Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,135 records · Page 63

Y-12 Groundwater Protection Program Groundwater and Surface Water Sampling and Analysis Plan (CY 2021)

This plan provides a description of the groundwater and surface water quality monitoring activities planned for calendar year (CY) 2021 at the U.S. Department of Energy Y-12 National Security Complex (Y-12) that will be managed by the Y-12 Groundwater Protection Program (GWPP). Groundwater and surface water monitoring is performed by the GWPP. Groundwater and surface water monitoring will be performed in three hydrogeologic regimes at Y-12: the Bear Creek Hydrogeologic Regime (Bear Creek Regime), the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek and East Fork regimes are located in Bear Creek Valley and the Chestnut Ridge Regime is located south of Y-12. Additional surface water monitoring will be performed north of Pine Ridge along the boundary of the Oak Ridge Reservation. The following sections of this report provide details regarding the CY 2021 groundwater and surface water monitoring activities. Section 2 describes the monitoring locations in each regime and the processes used to select the sampling locations. A description of the field measurements and laboratory analytes is provided in Section 3. Sample collection methods and procedures are described in Section 4, and Section 5 lists the documents cited for more detailed operational and technical information. The narrative sections of the report reference several appendices. Figures (maps and diagrams) and tables (excluding a data summary table presented in Section 4) are in Appendix A and Appendix B, respectively. Groundwater Monitoring Schedules (when issued throughout CY 2021) will be inserted in Appendix C, and addenda to this plan (if issued) will be inserted in Appendix D. Laboratory requirements (bottle lists, holding times, etc.) are provided in Appendix E, and an approved Waste Management Plan is provided in Appendix F. Modifications to the CY 2021 monitoring program may be necessary during implementation. Changes in programmatic requirements may alter the analytes specified for selected monitoring wells or may add or remove wells from the planned monitoring network. Each modification to the monitoring program will be approved by the Y-12 GWPP manager and documented as an addendum to this sampling and analysis plan.

54 ENVIRONMENTAL SCIENCES↗

Y-12 Groundwater Protection Program Monitoring Well Inspection and Maintenance Plan

This plan describes the systematic approach for: inspecting the physical condition of monitoring wells at Y-12, determining maintenance needs that extend the life of a well, and identifying those wells that no longer meet acceptable monitoring well design or well construction standards and require plugging and abandonment. The inspection and maintenance of groundwater monitoring wells is one of the primary management strategies of the Y-12 Groundwater Protection Program (GWPP) Management Plan, that is, the “proactive stewardship of the extensive monitoring well network at Y-12" (Consolidated Nuclear Security, L.L.C. [CNS], 2018). Effective stewardship, and a program of routine inspections of the physical condition of each monitoring well, ensures that representative water-quality samples and hydrologic data are obtained from the well network and protects the subsurface environment. In accordance with the Y-12 GWPP Monitoring Optimization Plan (MOP) for Groundwater Monitoring Wells at the Y-12 National Security Complex, Oak Ridge, Tennessee (CNS, 2017), the status designation (active or inactive) for each well determines the scope and extent of well inspections and maintenance activities. This plan, in conjunction with the above document, formalizes the GWPP approach to focus available resources on monitoring wells which provide the most useful data, and for that reason the GWPP inspects and performs maintenance on the wells sampled by the GWPP. This plan applies to groundwater monitoring wells installed at Y-12 and the related waste management facilities located within the three hydrogeologic regimes: (1) the Bear Creek Hydrogeologic Regime (Bear Creek Regime), (2) the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and (3) the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek Regime encompasses the section of Bear Creek Valley (BCV) immediately west of Y-12. The East Fork Regime encompasses most of the Y-12 process, operations, and support facilities in BCV west of Scarboro Road. The Chestnut Ridge Regime is directly south of Y-12 and encompasses a section of Chestnut Ridge that is bounded to the west by a surface drainage feature (Dunaway Branch, located immediately west of Industrial Landfill II) and by Scarboro Road to the east. The GWPP maintains an extensive database of geographic and construction details and related information for the monitoring wells in each hydrogeologic regime in the Updated Subsurface Database for Bear Creek Valley, Chestnut Ridge, and Parts of Bethel Valley on the U.S. DOE Oak Ridge Reservation (CNS, 2019). A detailed description of the hydrogeologic framework at Y-12 can be found in the GWPP Management Plan (CNS, 2018).

