The Retrieval project Asse II - Lessons Learned in Radiological Protection - 18263

From 1967 to 1978 in total 125,787 drums and packages with low- and intermediate level waste were emplaced in the Asse II mine. The disposal operation ended in 1978 due to a revision of the Atomic Energy Act. For the disposal of radioactive waste, a plan approval procedure would have been mandatory due to the Atomic Energy Act, but the mining law was the legal basis for operating the Asse II mine, further on. A concept for a closure of the mine was not existing at that time. On January 1, 2009, the Federal Office for Radiation Protection (Bundesamt fuer Strahlenschutz BfS) became the new license-holder and operator of the Asse II mine under the Atomic Energy Act. The Act on the Organizational Restructuring in the Field of Disposal in Germany became effective on July 30, 2016. The act provides that a federally owned company, the Bundesgesellschaft fuer Endlagerung (BGE mbH, Federal Company for Radioactive Waste Disposal) is formed to carry out the operative tasks of searching for a High Level Waste (HLW) repository, the construction and operation of repositories (Konrad, Morsleben) and of the Asse II mine. Since April 25, 2017 BGE is in charge of the operative tasks that have so far been carried out by BfS. Up to now, the long-term safety of the Asse II mine has not been demonstrated in the case that all the waste will remain inside the mine. Further problems arise from a lack of host rock stability, the incomplete backfilling of the mining areas that have not been used for the emplacement of radioactive waste, and a continuous brine inflow into the mine of approx.12 m{sup 3} per day. For these reasons, according to chap. 57b of the Atomic Energy Act, the Asse II mine is to be closed without delay after retrieving the emplaced nuclear waste. Besides the recent organizational changes in Germany and the special problems giving rise to retrieve the waste, in this paper the operational experiences since 2009 on the way from mining law to atomic law will be described. This applies to the radiation protection regime, the release and clearance procedure, and some measures to boost efficiency. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Knowledges and Insights Obtained from the Fukushima Daiichi Accident

It was very hard to estimate how the accident had progressed at each unit of Fukushima Daiichi NPS at the early stage of post-accident analytical activities, because the knowledge relevant to BWR severe accident phenomena and progression was insufficient and the collected data was very limited since complete station blackout (loss of AC and DC power) was occurred at Fukushima Daiichi NPS. However, because of the progression of the measured data analysis, system behavior or response of reactors before the core melt has already been clarified. System behaviors after the core melt have been clarified, as well. Measured data and circumstantial evidence clearly indicated that the fuel temperature went up to melting point and the RPV was damaged by the molten core, and the Fukushima accident is known as a more serious accident than TMI-2 because of including ex-vessel phenomena. But, the information regarding detailed accident progression (for example, amount of melted fuel and timing of RPV breach, etc.) is still unclear and we are struggling to solve such a detailed accident progression. At present, there are two challenges in front of us. One of them is to improve nuclear reactor safety by applying the insights from the Fukushima accident and the other is to solve unclear issues before conducting the first RPV internal investigation. Tokyo Electric Power Company is willing to stand up against these two challenges as the company concerned and appreciate supports of the world nuclear community. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Transition of Site Programs and Implementation of Decommissioning Agent Oversight - 18653

