Engineering Papers⌕ Search

DOE OSTI · 2349499

2022 Component Innovation Awardee: Windurance

Abstract

Combining battery energy storage with distributed wind energy systems can increase production, ability to meet local electricity demands, interconnection capacity, and potential sales of surplus energy back to the grid, while reducing demand charges and the overall levelized cost of energy (LCOE). Energy storage options for distributed wind energy systems can vary widely in terms of power level and energy storage capacity, and their potential benefits depend on factors including wind resource, turbine design, connection requirements, use patterns, utility rates, and regulations. Windurance received a 2022 Competitiveness Improvement Project (CIP) funding award to add battery energy storage capabilities to the company's bidirectional DC converter. The energy storage component will complete a comprehensive portfolio of power conversion and control electronics that can be seamlessly integrated with distributed wind systems. The company received earlier CIP awards to fund prototype design and construction of wind turbine pitch actuators, inverters, and controllers.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

2024-05-07. 2022 Component Innovation Awardee: Windurance. https://www.osti.gov/biblio/2349499

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

2022 Component Innovation Awardee: Pecos Wind Power

Distributed wind energy systems supply electricity for nearby homes and businesses, often in remote and rural regions. Systems capable of capturing energy in areas with low wind speeds make it possible to deploy these clean energy systems in many geographic locations. Pecos Wind Power's 85-kilowatt (kW) horizontal-axis PW85 wind turbine shows potential to reduce the levelized cost of energy by approximately 55% when compared to typical small wind systems while achieving utility-scale capacity factors of more than 40% in areas with lower wind speeds. To maximize cost competitiveness, the Pecos Wind Power turbine needs a blade optimized for low wind speeds. Through its 2022 Competitiveness Improvement Project (CIP) award, Pecos Wind Power and partner Wetzel Wind Energy Services will model, optimize, fabricate, and validate a 14.5-meter wind turbine blade made specifically for these applications. Three prior CIP awards supported Pecos Wind Power's initial development of the PW85 turbine.

CIP↗