Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “scheduling and coordination”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Multiscale simulation of integrated energy system and electricity market interactions

Accelerating the deep decarbonization of the world's electric grids requires the coordination of complex energy systems and infrastructures across timescales from seconds to decades. Here, we present a new multiscale simulation framework that integrates process- and grid-centric modeling paradigms to better design, operate, and control integrated energy systems (IESs), which combine multiple technologies, in wholesale energy markets. Traditionally, IESs are analyzed with a process-centric paradigm such as levelized cost of electricity (LCOE) or annualized net revenue, ignoring important interactions with electricity markets. This framework explicitly models the complex interactions between an IES's bidding, scheduling, and control decisions and the energy market's clearing and settlement processes, while incorporating operational uncertainties. Through two case studies, we show the importance of understanding and quantifying complex resource-grid interactions. In case study 1, we demonstrate that optimized bidding from one resource shifts the profit distribution for all energy systems in the market. This result suggests new and more flexible IES technologies can disrupt the economics of all market participants, possibly leading to accelerated retirements of less flexible resources. Interestingly, the optimized bidding has little impact on grid-level aggregate statistics, such as total generation costs and renewable penetration rate. While aggregate modeling strategies may remain valid under some IES adoption scenarios for analysis focused on regional outcomes, direct comparisons of IES technologies at specific locations without considering these interactions may lead to misleading or incorrect conclusions. In case study 2, we consider the design and flexible operation of IESs that hybridize conventional generators with energy storage. Through a sensitivity analysis, we find that as the size of the storage system increases, the total number of start-ups for coal- and natural gas-based IESs reduced by 25% and 33.6%, and the total thermal generator ramping (i.e., mileage) reduced by 86.5% and 62.5%, respectively. This shows the primary benefit of storage may not be reduced operational costs (which do not change significantly) but fewer start-ups and less ramping, which may greatly simplify the design, operation, and control of carbon capture systems. The new modeling and optimization capabilities from this work enable the coupling of rigorous, dynamic process models with grid-level production cost models to quantitatively identify the nuanced interdependencies across these vast timescales that must be addressed to realize clean, safe, and secure energy production. Moreover, the proposed general multiscale simulation framework is applicable to all IES technologies and can be easily extended to consider other energy carriers (e.g., hydrogen, ammonia) and energy infrastructures (e.g., natural gas pipelines).

24 POWER TRANSMISSION AND DISTRIBUTION↗

Impact of Glen Canyon Generation Loss

Colorado River Basin hydropower generation has faced challenges due to droughts and ecological and social water requirements. Specifically, Glen Canyon hydropower generation fluctuates substantially with recent extreme weather trends. Further, the western grid evolves with higher wind and solar share, and Glen Canyon hydropower's contribution to grid flexibility services is essential. The Western Area Power Administration (WAPA) markets and schedules electricity production at GCD, and the loss of this power could have significant financial consequences for the WAPA Colorado River Storage Project's (CRSP) Office because it may need to purchase relatively large amounts of energy to serve its firm electrical obligations. In addition, GCD provides grid reliability services for the WAPA Colorado-Missouri (WACM) balancing authority (BA). Both WAPA and DOE's Water & Power Technology Office (WPTO) are interested in researching how these drier hydrological conditions will impact federal electrical energy production, the Western Electricity Coordinating Council (WECC) power grid, and the value of hydropower in the face of lower production. We study multiple hydrologic and power grid scenarios to understand the grid impacts of the loss of Glen Canyon generation. The study uses a production cost model, water resources planning models, water-centric grid models, and various data analytic techniques. The study progress presentation discusses the selection of probable CRSP' hydropower scenarios and power grid scenarios to understand the impacts of Glen Canyon generation, which includes technologies that compensate the Glen Canyon energy and ancillary services contributions, transmission availability, and energy local marginal prices at interested grid locations of WAPA operation.