San Onofre Nuclear Generating Station (SONGS), acting as the Decommissioning Agent (DA), retained its NRC License and contracted a Decommissioning General Contractor (DGC) to manage plant programs and execute the Demolition and Dismantlement (D and D) of the site. To support this effort, over twenty-one programs transitioned to the DGC, including Occupational Health and Safety, Radiation Protection, Maintenance, and Engineering. In addition, SONGS effected a cultural shift from an operating station performing work to one of overseeing it. The framework and road map for this kind of D and D model is new to the industry. This presentation shares the SONGS' experience and lessons learned associated with this transition. SONGS and the DGC entered an Agreement that established the contractual requirements and responsibilities of the parties, the Scope of Work, and the mechanisms to ensure effective transition of DA programs. As a part of defining the Scope of Work, the contract established functional areas and divisions of responsibilities divided into the roles of Governance, Oversight, Support, and Performance (GOSP). SONGS, as the site licensee, retained the Oversight Role, with exception of those areas that, as the licensee, would be considered 'non-transferrable'. Examples of those programs were Quality Assurance, Regulatory Affairs and the Employee Concerns Program. While the Company retained responsibility for those programs the DGC developed their own 'parallel' programs that the Company provided Oversight for. In 2017, SONGS completed program transition within one-year following the notice-to-proceed. The overall strategy was driven by three high-level principles: - Allow the DGC the most unfettered execution of the Scope of Work with limited interference and maximum self-governance. With the overriding principle that transitioned programs have a direct link to a basis in regulation or law. - Identify safety and compliance risks, and then bridge the transition of programs from the SONGS to the DGC such that identified risks are minimized and/or mitigated. - Allow the SONGS organization to transition from a Performance role to a primarily Oversight role as the DA. Working collaboratively with the DGC, programs were strategically grouped and sequenced for turnover. Central to the success of transition was fostering a collaborative environment with the DGC, facilitating knowledge transfer, applying schedule rigor, and keeping the team horizontally and vertically aligned to management expectations. SONGS achieved this alignment by embedding the formal process with management expectations for review and acceptance of proposed programs. SONGS' transitioned core programs to a general contractor and transition from a 'perform' organization to an 'oversight' organization. Lessons learned from this experience may benefit other nuclear generating station owners currently evaluating options for site D and D. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Decommissioning Status and Preliminary Engineering Planning for Chinshan NPP in Taiwan - 19114

The Chinshan Nuclear Power Plant, which consists of two BWR units and was owned by Taiwan Power Company (TPC), has an electrical output of 636 MWe for each unit. Unit No. 1 and Unit No. 2 were licensed till December 2018 and July 2019, respectively. According to regulations of decommissioning in Taiwan, decontamination and dismantling of a NPP should be completed within 25 years. Therefore, TPC had started compiling the decommissioning plans (DP, 17 chapters) with INER, national engineering companies and international consultants since 2012. The DP of Chinshan NPP has been approved by the regulator, Atomic Energy Council (AEC), in the end of June, 2017. There are 17 chapters in the decommissioning plans, which deal with all aspects of safety-related considerations during the decommissioning period, such as spent fuel management, waste management, personnel/workers planning, schedules/working items, environmental management and monitoring. Those items are discussed in detail in this paper in accordance with the approved DP. The implementation of decommissioning will be started while the Environmental Impact Assessment (EIA) is still under approval by EPA, which is expected to be completed in the end of 2018 or the mid of 2019. Once the decommissioning be started, all dismantling, decontamination, management teams, and preparation would be kicked off simultaneously in a very short period of time. In this paper, the planning assumptions, strategies from INER and TPC, management of radioactive waste, conversion of Turbine Building and detailed description of turbine-generator set are discussed. For the Turbine Building dismantling, inventories of equipment, cutting technology determination, storage logistics, container options and radwaste treatment and reduction would be important factors to be evaluated in the beginning. Afterwards, WBS (work breakdown structure) would be determined and be the basis for working bids, construction of a new storage warehouse, an incinerator and a super high pressure compactor. This preliminary engineering planning would be applied in the decommissioning of Chinshan NPP for the first time and be duplicated in Kuosheng NPP and Maanshan NPP in Taiwan as well. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Current Status of Decommissioning Plans and Chemical Decontamination of Metal Scraps in Chinshan NPP - 19304

