Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “HiL test”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Modeling and Feedback Compensator Design for Power-Hardware-in-the-Loop System for Medium-Voltage Grid-Connected Power Converters

Hardware-in-the-loop (HIL) evaluation is a method in which the test subject is split into a physical part and a simulated part, and these parts are connected with interfaces to form a combined physical-numerical system. Power-hardware-in-the-loop (PHIL) systems, where actual hardware is connected to a real-time model, can exhibit issues of instability, inaccuracy and errors when operating in a closed-loop. The challenges of generating a PHIL setup are that, first, because of the limited dynamic response of the different parts of the system, the test results might be inaccurate, and, second, because of the high frequency noise introduced by the sensors to the closed-loop system, it can be difficult to design a compensator for the real-time emulator response, while stabilizing the closed-loop system at the same time. In this paper, different parts of a PHIL system are characterized, and the feedback compensator system design is proposed for the stable operation of the closed-loop PHIL system. The issues as observed in a PHIL system without any compensator are demonstrated using experimental results, and the effectiveness of a first order phase lead compensator is validated.

compensator design↗

A full-scope, high-fidelity simulator-based hardware-in-the-loop testbed for comprehensive nuclear power plant cybersecurity research

Nuclear power plant (NPP) cybersecurity research often relies on hardware-in-the-loop (HIL) testbeds that integrate real hardware components into simulated environments. These testbeds allow researchers to identify vulnerabilities, evaluate attack impacts, and test security measures in a controlled setting. Furthermore, previous HIL testbeds lacked fidelity to accurately represent real nuclear systems, limiting the scope of cybersecurity analysis. This study presents the creation of a HIL testbed, devised upon a full-scope, high-fidelity NPP simulator, to facilitate realistic and comprehensive cybersecurity research. To demonstrate its capabilities, the control logic for the steam generator water level was migrated from the simulator to an external programmable logic controller. As a practical application of the developed testbed, supply chain attack scenarios were simulated by injecting malicious code into the controller logic, and the effects of manipulating sensor inputs and control commands were observed. While this HIL testbed provides more detailed simulations, enhanced realism, and wider applicability compared to other options utilizing a less complex simulator, it is also more intricate and costly. For this reason, we include a detailed comparison with some alternative architectures to aid fellow researchers and practitioners in the selection of a suitable HIL architecture based on specific research objectives.

47 OTHER INSTRUMENTATION↗

Performance Validation of Version 152.0 ANSER Control Laws for the F-18 HARV

The Actuated Nose Strakes for Enhanced Rolling (ANSER) Control Laws were modified as a result of Phase 3 F/A-18 High Alpha Research Vehicle (HARV) flight testing. The control law modifications for the next software release were designated version 152.0. The Ada implementation was tested in the Hardware-In-the-Loop (HIL) simulation and results were compared to those obtained with the NASA Langley batch Fortran implementation of the control laws which are considered the 'truth model.' This report documents the performance validation test results between these implementations for ANSER control law version 152.0.

Messina, Michael D.↗

Hardware-in-the-Loop Simulation of Modular Antenna Assembly

Robots are playing an increasing role in space exploration and in-space servicing. Robotic arms are good for performing in-space tasks such as modular assembly. The SPIDER arm (SPace Infrastructure Dexterous Robot) of the OSAM-1 mission represents an example of a system that can perform modular antenna assembly tasks in environmental conditions that would be dangerous for astronauts. One of the WVRTC activities is to perform independent verification and validation of the SPIDER assembly operations. Space robotic systems adopting large manipulators such as the SPIDER arm are complex to test and verify under normal 1-G conditions. Our work involves proof-of-principle testing of a hardware-inthe-loop (HIL) simulator operating in 1-g conditions, which replicates the motion of the space robot end-effector under the same geometric, kinematic and dynamic conditions, and in response to externally applied forces from its space environment. In particular, our software simulates in real-time the robot dynamics inclusive of flexibility, an important aspect in case of a long robotic arms operating in 0-G conditions. For example, the same oscillatory motions of the space manipulator’s end-effector can be mimicked on ground through our industrial manipulator, allowing us to test the feasibility of complex operation such as assembling modular components.