droughts↗

Hydropower Flexibility and Environmental Tradeoffs Analysis

The importance of hydropower increases as the power grid evolves with the higher variable renewable contribution. As conventional thermal power plants are retired, the importance of hydropower contribution increases to balance the variability of solar and wind generation. However, reservoir water resources are constrained by multiple constraints, and variability of water inflow to the reservoirs creates limitations to dam water releases for power grid needs. Coordinating multiple tools, including water resources, ecological, and technical and economic power grid modeling, informs dam water releases. The case study, the Columbia River Basin multipurpose reservoir project, is operated for hydropower production and many other purposes considering the aquatic habitat of the river basin. Specifically, the river basin fish population is a vital element for the tribal community of the river basin. We integrated a production cost model, a water resource model, and decades of tribal knowledge to analyze the fish-friendly way of operating Columbia hydropower scheduling and grid impacts. We measure power grid impacts for various water resources planning scenarios in terms of total system operating cost, system reliability indicators, changes in wind and solar generation and curtailments, local marginal prices, and revenue for hydropower producers. The study results inform reservoir operating rules decisions from hydropower power producers, system operators, other water users, tribes, environmentalists, and other stakeholders.

Columbia River↗

Innovating the next generation of commercial smart building software

Nearly 30% of commercial building energy use is wasted due to equipment faults and HVAC controls problems. The result is increased emissions, compromised comfort and productivity, and less reliable coordination of building power needs with a clean grid. The energy impact alone represents $17 billion in potential savings. Today’s smart building software provides a robust solution to address these operational deficiencies. Energy management and information systems (EMIS) are saving up to 9% on average, with two-year paybacks. They are being incorporated into energy management processes, commissioning services, and utility programs. As effective as they are, two barriers prevent even deeper benefits; limited personnel to fix problems once they are identified, and the expense and time to manually implement changes in control systems. In partnership with the research community, the EMIS industry is developing new capabilities to overcome these barriers. Moving beyond siloed products for either fault detection and diagnostics, or optimal control, these new capabilities empower users to not only automatically identify faults, but also to push corrective action, and control improvements to their buildings. In this paper, several areas for enhancements are documented: ‘one-time’ correction of faults such as setpoints, schedules, and economizer lockouts; short-term active testing for automated proportional integral derivative (PID) loop tuning and functional testing; and continuous supervisory control for demand flexibility and year-round efficiency. Results are presented from a pair of partner implementations out of a dozen providers integrating these enhancements into their products, including field tests from across the country, and insights into operator acceptance and integration into operations and maintenance practices.

Casillas, Armando↗

Cyber-Physical Smart Light Control System Integration with Smart Grid using Zigbee

This paper presents a hardware-in-the-loop cyber-physical system architecture design to monitor and control smart lights connected to the active distribution grid. The architecture uses Zigbee-based (IEEE 802.15.4) wireless sensor networks and publish-subscribe architecture to exchange monitoring and control signals between smart-light actuators (SLAs) and a smart-light central controller (SLCC). Each SLA integrated into a smart light consists of a Zigbee-based endpoint module to send and receive signals to and from the SLCC. The SLCC consists of a Zigbee-based coordinator module, which further exchanges the monitoring and control signals with the active distribution management system over the TCP/IP communication network. The monitoring signals from the SLAs include light status, brightness level, voltage, current, and power data, whereas, the control signals to the SLAs include light intensity, turn ON, turn OFF, standby, and default settings. We have used our existing hardware-in-the-loop (HIL) cyber-physical system (CPS) security SCADA testbed to process signals received from the SLCC and respond suitable control signals based on the smart light schedule requirements, system operation, and active distribution grid dynamic characteristics. We have integrated the proposed cyber-physical smart light control system (CPSLCS) testbed to our existing HIL CPS SCADA testbed. We use the integrated testbed to demonstrate the efficacy of the proposed algorithm by real-time performance and latency between the SLCC and SLAs. The experiments demonstrated significant results by 100% realtime performance and low latency while exchanging data between the SLCC and SLAs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The Hidden Flexibility of the Natural Gas Network for Electric Power Operations: A Case Study of a Near-Miss Winter Event