The decommissioning of nuclear facilities has become a significantly attractive and worldwide topic due to the end of lifetime of many nuclear power plants within next coming years. In Taiwan, Chinshan nuclear power plant owned by the Taiwan Power Company will be the first candidate to be decommissioned according to the Nuclear Reactor Facilities Regulation Act. The Chinshan nuclear power plant located in New Taipei City has two units of 636 MWe boiling water reactors (BWRs) for the generation of 9 billion kWh of electricity per year. The date of cessation of operation of Unit No. 1 and Unit No. 2 will be December in 2018 and July in 2019, respectively. Based on the Regulations for the Review and Approval of Applications for a Decommissioning Permit of Nuclear Reactor Facilities, Taiwan Power Company have submitted a decommissioning plan of Chinshan nuclear power plant to the authority, Atomic Energy Council (AEC). After the review process, the decommissioning plan of Chinshan nuclear power plant has been permitted by AEC in 2017. Decontamination is generally utilized during the period of decommissioning of nuclear facility in order to minimize the radiation exposure of personnel and the cost of management of radioactive wastes. The successful decontamination also probably provides the benefits of lowering the level of radioactive wastes, facilitating potential releases, permitting the reuse of metals and facilitating the radiation principle of As Low As Reasonably Achievable (ALARA) management. Decontamination aims at the removal of radioactive materials from the contaminated surfaces by several technologies such as washing, heating, chemical reaction and mechanical process. The selection of proper decontamination technologies are depended on the requirement of the target materials and the purpose of the decontamination. Chemical decontamination has been proven to be an effective in reducing the radioactivity for metallic materials by using chemical reagents in contact with the contaminated surfaces. During the operation of Chinshan nuclear power plant, chemical decontamination was performed for Unit No.1 and No.2 in 2000 to decontaminate the Reactor Recirculation System (RRS) and Reactor Water Clean-up Systems (RWCU) by using LOMI-NP-LOMI process. Based on the previous experience of chemical decontamination, the dismantled metallic piping is provided as sample by Chinshan nuclear power plant for the evaluation of the feasibility of chemical decontamination. The provided metallic sample is composed of carbon steel with dose rate around 0.2 mSv/hr. In this report, a multistep decontamination process using strongly oxidizing solution and organic acid solution is performed to remove the contaminated oxide layer from the metal surface, and the resulting contact dose rate and decontamination factor (DF) are also shown to discuss the performance in relation to the process control factors. In this paper, the recent progress in decommissioning programs and preliminary results of the decontamination experiment are described to provide usable information regarding the future decommissioning for Chinshan nuclear power plant. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 53: Japan Fukushima Daiichi Decommissioning Update (1/2)

This panel focused on up-dating the activities at Fukushima Daiichi. Panelists include Japanese representatives from Tokyo Electric Power Company Holdings, Inc. (TEPCO) and invited US Institute specialists. Presentations proposed include: 1 - Fukushima Daiichi Decontamination and Decommissioning: Current Status and Challenges (Akira Ono, TEPCO Holdings (Japan)); 2 - SRNL Engagement in Japan Recovery: From Clean-up to Decommissioning and Reclamation (Andrew Fellinger, Savannah River National Laboratory (USA)); 3 - Fukushima Daiichi Decommissioning Progress (Adrian Simper, Nuclear Decommissioning Authority UK (United Kingdom)); 4 - Stable Storage of Secondary Waste from Contaminated Water Treatment in Fukushima Daiichi (Kosuke Sato, Tokyo Electric Power Company Holdings, Inc. (Japan))

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Stability of a Uranium-Contaminated Plume in a Karst Aquifer in Northwest New Mexico - 19574

