Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “state policy”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,189 records · Page 66

Ambitious efforts on residual emissions can reduce CO 2 removal and lower peak temperatures in a net-zero future

Carbon dioxide removal (CDR) is expected to play a critical role in reaching net zero CO 2 and especially net zero greenhouse gase (GHG) emissions. However, the extent to which the role of CDR in counterbalancing residual emissions can be reduced has not yet been fully quantified. Here, we use a state-of-the-art integrated assessment model to develop a 'Maximum Sectoral Effort' scenario which features global emissions policies alongside ambitious effort across sectors to reduce their gross GHG emissions and thereby the CDR required for offsets. We find that these efforts can reduce CDR by over 50% globally, increase both the relative and absolute role of the land sink in storing carbon, and more evenly distribute CDR contributions and associated side-effects across regions compared to CO 2 pricing alone. Furthermore, the lower cumulative CO 2 and nonCO 2 emissions leads to earlier and lower peak temperatures. Emphasizing reductions in gross, in addition to net emissions while disallowing the substitution of less durable CDR for offsets can therefore reduce both physical and transition risks associated with high CDR deployment and temperature overshoot.

54 ENVIRONMENTAL SCIENCES↗

Expedited desalination permitting enables adaptive planning and water system cost reduction

Seawater desalination is a drought-proof water supply for coastal cities, but widespread development of desalination plants in the U.S. has been limited by both cost and the complexity of permitting processes designed to minimize environmental impact . This work estimates the value of accelerating the permitting timeline without changing environmental or social standards. On average, faster permitting reduces the frequency of desalination plant construction and operation, the overall costs of robust water system operation, the environmental impacts of drought-tolerant water supplies due to shorter duration of plant operation. Expedited permitting allows fundamental changes in how water infrastructure is deployed, facilitating a transition from anticipatory construction and continuous operation of seawater desalination capacity as a redundant drought buffer to just-in-time (i.e. adaptive) deployment of seawater desalination capacity when critical drought thresholds are crossed. We demonstrate the value of expedited desalination permitting in enabling adaptive planning and reducing water system costs using a simple case study in Santa Barbara, CA. We discuss additional forms of adaptive water infrastructure planning as enabled by faster permitting and address their challenges and opportunities. Lastly, we identify synergies between innovation in adaptive planning, innovation in expedited permitting practices, and innovation in water technology.

adaptive planning↗

Designing and Utilizing Material Acceleration Platforms: Need for Workforce Development

In the quest to accelerate scientific discovery, the materials science field is rapidly moving toward the implementation of robotics and artificial intelligence driven workflows. Our recent summer school “Future Labs: Robotic Synthesis Coupled with Machine Learning for Energy Materials” provided learning opportunities for students, researchers, and educators in the materials science community. We describe this experience and provide our perspective on which new directions could be pursued to enable the future workforce to acquire cross-disciplinary skills.

Educational policy↗

Virtual Power Plants: Pilots, Challenges, and Innovations Shaping Future Development

Virtual Power Plants (VPPs) aggregate distributed energy resources (DERs) to provide grid services traditionally delivered by centralized power plants. This article reviews the current state of VPP deployment, highlighting business models, compensation mechanisms, and global pilot projects. While VPPs offer benefits such as grid flexibility, resilience, and cost savings, challenges remain in communication infrastructure, regulatory frameworks, market access, and customer engagement. To address these, we propose a scalable, privacy-preserving hierarchical VPP architecture that coordinates with distribution utilities and preserves customer data. We also present the Integrated T&D Control Room of the Future as a key test bed for validating and accelerating VPP adoption. These innovations can help transition VPPs from pilot programs to integral components of a modern, reliable power grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Resilient State Recovery Using Prior Measurement Support Information

Resilient state recovery of cyber-physical systems has attracted much research attention due to the unique challenges posed by the tight coupling between communication, computation, and the underlying physics of such systems. By modeling attacks as additive adversary signals to a sparse subset of measurements, this resilient recovery problem can be formulated as an error correction problem. To achieve exact state recovery, most existing results require less than 50% of the measurement nodes to be compromised, which limits the resiliency of the estimators. In this paper, we show that observer resiliency can be further improved by incorporating data-driven prior information. Here, we provide an analytical bridge between the precision of prior information and the resiliency of the estimator. By quantifying the relationship between the estimation error of the weighted ℓ 1 observer and the precision of the support prior, this quantified relationship provides guidance for the estimator’s weight design to achieve optimal resiliency. Several numerical simulations and an application case study are presented to validate the theoretical claims.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Technology Transfer from Los Alamos [Slides]