Robotic Assembly↗

Integrate Latimer Controls' Solution into RTAC (CRADA Final Report, CRD-23-24672)

Latimer Controls, Inc. was awarded two vouchers under the Department of Energy's American-Made Solar Prize Round 6 to conduct collaborative research at a national laboratory. The National Renewable Energy Laboratory (NREL) was selected as a partner to assist Latimer Controls in the performance evaluation of its photovoltaic (PV) control software. This collaboration focuses on developing a hardware-in-the-loop (HIL) testbed at NREL, which will be used to test and validate the Latimer PV control technology in a realistic yet de-risked environment. Both Latimer and NREL teams will work together to analyze the collected test data, derive insights, and disseminate the scientific findings. Recent studies underscore the potential of solar energy as a zero-marginal-cost and zero-emission flexibility resource within the bulk power system, particularly when integrated with advanced control systems. To enhance the performance of such systems, Latimer Controls has developed leading-edge technologies, including machine learning (ML) algorithms and hierarchical inverter set-point allocation methods. These innovations are designed to estimate the operational headroom of large PV plants for grid integration and control. However, comprehensive validation under real-world conditions remains necessary. To address this gap, the concurrent CRADA project proposes the real-world application and validation of the Latimer Control solution within a HIL environment. Initially, the Latimer algorithm was developed and tested within MATLAB Simulink, a platform suitable for research-level simulations and iterative development. However, transitioning this technology to a real solar site as an industry-ready solution necessitates implementation in a format compatible with widely used solar power plant controllers. In this additional CRADA work, the MATLAB Simulink-based logic will be translated into Structured Text, a programming language compliant with IEC 61131 standards, which is commonly used for custom logic implementations in industry-leading programmable logic controllers (PLCs), such as the Schweitzer SEL real-time automation controller (RTAC). This transition will facilitate the deployment of the Latimer Control solution in real-world solar power plants, thereby advancing the technology towards commercialization.

14 SOLAR ENERGY↗

BENEFIT with Northeastern University: HVAC Hardware-in-the-Loop Experimental Testing of a Heat Pump and Air Conditioner