54 ENVIRONMENTAL SCIENCES↗

Los Alamos National Laboratory SAVY-4000 Field Surveillance Plan (Update for 2021)

The Packaging Surveillance Program section of the Department of Energy (DOE) Manual 441.1- 1, Nuclear Material Packaging Manual (DOE 2008), requires DOE contractors to “ensure that a surveillance program is established and implemented to ensure the nuclear material storage package continues to meet its design criteria.” The Los Alamos National Laboratory (LANL) SAVY-4000 Field Surveillance Plan was first issued in fiscal year (FY) 2013. The surveillance plan is reviewed annually and updated as necessary based on SAVY-4000 surveillance findings, as well as results of the lifetime extension studies. Six surveillance plan updates have been issued, one in 2014, one in 2016, one in 2017, one in 2018 one in 2019 and one in 2020. This 2021 update documents what was actually done in 2020 and what is planned for 2021. Deviations from the 2020 surveillance plan were necessary because some of the planned surveillance containers were not available for examination.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Oak Ridge National Laboratory FY 2023 Site Sustainability Plan With FY 2022 Performance Data

At the close of each fiscal year, the US Department of Energy (DOE) Sustainability Performance Division (SPD) issues guidance documents and technical resource aids/tools necessary for DOE sites and national laboratories to complete sustainability reporting requirements. SPD is part of the DOE Office of Asset Management. As required by DOE Order 436.1, Departmental Sustainability, “each site will develop and commit to an annual Site Sustainability Plan (SSP) that identifies its respective contribution toward meeting the DOE’s sustainability goals.” SPD collects and compiles information reported by each site to develop an agency-wide Sustainability Report and Implementation Plan, which is used to report DOE sustainability progress to the federal government as required by all major federal agencies. DOE launched a formal Sustainability Office and annual SSP process in 2011. Each year, Oak Ridge National Laboratory (ORNL), in concert with the Office of Science (SC), provides the resources essential to fulfill its commitment to deliver a complete and accurate SSP report and quality performance data for entry into the DOE Sustainability Dashboard as managed by SPD. The performance data entered by each DOE site are then combined to disclose the progress of each DOE Program Office and are further combined to show comprehensive progress for the agency. The Office of Asset Management provides assistance to program offices in sustaining their missions, freeing up resources by reducing waste, avoiding excess expenditure on utilities, maximizing productivity, and improving the efficiency of facilities and processes. By focusing on mission needs, programs and associated DOE sites can help the agency meet its sustainability goals, as outlined in federal statutory and regulatory requirements. In FY 2022, the SSP guidance was updated to capture requirements from Executive Order (EO) 14008, Tackling the Climate Crisis at Home and Abroad, the Energy Act of 2020 (EAct 20), actions outlined in DOE’s Climate Adaptation & Resilience Plan and Sustainability Plan, and EO 14057, Catalyzing Clean Energy Industries and Jobs Through Federal Sustainability. Updates in SSP guidance help to minimize and streamline reporting while simultaneously addressing updated federal requirements. Per DOE, each SSP report should provide an overview of the site’s planned actions, as well as an overview of efforts and accomplishments during the reporting period. SPD collects and compiles information reported by each site to develop DOE’s Annual Sustainability Report, Climate Adaptation & Resilience Plan, and Annual Energy Management Report to Congress. The agency goal has been to lower the reporting burden for sites and increase and improve the consistency of information available to decision makers, allowing them to better identify projects and potential for increased efficiency, as well as to reduce waste, lower emissions, and enhance operational resilience. Sites may elect to produce a more polished publication for their leadership and stakeholders, but this step is no longer required. The ORNL SSP narrative report (this document) and the reporting of DOE SPD Sustainability Dashboard performance data is a collaborative effort of approximately 30 subject matter experts (SMEs) from ORNL facility management and research divisions. Annually, these associates come together to provide a report that can be used by DOE to demonstrate continued agency progress in energy efficiency and sustainable federal operations.

