities that did not meet the intent of the Recovery Act to create new or save existing jobs. With the approval of the Department, Florida used these funds to pay for rebates related to solar energy projects that had been completed prior to passage of the Recovery Act; (2) State officials did not meet Florida's program goals to obligate all Recovery Act funds by January 1, 2010, thus delaying projects and preventing them from achieving the desired stimulative economic impact. Obligations were delayed because Florida officials selected a number of projects that either required a lengthy review and approval process or were specifically prohibited. In June 2009, the Department notified Florida that a number of projects would not be approved; however, as of April 1, 2010, the State had not acted to name replacement projects or move funds to other projects; (3) Florida officials had not ensured that 7 of the 18 award requirements for Recovery Act funding promulgated by the Department had been passed down to sub-recipients of the award, as required; and, (4) Certain internal control weaknesses that could jeopardize the program and increase the risk of fraud, waste and abuse were identified in the Solar Energy System Incentives Program during our September 2009 visit to Florida. These included a lack of separation of duties related to the processing of rebates and deficiencies in the written procedures for grant managers to review and approve rebates. From a forward looking perspective, absent aggressive corrective action, these weaknesses threaten Florida's efforts to meet future Recovery Act goals. In response to our review, Florida took corrective action to incorporate the additional award requirements in sub-recipient documents. It also instituted additional controls to correct the internal control weaknesses we identified. More, however, needs to be done with respect to Department oversight. This report details the circumstances surrounding these program issues and outlines actions that, in our opinion, will help Florida achieve its SEP Recovery Act-funded goals.

14 SOLAR ENERGY↗