This dataset includes HVAC Hardware-in-the-Loop (HIL) experimental results for a single stage, SEER 16, HSPF 9.5, 3-ton single-speed air source heat pump with 15 kW of backup auxiliary heating tested in both cooling and heating mode, and a two stage, SEER 21, 2-ton central air conditioner tested in cooling mode for a set of outdoor temperatures and indoor setpoint temperatures. In addition to these tests, experimental tests focused on the operation of auxiliary heating for the heat pump for winter condition were also conducted. The laboratory experiments for transient testing of the heat pump and air conditioner were conducted using the two HIL systems in the Systems Performance Laboratory (SPL) at NREL’s Energy Systems Integration Facility (ESIF). Further information on laboratory design and capabilities of the SPL along with the architecture of HVAC HIL system can be found in: Sparn, B. F. 2018. Laboratory Resources and Techniques to Evaluate Smart Home Technology (No. NREL/CP-5500-71696). National Renewable Energy Laboratory (NREL), Golden, CO (United States). https://www.nrel.gov/docs/fy18osti/71696.pdf and the experimental setup and validation of HVAC HIL platform can be found in: Ramaraj, S. and Sparn, B. 2022. Validation of HVAC Hardware-In-the-Loop Simulation for Advanced Control Strategies in Smart Homes (No. NREL/CP-5500-82562). National Renewable Energy Lab (NREL), Golden, CO (United States). https://www.nrel.gov/docs/fy22osti/82562.pdf. These experimental results can be used to validate how we currently model the cycling behavior of heat pumps and air conditioners. Additionally, many demand response programs implement heat pump and air conditioner control by changing the thermostat set point – these data may also be used to verify our models for heat pump and air conditioner demand response control are implemented correctly. The Test_Matrix file describes all the indoor and outdoor test conditions for heat pump and air conditioner and the file names of data sets include information about the test conditions. A wide range of outdoor air temperatures were chosen to accommodate summer and winter conditions. In addition to operating the HVAC equipment with different outdoor temperatures, we also operate the system with different indoor temperature set points to represent different grid signals or different operating conditions. For cooling conditions, the baseline set point is 72°F. To represent Load Up signals, the setpoint is changed to 68°F. The Load Shed set point is 76°F. For heating conditions, the baseline set point was assumed to be 68°F. The Load add set point is 72°F and the Load shed set point is 64°F. The starting indoor temperature for cooling conditions was set ~2°F above the indoor setpoint temperature so that the equipment turned on quickly. Similarly, the initial indoor temperature was set ~2°F lower than setpoint for heating mode tests to ensure that heating began quickly. The return air temperature was assumed to be equal to the indoor setpoint temperature in all cases. The experimental data are sampled at 1-second intervals. The data from ecobee thermostat at 5-minute interval are resampled and added to the corresponding file. The content of each data set is as follows: • T_Return (C): Measured return air temperature [C] • T_Return_SP (C): Return air temperature setpoint from E+ model, sent to HIL [C] • T_Supply (C): Measured supply air temperature at evaporator outlet [C] • T_Outdoor (C): Measured outdoor air temperature [C] • T_Outdoor_SP (C): Outdoor air temperature setpoint from weather file, sent to HIL [C] • T_Indoor (C): Measured indoor air temperature [C] • T_Indoor_SP (C): Indoor air temperature setpoint from E+ model, sent to HIL [C] • Outdoor Unit Power (W): Measured power of the outdoor unit [W] • Indoor Unit Power (W): Measured power of the indoor unit [W] • Evaporator Airflow Rate (CFM): Measured evaporator or indoor unit airflow rate sent to E+ model [CFM] • Cooling/Heating Capacity (kW): Calculated cooling/heating capacity sent to E+ model [kW] • T_SP_Thermostat (C): Thermostat cooling/heating setpoint temperature [C] • T_Indoor_Thermostat (C): Thermostat indoor air temperature [C]

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Plug-and-Play Design Suite of Converters for the Electric Grid

Power electronic (PE) systems are increasingly being integrated into the electric grid in a distributed fashion. As the number of installations increases, the challenge of integration of these systems into the grid is also growing. Advanced control features of these systems are often overlooked or neglected due to the complex nature and novelty of these systems. This is also complicated from the vendor point of view as different converter topology integration is usually composed of single system designs with tight coupling and configurations. The presented work discusses a novel architecture for the integration of PE systems with other sources and loads to create a coordinated controllable resource for the grid. The presented work also describes a system level controller to coordinate these systems. 1 Testing results on a hardware in the loop (HIL) platform are provided to show the validity of the proposed architecture and framework.

Starke, Michael↗

Bulb-style Kaplan Turbine - Run-of-the-river (ror) Hydro Governor And Turbine Model

This software package includes hydro governor and turbine models developed in Simulink (Mathworks Inc.) and RSCAD (RTDS Technologies) for low-head bulb-style Kaplan turbine hydropower plants. The model developed in Simulink has been designed and tuned to match the governor-turbine response for a real-world hydropower unit owned by Idaho Falls Power (IFP). The Simulink and RSCAD models enable real-time testing in a hardware-in-the-loop (HIL) implementation using OPAL-RT and RTDS digital real-time simulators, respectively. An automatic initialization for dynamic simulation has also been integrated to each model in both Simulink and RSCAD. The RSCAD initialization involves a novel python-based interfacing for automatic modification of the initial conditions in the model. The parameters of these models can be tuned to match other hydropower plants in this class.

