Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Qualification”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Radioactive Waste Sludge Washing and Demonstration of the Nitric-Glycolic Acid Flowsheet for Sludge Batch 10 Qualification

For each sludge batch that is processed in the Defense Waste Processing Facility (DWPF), the Savannah River National Laboratory (SRNL) performs qualification testing to demonstrate that the sludge batch (SB) is processible. During processing of SB9, DWPF will be transitioning from the Nitric-Formic Acid (NFA) flowsheet to the Nitric-Glycolic Acid (NGA) flowsheet. Thus, the qualification of SB10 was requested to only be performed using the NGA flowsheet. In order to qualify the batch for the NGA flowsheet, Sludge Receipt and Adjustment Tank (SRAT) and Slurry Mix Evaporator (SME) cycles, designated SC-19, were performed using SB10 Tank 51 sample material. SRNL received Tank 51 material in the midst of Tank Farm washing. SRNL continued the washing in the SRNL Shielded Cells. The SRNL process included the addition of Sodium Reactor Experiment (SRE) material from H Canyon, simulating the transfer of SRE from H Canyon to Tank 51 during Tank Farm washing. The washed SB10 Tank 51 material, with SRE, was characterized prior to flowsheet qualification testing.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Qualification of SAS4A/SASSYS-1 for Sodium-Cooled Fast Reactor Authorization and Licensing (Final CRADA Report)

This project focuses on assessment and qualification of the SAS4A/SASSYS-1 advanced reactor safety analysis code and its capacity to fulfill requirements associated with license/authorization of a sodium-cooled fast reactor (SFR). Specific objectives of this proposal include: development of a formal documentation requirements matrix that complies with a vendor’s NQA-1 program to identify needs for qualification documentation; completion of software methods qualification gap analysis to identify and close gaps in the verification and validation basis of the software; generation of an Acceptance Test Report to confirm compliance with the software requirements specification; and closure of gaps in Software Design Description (SDD) to assist with the eventual generation of a Modeling Licensing Topic Report (LTR).

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Conduct of Engineering Project Engineer Qualification Standard

This document describes the training and qualification requirements for the Project Engineer (PE) position at the Los Alamos National Laboratory (LANL). Analysis indicates that the Project Engineer position is not required to meet the requirements of DOE Order 426.2, Personnel Selection, Training, Qualification, and Certification Requirements for DOE Nuclear Facilities for “Technical Staff” positions. However, Engineering Services Division (ESD) has decided to hold their Project Engineers to a higher professional standard by developing a qualification program for the PEs.

42 ENGINEERING↗

Fuel Salt Qualification and Associated Fuel Cycle Opportunities & Issues

NRC staff have defined fuel qualification as a process which provides high confidence that the physical and chemical behavior of fuel is sufficiently understood so that it can be adequately modeled for both normal and accident conditions, reflecting the role of the fuel design in the overall safety of the facility. Uncertainties are defined so that calculated fission product releases include the appropriate margins to ensure conservative calculation of radiological dose consequences. The Advisory Committee on Reactor Safeguards (ACRS) has accepted the methodology described in NUREG/CR-7299 as an acceptable method for fuel qualification for molten salt reactors. The fuel salt qualification process described in NUREG/CR-7299 is based upon understanding the role that the fuel salt plays in achieving the fundamental safety functions, which in-turn is based on the fuel salt thermophysical and thermochemical properties.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Accelerated Irradiation and Qualification of Ceramic Nuclear Fuels

Accelerated irradiation efforts are an important topic in accelerated qualification of new nuclear fuel concepts for light water reactor (LWRs), microreactors, and other special purpose reactors. Accelerated fuel qualification combines both experimental and modeling work to expedite the total qualification time from approximately 20-25 years to 5-10 years timeframe. The scope covered under the current work package focuses on the experimental contributions for the neutron irradiations. Accelerated irradiation aims to reduce the total time needed for neutron irradiation to achieve targeted burnup, which is timely using conventional irradiation profiles. The purpose of this report is to detail the samples preparation for such irradiations, which contain standard, medium, and large grain undoped UO 2 , as well as large grain, Cr 2 O 3 -doped UO 2 . The data that will be generated from the irradiation of these samples will yield important information regarding fission gas retention as a function of grain size and the effect that Cr dopants have on diffusivity of fission gases.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Updated ASME design correlations and qualification plan for powder bed fusion 316H stainless steel