The US Department of Energy (DOE) Office of Legacy Management monitors groundwater contamination resulting from ore processing operations conducted between 1953 and 1982 at a former uranium mill site on property that is now part of the Bluewater, New Mexico, Disposal Site. The site is located in the Grants Mineral Belt in northwest New Mexico at the base of the Zuni Mountains. It is estimated that prior to mill tailings encapsulation in 1995, approximately 21.6 billion liters (5.7 billion gallons) of tailings fluid seeped from the main tailings impoundment into the underlying aquifers. Today, there is remnant groundwater contamination from the mill in two aquifers: the San Andres-Glorieta (SAG) bedrock aquifer and the Ancestral Rio San Jose alluvial aquifer. Groundwater contamination in the SAG aquifer is of particular concern, as the aquifer is the primary water source in the region for municipal, agricultural, and industrial use. Municipal wells for the region are located as close as 6.4 kilometers (4 miles) southeast of the Main Tailings Disposal Cell. The SAG uranium plume extends east for more than 4.8 kilometers (3 miles) beyond the site's eastern boundary, along the direction of groundwater flow. The plume intersects the Homestake Mining Company site, another former uranium mill site undergoing active remediation. The SAG aquifer contains two formations, the Lower Permian San Andres Limestone and the Glorieta Sandstone. Most of the groundwater moving through the SAG aquifer is in ancient karst features consisting of open conduits where the limestone has dissolved, resulting in flow through solution cavities, solution channels, cavernous zones, and enlarged fracture openings. These features make the San Andres Limestone extremely permeable and capable of rapidly transporting groundwater. In addition, the karst characteristics make the aquifer difficult to evaluate and the uranium plume difficult to characterize. Numerous faults in the area, including two directly under the Main Tailings Disposal Cell, further complicate characterization by impacting groundwater flow both onsite and in the vicinity. A DOE study of the SAG aquifer uranium plume at the Bluewater site, conducted in 2014, indicated that the plume had moved offsite soon after the start of milling and effectively stabilized in its present location prior to the 1980's. An updated study completed in 2018 confirmed previous information regarding general plume stability and provided insight regarding potential localized trends east and south of the Main Tailings Disposal Cell. One such trend may be decreasing uranium concentrations east of the Main Tailings Disposal Cell, potentially attributable to regional groundwater elevation decreases. Both the 2013 and 2017 plumes suggest that the dissolved uranium contamination is derived from the leaching of a secondary mineralized zone derived from seeped tailings fluids in the geologic formations and fault zones below the Main Tailings Disposal Cell at the Bluewater site. In developing the 2013 and 2017 SAG aquifer uranium plume depictions, DOE had to address challenges associated with data quality and comparability. Analytical results used to determine the plume extent were compiled from multiple sources, including the state of New Mexico, Homestake Mining Company, and DOE. Each source used different well identifiers and coordinate systems, and well information between sources was inconsistent. Also, the integrity of some wells was questionable and necessitated review; casing integrity was found to be compromised in multiple wells. Given these uncertainties, some of these wells were excluded from the characterization. Another source of uncertainty is the paucity of wells, particularly monitoring wells, near or immediately downgradient of the leading edge of the plume. Therefore, the exact extent of the SAG aquifer uranium plume is not known at this time. There is, however, no evidence or indication of milling-related contamination in municipal wells. Furthermore, due to plume stability and direction of groundwater flow, the municipal wells are not expected to be impacted. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integrating Commercial Ready Autonomous Robotic Platforms to Enhance Worker Safety and Efficiency - 20053

This paper will explore the challenges and triumphs of implementing advanced robotic systems and the supporting technology for the waste management industry. Deployment-ready solutions for autonomous robotic platforms are new to the radioactive waste management industry and have been slow to implement across the complex. Specifically, it will explore Hanford Tank Operations Contractor's implementation of ground-based autonomous robotic platforms to enhance workforce safety and efficiency. The first objective of the project is to demonstrate safe operation of autonomous instrumented robots, followed by a scaling up of capabilities for the platform to meet any additional requests of internal stakeholders. Autonomous robotics platforms offer a fantastic range of capabilities that will aid in decreasing long-term liability of radioactive waste management industry by enhancing clean-up efforts and worker safety. Over the past five years, deployment-ready solutions for autonomous robotic platforms have come a long way. Autonomous robotic platforms are increasingly available to purchase from many vendors, often for prices under $100,000. Additionally, the vendors who produce these products are efficient in accommodating customized solutions to unique challenges, such as those often found in the radioactive waste management industry. However, the newness of this technology to the radioactive waste management industry and has resulted in a slow implementation across the complex. This paper will explore the challenges and triumphs of implementing advanced robotic systems and supporting technology for the waste management industry. Specifically, it will explore Hanford Tank Operations Contractor's implementation of ground based autonomous robotic platforms to enhance workforce safety and efficiency. While the company has utilized robots in many parts of the tank farms mission, this was first attempted in the deployment of an autonomous platform that required no operator with only minor maintenance and created challenges not yet encountered. These challenges included stakeholder buy-in, operational safety, procurement uncertainties, adaption of 'off the shelf products, overcoming the 'Fukushima complexity' perception, security concerns, and the initial criteria down select. Hanford Tank Operations Contractor's management identified the need for a workforce protecting low cost robotics solution in the fall of 2017. The project scope generated was part of the response to the Tank Vapor Assessment Team recommendation to enhance the safety of the workforce by utilizing new technology. Since the projects inception, it has been incorporated into the Tank Stewardship Plan. This project was unique to Hanford Tank Operations Contractor, as the company does not frequently incorporate advanced technology for field deployment quickly. The project was also progressive to the Hanford Tank Operations Contractor as it functions as a partnership project with a local university. The first objective of the project is to demonstrate safe operations of autonomous instrumented robotics, monitoring and collecting data, and the wireless transmission of data to a central computing system. Following the completion of this first objective, the project will scale up capabilities of the platform to meet the requests of additional internal stakeholders throughout the tank farms - including completion of specific in-field tasks. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Accelerating Hanford Site Cleanup through Operations Research Modeling - 20238