Alam, SMShafiul↗

Real-Time Testbed for Studying Cyberattacks and Defense in DER-integrated Smart Inverter Systems

In this paper, we propose a Hardware-in-the-Loop (HIL) simulation testbed suitable for the implementation and testing of realistic cyberattacks on grid-tied smart inverter systems integrated with Distributed Energy Resources (DER) that use the Distributed Network Protocol-3 (DNP3) protocol for communications between grid components. Specifically, our testbed combines a Real-Time Digital Simulator (RTDS) NovaCor device, outfitted with GNETx2 network interface cards, a gridtied DER topology implemented via the RTDS software package RSCAD, and a custom virtual network that emulates a man in the middle attacker. The Man-in-the-Middle (MITM) attacker captures DNP3 traffic and falsifies telemetry data in DNP3 packets to trigger unwarranted commands from a DNP3 controller that exploit smart inverter grid support functions. We choose DNP3 and implement grid support functions according to the IEEE Std. 1547-2018 mandated for the interconnection and interoperability of DER power systems with associated power components. Furthermore, we develop a protocol payload agnostic attack detection framework that leverages the round-trip time (RTT) anomalies between DNP3 requests and responses and can detect the presence of attacks without having to analyze the payload’s contents, while balancing trade-offs between false alarm counts, missed detections, and time to detection. To facilitate further research, we publicly release benign and attack network traffic exchanged between various sensors, controllers, and actuators in our grid-tied inverter testbed.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Control and Management of Multiple Converters in a Residential Smart Grid

Power electronic systems are becoming a staple building block for electric grid networks. However, these systems have been largely designed to grid integrate in ad hoc configurations with little or no coordination of control. This work proposes a central controller and power electronic system hardware and software design for a residential system (photovoltaic, energy storage and residential building). This system supports auto-integration, plug and play capabilities, and optimal energy management to meet different use cases. Modelling and multi-day testing of the system have been conducted in a controller hardware-in-the-loop (C-HIL) testbed. Multiple use cases and pricing options have been considered as part of the simulation and testing. Results are presented of these systems as a proof of principle.

Starke, Michael↗

Real-Time Testbed for Smart Grid Recloser Controller

The growing need for a low voltage recloser has become apparent due to the rise in requirements for a smart grid. This includes more detailed management of power flow forward (towards load) and backward (towards generation), source synchronization in real time, more indepth fault responses, and the use of green energy. The SEL-651R-2 relay is a device that can manage these needs, especially in fault response and synchronization, and is commonly used in systems called microgrids. Microgrids are distribution level systems that are able to operate separated from the main grid, are typically installed much closer to the load(s), and are fed by distributed energy resources (DERs), such as wind, solar or diesel generators. The SEL-651R-2 is normally used in the field with presets operative settings, but the Western Michigan University (WMU) Center for Interdisciplinary Research on Secure, Efficient and Sustainable Energy Technology (WMU InterEnergy Center) wished to test this device in its range of capabilities for microgrid application. A Hardware-In-the-Loop (HIL) testbed was implemented and used through the Real Time Digital Simulator (RTDS) using the RSCAD software to test the SEL-651R-2's use cases and functions. The testbed includes a microgrid with interconnection to a larger main grid, and the relay is meant to control the recloser at the point of common coupling (PCC) between the main grid and microgrid. The testbed shows how basic protections, reclosing, and synchronization checks function when handling faults that affect both the microgrid and the main grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Advanced Power-Hardware-in-the-Loop Evaluation of Inverter-Based Resources (IBRs)

