Engineering PapersโŒ• Search

NASA NTRS ยท 19780021201

Integrated guidance, navigation and control verification plan primary flight system

Abstract

The verification process and requirements for the ascent guidance interfaces and the ascent integrated guidance, navigation and control system for the space shuttle orbiter are defined as well as portions of supporting systems which directly interface with the system. The ascent phase of verification covers the normal and ATO ascent through the final OMS-2 circularization burn (all of OPS-1), the AOA ascent through the OMS-1 burn, and the RTLS ascent through ET separation (all of MM 601). In addition, OPS translation verification is defined. Verification trees and roadmaps are given.

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

1978-05-01. Integrated guidance, navigation and control verification plan primary flight system. https://ntrs.nasa.gov/citations/19780021201

Cite the original work for its findings. Save a collection to share your selection of sources.