This report provides an update on the Advanced Materials and Manufacturing Technologies (AMMT) program effort to qualify Laser-Powder Bed Fusion (L-PBF) 316H stainless steel for use with the ASME Boiler & Pressure Vessel Code Section III, Division 5 rules. The report summarizes progress in testing and characterizing L-PBF material at elevated temperatures by providing preliminary design data for L-PBF 316H and by comparing the elevated temperature performance of the L-PBF material to wrought and conventional fusion welded 316H. The report then updates the initial AMMT qualification plan for L-PBF 316H, originally developed in 2023, to update the accelerated qualification strategy adopted in that plan to account for the new high temperature test data. The report also explores a few methods for further accelerating the qualification process using machine learning techniques to supplement the more conventional, empirical analysis methods typically used by ASME to correlate and extrapolate time-dependent material test data.

36 MATERIALS SCIENCE↗

Qualification Framework Evaluations, Status Quo, and Recommendations

The Advanced Materials and Manufacturing Technology (AMMT) program develops cross-cutting technologies in support of a broad range of nuclear reactor technologies and maintains U.S. leadership in materials and manufacturing technologies for nuclear energy applications. The overarching vision of AMMT is to accelerate the development, qualification, demonstration, and deployment of advanced materials and manufacturing technologies to enable reliable and economical nuclear energy. The acceleration of qualification processes is one of the key aspects and qualification processes for the nuclear industry is not necessarily equivalent or benchmarked against other industries.

36 MATERIALS SCIENCE↗

Automated qualification data tool for high temperature metallic materials

This report describes a framework for storing, processing, and displaying qualification data for high temperature mechanical properties. The framework automates the process of generating design data from mechanical test results, for example for a data qualification report for the ASME Boiler \& Pressure Vessel Code. The framework has three parts: a data storage model with common formats for several types of typical mechanical property tests, a backend based on the \pycreep Python library for correlating and extrapolating the data to generate design material properties and allowable stresses, and a demonstration user interface for displaying, sorting, and filtering the data and exploring different options for modeling the design mechanical properties. The report discusses the options available for data processing, with illustrations from real test data on Alloy 617, Alloy 709, Alloy 740H, and Laser-Powder Bed Fusion 316H. The framework is complete for ASME type data analysis and will be used to store test data generated by the Department of Energy, Office of Nuclear Energy, Advanced Materials and Manufacturing Technologies sponsored qualification programs. Future work could extend the tool to other types of material properties and/or expand the demo user interface to make it accessible across the AMMT program.

36 MATERIALS SCIENCE↗

Feature Based Qualification of 17-4PH Stainless Steel to Evaluate Location-Specific Variability in Wire Arc Additive Manufacturing

Qualifying large-scale metal additive manufacturing (M-AM) technologies such as wire arc additive manufacturing (WAAM) can be challenging. This is especially significant in precipitation hardened martensitic stainless steels like SS 17-4PH, where thermal histories induce location-specific microstructural variability and property anisotropy. The Department of Defense (DOD) and the United States Army Combat Capabilities Development Command Ground Vehicle Systems Center (GVSC) Ground Vehicle Materials Engineering (GVME) aim to build robust and qualified large-scale M-AM workflows that could reduce the time and cost through quick and informed evaluation, testing, and development of feedstock, processes, and parts. The report presents the findings from the collaborative efforts between Oak Ridge National Laboratory (ORNL) and the U.S. Army GVSC GVME. The aim of this project was to develop a geometric feature-based qualification framework for WAAM of SS 17-4PH components. This report outlines selection methodology of representative build geometries, optimization of WAAM process parameters, in-situ monitoring, microstructure-property evaluation, thermal simulations, as well as data visualization techniques incorporated in this project. The results from this project demonstrate a clear understanding of thermal history dependent phase evolution and consequent location-specific property variations in WAAM of SS 17-4PH. These results in conjunction with the data-driven methodologies used in this project are expected to reduce qualification timelines, improve predictability, and accelerate the development of reliable feature-based qualification strategies for part production via large-scale M-AM technologies.