The U.S. power sector has become increasingly reliant on gas pipeline networks to deliver fuel to natural gas power plants. In addition to supplying relatively low-cost fuel, gas networks offer generators flexibility in their operations through the ability to deliver fuel when needed by using gas storage facilities or linepack if the gas network is at an operating point below its design capacity. However, disruptions or stress events on the gas network - like those occurring in the Northeast and Texas in recent years - can result in limitations on gas availability to generators at times when generation is in short supply. Here we examine a period of stress that occurred in the winter of 2022 in the Western United States. Using data on the region's natural gas pipeline network and electric generators, we build an integrated gas and electric model that closely replicates the actual dispatch of the period. We then evaluate the implications of removing flexibility employed by the gas network operator, which during that period curtailed scheduled gas deliveries to other parties to increase deliveries to natural gas power plants, which requested more gas than initially forecasted. We find that without the flexibility supplied by the gas network operator, there would have been curtailment of gas generation due to gas offtake constraints, requiring the power system operator to redispatch relying on more expensive generation or to potentially shed load. A sensitivity exploring a wind drought further exacerbates the strain, illustrating the potential challenge of managing gas and grid interactions as systems move to higher shares of variable renewable electricity. Based on this example, we discuss potential coordination strategies between the two system operators to ensure that the power system can successfully utilize and rely on the flexibility offered by natural gas networks.

03 NATURAL GAS↗

Feedback on the Electric Emergency Incident and Disturbance Report, OE-417

The US Department of Energy (DOE) Office of Electricity (OE) mandates requirements for reporting electric emergencies and disruptions in the United States. Specific electric power industry organizations (such as balancing authorities, reliability coordinators, some generating entities, and electric utilities) report this information through the OE-417 Electric Emergency Incident and Disturbance Report via Form OE-417. Entities are required to submit Form OE-417 when at least one of the qualifying 26 criteria is met pursuant to Section 13(b) of the Federal Energy Administration Act of 1974 (Public Law 93-275). Entities are required to report, within 6 hours of the incident, loss of electric service to 50,000 customers or more for 1 hour or longer. The deadline for submitting Form OE-417 depends on the nature of the incident. An updated Form OE-417 Schedule 1 and all of Schedule 2 are both due within 72 hours of the incident to provide complete disruption information. Additionally, a Final Report must be filed within 72 hours of the incident, unless an interim update has been provided. If the incident meets specific criteria, the form must be filed within one hour, six hours, or by the later of 24 hours after the recognition of the incident or by the end of the next business day.1 The ability of DOE to respond quickly to energy emergencies that could affect the nation’s infrastructure and help alleviate or prevent further disruptions depends on the industry’s prompt and complete submission of information. This report summarizes current issues with Form OE-417 and the reporting process and presents recommendations for improvements.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Cooperative Game Theory-based Approach to Under-frequency Load Shedding Control

This paper proposes a cooperative game theory-based under-frequency load shedding (UFLS) approach for frequency stability and control in power systems. UFLS is a crucial factor for frequency stability and control especially in power grids with high penetration of renewable energy sources and restructured power systems. Conventional UFLS methods, most of which are off-line, usually shed fixed amounts of predetermined loads based on a predetermined schedule which can lead to over or under curtailment of load. This paper presents a co-operative game theory-based two-stage strategy to effectively and precisely determine locations and amounts of loads to be shed for UFLS control. In the first stage, the total amount of loads to be shed, also referred to as deficit in generation or the disturbance power, is computed using the initial rate of change of frequency (ROCOF) referred to the equivalent inertial center. In the second stage, the Shapley value, one of the solution concepts of cooperative game theory, is used to determine load shedding amounts and locations. The proposed method is implemented on the reduced 9-bus 3-machine Western Electricity Coordinating Council (WECC) system and simulated on Real-time Digital Simulators (RTDS). The results show that the proposed UFLS approach can effectively return the system to normal state after disturbances.

