Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “OPS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Effectiveness evaluation of STOL transport operations

A short-takeoff and landing (STOL) systems simulation model has been developed and implemented in a computer code (known as STOL OPS) which permits evaluation of the operation of a STOL aircraft and its avionics in a commercial airline operating environment. STOL OPS concentrated on the avionics functions of navigation, guidance, control, communication, hazard aviodance, and systems management. External world factors influencing the operation of the STOL aircraft include each airport and its geometry, air traffic at each airport, air traffic control equipment and procedures, weather (including winds and visibility), and the flight path between each airport served by the route. The development of the STOL OPS program provides NASA a set of computer programs which can be used for detailed analysis of a STOL aircraft and its avionics and permit establishment of system requirements as a function of airline mission performance goals.

Hitt, E. F.↗

Investigation into the common mode rejection ratio of the physiological signal conditioner circuit

The common mode rejection ratio (CMRR) of the single operational amplifier (op amp) differential amplifier and of the three operational amplifier differential amplifier was investigated. The three op amp differential amplifier circuit is used in the signal conditioner circuit which amplifies signals such as the electromyograph or electrocardiogram. The investigation confirmed via SPICE modeling what has been observed by others in the recent literature that the CMRR for the circuit can be maximized without precision resistor values or precisely matched op amps. This can be done if one resistor in the final stage can be adjusted either by a potentiometer or by laser trimming in the case of hybrid circuit fabrication.

Obrien, Edward M.↗

Thermomechanical Fatigue Damage/Failure Mechanisms in SCS-6/Timetal 21S [0/90](Sub S) Composite

The thermomechanical fatigue (TMF) deformation, damage, and life behaviors of SCS6/Timetal 21S (0/90)s were investigated under zero-tension conditions. In-phase (IP) and out-of-phase (OP) loadings were investigated with a temperature cycle from 150 to 650 deg C. An advanced TMF test technique was used to quantify mechanically damage progression. The technique incorporated explicit measurements of the macroscopic (1) isothermal static moduli at the temperature extremes of the TMF cycle and (2) coefficient of thermal expansion (CTE) as functions of the TMF cycles. The importance of thermal property degradation and its relevance to accurate post-test data analysis and interpretation is briefly addressed. Extensive fractography and metallography were conducted on specimens from failed and interrupted tests to characterize the extent of damage at the microstructure level. Fatigue life results indicated trends analogous to those established for similar unidirectional(0) reinforced titanium matrix composite systems. High stress IP and mid to low stress OP loading conditions were life-limiting in comparison to maximum temperature isothermal conditions. Dominant damage mechanisms changed with cycle type. Damage resulting from IP TMF conditions produced measurable decreases in static moduli but only minimal changes in the CTE. Metallography on interrupted and failed specimens revealed extensive (0) fiber cracking with sparse matrix damage. No surface initiated matrix cracks were present. Comparable OP TMF conditions initiated environment enhanced surface cracking and matrix cracking initiated at (90) fiber/matrix (F/M) interfaces. Notable static moduli and CTE degradations were measured. Fractography and metallography revealed that the transverse cracks originating from the surface and (90) F/M interfaces tended to converge and coalesce at the (0) fibers.

Castelli, Michael G.↗

Characterization of Damage Progression in SCS-6/timetal 21S (0)4 Under Thermomechanical Fatigue Loadings

A detailed experimental investigation was performed at a single maximum cyclic stress (sigma max) level to physically characterize the progression of thermomechanical fatigue (lW) damage in continuously reinforced (0 deg) SCS-6/Timetal 21S, a titanium matrix composite. In-phase (IP) and out of-phase (OP) loadings were investigated at sigma max = 1000 MPa with a temperature cycle from 150 to 6500 C. Damage progression, in terms of macroscopic property degradation, was experimentally quantified through an advanced TMF test methodology which incorporates explicit measurements of the isothermal static moduli at the TMF temperature extremes and the coefficient of thermal expansion (CTE) as functions of the TMF cycles. Detailed characterization of the physical damage progression at the microstructural level was performed by interrupting multiple TMF tests at various stages of mechanical property degradation and analyzing the microstructure through extensive destructive metallography. Further, the extent of damage was also quantified through residual static strength measurements. Results indicated that damage initiation occurred very early in cyclic life (N less than 0.1Nf) for both the IP and OP TMF loadings. IP TMF damage was found to be dominated by fiber breakage with a physical damage progression in the microstructure which was difficult to quantify. OP TMF loadings produced matrix cracking exclusively associated with surface initiations. Here, damage progression was easily distinguished in terms of both the number of cracks and their relative inward progressions toward the outer fiber rows with increased cycling. The point at which the leading cracks reached the outer fiber rows (when localized fiber/matrix de-bonding and matrix crack bridging occurred) appeared to be reflected in the macroscopic property degradation curves.