99 GENERAL AND MISCELLANEOUS↗

United States Nuclear Data Program: Work Plan for Fiscal Year 2023

The work plan described in this document has been developed to cover work to be performed by the U. S. Nuclear Data Program (USNDP) during Fiscal Year (FY) 2023 that begins on October 1, 2022. Previously, 23 work plans have been prepared for the nuclear data program covering FYs 2021-2022. This plan has been prepared in consultation with the members of the Coordinating Committee who represent the organizations participating in the program. Each Coordinating Committee member prepared a draft plan for his/her organization. Each contribution was integrated into a unified work plan. The draft plan was then circulated to the Coordinating Committee for comments and corrections before the final document was submitted to the U.S. Department of Energy (DOE). As was done in previous years, the tasks proposed by the various organizations were reviewed internally according to the following criteria, which were developed considering the mission and goals outlined in past review panel reports and oversight committee discussions, and in consultation with the DOE program manager.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Motion Planning Algorithms for Safety and Quantum Computing Efficiency

Motion planning remains a fundamental problem in robotics. Sampling-based algorithms use randomization to allow efficient solutions to this complex problem. As mobile robots and autonomous vehicles become more prevalent in everyday life, motion planning must be applied to increasingly challenging scenarios. Safety has become a paramount concern in motion planning for ensuring robotic applications enrich human lives. To date, many motion planning techniques to increase safety in the face of uncertain and dynamic environments have been developed. This dissertation first addresses distributional safety of Rapidly-Exploring Random Trees (RRT) through our algorithm W-Safe RRT. To acknowledge distributional uncertainty and poor modeling, W-Safe RRT uses the Wasserstein metric to provide a probabilistic bound on the distributional distance between a robot and obstacles. Human-interpretable environmental agent classification allows online safety margin adaptation. We propose and analyze an integrating region method for online classification that increases actor labeling accuracy based on behavioral feature values when compared to state of the art methods. The method performs class assignments based on local maximum likelihood in a created behavioral feature-space, allowing a notion of classification uncertainty. Model-based methods with safety guarantees can quickly become computationally in tractable, especially with multiple agents, higher dimensions, and plentiful unknowns. Sampling based algorithms have been parallelized for computation with multi-core computers and GPUs. We consider the use of quantum algorithms and computers for sampling-based motion planning for the first time. Quantum computing performs operations on superpositions of states and can solve certain problems much more efficiently than classical computers, but introduces previously unseen challenges. With Quantum-RRT, we recast the motion planning problem into a database-search structure and use Quantum Amplitude Amplification to find reachable states in the database with a quadratic performance increase over classical methods. We address two error sources with this method: quantum measurement and quantum oracle errors. We then extend this method to Parallel Quantum-RRT, which uses a manager-worker architecture with multiple parallel quantum workers to increase database search efficiency. We compare algorithm architectures and characterize probabilities of multiple workers finding solutions. Lastly, we test in simulation the quantum algorithms against classical versions in a wide variety of scenarios, concluding that a similar parallelization improvement is to be found in the quantum case as was found in the parallelization of classical RRT.

97 MATHEMATICS AND COMPUTING↗

United States Nuclear Data Program Work Plan for FY 24

The work plan described in this document has been developed to cover work to be performed by the U. S. Nuclear Data Program (USNDP) during Fiscal Year (FY) 2024 that begins on October 1, 2022. Previously, 23 work plans have been prepared for the nuclear data program covering FYs 2021-2022. This plan has been prepared in consultation with the members of the Coordinating Committee who represent the organizations participating in the program. Each Coordinating Committee member prepared a draft plan for his/her organization. Each contribution was integrated into a unified work plan. The draft plan was then circulated to the Coordinating Committee for comments and corrections before the final document was submitted to the U.S. Department of Energy (DOE).