36 MATERIALS SCIENCE↗

Robustness and printed sensor qualification

A limiting factor of additive manufactured (AM) sensors for in-pile applications is the development of appropriate interconnection and packaging strategies that can maintain reliable performance in extreme environments. Failure mechanisms in these harsh conditions could include, but not limited to, materials interaction (i.e., intermetallic formation) and coefficient of thermal expansion (CTE) mismatch between the individual components of the sensors. To mitigate premature failure and enable the successful sustained operation of AM sensors, non-destructive qualification tests are used as an intermediate process control step used for verifying robustness and reliability of the sensor before they are deployed. A materials system of interest is the use of barium strontium titanium oxide (BST) films on stainless steel 316L (SS316L) substrate. Due to BST’s high dielectric constant and tunable dielectric properties, there is an interest for its application as an insulation/encapsulation layer for capacitive strain gauges when printed on structural materials. Previous work on the BST/SS316L material system, however, showed that the BST cracks when exposed to temperatures up to 600 °C due to CTE mismatch between the printed BST film and the metallic substrate. When comparing different fabrication techniques, less surface cracking was observed in the samples that deposited thinner (i.e., 2-20 μm) than samples that were thicker (i.e., 135 µm – 300 µm). The objective of this report is to establish a qualification process that will determine and address any challenges (i.e., mechanical failure of thick prints) of the AM sensor prior to its application in experimental tests. To demonstrate the qualification process in this report, laser spallation and uniaxial tensile tests using dynamic and quasi-static loading, respectively, will be discussed.

36 - MATERIALS SCIENCE↗

SLUDGE BATCH 5 ACCEPTANCE EVALUATION RADIONUCLIDE CONCENTRATIONS IN TANK 51 SB5 QUALIFICATION SAMPLE PREPARED AT SRNL

Presented in this report are radionuclide concentrations required as part of the program of qualifying Sludge Batch Five (SB5) for processing in the Defense Waste Processing Facility (DWPF). Part of this SB5 material is currently in Tank 51 being washed and prepared for transfer to Tank 40. The acceptance evaluation needs to be completed prior to the transfer of the material in Tank 51 to Tank 40 to complete the formation of SB5. The sludge slurry in Tank 40 has already been qualified for DWPF and is currently being processed as SB4. The radionuclide concentrations were measured or estimated in the Tank 51 SB5 Qualification Sample prepared at Savannah River National Laboratory (SRNL). This sample was prepared from the three liter sample of Tank 51 sludge slurry taken on March 21, 2008. The sample was delivered to SRNL where it was initially characterized in the Shielded Cells. Under direction of the Liquid Waste Organization it was then modified by five washes, six decants, an addition of Pu/Be from Canyon Tank 16.4, and an addition of NaNO2. This final slurry now has a composition expected to be similar to that of the slurry in Tank 51 after final preparations have been made for transfer of that slurry to Ta Determining the radionuclide concentrations in this Tank 51 SB5 Qualification Sample is part of the work requested in Technical Task Request (TTR) No. HLW-DWPF-TTR-2008-0010. The work with this qualification sample is covered by a Task Technical and Quality Assurance Plan and an Analytical Study Plan. The radionuclides included in this report are needed for the DWPF Radiological Program Evaluation, the DWPF Waste Acceptance Criteria (TSR/WAC) Evaluation, and the DWPF Solid Waste Characterization Program (TTR Task 2). Radionuclides required to meet the Waste Acceptance Product Specifications (TTR Task 5) will be measured at a later date after the slurry from Tank 51 has been transferred to Tank 40. Then a sample of the as-processed SB5 will be taken and transferred to SRNL for measurement of these radionuclides. Data presented in this report represents the measured or estimated radionuclide concentrations obtained from several standard and special analytical methods performed by Analytical Development (AD) personnel within SRNL. The method for I-129 measurement in sludge is described in detail. Most of these methods were performed on solutions resulting from the dissolutions of the slurry samples. Concentrations are given for twenty-nine radionuclides along with total alpha and beta activity. Values for total gamma and total gamma plus beta activities are also calculated. Results also indicate that 98% of the Tc-99 and 92% of the I-129 that could have been in this sludge batch have been removed by chemical processing steps in the SRS Canyons or Tank Farm.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SLUDGE WASHING AND DEMONSTRATION OF THE DWPF FLOWSHEET IN THE SRNL SHIELDED CELLS FOR SLUDGE BATCH 5 QUALIFICATION