The Hanford Site cleanup effort will require the integration of dozens of unique facilities and processes, many of which will be first-of-a-kind in implementation and design. Each facility will be governed by its own set of operating logic, configured with a unique array of unit operations, and subject to a set of constraints that will affect its behavior. The collection of facilities have multiple points of interface, making the operations of any one facility potentially significant to the operations of other up- or downstream processes. It is therefore highly desirable to accurately predict these operations, as it allows for Site officials to identify and preempt bottlenecks and vulnerabilities before they unexpectedly inhibit the cleanup mission. With the quantity and complexity of the processes that will be on Site, building a pen-and-paper or even a spreadsheet-assisted model of the cleanup mission quickly becomes overwhelming in scope and inaccurate in execution. The Engineering organization for the Site's Tank Operations Contract (TOC) has therefore implemented the use of operations research (OR) modeling to simulate and predict future operations of Site facilities. These models are created using a discrete event simulation tool that allows for the development of detailed, versatile, and robust models. Not only can these models account for complex logical behaviors, but they can also simulate process details down to the level of vessel sizing, labor utilization, equipment reliability, and resource availability. To date, the TOC has developed OR models for several facilities on Site, including for single-shell tank (SST) farms, double-shell tank (DST) farms, the Effluent Treatment Facility (ETF), and the waste transfer system. These models have focused on identifying bottlenecks and operational constraints, and have been used to quantify the effects of implementing process changes. This latter point is particularly valuable, as it allows for several alternatives to be studied in a virtual setting before committing resources to making a change in the field. The decision to develop OR models has gained tremendous support from the Site's stakeholders and the U.S. Department of Energy (DOE) management, and has prompted the use of the tool to support additional internal and external initiatives. Recently, an initiative was proposed to use the models to help identify and provide quantitative backing for risks and opportunities for the TOC. This application of OR could not only help inform how the TOC manages its risks (e.g. quantities and types of spare parts), but could also help drive process improvements whose benefits might otherwise be hard to quantify. The models have also been used to drive the TOC's cloud computing, artificial intelligence (AI), and machine learning (ML) initiatives. These initiatives will not only improve the ability of the TOC to more rapidly respond to the needs of its customers, but it will also aid in the ability of the TOC to analyze and improve the processes it studies. Partnership with two external software development and consulting companies (Lanner and Ynformed) has furthered not only the application of AI and ML within the TOC, but has also spurred the development of new/improved software tools and platforms used by the companies. These partnerships have proven to be mutually beneficial and productive, and have set a precedent for the types of gains that can be made by exploring such options. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons Learned from Demolition of Hanford's Plutonium Finishing Plant - 20507