The Feynman Center for innovation is responsible for all of the Laboratory’s technology transfer activities. The goal of technology transfer is to leverage federal R&D investments to promote U.S. economic competitiveness and job growth, while supporting the Laboratory’s national security mission objectives. FCI authorities and functions originate from federal and state statutes and prime contract directives.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Hydrogen Considerations Tree: Executive Deck [Slides]

The Hydrogen Considerations Tree is designed to enhance the understanding and capabilities of U.S. Agency for International Development Missions and country partners, empowering them to make informed decisions regarding potential support for hydrogen and its derivatives, such as e-fuels, hydrogen carriers, or ammonia, within their respective nations. Moreover, the Considerations Tree is designed to provide fundamental and applied information for the identification of deployment, regulation, policy priorities for hydrogen technologies in the context of each country or region. Key topics are organized into a "considerations tree," enabling stakeholders to systematically and holistically address technical, regulatory, economic, environmental, social, and analytical questions.

08 HYDROGEN↗

Electric Grid and Markets 101 [Slides]

This presentation covers aspects of operating the bulk power system with a focus on the regulatory levels of the US grid at a pretty introductory level. It was meant ot help inform a request from USDA for a "101" presentation that spoke to how electricity markets, contracting and regulation interact with the engineering and physics of operating the bulk power system. They are presently moving to being able to more directly fund PPAs or other non-co-op owned assets for member co-ops, is my understanding.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The Iowa Tribe of Kansas and Nebraska: Advancing Clean, Resilient, and Sovereign Energy (Summary Report of Communities LEAP Activities)

The Iowa Tribe of Kansas and Nebraska (ITKN) is a federally recognized Native American Tribe located along the Missouri River on the border of northeast Kansas and southeastern Nebraska. There are over 800 residents (Tribal citizens and non-Tribal) who live on the reservation, as well as more than 500 people who visit or work on the reservation on a daily basis. The ITKN faces many energy challenges, including rising service costs and dozens of power outages annually that impact resident well-being and business activities on Tribal lands. Power service issues are made more challenging by the remoteness of the reservation, which is 20 miles from the nearest town. Despite this, the ITKN has a long history of cultural and economic resilience: Local self-reliance, environmental stewardship, respecting the carrying capacity of the land, and strengthening the community are Tribal communities' traditional strengths. Long-term energy goals for the ITKN are centered around achieving energy sovereignty. Priority actions include: (1) Establishing a Tribal Utility Authority (TUA) to promote social welfare and community development.; (2) Deploying renewable community microgrids with ground-mount solar arrays and sustainable energy storage systems to advance energy sovereignty, resilience, and reliability. To advance these goals, the ITKN partnered with the U.S. Department of Energy's (DOE's) Communities LEAP (Local Energy Action Program) pilot. From August 2022 to March 2024, the ITKN community coalition collaborated with technical assistance providers at DOE's National Renewable Energy Laboratory (NREL) and Sandia National Laboratories to evaluate TUA planning needs and microgrid deployment scenarios. This final report details the Communities LEAP technical assistance process, models and analysis performed, and results.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Community Solar Consolidated Billing: An Exploration of Implementation and Alternatives

The report presents an analysis of the considerations, costs, and benefits surrounding the implementation of utility consolidated billing in community solar programs while also exploring alternatives to achieve similar benefits in its absence. Consolidated billing simplifies the billing process for customers by combining all charges and credits associated with electricity service and community solar subscriptions into a single bill. The potential benefits of consolidated billing implementation include increased transparency, improved customer experience, and ultimately increased retention rates and decreased subscriber acquisition costs. Currently, community solar subscribers often receive two separate bills - one from the utility and one from a third-party community solar provider - potentially causing confusion. Consolidated billing seeks to resolve this by offering a unified bill, which, while beneficial to numerous stakeholders, presents administrative, technical, and financial hurdles that utilities and program administrators must address.