Sludge Batch 5 (SB5) is predominantly a combination of H-modified (HM) sludge from Tank 11 that underwent aluminum dissolution in late 2007 to reduce the total mass of sludge solids and aluminum being fed to the Defense Waste Processing Facility (DWPF) and Purex sludge transferred from Tank 7. Following aluminum dissolution, the addition of Tank 7 sludge and excess Pu to Tank 51, Liquid Waste Operations (LWO) provided the Savannah River National Laboratory (SRNL) a 3-L sample of Tank 51 sludge for SB5 qualification. SB5 qualification included washing the sample per LWO plans/projections (including the addition of a Pu/Be stream from H Canyon), DWPF Chemical Process Cell (CPC) simulations, waste glass fabrication (vitrification), and waste glass chemical durability evaluation. This report documents: (1) The washing (addition of water to dilute the sludge supernatant) and concentration (decanting of supernatant) of the Tank 51 qualification sample to adjust sodium content and weight percent insoluble solids to Tank Farm projections. (2) The performance of a DWPF CPC simulation using the washed Tank 51 sample. This includes a Sludge Receipt and Adjustment Tank (SRAT) cycle, where acid is added to the sludge to destroy nitrite and remove mercury, and a Slurry Mix Evaporator (SME) cycle, where glass frit is added to the sludge in preparation for vitrification. The SME cycle also included replication of five canister decontamination additions and concentrations. Processing parameters for the CPC processing were based on work with a non radioactive simulant. (3) Vitrification of a portion of the SME product and Product Consistency Test (PCT) evaluation of the resulting glass. (4) Rheology measurements of the initial slurry samples and samples after each phase of CPC processing. This work is controlled by a Task Technical and Quality Assurance Plan (TTQAP) , and analyses are guided by an Analytical Study Plan. This work is Technical Baseline Research and Development (R&D) for the DWPF.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SLUDGE BATCH 6 ACCEPTANCE EVALUATION: RADIONUCLIDE CONCENTRATIONS IN TANK 51 SB6 QUALIFICATION SAMPLE PREPARED AT SRNL