Castelli, Michael G.↗

Sea-Ice Feature Mapping using JERS-1 Imagery

JERS-1 SAR and OPS imagery are examined in combination with other data sets to investigate the utility of the JERS-1 sensors for mapping fine-scale sea ice conditions. Combining ERS-1 C band and JERS-1 L band SAR aids in discriminating multiyear and first-year ice. Analysis of OPS imagery for a field site in the Canadian Archipelago highlights the advantages of OPS's high spatial and spectral resolution for mapping ice structure, melt pond distribution, and surface albedo.

Maslanik, James↗

Evaluation of the VIIRS Land Algorithms at Land PEATE

The Land Product Evaluation and Algorithm Testing Element (Land PEATE), a component of the Science Data Segment of the National Polar-orbiting Operational Environmental Satellite System (NPOESS) Preparatory Project (NPP), is being developed at the NASA Goddard Space Flight Center (GSFC). The primary task of the Land PEATE is to assess the quality of the Visible Infrared Imaging Radiometer Suite (VIIRS) Land data products made by the Interface Data Processing System (IDPS) using the Operational (OPS) Code during the NPP era and to recommend improvements to the algorithms in the IDPS OPS code. The Land PEATE uses a version of the MODIS Adaptive Processing System (MODAPS), NPPDAPS, that has been modified to produce products from the IDPS OPS code and software provided by the VIIRS Science Team, and uses the MODIS Land Data Operational Product Evaluation (LDOPE) team for evaluation of the data records generated by the NPPDAPS. Land PEATE evaluates the algorithms by comparing data products generated using different versions of the algorithm and also by comparing to heritage products generated from different instrument such as MODIS using various quality assessment tools developed at LDOPE. This paper describes the Land PEATE system and some of the approaches used by the Land PEATE for evaluating the VIIRS Land algorithms during the pre-launch period of the NPP mission and the proposed plan for long term monitoring of the quality of the VIIRS Land products post-launch.

Wolfe, Robert E.↗

High-Order Implicit-Explicit Multi-Block Time-stepping Method for Hyperbolic PDEs

This work seeks to explore and improve the current time-stepping schemes used in computational fluid dynamics (CFD) in order to reduce overall computational time. A high-order scheme has been developed using a combination of implicit and explicit (IMEX) time-stepping Runge-Kutta (RK) schemes which increases numerical stability with respect to the time step size, resulting in decreased computational time. The IMEX scheme alone does not yield the desired increase in numerical stability, but when used in conjunction with an overlapping partitioned (multi-block) domain significant increase in stability is observed. To show this, the Overlapping-Partition IMEX (OP IMEX) scheme is applied to both one-dimensional (1D) and two-dimensional (2D) problems, the nonlinear viscous Burger's equation and 2D advection equation, respectively. The method uses two different summation by parts (SBP) derivative approximations, second-order and fourth-order accurate. The Dirichlet boundary conditions are imposed using the Simultaneous Approximation Term (SAT) penalty method. The 6-stage additive Runge-Kutta IMEX time integration schemes are fourth-order accurate in time. An increase in numerical stability 65 times greater than the fully explicit scheme is demonstrated to be achievable with the OP IMEX method applied to 1D Burger's equation. Results from the 2D, purely convective, advection equation show stability increases on the order of 10 times the explicit scheme using the OP IMEX method. Also, the domain partitioning method in this work shows potential for breaking the computational domain into manageable sizes such that implicit solutions for full three-dimensional CFD simulations can be computed using direct solving methods rather than the standard iterative methods currently used.