14 SOLAR ENERGY↗

Bringing Alaska's Carbon Ore, Rare Earth, and Critical Minerals (CORE-CM) into Perspective

The final report outlines the outcomes of the Alaska CORE-CM Program, funded by the U.S. Department of Energy under award DE-FE0032050. Led by the University of Alaska Fairbanks and the Alaska Division of Geological and Geophysical Surveys, with assistance from other organizations, the project assessed Alaska's potential for Carbon Ore, Rare Earth Elements, and Critical Minerals (CORE-CM). Leveraging advanced analytical techniques, the project identified high-potential resource basins, evaluated geochemical and satellite data, and conducted targeted field investigations. Findings revealed promising concentrations of critical minerals in legacy samples and newly collected materials. The project also investigated innovative extraction technologies, including BioExtraction and use of supercritical CO2, which show significant promise for sustainable resource recovery. Additionally, the study explored the reuse of waste streams from active mining operations and coal byproducts such as using alkali-activated coal ash to manufacture concrete. Infrastructure and logistical challenges in Alaska’s remote regions are discussed, alongside strategies to establish a Technology Innovation Center aimed at advancing CORE-CM development in Alaska. The report includes actionable insights to support Alaska’s critical role in securing domestic supplies of essential minerals while addressing economic, environmental, and technological challenges.

01 COAL, LIGNITE, AND PEAT↗

EV Charging Infrastructure Energization An Overview of Approaches for Simplifying and Accelerating Timelines to Processing EV Charging Load Service Requests

The United States has seen significant growth in electric vehicle (EV) adoption, leading to increased demand for EV charging infrastructure. Over the past decade, EV charging infrastructure site developers, site hosts, and electric distribution utilities have navigated the process to integrate chargers onto the electric grid. Site developers and site hosts have raised the alarm that the integration process for high-powered EV charging projects does not meet the needs of the EV market for timeliness or cost. High-powered charging stations typically require a load service request or an agreement with the local utility to connect to the grid. The process of energizing a new high-powered charging site can be complex and time-consuming, often taking up to 2 years. This timeline is the result of current utility energization processes having been designed for construction projects that take longer to build (i.e., buildings). The specific challenges stem from various factors, including compartmentalization in application processes, the integration of EV charging process approvals with other distributed energy resources (DERs), and the need to ensure grid reliability. The energization process needs to evolve to meet the growing demand for high-powered EV charging. This white paper compiles information gathered through various conversations with key stakeholders, including utilities, utility regulators, EV charging operators, site developers, and authorities having jurisdiction (AHJ) as well as through an extensive literature review. This document identifies the challenges and provides potential solutions to streamline the process of connecting EV charging infrastructure to the power grid in the United States, serving as a starting point for future conversations around these solutions. The solutions noted in this white paper require collaborative efforts among utilities, regulators, and EV charging infrastructure developers to streamline the grid connection process for EV charging infrastructure. They are broadly organized into four areas: 1. Increase data access and transparency: Develop automated load service request tools, integrate hosting capacity and load service request analyses, incorporate EV adoption forecasts, and provide transparency on the processing queue. 2. Improve energization processes and timing: Create fast-track options based on prescreening criteria, provide flexibility or phased approvals in the load service request/interconnection process, build internal knowledge within utilities about EV charging technologies, and provide standardized workforce training. 3. Promote economic efficiency: Right size distribution components to accurately reflect the load requirements of EV charging infrastructure, make proactive investments in grid infrastructure based on EV adoption forecasts and growth projections, and consider energy equity and environmental justice factors such as equitable access to EV charging when planning infrastructure. 4. Improve grid reliability and resilience: Use load management/power control systems (PCS) at EV charging stations, adopt and implement harmonized standards for communication protocols and information models between the EV charging and grid control infrastructure, and address cybersecurity considerations by implementing robust security measures and standards for EV charging infrastructure—with particular emphasis on clarifying the security requirements for the interface to the grid. The objective of the solutions proposed in this white paper is to accelerate the timeline and decrease costs associated with connecting EV charging infrastructure to the grid. Electric utilities, utility regulators, EV charging infrastructure developers, and site hosts will first need to understand which solutions are available in their service territory, and if warranted, which combination of solutions would support their specific needs. Through the successful implementations of solutions at scale detailed here, industry will demonstrate a new and innovative ecosystem where timely deployment and energization of EV charging infrastructure with greater grid resiliency and reliability is a reality.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Virtual Power Plant Profiles and Inventory

