Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Status”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,063 records · Page 59

Status Report on the Development of Cladding Inner-wall and Outer-wall Coatings

Advanced cladding is critical for nuclear reactors with enhanced performance in radiation tolerance, neutron transparency and reactor safety. Using advanced cladding will ensure the adequate thermal conductivity and mechanical stability of the cladding base material, corrosion resistance and high-temperature coolant compatibility of the cladding surface, and chemical stability in the cladding inner wall against fuel cladding chemical interaction (FCCI). An innovative cladding with a three-layer structure (i.e., a modified outer surface, a robust clad base material, and a modified inner wall) promises to meet all these requirements. In this status report, the initial efforts on the development of cladding inner-wall and outer-wall coatings are summarized. The activities covered in this report are (1) High-resolution TEM studies of TiN/HT-9 interface atomic structure and chemistry after ion irradiation, (2) High-resolution TEM studies of TiN/14YWT ODS interface atomic structure after thermal cycling, (3) Inner-wall TiN coating for an experimental 14YWT ODS cladding, and (4) Corrosion test of TiN coated Ziracloy-4 bar samples.

36 - MATERIALS SCIENCE↗

Controls Status of Fermilab's PIP-II Project

The Fermilab Proton Improvement Project II (PIP-II) is building a new Super Conducting Linear Accelerator (SCL) accelerating protons to 800 MeV for injection into the rest of the FNAL beam complex. Key progress since the last status report given at ICALEPCS includes the adoption of modern DevOps practices with continuous integration and GitOps-based deployments, commissioning of EPICS-based systems at the Cryomodule Test Facility, and integration of a Virtual Accelerator framework for application development ahead of installation. In parallel, web-based applications using Dart and Flutter have matured, providing secure, unified access to both EPICS and legacy ACNET data. Data acquisition and timing systems have also evolved. This paper presents the current state of controls, emphasizing these recent developments and outlining upcoming milestones as PIP-II approaches commissioning of its cryoplant in 2026 and the Warm Front End in 2027.

Crisp, D. B. [Fermilab]↗

Untangling the heavy-flavor mess: status of the Fermilab-MILC calculation of the $B_{(s)}\to D^{(\ast)}_{(s)}\ellν$ form factors

We present the status of calculations of the form factors of the most relevant heavy-to-heavy and heavy-to-light decay channels. Using seven $N_f = 2+1+1$ HISQ ensembles, with lattice spacings ranging from 0.15 fm down to 0.06 fm, we calculate the form factors of the decays, including correlations among them. More than half of our ensembles feature physical pion masses, and the heavy quarks are simulated at their physical masses using the Wilson-clover action with the Fermilab interpretation. Even though we have recently seen huge qualitative and quantitative leaps in the characterization of heavy-to-heavy decays, these advances have failed to translate into improvements for the inclusive vs exclusive question, or the matter of the Lepton Flavor Universality ratios. In particular, in the $B\to D^{\ast}\ellν$ channel, the current situation of the lattice-QCD form factors is far from clear. Further, the latest lattice-QCD results on the heavy-to-light form factors display unexplained tensions that must urgently be resolved. The work presented here is an attempt to address these issues.

Vaquero, Alejandro [Zaragoza U.]↗

FY24 progress report on A709 mechanical properties data development and A709 thermal aging status

The report provides the status of the creep, fatigue, and creep-fatigue testing to date conducted at Idaho National Laboratory to generate the data package. This data package evaluates the material performance from three commercial heats to support the Alloy 709 qualification in American Society of Mechanical Engineers, Boiler and Pressure Vessel Code, Section III, Division 5. First procured heat was manufactured by G.O. Carlson with heat number 58776. Second and third heats were fabricated by ATI Specialty Rolled Products with heat numbers 529900 and 530843, respectively. A series of creep and cyclic specimens were fabricated from these three heats and tests were performed. A list of finished, ongoing, and planned test are presented for creep, fatigue, and creep-fatigue tests. Cyclic properties of three commercial heats are compared.

36 - MATERIALS SCIENCE↗

Current Status of Problem 2 in the HTGR T/H Benchmark

Problem 2 of the HTGR T/H Benchmark is for modeling the depressurized conduction cooldown (DCC) transient. This presentation shares the status of code-to-code and code-to-date comparisons (Exercises 1 and 2) of Problem 2 with results from several participants. A key factor in the discrepancy between results and data in Exercise 2 is the assumed power distribution that is used to model PG-29. This talk highlights both the similarities and differences in solutions and discusses areas where further investigation is merited.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

AFC FAST Status Report Fiscal Year 2025

The Fission Accelerated Steady-state Test (FAST) methodology has been used to test several innovative metallic fuel designs for use in Sodium?cooled Fast Reactors (SFRs). The FAST method utilizes geometrically scaled fuel pins to produce improved burnup rates for fuels while maintaining semi-prototypic thermal conditions. This report provides a summary description of the test matrix and test objectives for the AFC FAST irradiation campaign as well as details of the as-built conditions for all rodlets. This report also include status update on the irradiation conditions for the rodlets as well as post-irradiation examination (PIE) results on low to mid?range burnup fuel rodlets and a summary power history for those rodlets. A brief discussion provides some early interpretation of the results and whether or not FAST is producing results typical of metallic fuels. Lastly, an outlook for the work expected to be completed in fiscal year (FY) 2026 is also included.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Status of the SPARC-X Project