Power-hardware-in-the-loop evaluation of IBRs has become more and more important as it provides reliable testing results to investigate the real responses of inverters with interconnected systems. A successful laboratory PHIL testing gives confidence of the hardware system to be deployed and de-risk technology integration prior to field deployment. So far, there are two important applications for PHIL evaluation: (1) test stability and functionality of large utility inverters into the system when it interconnects to the distribution systems/microgrids; and (2) test the collective grid service that inverters can provide to the grid. For the first application, the PHIL evaluation has high requirements for the stability and accuracy of the PHIL interface as the close-loop in digital real time simulator (DRTS) should replicate the actual current and voltage dynamics in the inverter. This is challenging because of the delays, sensing errors, nonlinearities of inverters, and hardware bandwidth limitations of the elements in the HIL loop. For the second application, multiple inverters will be tested resulting in multiple PCCs, which naturally causes competing dynamics and oscillations among hardware inverters if traditional PHIL interface is used. Therefore, new PHIL interface should be developed to compromise between stability and accuracy and represent the dispatched grid services for the hardware inverters. In this presentation, we will share our latest work in developing PHIL interface in these two applications to address the two key challenges.

DERMS↗

X-57 Flight Systems Integration Path

The foundation for a safe and successful flight test of the National Aeronautics and Space Administration (NASA) X-57 Maxwell all-electric experimental airplane, or any X-Plane, is comprehensive system testing on the ground. This test campaign includes verification and validation (V&V) that the integrated system operates as designed and expected, as well as understanding how the system reacts and responds to failures that can occur during flight by performing failure modes and effects testing (FMET). The aircraft should be in the final flight configuration for these test activities because any modifications, even those that appear insignificant, could affect test outcomes. Although the plan was to perform V&V and FMET testing once the airplane was in the flight configuration, due to multiple component redesigns, concurrent software development, and other problems with on-aircraft testing, the X-57 Maxwell never made it into a full-flight configuration. As a result, a build-up approach was followed to test software and hardware as they became ready in order to continue making progress wherever possible. Using this approach revealed problems with the hardware and software faster than waiting for a full-flight configuration, allowing solutions to be found more quickly and in parallel with other project tasks. Other than unloaded motor testing in a lab setting, the only other test setup was on the airplane itself. On-aircraft testing was preferrable in order to test things as close to a flight configuration as possible but was time consuming due to the requirements for testing on the airplane. To overcome some of the on-aircraft barriers, off-aircraft test configurations, such as the Systems Integration Laboratory (SIL) and hardware-in-the-loop (HIL) setups, were used, but each of these setups had limitations to be considered. As a result, solutions found in the SIL or HIL configurations did not always work as expected on the airplane, resulting in an iterative process between on- and off-aircraft testing to find the final solution. Having a dedicated test platform such as an iron bird that closely represents the aircraft - without flight hardware - would have been the most effective off-aircraft test setup, which could have allowed the project to save time and money and potentially reach flight. This paper will highlight the V&V and FMET considerations and testing prerequisites, the build-up approaches to both software and system testing, the benefits and drawbacks to different test configurations, as well as battery testing and operations.

Kassidy M. Mclaughlin↗

X-57 Flight Systems Integration Path

The foundation for a safe and successful flight test of the National Aeronautics and Space Administration (NASA) X-57 Maxwell all-electric experimental airplane, or any X-Plane, is comprehensive system testing on the ground. This test campaign includes verification and validation (V&V) that the integrated system operates as designed and expected, as well as understanding how the system reacts and responds to failures that can occur during flight by performing failure modes and effects testing (FMET). The aircraft should be in the final flight configuration for these test activities because any modifications, even those that appear insignificant, could affect test outcomes. Although the plan was to perform V&V and FMET testing once the airplane was in the flight configuration, due to multiple component redesigns, concurrent software development, and other problems with on-aircraft testing, the X-57 Maxwell never made it into a full-flight configuration. As a result, a build-up approach was followed to test software and hardware as they became ready in order to continue making progress wherever possible. Using this approach revealed problems with the hardware and software faster than waiting for a full-flight configuration, allowing solutions to be found more quickly and in parallel with other project tasks. Other than unloaded motor testing in a lab setting, the only other test setup was on the airplane itself. On-aircraft testing was preferrable in order to test things as close to a flight configuration as possible but was time consuming due to the requirements for testing on the airplane. To overcome some of the on-aircraft barriers, off-aircraft test configurations, such as the Systems Integration Laboratory (SIL) and hardware-in-the-loop (HIL) setups, were used, but each of these setups had limitations to be considered. As a result, solutions found in the SIL or HIL configurations did not always work as expected on the airplane, resulting in an iterative process between on- and off-aircraft testing to find the final solution. Having a dedicated test platform such as an iron bird that closely represents the aircraft - without flight hardware - would have been the most effective off-aircraft test setup, which could have allowed the project to save time and money and potentially reach flight. This paper will highlight the V&V and FMET considerations and testing prerequisites, the build-up approaches to both software and system testing, the benefits and drawbacks to different test configurations, as well as battery testing and operations.