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Bridging the Gap on Data and Analysis for Distribution System Planning: Information That Utilities Can Provide Regulators, State Energy Offices and Other Stakeholders

Electric utilities conduct planning annually to ensure their distribution system meets technical standards, policies, and regulations; addresses forecasted grid conditions; satisfies customer needs; and advances utility priorities. The plan identifies grid deficiencies, analyzes potential solutions, and prioritizes capital investments and other expenditures. About 20 U.S. states and jurisdictions require regulated utilities to file some type of distribution system plan with the public utility commission for review. Requirements for sharing distribution system data and analyses vary widely, from few specific requirements to a detailed list of information that must be provided. While utilities conduct extensive analysis to develop distribution system plans, in most jurisdictions regulators and stakeholders do not know what data are available and how the utility uses the data in planning and investing. This report aims to bridge the gap by increasing understanding of the types of data and analyses utilities employ to develop distribution system plans and how the information affects their decision-making. The report describes information that states and stakeholders can ask for related to 11 data categories: -Forecasting loads and distributed energy resources (DERs) -Scenario analysis -Worst-performing circuits -Asset management strategy -Hosting capacity analysis -Value of DERs -Grid needs assessment -Cost-effectiveness framework for investments -Distribution system investment strategy and implementation -Geotargeted programs -Non-wires alternatives procurements.

24 POWER TRANSMISSION AND DISTRIBUTION↗

United States Nuclear Data Program Work Plan for Fiscal Year 2026

The work plan described in this document has been developed to cover work to be performed by the U. S. Nuclear Data Program (USNDP) during Fiscal Year 2026 that begins on October 1, 2025. Previously, 26 work plans have been prepared for the nuclear data program covering FYs 2000-2025. This plan has been prepared in consultation with the members of the Coordinating Committee who represent the organizations participating in the program. Each Coordinating Committee member prepared a draft plan for his/her organization. Each contribution was integrated into a unified work plan. The draft plan was then circulated to the Coordinating Committee for comments and corrections before the final document was submitted to the U.S. Department of Energy (DOE). As was done in previous years, the tasks proposed by the various organizations were reviewed internally according to the following criteria, which were developed considering the mission and goals outlined in past review panel reports and oversight committee discussions, and in consultation with the DOE program manager.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

A Markovian model for assessment of personnel hiring plans

As a result of the current economic environment, many organizations are having to operate with fewer resources. In the manpower area, these constraints have forced organizations to operate within well-defined hiring plans. Exceeding personnel ceilings is in most cases an intolerable situation. A mathematical model, based on the theory of Markov processes, is presented which can be used to assess the chances of success of personnel hiring plans. The model considers a plan to be successful if the final population size, at the end of the planning period, lies within a range specified by management. Although this model was developed to assess personnel hiring plans at the Goddard Space Flight Center, it is directly applicable wherever personnel hiring plans are used.

Katz, L. G.↗

Skylab flight plan development

For the Skylab Program, extensive premission flight planning was accomplished in the 3-yr period preceding lift-off. After the activation phase for each mission, however, all flight planning for real-time operations was conducted by ground support personnel on a daily basis, primarily for two reasons: (1) the long duration of the missions precluded the continued use of a premission plan, and (2) the variation in the earth resources experiment package (EREP) requirements and opportunities (primarily due to weather), precluded any premission planning for these experiments. An onboard teleprinter was used each day to transmit the flight plan and necessary supporting data to the crew. The teleprinter enabled the routine transmission of large amounts of data to the crew and therefore was primarily responsible for the daily planning capability in the Skylab Program.

Anderson, W. M.↗

Studies of planning behavior of aircraft pilots in normal, abnormal, and emergency situations

A methodology for the study of human planning behavior in complex dynamic systems is presented and applied to the study of aircraft pilot behavior in normal, abnormal and emergency situations. The method measures the depth of planning, that is the level of detail employed with respect to a specific task, according to responses to a verbal questionnaire, and compares planning depth with variables relating to time, task criticality and the probability of increased task difficulty. In two series of experiments, depth of planning was measured on a five- or ten-point scale during various phases of flight in a HFB-320 simulator under normal flight conditions, abnormal scenarios involving temporary runway closure due to snow removal or temporary CAT-III conditions due to a dense fog, and emergency scenarios involving engine shut-down or hydraulic pressure loss. Results reveal a dichotomy between event-driven and time-driven planning, different effects of automation in abnormal and emergency scenarios and a low correlation between depth of planning and workload or flight performance.