Nielsen, Tanner B.↗

Risk of Adverse Cognitive or Behavioral Conditions and Psychiatric Disorders

The NASA commitment to human space flight includes continuing to fly astronauts on the ISS until it is decommissioned as well as possibly returning astronauts to the moon or having astronauts venture to an asteroid or Mars. As missions leave low Earth orbit and explore deeper space, BHP supports and conducts research to enable a risk posture that considers the risk of adverse cognitive or behavioral conditions and psychiatric disorders “acceptable given mitigations,” for pre-, in, and post-flight.The Human System Risk Board (HSRB) determines the risk of various mission scenarios using a likelihood (per person per year) by consequences matrix examining those risks across two categories—long term health and operational (within mission). Colors from a stoplight signal are used by HSRB and quickly provide a means of assessing overall perceived risk for a particular mission scenario. Risk associated with the current six month missions on the ISS are classified as “accepted with monitoring” while planetary missions, such as a mission to Mars, are recognized to be a “red” risk that requires mitigation to ensure mission success.Currently, the HSRB deems that the risk of adverse cognitive or behavioral conditions and psychiatric outcomes requires mitigation for planetary missions owing to long duration isolation and radiation exposure (see Table 1). While limited research evidence exists from spaceflight, it is well known anecdotally that the shift from the two week shuttle missions to the six month ISS missions renders the psychological stressors of space as more salient over longer duration missions. Shuttle astronauts were expected just to tolerate any stressors that arose during their mission and were successful at doing so (Whitmire et al, 2013). While it is possible to deal with stressors such as social isolation and to live with incompatible crewmembers for two weeks on shuttle, “ignoring it” is much less likely to be a successful coping mechanism on station. For the longer missions of the ISS, astronauts require a larger, more robust set of coping skills and more psychological support. Evidence of this are the number of BHP’s Operational Psychology (Op Psy) staff who have been awarded silver Snoopys by long duration astronauts†, in the statements of praise for the Op Psy and Family Support Office teams, and in the written and oral statements from flown astronauts regarding difficulty of longer missions and how much Op Psy helped.

Slack, Kelley J.↗

CARA Devolution ESMO Pilot Program

Information regarding the current effort ongoing with CARA to determine the steps needed to have a mission move away from being supported by CARA, otherwise referred to as Devolving/Devolution. Information regarding the working group established to undertake this effort, documents agreed that needed to be written and plans for a parallel operations period. The communication between ESMO and CARA during the Parallel Operations period will be as the following: – A daily email will be sent from ESMO to CARA describing each HIE that is being actively planned and worked, and the action that ESMO is planning on taking – A weekly email will be sent from ESMO to CARA listing the progress toward achieving the parallel operations success criteria – The CARA team will remain on distribution for ESMO HIE communications and CAM invitations associated with DAMs/RMMs during the parallel operations period – At a minimum, 2 members of the CARA team will be in attendance at all ESMO planning and review discussions – A monthly email will be sent from ESMO to CARA with the HIE metrics • During parallel operations, ESMO will contact NASA Headquarters to report any redDevolution Working Group laid out and completed all steps needed to begin parallel operations • Parallel Ops for ESMO began on 11/26 (CARA in shadow mode only) • Any lessons learned from parallel ops will be folded back into documents/templates • Hope to achieve all success criteria < 6 months • Decision for permanent devolution will be based on completion of parallel ops and other future documentation creation (CARA Standard and Handbook, etc) and reviews (ORR) event which is less than 2 days from TCA, including the proposed remediation, on an as-needed daily basis flow using SpaceTrack to send and receive data

ESMO pilot devolution program↗

Optimal Estimation Inversion of Ionospheric Electron Density from GNSS-POD Limb Measurements: Part II-Validation and Comparison Using NmF2 and hmF2