U.S. Department of Energy (DOE) contractor CH2M Hill Plateau Remediation Company (CHPRC), a Jacobs owned company, is making significant progress demolishing the Plutonium Finishing Plant (PFP), which has long been known as one of the most hazardous buildings in the DOE Environmental Management Complex (DOE Complex). The facility is located on the Hanford Site and produced plutonium metal during the Cold War. Production was stopped in 1989, the facility was formally shut down in 1996, and material processing was completed in 2004. After approximately 25 years of demolition preparations, open-air demolition of the main portions of the Hazard Category II nuclear facility began in November 2016. To prepare the PFP for demolition, CHPRC employees performed some of the most hazardous work across the DOE Complex. In addition to extensive demolition preparations, including a wide-reaching communication strategy across the Hanford Site, CHPRC implemented robust controls and monitoring during demolition, and when necessary, adjusted demolition practices and sequence to maintain employee safety and project efficiency. Demolition of the main PFP building began in November 2016. The technical complexity, high hazards and radiological concerns have all led to a difficult demolition environment. Following a spread of contamination at the project site beyond the radiological boundaries in December 2017, work was halted and a recovery plan was generated to allow the demolition work to continue. After the implementation of additional controls and concurrence from regulatory agencies and DOE, the demolition was ready to resume work and reinitiated in August 2018. There are a number of lessons learned from the demolition activities and recovery plan process. This paper allows CHPRC and DoE's Richland Operations Office (RL) to share lessons learned and progress to date with other challenging and hazardous projects across the DOE Complex. Understanding the risk acceptance level is critical to execution of any open-air demolition project and is unique to each facility. Four key lessons learned from this project include: 1) plan execution issues, 2) stakeholder communication issues, 3) watching for summit fever and 4) minimizing exposed contaminated surfaces during demolition. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results of a Soil Flushing Treatability Test for Hanford Site Hexavalent Chromium Removal - 20446

U.S. Department of Energy contractor CH2M Hill Plateau Remediation Company has made significant progress remediating hexavalent chromium in groundwater near the Columbia River through the operation of pump and treat facilities and source removal activities. To mitigate risks associated with hexavalent chromium contamination, which was identified in a CERCLA interim action record of decision as the primary groundwater contaminant of concern for the 100-KR-4 Operable Unit from discharging to the Columbia River, three ion-exchange pump and treat systems were installed between 1997 and 2009. Between 2010 and 2016, operation of the K West pump and treat system, located near the former 105K West plutonium production reactor, reduced concentrations below the groundwater remediation target for hexavalent chromium. In 2016, a rebound study was performed to evaluate the effectiveness of the pump and treat remedy and assess the potential for any residual hexavalent chromium sources continuing to contribute to groundwater contamination. As a result of the rebound study, a source of continued groundwater contamination was identified. To address this condition, a soil flushing treatability test was written and approved by the U.S. Department of Energy and the U.S. Environmental Protection Agency. The test included saturating about a 1-acre area of soil with treated water with the goal of forcing the residual hexavalent chromium to groundwater where existing extraction wells could remove it for treatment, accelerating the cleanup process. In spring and summer 2019, CH2M Hill Plateau Remediation Company installed and began operating a shallow underground leach system to support the treatability test. Preliminary sampling data show the test was effective in removing the residual contamination. Following further evaluation and analysis from the initial test, the process will be considered for implementation elsewhere on the Hanford Site, particularly at locations where there is a known or suspected continuing contamination source in the soil column. The paper will cover the goals of the study, as well as more details about the following: - Overview of pump and treat exit strategy (using U.S. Environmental Protection Agency guidance); - The design and installation of the soil flushing technology in the 100-K Area; - The testing process and results of sampling data; - Post-study evaluation and potential for implementation in other locations at the Hanford Site. Innovative solutions for cleanup, such as the soil flushing technology, have resulted in substantial progress in the removal of groundwater contaminants at the Hanford Site, potentially shortening the time frame required to meet cleanup goals and resulting in significant cost savings. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

On the Road to Achieving Safety Excellence at the Idaho Cleanup Project: The Initial Challenges, Solutions, and Positive Results of Striving to be the Best and Safest in the DOE Complex - 20518