Increased adoption of distributed energy resources (DERs), growing quantities of renewable energy on the grid, and load growth from buildings, industry, and data centers are driving the need for increased demand flexibility and solutions to reliably and cost-effectively balance electricity supply and demand. In order to deploy DERs on a similar scale as conventional supply-side resources, utilities and state decision-makers are exploring a range of programmatic approaches and market designs, including Virtual Power Plants (VPP). Based on interviews with more than twenty subject matter experts on VPPs, the Insights into Scaling Virtual Power Plants report and appendix outlines actions that utilities and regulators can take to expand VPPs, organized around successful VPP designs, deployment, and operation. The companion report, Virtual Power Plant Profiles and Inventory describes three conceptual profiles that can be used as a starting point to facilitate clear discussions among regulators, utilities, solution providers, and stakeholders about various VPP strategies. It also includes details on more than 790 demand response programs and net energy metering solar plus battery programs, and 180 VPP programs. The Inventory is provided below as a separate file.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Moving Beyond Direct Load Control: A Maturity Model for Realizing the Promise of Demand Flexibility

This report discusses a new maturity model that regulators and utilities can use to guide and expand demand flexibility programs and enable the resources to provide more grid services. The model has six demand flexibility categories: planning and design; customer engagement; program operations; evaluation, measurement and verification; distributed energy resource orchestration; and data infrastructure. Within each category, capabilities are identified and described on a maturity scale that ranges from performing below expectations to improving on best practices.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Electricity Rate Designs for Large Loads: Evolving Practices and Opportunities

Electricity demand from large load customers such as data centers is projected to grow significantly in the near term. While data centers play an important role in advancing technology innovation and economic growth in the United States, data center energy needs present challenges and opportunities for electricity supply and infrastructure. This technical brief serves as a foundation for the discussion of issues and sharing of perspectives among utilities, regulators, large load customers, and other stakeholders. As utilities and regulators explore rate structures to address growing data center electricity demand, several issues have emerged: -Fair allocation of electricity system costs to large-load customers without unfair shifting of costs to other customers -Appropriate mitigation of the financial risks associated with stranded assets from underutilized utility system investments -Mitigation of operational and resource adequacy risks if electricity demand exceeds supply -Appropriate risk-sharing in commercializing newer electricity technologies such as advanced geothermal, small modular reactors, and long duration energy storage -Accommodating the diverse needs of large-load customers, such as having the option to match electricity consumption with output from carbon-free resources or using onsite generation to provide system capacity The technical brief also identifies key design elements that aim to address these issues and uses leading examples from pending and approved rate structures, agreements, and special contracts to ground the elements in practice.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Bridging the Gap on Data, Metrics, and Analyses for Grid Resilience to Weather Events: Information that utilities can provide regulators, state energy offices, and other stakeholders

A growing number of states require regulated utilities to file resilience plans to improve the electric grid’s ability to anticipate, withstand, adapt to and recover from increasingly severe weather events. This report aims to help state regulators identify and request data, metrics, and analyses from utilities and use it in decisions on utility resilience plans and investments. The report reviews state requirements and utility plans focused on overall grid resilience, climate change resilience and vulnerabilities, infrastructure modernization, storm protection, and wildfire mitigation. It details types of data, metrics, and analyses across five categories--and provides examples of each from the utility plans. The first category is vulnerability assessments, or evaluations of the susceptibility of systems, communities, or assets to potential harm from identified hazards. The second is data on hazards and the exposure of utility assets and customers to these hazards. The third is attribute metrics, or system characteristics that contribute to or describe the resilience of a system. The fourth is performance metrics, which are impacts of resilience investments on system performance--typically a reduction of negative impacts from hazard events. Finally, evaluation and prioritization are analyses that utilities conduct to estimate impacts from resilience measures (evaluation) and prioritize measures based on costs and estimated impacts (prioritization). The report concludes with examples of key trends and emerging best practices for states and utilities, and identifies areas for further research.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Distributed Energy Resource (DER) Integration Framework: Regulatory Innovation for DER Compensation and Cost Allocation

Existing regulatory approaches to DER lack the precision and granularity necessary to ensure that DER can continue to scale in a cost-effective manner that is aligned with the public interest. To address this need, with the support of the U.S. Department of Energy’s Office of Electricity, Berkeley Lab and Current Energy Group developed an illustrative regulatory framework. By adopting a technology-neutral and modular approach, the framework enables flexibility and scalability for DER providers, utilities, and regulators. Clear price signals and incentives encourage the provision of valuable grid services, while equitable cost allocation promotes efficient use of distribution capacity and interconnection resources. This approach mirrors traditional ratemaking principles for importing customers and positions DERs as integral components of a dynamic and cost-effective energy future.

24 POWER TRANSMISSION AND DISTRIBUTION↗