A growing number of SmallSat/CubeSat constellations with high-rate (50–100 Hz) global navigation satellite system radio occultations (GNSS-RO) as well as low-rate (1 Hz) precise orbit determination (GNSS-POD) limb-viewing capabilities provide unprecedented spatial and temporal sampling rates for ionospheric studies. In the F-region electron density (N 𝑒 ) retrieval process, instead of the conventional onion-peeling (OP) inversion, an optimal estimation (OE) inversion technique was recently developed using total electron content measurements acquired by GNSS-POD link. The new technique is applied to data acquired from the COSMIC-1, COSMIC-2, and Spire constellations. Although both OE and OP techniques use the Abel weighting function in N 𝑒 inversion, OE significantly differs in its performance, especially in the lower F- and E-regions. In this work, we evaluate and compare newly derived data sets using F2 peak properties with other space-based and ground-based observations. We determine the F2 peak N 𝑒 (NmF2) and its altitude (hmF2), and compare them with the OP-retrieved values. Good agreement is observed between the two techniques for both NmF2 and hmF2. In addition, we also utilize autoscaled F2 peak measurements from a number of worldwide Digisonde stations (∼30). The diurnal sensitivity and latitudinal variability of the F2 peak between the two techniques are carefully studied at these locations. Good agreement is observed between OE-retrieved NmF2 and Digisonde-measured NmF2. However, significant differences appear between OE-retrieved hmF2 and Digisonde-measured hmF2. During the daytime, Digisonde-measured hmF2 remains ∼25–45 km below the OE-retrieved hmF2, especially at mid and high latitudes. We also incorporate F-region N 𝑒 measurements from two incoherent scatter radar observations at high latitudes, located in the North American (Millstone Hill) and European (EISCAT at Tromso) sectors. The radar measurements show good agreement with OE-retrieved values. Although there are several possible sources of error in the ionogram-derived N 𝑒 profiles, our further analysis on F1 and F2 layers indicates that the low Digisonde hmF2 is caused by the autoscaled method, which tends to detect a height systematically below the F2 peak when the F1 layer is present.

GNSS radio occultation↗

CloudSat Anomaly Recovery and Operational Lessons Learned

In April 2011, NASA's pioneering cloud profiling radar satellite, CloudSat, experienced a battery anomaly that placed it into emergency mode and rendered it operations incapable. All initial attempts to recover the spacecraft failed as the resultant power limitations could not support even the lowest power mode. Originally part of a six-satellite constellation known as the "A-Train", CloudSat was unable to stay within its assigned control box, posing a threat to other A-Train satellites. CloudSat needed to exit the constellation, but with the tenuous power profile, conducting maneuvers was very risky. The team was able to execute a complex sequence of operations which recovered control, conducted an orbit lower maneuver, and returned the satellite to safe mode, within one 65 minute sunlit period. During the course of the anomaly recovery, the team developed several bold, innovative operational strategies. Details of the investigation into the root-cause and the multiple approaches to revive CloudSat are examined. Satellite communication and commanding during the anomaly are presented. A radical new system of "Daylight Only Operations" (DO-OP) was developed, which cycles the payload and subsystem components off in tune with earth eclipse entry and exit in order to maintain positive power and thermal profiles. The scientific methodology and operational results behind the graduated testing and ramp-up to DO-OP are analyzed. In November 2011, the CloudSat team successfully restored the vehicle to consistent operational collection of cloud radar data during sunlit portions of the orbit. Lessons learned throughout the six-month return-to-operations recovery effort are discussed and offered for application to other R&D satellites, in the context of on-orbit anomaly resolution efforts.

cloud profiling radar satellite↗

Integrated guidance, navigation and control verification plan primary flight system

The verification process and requirements for the ascent guidance interfaces and the ascent integrated guidance, navigation and control system for the space shuttle orbiter are defined as well as portions of supporting systems which directly interface with the system. The ascent phase of verification covers the normal and ATO ascent through the final OMS-2 circularization burn (all of OPS-1), the AOA ascent through the OMS-1 burn, and the RTLS ascent through ET separation (all of MM 601). In addition, OPS translation verification is defined. Verification trees and roadmaps are given.