When Fluor Idaho, LLC (Fluor Idaho) assumed the Idaho Cleanup Project Core contract (ICP Core) in mid-2016, it inherited the successful multi-faceted, employee-owned safety programs of two prior contractors supporting cleanup operations at the Idaho National Laboratory Site. Fluor Idaho incorporated the best of both safety programs along with Fluor Corporate's 106-year legacy of safety initiatives and successes. Fluor Idaho integrated the separate programs and cultures under a One Fluor approach - one project, one mission, One Fluor. Job changes, management changes, and procedures, processes, and system changes presented multiple challenges. Those challenges combined with the severe Winter of 2016/2017 resulted in numerous slips, trips, and falls first aids and reportable injuries. The road to safety excellence started off bumpy and stayed that way for some time. Since then, Fluor Idaho has successfully implemented several key initiatives including employee engagement; management engagement and time in the field; communications improvements; safety culture sustainment; injury/illness prevention; organizational learning; and DOE Voluntary Protection Program (VPP) readiness and preparation. Management became more engaged by making more workplace visits and increasing their supervision of 'life critical work' or complex activities. Additional training became mandatory for first-line supervisors and front-line workers. Most recently, Fluor Idaho increased its injury and illness prevention initiatives extensively. In the last year, things have turned around in a dramatic way. This shift is directly attributable to the significant number of initiatives launched in late 2017 and 2018. These initiatives addressed safety performance in the five key areas of the DOE VPP and promoted sustainability of the company's safety culture. The five key areas are: management leadership, employee involvement, work-site analysis, hazard prevention and control, and safety and health training. Employees and managers alike recommitted to making safety the highest value. The result of this laser-like focus on safety and accident and injury prevention is that injuries and first aids are a fraction of what they were. During FY 2019, employees worked more than 4.2 million hours without a serious injury or lost work-day and 1 million hours without a recordable injury. Fluor Idaho is proud of its safety trend. The company invested significant resources in improving its safety record, and that investment is paying off. Other contractors in the DOE Complex can learn and benefit from this discussion of the challenges Fluor Idaho faced, as well as its innovative safety initiatives that are producing results that are being recognized by our U.S. Department of Energy (DOE) customer. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The German Site Selection Process - Implementation and Challenges - 20528

Federal Company for Radioactive Waste Disposal (Bundesgesellschaft fuer Endlagerung mbH; hereinafter referred to as BGE) is a state-owned company established in September 2016 following the 'Act on the Organisational Restructuring in the Field of Radioactive Waste Storage'. 'Repository Site Selection Act' (hereinafter referred to as StandAG) defines the site selection procedure, aiming to ensure the best possible safety for storing high-level radioactive waste in Germany for the duration of one million years. The selection procedure is a participatory, transparent, learning and self-questioning process based on scientific expertise. Possible repository sites are sought all over Germany, without excluding or predetermining any potential site at the beginning. The procedure consists of three phases. After each phase, the legislative decides on the regions for further consideration in the next phase of the site selection procedure. The current first phase (Phase I) is divided into two steps. Objective of Step 1 is to determine subareas of favorable geological conditions based on available data. Step 2 of Phase I will lead to identification of specific regions that are considered for further surface-based geoscientific and geophysical exploration. Potential host rocks are rock salt, clay rock and crystalline rock. As part of the site selection procedure, an overview of the status of the planning and implementation of R and D activities is given. Topics of particular interest are, for example, the adaptation of the maximum temperature of 100 deg. C at the container surface, the impact of long-term climate variations as well as minimally invasive exploration methods. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Unstated assumptions in alarm management - 202

Alarm management in the process industries has been an increasing area of activity since the first publications of EEMUA 191 in 1999 and ISA18.2 in 2008. Most major oil and chemical companies have adopted some or all of the metrics for alarm management presented in these documents. However, simply targeting for these metrics might not be the best course of action for a company. Many of the metrics involve assumptions or logic not explicitly stated in the guidelines, assumptions that might not be valid for a given console or plant. In other cases, metrics are the result of implied, rather than explicit, relationships between alarm guidelines. Again, the implied connection might not be true under certain circumstances. Understanding these unstated underpinnings of alarm management can facilitate the implementation of a useful and efficient alarm management program. This paper explores some of the key unstated assumptions in alarm management and how changes in those assumptions can alter both the interpretation of alarm metrics as well as what metrics are utilized. (authors)

47 OTHER INSTRUMENTATION↗

Design Report of the Molten-Chloride High Temperature Reactor (M-CHTR)

Liquid fueled molten salt reactors have seen renewed attention from reactor vendors and utility companies. In January of 2016, the Department of Energy awarded Southern Company, partnered with TerraPower, Electric Power Research Institute, Vanderbilt University, and Oak Ridge National Laboratory, a $40 million grant to support the development of the Molten Chloride Fast Reactor. This design report will discuss the design of the 2000 MW{sub th} Molten-Chloride High Temperature Reactor (M-CHTR). The M-CHTR is a liquid fuel molten sodium chloride fast reactor that is designed to consume spent nuclear fuel with normal operating temperatures near 1000 deg. C. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Recent activities of the UK working party on criticality - 14334