Kassidy McLaughlin↗

Commercial PV Inverter IEEE 1547.1 Ride-Through Assessments Using an Automated PHIL Test Platform

As more countries seek solutions to their de-carbonization targets using renewable energy (RE) technologies, interconnection standards and national grid codes for distributed energy resources (DER) are being updated to support higher penetrations of RE and improve grid stability. Common grid-code revisions mandate DER devices, such as solar inverters and energy storage systems, ride-through (RT) voltage and frequency disturbances. This is necessary because as the percentage of generation from DER increases, there is a greater risk power system faults will cause many or all DER to trip, triggering a substantial load-generation imbalance and possible cascading blackout. This paper demonstrates for the first time a methodology to verify commercial DER devices are compliant to new voltage, frequency, and rate of change of frequency (ROCOF) RT requirements established in IEEE Std. 1547-2018. The methodology incorporates a software automation tool, called the SunSpec System Validation Platform (SVP), in combination with a hardware-in-the-loop (HIL) system to execute the IEEE Std. 1547.1-2020 RT test protocols. In this paper, the approach is validated with two commercial photovoltaic inverters, the test results are analyzed for compliance, and improvements to the test procedure are suggested.

14 SOLAR ENERGY↗

Transient Efficiency, Flexibility, and Reliability Optimization of Coal-Fired Power Plants - Final Report

This program developed an advanced model-based monitoring and model-predictive control algorithms for a coal fired power plant (CFPP), and deployed these algorithms in a real-time platform to demonstrate performance benefits for transient flexibility and plant operation efficiency. More specifically, the objectives were successfully achieved through a combination of (i) developing a high-fidelity transient plant model in Apros, which was used as a high-fidelity plant simulation between $100-50\% TMCR$ where TMCR denotes the turbine maximum continuous rating, i.e., baseload, (ii) developing a very fast physics-based reduced-order model (ROM) of the plant, which ran more than $100\times$ faster than real-time, enabling its use as real-time embedded model for model-based estimation (MBE) and model predictive control (MPC) (iii) implementing a real-time MBE based on ROM using a robust unscented Kalman filter (UKF) to continuously tune the ROM to match the measurements from high-fidelity Apros plant model despite significant plant-model mismatch, and thus, obtain a Digital Twin of the plant (iv) designing and implementing a real-time MPC with dual objectives of transient plant load tracking with high ramp rates and minimizing coal consumption, i.e., improving plant efficiency in the baseload-partload operation range of $100-50\% TMCR$. Each key element above was developed and tested individually, and has been reported in corresponding Topical Reports. Finally, all the individual elements were integrated in an overall closed-loop system, that was successfully tested in desktop Simulink test harness simulations with ROM or high-fidelity model as the plant. Thereafter, the Simulink implementation was used to auto-generate C-code and deploy as real-time Docker microservice containers in Linux, and validate that they can run in real-time in the hardware-in-the loop (HIL) setup and produce the same results as in Simulink. The results of the integrated simulation tests in Simulink as well as the real-time HIL deployment are documented in this final report, showing good load tracking for load ramps at $3-4\%/min$ ramp rates, and achieving up to $5.5\%$ reduction in coal relative to baseline operation at $50\% TMCR$ load. The desktop and HIL simulations show successful performance of the overall model based estimation and control solution and achieve the key objectives of the program for flexible, efficient and reliable operation of subcritical coal fired power plants.