Source record↗

Time-delay-and-integration charge coupled devices /CCDs/ applied to the Thematic Mapper

The visible focal plane of the Thematic Mapper, the next generation sensor system for application to earth resource survey, uses complex hybrid assembly techniques to interface silicon photodiodes to JFET preamplifiers. This complexity can be ameliorated by the use of a 20-channel time-delay-and-integration (TDI) CCD with nine stages of integration per channel. By going to a CCD array operating in a TDI mode, over 700 individual op amps can be replaced with only 48 op amps. Smooth spectral response and 70% quantum efficiency have been provided by using doped tin oxide gates over the imaging region.

Thompson, L. L.↗

Software design specification. Part 2: Orbital Flight Test (OFT) detailed design specification. Volume 3: Applications. Book 2: System management

The functions performed by the systems management (SM) application software are described along with the design employed to accomplish these functions. The operational sequences (OPS) control segments and the cyclic processes they control are defined. The SM specialist function control (SPEC) segments and the display controlled 'on-demand' processes that are invoked by either an OPS or SPEC control segment as a direct result of an item entry to a display are included. Each processing element in the SM application is described including an input/output table and a structured control flow diagram. The flow through the module and other information pertinent to that process and its interfaces to other processes are included.

Source record↗

Shuttle OFT Level C navigation requirements

Detailed requirements for the orbital operations computer loads, OPS 2, and OPS 8 are given. These requirements represent the total on-orbit/rendezvous navigation baseline requirements for the following principal functions: on-orbital/rendezvous navigation sequencer; on-orbit/rendezvous UPP sequencer; on-orbit rendezvous navigation; on-orbit prediction; on-orbit user parameter processing; and landing Site update.

Source record↗

Beta decay and the origin of biologial chirality - New experimental results

The hypothetical connection developed by Vester and Ulbricht (1959), between the handedness of beta particles in radioactive decay and the (L) sign of biologial chirality is investigated in a radiolysis experiment. The experiment measured the predicted asymmetry in the formation triplet or 'ortho-' positronium (oPs) in amino acid enantiomers by low energy positrons under conditions of helicity reversal. The positrons were focused on amino acid powder samples. By measuring the time between positron arrival and emission of gamma rays, long-lived oPs were separated from other species. It is found that the asymmetry in leucine (0.8 x 10 to the -4th) is consistent with the theoretical prediction of 10 to the -6th. Neither the experimental limits nor the theoretical estimates are found to rule out a mechanism like that described by Vester and Ulbricht as the cause of the sign of the observed chiral polarization.

Van House, J.↗

Space station proximity operations and window design

On-orbit proximity operations (PROX-OPS) consist of all extravehicular activity (EVA) within 1 km of the space station. Because of the potentially large variety of PROX-OPS, very careful planning for space station windows is called for and must consider a great many human factors. The following topics are discussed: (1) basic window design philosophy and assumptions; (2) the concept of the local horizontal - local vertical on-orbit; (3) window linear dimensions; (4) selected anthropomorphic considerations; (5) displays and controls relative to windows; and (6) full window assembly replacement.

Haines, Richard F.↗

Stochastic model of the NASA/MSFC ground facility for large space structures with uncertain parameters: The maximum entropy approach, part 2

A validated technology data base is being developed in the areas of control/structures interaction, deployment dynamics, and system performance for Large Space Structures (LSS). A Ground Facility (GF), in which the dynamics and control systems being considered for LSS applications can be verified, was designed and built. One of the important aspects of the GF is to verify the analytical model for the control system design. The procedure is to describe the control system mathematically as well as possible, then to perform tests on the control system, and finally to factor those results into the mathematical model. The reduction of the order of a higher order control plant was addressed. The computer program was improved for the maximum entropy principle adopted in Hyland's MEOP method. The program was tested against the testing problem. It resulted in a very close match. Two methods of model reduction were examined: Wilson's model reduction method and Hyland's optimal projection (OP) method. Design of a computer program for Hyland's OP method was attempted. Due to the difficulty encountered at the stage where a special matrix factorization technique is needed in order to obtain the required projection matrix, the program was successful up to the finding of the Linear Quadratic Gaussian solution but not beyond. Numerical results along with computer programs which employed ORACLS are presented.

Hsia, Wei Shen↗