The Working Party on Criticality (WPC) in the United Kingdom (UK) is the non-executive national committee that focuses on criticality safety issues up to, but not including, experimental and in-core power reactor operations. The current membership includes representatives from all relevant UK Site Licensee Companies and Regulators together with a small number of other key companies with interests in this area. In recent times, the primary focus of the committee has been to provide a forum for the discussion and distribution of information of relevance to criticality safety in the UK, particularly the sharing and development of good practice. However, it also serves as a useful forum to (i) disseminate regulatory issues of relevance to criticality safety and facilitate the development of a UK criticality community view on such matters, (ii) guide, promote, coordinate and encourage cooperation on high priority activities of common interest to the UK criticality community, (iii) promote international collaboration in the field of criticality safety, and (iv) provide opportunities for the professional development of criticality safety personnel. This paper gives a detailed overview of the activities of the WPC in the years since the last International Conference on Nuclear Criticality (ICNC), held at Edinburgh in 2011. It undoubtedly continued to be a challenging time for the UK criticality community, not least because of difficulties with the central coordination (and hence funding) of strategic issues in the UK as the nuclear industry has become increasingly fragmented. However, despite these issues, the committee has still been able to fulfil its objectives during that time and successfully supported the UK criticality community. A particular focus of the paper will be the success of the Continued Professional Development workshops and the potential benefits of other countries adopting a similar initiative. (author)

42 ENGINEERING↗

An assessment of existing barriers to market adoption of thermal energy storage in buildings based on interviews with stakeholders

The United States administration recently established a goal of reducing greenhouse gas emissions by half below 2005 levels by 2030 and becoming a carbon-neutral economy by 2050. The transition to renewable energy sources may be significantly aided by energy storage. Energy storage could smooth the delivery of variable or intermittent renewable energy sources such as wind, hydro, and sun by storing excess renewable energy when it’s available and delivering it back when renewable energy production is low. Thermal energy storage (TES) is a way that stores thermal energy by heating or cooling a storage medium, which is then used for space heating and cooling, industrial processes, or power generation purposes later. This TES operation could lessen the demand for electricity in both the winter's and the summer's peak hours of electricity. While there are various studies that focus on the advancements and successes of TES technology, less attention is placed on its market adoption. Therefore, the current study undertakes survey-based interview research to understand the existing market barriers hindering TES application in buildings. A series of interviews were performed in this study with individuals from various backgrounds, ranging from homeowners to market specialists who work for TES manufacturers and utility companies. According to the responses obtained during the interviews, they strongly believe that TES has a high potential to contribute to the nation's grid stability and decarbonization goals, however, there are several barriers that prevent homeowners and heat pump manufacturers from investing in TES applications. The current study divided the responses from various background groups into categories to better understand the current challenges for TES applications in buildings. These responses range from payback concerns from homeowners to the need to develop a new metric to represent the benefits of TES from the heat pump and TES manufacturers. The findings from this study can be used by policymakers, utility companies, and manufacturers to better understand present obstacles and develop strategies to overcome them.

Prem Anand Jayaprabha, Jyothis Anand↗

2022 Component Innovation Awardee: Windurance

Combining battery energy storage with distributed wind energy systems can increase production, ability to meet local electricity demands, interconnection capacity, and potential sales of surplus energy back to the grid, while reducing demand charges and the overall levelized cost of energy (LCOE). Energy storage options for distributed wind energy systems can vary widely in terms of power level and energy storage capacity, and their potential benefits depend on factors including wind resource, turbine design, connection requirements, use patterns, utility rates, and regulations. Windurance received a 2022 Competitiveness Improvement Project (CIP) funding award to add battery energy storage capabilities to the company's bidirectional DC converter. The energy storage component will complete a comprehensive portfolio of power conversion and control electronics that can be seamlessly integrated with distributed wind systems. The company received earlier CIP awards to fund prototype design and construction of wind turbine pitch actuators, inverters, and controllers.

CIP↗