Presented in this report are radionuclide concentrations required as part of the program of qualifying Sludge Batch Six (SB6) for processing in the Defense Waste Processing Facility (DWPF). The SB6 material is currently in Tank 51 being washed and prepared for transfer to Tank 40. The acceptance evaluation needs to be completed prior to the transfer of the material in Tank 51 to Tank 40. The sludge slurry in Tank 40 has already been qualified for DWPF and is currently being processed as SB5. The radionuclide concentrations were measured or estimated in the Tank 51 SB6 Qualification Sample prepared at Savannah River National Laboratory (SRNL). This sample was prepared from the three liter sample of Tank 51 sludge slurry (HTF-51-09-110) taken on October 8, 2009. The sample was delivered to SRNL where it was initially characterized in the Shielded Cells. Under the direction of the Liquid Waste Organization it was then modified by eight washes, nine decants, an addition of Pu from Canyon Tank 16.3, and an addition of NaNO{sub 2}. This final slurry now has a composition expected to be similar to that of the slurry in Tank 51 after final preparations have been made for transfer of that slurry to Tank 40. Determining the radionuclide concentrations in this Tank 51 SB6 Qualification Sample is part of the work requested in Technical Task Request (TTR) No. HLW-DWPF-TTR-2009-0014. The work with this qualification sample is covered by a Task Technical and Quality Assurance Plan and an Analytical Study Plan. The radionuclides included in this report are needed for the DWPF Radiological Program Evaluation, the DWPF Waste Acceptance Criteria (TSR/WAC) Evaluation, and the DWPF Solid Waste Characterization Program (TTR Task I.2). Radionuclides required to meet the Waste Acceptance Product Specifications (TTR Task II.2.) will be measured at a later date after the slurry from Tank 51 has been transferred to Tank 40. Then a sample of the as-processed SB6 will be taken and transferred to SRNL for measurement of these radionuclides. The results presented in this report are those necessary for DWPF to assess if the Tank 51 SB6 sample prepared at SRNL meets the requirements for the DWPF Radiological Program Evaluation, the DWPF Waste Acceptance Criteria evaluation, and the DWPF Solid Waste Characterization Program. The sample is the same as that on which the chemical composition was reported. Concentrations are given for thirty-four radionuclides along with total alpha and beta activity. Values for total gamma and total gamma plus beta activities are also calculated. Results also indicate that 99% of the Tc-99 and at least 90% of the I-129 that could have been in this sludge batch have been removed by chemical processing steps in the SRS Canyons or Tank Farm.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Electromagnetic compatibility qualification of power electronics for I and C power applications - 152

Electromagnetic Compatibility (EMC) is a growing field in nuclear equipment qualification. Previously confined to I and C equipment residing in control and cable spreading rooms, EMC qualification has expanded to include the inverters and battery chargers which often power safety-related I and C equipment, as well as adjustable speed drives and material handling equipment which could potentially affect sensitive safety-related I and C systems. Because much of the data collected to form the current EMC limits and guidance was collected from low-power equipment in relatively low EMI environments, the same guidance, applied to power electronic equipment, produces overly conservative estimations of the performance needed for EMC. Excessive modification in an attempt to bring the equipment into compliance with EMC limits may not be necessary. This paper provides a brief summary of current applicable EMC guidance and demonstrates a road map for the qualification of larger, more powerful devices which takes into account the entire EMC process, including design, testing, mapping of the installed location, and justification of EMC failures with the end goal being successful, timely, and cost-effective implementation of upgrades and compatibility with existing plant infrastructure (in the intended installation environment), even if equipment exceeds traditional operating envelopes. (authors)

42 ENGINEERING↗

Design of Mini-Plate-1 Irradiation Test for Qualification of High-Density, Low-Enriched U-10Mo Monolithic Fuel

The United States High Performance Research Reactor project is tasked with fuel development and qualification leading to conversion of higher power research and test reactors in the US from high-enriched uranium (HEU) to low-enriched uranium (LEU) fuels. Here, this manuscript identifies the functional and operational design requirements of the first miniature test plate (mini-plate [MP]) irradiation campaign (MP-1) of commercially fabricated LEU U-10Mo monolithic plate-type fuel and is the precursor to a large parametric mini-plate test (MP-2) aimed at producing the data to support regulatory qualification of the LEU U-10Mo monolithic fuel. The manuscript (1) provides a general description of the selected U-10Mo LEU fuel and (2) defines the overall experiment design and functional requirements to accomplish the specific test objective of MP-1, which is to confirm that the commercially manufactured LEU U-10Mo monolithic fuel meets the established requirements of geometric stability, mechanical integrity and stable and predictable behavior. The fuel testing parameters are established by the need to bound performance behavior within the operational envelope of the reactors being converted.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

An approach to combine neutron and ion irradiation data to accelerate material qualification for nuclear reactors