42 ENGINEERING↗

Nuclear Materials Process Modeling at the Y-12 National Security Complex

The Y-12 National Security Complex (Y-12) has implemented process modeling for various accountable nuclear materials operations that are performed throughout the plant. Using a discrete, event-based dynamic simulation program, key nuclear material streams are modeled, allowing Y-12 to effectively manage numerous points of interest within the plant’s production operations. Integration of the various material processes into a single, interdependent supply and demand model is one of the ongoing focuses within Y-12’s process modeling effort. The primary purpose of using dynamic simulation modeling is to allow for analysis of the nuclear materials inventories and forecasted supplies based on future demands. Analysis of these inventories includes capacity evaluation, bottleneck mitigation, and assessments of individual pieces of equipment to inform future facility investment decisions and associated project schedules. Modeling of the nuclear materials processes throughout the complex also allows for incorporation of changes relevant to production capabilities such as the upcoming transition of specific operations to the new Uranium Processing Facility. Prior to implementation of process modeling, Y-12 forecasted supply and demand of accountable nuclear materials streams using Microsoft Excel. With deterministic models such as Microsoft Excel, the annual forecasts, generated within data input condition parameters, can only provide a fixed point of data. Fixed data cannot simulate integrated material streams and account for the possibility of occurrences and other changes that dynamic simulations take into consideration. Y-12’s dynamic process modeling allows integrated simulations of multiple accountable nuclear materials processes, including supply and demand forecasting and analysis, and is a coordinated effort involving many steps of verification and validation (V&V), site briefings, testing, reporting, data mining, planning, and documentation that spans various programs throughout the Y-12 complex.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hydropower Role in a Power Grid with a High Proportion of Variable Renewables

The importance of hydropower increases as the power grid evolves with the higher variable renewable contribution. As conventional thermal power plants are retired, the importance of hydropower contribution increases to balance the variability of solar and wind generation. However, reservoir water resources are constrained by multiple constraints, and variability of water inflow to the reservoirs creates limitations to dam water releases for power grid needs. Coordination of multiple tools, including water resources modeling, ecological modeling, and technical and economic power grid modeling, informs dam water releases. Better representation of ecological constraints and other water use details in the suit of power grid models are required to identify the hydropower flexibility to provide multiple power grid services. Impacts of water planning and hydropower operation changes to a power grid are better understood by production cost model simulations with technical and economic data, including unserved energy, reserve failures, transmission congestion to serve load, and local marginal price increases. Similarly, PCM simulation of current and future projected power grid information, including LMP, and carbon emission rates, informs short-term water release plans and long-term investments for power plant upgrades for technical and ecological needs. Hydropower operations of several case studies are simulated to understand operation patterns, revenue, water release decisions in multiple time scales (month, day, minutes), hydropower contracts scheduling, and water variability impacts.

environmental↗

Powernet in Farms Project

Coordinating behind-the-meter (BTM) distributed energy resources (DERs) is critical to ensuring efficiency and reliability for consumers facing an increasingly variable grid supply. Outside of very controlled environments, however, such coordination of heterogeneous resources at scale has remained a challenge due to harsh field conditions, the lack of adequate communication infrastructure, and the difficulty of modeling the system. The intent of this research was to refine the Powernet system deployed in a California dairy farm to achieve the following objectives: a) validate the results of the previous deployment and b) validate new hypothesis about system performance based on the simulation of the new system. The new system design would reduce the overall system cost, and achieve a payback period of less than 3 years, demonstrating the feasibility of such system and its relevance for a segment not well known for technology advancements in power systems. The new proposed system was significantly cheaper than the original design, which would enable the solution to be cost effective and likely economically viable. However, due to significant delays in project start date which affected funding availability, overlap with prior scheduled mandatory military leave from key members of the project team, and customer drop-out, due to the significant delays, which could not be replaced in time, caused the project to be ended prior to completion.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Agent-Based Coordination Scheme for PV Integration (ABC4PV)