Johannsen, G.↗

Remote sensing for rural development planning in Africa

Multilevel remote-sensing techniques were combined to provide land resource and land-use information for rural development planning in Arusha Region, Tanzania. Enhanced Landsat imagery, supplemented by low-level aerial survey data, slope angle data from topographic sheets, and existing reports on vegetation and soil conditions, was used jointly by image analysts and district-level land-management officials to divide the region's six districts into land-planning units. District-planning officials selected a number of these land-planning units for priority planning and development activities. For the priority areas, natural color aerial photographs provided detailed information for land-use planning discussions between district officials and villagers. Consideration of the efficiency of this remote sensing approach leads to general recommendations for similar applications. The technology and timing of data collection and interpretation activities should allow maximum participation by intended users of the information.

Dunford, C.↗

Design and analysis of advanced flight planning concepts

The objectives of this continuing effort are to develop and evaluate new algorithms and advanced concepts for flight management and flight planning. This includes the minimization of fuel or direct operating costs, the integration of the airborne flight management and ground-based flight planning processes, and the enhancement of future traffic management systems design. Flight management (FMS) concepts are for on-board profile computation and steering of transport aircraft in the vertical plane between a city pair and along a given horizontal path. Flight planning (FPS) concepts are for the pre-flight ground based computation of the three-dimensional reference trajectory that connects the city pair and specifies the horizontal path, fuel load, and weather profiles for initializing the FMS. As part of these objectives, a new computer program called EFPLAN has been developed and utilized to study advanced flight planning concepts. EFPLAN represents an experimental version of an FPS. It has been developed to generate reference flight plans compatible as input to an FMS and to provide various options for flight planning research. This report describes EFPLAN and the associated research conducted in its development.

Sorensen, John A.↗

A dynamic case-based planning system for space station application

We are currently investigating the use of a case-based reasoning approach to develop a dynamic planning system. The dynamic planning system (DPS) is designed to perform resource management, i.e., to efficiently schedule tasks both with and without failed components. This approach deviates from related work on scheduling and on planning in AI in several aspects. In particular, an attempt is made to equip the planner with an ability to cope with a changing environment by dynamic replanning, to handle resource constraints and feedback, and to achieve some robustness and autonomy through plan learning by dynamic memory techniques. We briefly describe the proposed architecture of DPS and its four major components: the PLANNER, the plan EXECUTOR, the dynamic REPLANNER, and the plan EVALUATOR. The planner, which is implemented in Smalltalk, is being evaluated for use in connection with the Space Station Mobile Service System (MSS).

Oppacher, F.↗

Task planning and control synthesis for robotic manipulation in space applications

Space-based robotic systems for diagnosis, repair and assembly of systems will require new techniques of planning and manipulation to accomplish these complex tasks. Results of work in assembly task representation, discrete task planning, and control synthesis which provide a design environment for flexible assembly systems in manufacturing applications, and which extend to planning of manipulatiuon operations in unstructured environments are summarized. Assembly planning is carried out using the AND/OR graph representation which encompasses all possible partial orders of operations and may be used to plan assembly sequences. Discrete task planning uses the configuration map which facilitates search over a space of discrete operations parameters in sequential operations in order to achieve required goals in the space of bounded configuration sets.

Sanderson, A. C.↗

Strategies for automatic planning: A collection of ideas

The main goal of the Jet Propulsion Laboratory (JPL) is to obtain science return from interplanetary probes. The uplink process is concerned with communicating commands to a spacecraft in order to achieve science objectives. There are two main parts to the development of the command file which is sent to a spacecraft. First, the activity planning process integrates the science requests for utilization of spacecraft time into a feasible sequence. Then the command generation process converts the sequence into a set of commands. The development of a feasible sequence plan is an expensive and labor intensive process requiring many months of effort. In order to save time and manpower in the uplink process, automation of parts of this process is desired. There is an ongoing effort to develop automatic planning systems. This has met with some success, but has also been informative about the nature of this effort. It is now clear that innovative techniques and state-of-the-art technology will be required in order to produce a system which can provide automatic sequence planning. As part of this effort to develop automatic planning systems, a survey of the literature, looking for known techniques which may be applicable to our work was conducted. Descriptions of and references for these methods are given, together with ideas for applying the techniques to automatic planning.

Collins, Carol↗

Automating Space Station operations planning

The development and implementation of the operations planning processes for the Space Station are discussed. A three level planning process, consisting of strategic, tactical, and execution level planning, is being developed. The integration of the planning procedures into a tactical planning system is examined and the planning phases are illustrated.

Ziemer, Kathleen A.↗