Next-generation nuclear power plants are generally characterized by higher operating temperatures, increased neutron fluences and energies, and distinct corrosive coolant environments versus the existing light water reactor fleet. Whether using existing materials in new environments, newly developed materials tailored for these environments, or new manufacturing methods, the traditional decades-long approach for materials qualification does not facilitate rapid deployment. Ion irradiation has demonstrated success in reproducing material microstructure and select property evolution resulting from neutron irradiation with three to four orders of magnitude reduction in time and cost, making it an ideal candidate for accelerated irradiation testing. Because microstructure has a large impact on bulk material properties, limited neutron irradiation data at lower damage levels can in principle be combined with accelerated ion testing results and modeling and simulation to form an accurate prediction of microstructure evolution and select properties under different neutron irradiation conditions and at higher damage levels. The objective of this work is to present a conceptual framework of specific steps to fulfill several technical challenges associated with qualifying materials for performance in radiation environments on an accelerated time frame. A brief review of the regulatory landscape for materials in nuclear environments is presented, followed by additional overviews to understand the current state of the art for correlation of materials properties across radiation environments using experimental and computational methodologies. Finally, the roles of academia, national laboratories, and industry in the advancement of this accelerated materials qualification framework are discussed as a path forward, with possible case studies presented.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Multiscale Modeling of the Mechanical Response of Silicon Carbide Composite Within the Accelerated Fuel Qualification Framework

The accelerated fuel qualification (AFQ) framework has been used for the initial development of multiscale modeling of silicon carbide (SiC) fiber reinforced composite (SiC-SiC). The AFQ framework provides a methodology to leverage physics-informed multiscale modeling along with a reduced set of empirical test data to reduce the time and cost of licensing and qualification of new nuclear fuel systems while maintaining the overall nuclear power plant safety case. SiC-SiC is being proposed for in-core applications, most notably fuel cladding, for current and next-generation nuclear reactors because of its high temperature stability, irradiation tolerance, and ability to withstand many accident conditions. As these composites exhibit multiscale architectures and complex microstructure-based fracture mechanics, it is an appealing use case for the AFQ methodology. While the end goal of this work is a single multiscale model that can be used for predictive in-core performance, current focus is on the individual various length scale models. Four individual models have been initially developed from microscale to engineering system level to capture key physics-based effects across different length scales. These models include a microscale homogenized tow model, a mesoscale fast Fourier transform–based weave model that integrates the homogenized tow model, a mesoscale finite element–based weave model, and a system-level BISON fuel performance model. Results of these models have undergone an initial comparison with separate-effects test data showing a good match to experimental results. By using the AFQ framework during model development, several near-term benefits have been secured including a reduction in development time for the SiC-SiC cladding, more targeted irradiation testing, and a better understanding of uncertainty.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

AGR-2 Data Qualification Report for ATR Cycles 151B-2, 152A, 152B, 153A, 153B and 154A

This report documents the data qualification status of AGR-2 fuel irradiation experimental data from Advanced Test Reactor (ATR) Cycles 152A, 152B, 153A, 153B, and 154A, as recorded in the Nuclear Data Management and Analysis System (NDMAS). The AGR-2 data streams addressed include thermocouple (TC) temperatures, sweep gas data (flow rate, pressure, and moisture content), and fission product monitoring system (FPMS) data for each of the six capsules in the experiment. A total of 13,400,520 every minute instantaneous TC and sweep gas data records were received and processed by NDMAS for this period. Of these data, 8,911,791 records (66.5% of the total) were determined to be Qualified based on NDMAS accuracy testing and data validity assessment. For temperature, there were 4,266,081 records (74% of the total TC data) that were Failed due to TC instrument failures. For sweep gas flows, there were 222,648 gas flow records (2.91% of the flow data) that were Failed. The inlet gas flow failures due to gas flow cross-talk and leakage problems that occurred after Cycle 150A were corrected by using the same gas mixture in all six capsules and the Leadout. For FPMS data, NDMAS received and processed preliminary release rate and release-to-birth rate ratio (R/B) data for three reactor cycles (Cycles 149B, 150B, and 151A) . This data consists of 45,983 release rate records and 45,235 R/B records for the 12 radionuclides reported. The qualification status of these FPMS data has been set to In Process until receipt of Quality Assurance-approved data generator reports. All of the above data have been processed and tested using a SAS®-based enterprise application software system, stored in a secure Structured Query Language database, made available on the NDMAS Web portal (http://ndmas.inl.gov), and approved by the INL STIM for release to both internal and appropriate external Very High Temperature Reactor Program participants.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