Renewables and especially photovoltaics (PV) have benefitted significantly from a host of incentives and policies targeted toward enhanced integration and adoption of specific energy technologies. However, with the push to move forward into a subsidy-free market framework, behind-the-meter residential PV applications have generally struggled to retain their value (unlike utility scale and commercial projects) [1]. This project focused on developing control-theoretic solutions aimed at improving the integration and interaction of behind-the-meter residential PV with other distribution system assets (controllable and non-controllable) to enhance the integrated value of residential PV. To this end, a suite of decentralized control methodologies have been developed to enable effective coordination and control of behind-the-meter residential load customers’ PV, battery storage systems (BSS), controllable loads and other similar assets within a distribution feeder. This interaction aims at procuring energy savings and, thus, energy bill savings. The main source of savings is drawn from reducing the effect of demand charge pricing and is realized at the feeder level, assuming community level interaction and management among the aforementioned assets. Optimal control of the assets is implemented with a distributed optimization methodology, leveraging consensus-based algorithms. The results gathered from the optimal control simulations demonstrates that the savings can be duly achieved and the algorithm decision times (to dynamically control asset set points, for example) are fast. As for the overall efficiency of PV+BSS systems, to procure energy savings from curtailment of the demand charge pricing effects, the optimal control is set up so as to minimize the variance of the load for all customers, throughout a feeder and throughout time in a rolling horizon scheduling with model predictive control. The control takes into account inter-temporal electrochemical storage (battery) degradation costs: specifically, we have developed a long-term lifetime model for the BSS that weighs in the effect of the degradation factor in the dispatch formulations, thus, a considerable operating cost that affects energy decision making. The levelized cost of energy (LCOE – redefined for the purpose of quantifying asset integration effectiveness through the customers’ energy cost) is shown to be below the threshold set for the combined PV+BSS topology of $ 0.14/kWh for multiple cases of PV penetration all the way up to 50%, provided that a policy of shared ownership of and savings is in place. Further, the LCOE calculated for the case before the deployment PV+BSS systems is also achievable, i.e. the deployment of PV+BSS, if planned and scheduled optimally. will have no effect on customers’ energy costs. From the control methodology viewpoint, the developed consensus-based algorithms are shown to converge for a wide range of problem cases (spanning normal operating scenarios and contingencies), guaranteeing dispatch solutions under forecasting errors, communication break-downs and cyber-security attacks. The proposed control solutions are scalable and real-time implementable, with dispatch computations and device set-point updates converging in less than 2s in most practical instances of the above events.

14 SOLAR ENERGY↗

Constrained variational optimization of counting-time allocation in sequential scattering measurements: Application to Bonse–Hart USANS

Sequential scattering measurements are often performed under a fixed experimental-time budget, even though the expected count rate varies strongly across the measured coordinate. When the dwell time at each measurement position can be controlled independently, this variation creates a general resource-allocation problem: how should the available time be distributed to minimize the uncertainty of the reconstructed profile? We formulate this problem as a constrained variational optimization for measurements governed by Poisson counting statistics. When each measurement is treated independently, minimizing the averaged squared relative uncertainty yields an inverse-square-root intensity allocation. The formulation is then generalized to include correlations between neighboring measurements and an instrumental resolution operator, leading to an allocation criterion that equalizes the marginal reduction in posterior uncertainty per unit measurement time. Bonse–Hart ultra-small-angle neutron scattering (USANS), in which reciprocal space is sampled sequentially through analyzer-angle stepping, provides an experimentally grounded application. Computational benchmarking shows that the optimized allocation outperforms uniform-time and constant-relative-error strategies, while application to an experimentally measured graphite USANS profile from the Spallation Neutron Source, using Poisson resampling under alternative schedules, demonstrates how counting time should be redistributed toward weak-intensity regions under an identical total duration. The resulting framework applies to sequential scattering and related scanning measurements whenever local dwell times are adjustable and directly determine the measurement uncertainties, and when the relevant correlation and instrumental-response models are available.