20 FOSSIL-FUELED POWER PLANTS↗

Transient Efficiency, Flexibility, and Reliability Optimization of Coal-Fired Power Plants - Final Program Review

This program developed an advanced model-based monitoring and model-predictive control algorithms for a coal fired power plant (CFPP), and deployed these algorithms in a real-time platform to demonstrate performance benefits for transient flexibility and plant operation efficiency. More specifically, the objectives were successfully achieved through a combination of (i) developing a high-fidelity transient plant model in Apros, which was used as a high-fidelity plant simulation between $100-50\% TMCR$ where TMCR denotes the turbine maximum continuous rating, i.e., baseload, (ii) developing a very fast physics-based reduced-order model (ROM) of the plant, which ran more than $100\times$ faster than real-time, enabling its use as real-time embedded model for model-based estimation (MBE) and model predictive control (MPC) (iii) implementing a real-time MBE based on ROM using a robust unscented Kalman filter (UKF) to continuously tune the ROM to match the measurements from high-fidelity Apros plant model despite significant plant-model mismatch, and thus, obtain a Digital Twin of the plant (iv) designing and implementing a real-time MPC with dual objectives of transient plant load tracking with high ramp rates and minimizing coal consumption, i.e., improving plant efficiency in the baseload-partload operation range of $100-50\% TMCR$. Each key element above was developed and tested individually, and has been reported in corresponding Topical Reports. Finally, all the individual elements were integrated in an overall closed-loop system, that was successfully tested in desktop Simulink test harness simulations with ROM or high-fidelity model as the plant. Thereafter, the Simulink implementation was used to auto-generate C-code and deploy as real-time Docker microservice containers in Linux, and validate that they can run in real-time in the hardware-in-the loop (HIL) setup and produce the same results as in Simulink. The results of the integrated simulation tests in Simulink as well as the real-time HIL deployment are documented in this final report, showing good load tracking for load ramps at $3-4\%/min$ ramp rates, and achieving up to $5.5\%$ reduction in coal relative to baseline operation at $50\% TMCR$ load. The desktop and HIL simulations show successful performance of the overall model based estimation and control solution and achieve the key objectives of the program for flexible, efficient and reliable operation of sub-critical coal fired power plants.

20 FOSSIL-FUELED POWER PLANTS↗

Development of a DC Distribution Testbed for High-Power EV Charging

This paper explores the design and implementation of a power hardware-in-the-loop (P-HIL) setup for DC distribution infrastructure integrated with high-power charging (HPC) of electric vehicles (EVs), DC loads, and sources. The utilization of DC distribution holds significant potential for enhancing the operation of a HPC station architecture. However, there are challenges establishing a DC charging hub including interoperability, commoditization, distributed energy resource integration, stability, DC protection, and lack of common system level controllers. To address these challenges, a testing setup is required that accommodates commercial off-the-shelf (COTS) products to evaluate different use cases at rated power and voltage levels. The developed P-HIL setup features a dedicated DC charging hub, DC-coupled chargers, DC loads/sources, DC protection, and a communication architecture. The integrated P-HIL system provides a versatile testing environment to address technology and interoperability gaps and implements a smart energy management system (SEMS). This platform enables comprehensive and robust testing of COTS devices, charger prototypes, SEMS controllers and protection schemes, which together will accelerate transition to EVs at scale. The setup is tested for various use-cases at full-scale, integrating 950 V DC bus voltage, 660 kW grid-tied inverter, 150 kW COTS charger, and 100 kW energy storage system within an open-source SEMS platform.

ADVANCED PROPULSION SYSTEMS,POWER TRANSMISSION AND↗