Tung, Chi-Huan [ORNL] (ORCID:0000000221972074)↗

Optimal Traffic Signal Control Using Priority Metric Based on Real-Time Measured Traffic Information

Optimizing traffic control systems at traffic intersections can reduce network-wide fuel consumption as well as improve traffic flow. While traffic signals have conventionally been controlled based on predetermined schedules, various adaptive control systems have been developed recently using advanced sensors such as cameras, radars, and LiDARs. By utilizing rich traffic information enabled by the advanced sensors, more efficient or optimal traffic signal control is possible in response to varying traffic conditions. This paper proposes an optimal traffic signal control method to minimize network-wide fuel consumption utilizing real-time traffic information provided by advanced sensors. This new method employs a priority metric calculated by a weighted sum of various factors, including the total number of vehicles, total vehicle speed, vehicle waiting time, and road preference. Genetic Algorithm (GA) is used as a global optimization method to determine the optimal weights in the priority metric. In order to evaluate the effectiveness of the proposed method, a traffic simulation model is developed in a high-fidelity traffic simulation environment called SUMO, based on a real-world traffic network. The traffic flow within this model is simulated using actual measured traffic data from the traffic network, enabling a comprehensive assessment of the novel optimal traffic signal control method in realistic conditions. The simulation results show that the proposed priority metric-based real-time traffic signal control algorithm can significantly reduce network-wide fuel consumption compared to the conventional fixed-time control and coordinated actuated control methods that are currently used in the modeled network. Additionally, incorporating truck priority in the priority metric leads to further improvements in fuel consumption reduction.

47 OTHER INSTRUMENTATION↗

Infrastructure and DFLAW Support at Hanford - 20443

Manhattan Project era infrastructure systems are degrading at an accelerated pace across the Department of Energy's (DOE) Environmental Management complex. Revitalizing, rejuvenating and right-sizing these systems to ensure reliability for ongoing cleanup missions is a major focus at the 580-square- mile Hanford Site in southeast Washington State. The push to complete construction, commissioning, startup, and operation of facilities and systems in the Direct-Feed Low-Activity Waste (DFLAW) program at Hanford by 2023 requires considerable coordination among site contractors and a significant investment in infrastructure. The passage of time also poses a challenge. It has been about 75 years since facilities were first operated at the site, and approximately 40 years of plutonium production created a legacy of unidentified active and abandoned underground obstacles and waste sites that must be avoided when building and upgrading the infrastructure. Converting infrastructure systems originally built to support plutonium production from the 1940's to the 1980's and upgrading those systems to optimize technology is an ever-changing balance of funding profiles, available resources and execution strategies. The DOE Richland Operations Office (RL) has long recognized the need for increased investment in Hanford Site infrastructure to support the future processing of approximately 56 million gallons of waste currently stored in large underground tanks. When DFLAW is fully operational, safe and reliable infrastructure systems will be needed to ensure continuity of operations around the clock, 365 days a year. These include roadways, water, power, sewer, information technology systems and facilities. To ensure the readiness of Hanford's infrastructure to support treating tank waste in the next three years, 15 projects were identified with a combined value of $133.8 million. Through calendar year 2019, 7 infrastructure projects have been substantially completed and the remaining 8 projects, with a remaining value of $103.8 million, are scheduled to be completed by December 2023. RL and its site services/infrastructure contractor, Mission Support Alliance (MSA), regularly evaluate the needs of the DFLAW program and other Hanford Site missions to ensure the highest priority systems are addressed. In addition to a fast-approaching deadline for round-the-clock treatment operations, RL and MSA face another significant infrastructure challenge. As cleanup is being completed in a 220-square-mile area called the River Corridor, most of the cleanup operations going forward will occur in a 20-square-mile area in the center of the Hanford Site, known as the Central Plateau. Infrastructure systems are becoming more congested in an already overcrowded area. This paper/presentation will outline some of the challenges Hanford faces while executing infrastructure reliability projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Decentralized Failure-Tolerant Optimization of Electric Vehicle Charging

We present a decentralized failure-tolerant algorithm for optimizing electric vehicle (EV) charging, using charging stations as computing agents. The algorithm is based on the alternating direction method of multipliers (ADMM) and it has the following features: (i) It handles capacity, peak demand, and ancillary services coupling constraints. (ii) It does not require a central agent collecting information and performing coordination (e.g. an aggregator), instead all agents exchange information and computations are carried out in a fully decentralized fashion. (iii) It can withstand the failure of any number of computing agents, as long as the remaining computing agents are in a connected communications network. We construct this algorithm by reformulating the optimal EV charging problem in a decomposable form, amenable to ADMM, and then developing efficient decentralized solution methods for the subproblems dealing with coupling constraints. We conduct numerical experiments on industry-scale synthetic EV charging datasets, with up to 1,152 charging stations, using a high performance computing cluster. The experiments demonstrate that the proposed algorithm can solve the optimal EV charging problem fast enough to permit the integration of EV charging with real-time electricity markets, even in the presence of failures.

42 ENGINEERING↗

Co-Simulation Model for Optimal Wind-Hydro Coordination Using Wind Farm Control Dynamics

The growing share of Variable Renewable Energy sources (VRES) in power systems presents challenges for regula- tors, grid operators and energy producers. The VRES’ operation has limited flexibility in their operations, as they are highly dependent on ambient environments. To address these challenges, decision-makers must consider multiple objectives, among these are revenue, power system services and mechanical load on wind turbines. Coordinated operation of power plants and different wind farm control strategies are examples of measures that can benefit these objectives. This study proposes a Multi-Objective Linear Programming (MOLP) model to simulate the optimum operation of wind and hydropower plants that share limited transmission capacity. Further, wind farm control dynamics are included to obtain realistic output power and accumulated damage. From this, a case study based on a relevant location in Norway is presented to analyze the improved effect of wind- hydro coordination and wind farm control in achieving the objectives of accumulated wind turbine damage and total revenue of the hybrid power system. In addition, the study considers the potential advantages of adding a variable-speed pump to the hydropower plant. The results demonstrate that by considering multiple objectives in the optimization, one may achieve better overall performance of the objectives. By utilizing the flexibility of hydro storage, the decision maker may adjust to obtain the most desired outcome. Moreover, the added flexibility of utilizing a pump for hydro storage shows great improvements for the combined revenue of the power plants and reduced curtailment of the wind farm. However, less impact is observed from using a variable speed pump compared to a fixed speed pump.

13 HYDRO ENERGY↗

Dispatch analysis of flexible power operation with multi-unit small modular reactors

The relevance of nuclear power plant flexible power operation (FPO) is rising due to increased penetration of variable renewables. Small Modular Reactors (SMRs) such as NuScale are envisaged to have multiple units on one site. This provides opportunities for coordinating FPO between units, but also introduces challenges as common services (e.g., refueling equipment) must be shared between units and fuel loadings may be standardized. It is therefore important to quantify whether FPO with SMRs is economically beneficial. Here, this paper quantifies the economics of FPO on different timescales to analyze refueling outages of such multi-unit SMRs. A 24-h price-taker profit maximization of SMR operation is first solved considering revenues from wholesale power and ancillary service (AS) markets. The results are then used to find the most profitable operation strategy over several years for multiple units at the site accounting for the physics and materials limits on NPP operation, including refueling outages. Results show a small but appreciable participation of nuclear into AS, contributing 4% of revenues. Due to the longer fuel cycle, over a decade of operation the units’ refueling outages drifted by 3 months, ultimately leading to refueling during summer.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