SPARC-X is a two branch project consisting in the SPARC test facility dedicated to the development and test of critical subsystems such as high brightness photoinjector and a modular expandable undulator for SASE-FEL experiments at 500 nm with seeding, and the SPARX facility aiming at generation of high brilliance coherent radiation in the 1.5-13 nm range, based on the achieved expertise. The projects are supported by MIUR (Research Department of Italian Government) and Regione Lazio. SPARC has completed the commissioning phase of the photoinjector in November 2006. The achieved experimental results are here summarized together with the status of the second phase commissioning plans. The SPARX project is based on the generation of ultra high peak brightness electron beams at the energy of 1 and 2 GeV generating radiation in the 1.5-13 nm range. The construction is at the moment planned in two steps starting with a 1 GeV Linac. The project layout including both RF-compression and magnetic chicane techniques has been studied.

43 PARTICLE ACCELERATORS↗

Status of the National Security Workforce

This report documents the status of the national security workforce as part of the National Security Preparedness Project, being performed by the Arrowhead Center of New Mexico State University under a DOE/NNSA grant. This report includes an assessment of the current workforce situation. The national security workforce is an important component of national security for our country. With the increase of global threats of terrorism, this workforce is being called upon more frequently. This has resulted in the need for an increasing number of national security personnel. It is imperative to attract and retain a skilled and competitive national security workforce.

99 GENERAL AND MISCELLANEOUS↗

Status of Educational Efforts in National Security Workforce

This report documents the status of educational efforts for the preparation of a national security workforce as part of the National Security Preparedness Project, being performed by the Arrowhead Center of New Mexico State University under a DOE/NNSA grant. The need to adequately train and educate a national security workforce is at a critical juncture. Even though there are an increasing number of college graduates in the appropriate fields, many of these graduates choose to work in the private sector because of more desirable salary and benefit packages. This report includes an assessment of the current educational situation for the national security workforce.

99 GENERAL AND MISCELLANEOUS↗

Development Status of the ILC Marx Modulator

The ILC Marx Modulator is under development as a lower cost alternative to the 'Baseline Conceptual Design' (BCD) klystron modulator. Construction of a prototype Marx is complete and testing is underway at SLAC. The Marx employs solid state elements, IGBTs and diodes, to control the charge, discharge and isolation of the modules. The prototype is based on a stack of sixteen modules, each initially charged to {approx}11 kV, which are arranged in a Marx topology. Initially, eleven modules combine to produce the 120 kV output pulse. The remaining modules are switched in after appropriate delays to compensate for the voltage droop that results from the discharge of the energy storage capacitors. Additional elements will further regulate the output voltage to {+-} 0.5%. The Marx presents several advantages over the conventional klystron modulator designs. It is physically smaller; there is no pulse transformer (quite massive at these parameters) and the energy storage capacitor bank is quite small, owing to the active droop compensation. It is oil-free; voltage hold-off is achieved using air insulation. It is air cooled; the secondary air-water heat exchanger is physically isolated from the electronic components. This paper outlines the current developmental status of the prototype Marx. It presents a detailed electrical and mechanical description of the modulator and operational test results. It will discuss electrical efficiency measurements, fault testing, and output voltage regulation.

43 PARTICLE ACCELERATORS↗

Status of the MANX muon cooling experiment

A demonstration experiment of six-dimensional (6D) phase space muon beam cooling is a key milestone on the roadmap toward to a real muon collider. In order to achieve this goal, they have designed the Muon Collider and Neutrino Factory Experiment (MANX) channel, which consists of the Helical Cooling Channel (HCC). They discuss the status of the simulation study of the MANX in this document.

43 PARTICLE ACCELERATORS↗

EBIS preinjector construction status

A new heavy ion preinjector is presently under construction at Brookhaven National Laboratory. This preinjector uses an Electron Beam Ion Source (EBIS), and an WQ and IH Linac, both operating at 100.625 MHz, to produce 2 MeV/u ions of any species for use, after further acceleration, at the Relativistic Heavy Ion Collider, and the NASA Space Radiation Laboratory. Among the increased capabilities provided by this preinjector are the ability to produce ions of any species, and the ability to switch between multiple species in 1 second, to simultaneously meet the needs of both physics programs. Fabrication of all major components for this preinjector is in process, with testing of the EBIS and WQ starting this year. The status of this construction is presented.

43 PARTICLE ACCELERATORS↗

The NRC's SPAR Models: Current Status, Future Development, and Modeling Issues

Probabilistic risk assessments (PRAs) play an increasingly important role in the regulatory framework of the U.S. nuclear power industry. The Nuclear Regulatory Commission (NRC) relies on a set of plant-specific Standardized Plant Analysis Risk (SPAR) models to provide critical risk-based input to the regulatory process. The Significance Determination Process (SDP), Management Directive 8.3 - NRC Incident Investigation Program, Accident Sequence Precursor (ASP) and Mitigating Systems Performance Index (MSPI) programs are among the regulatory initiatives that receive significant input from the SPAR models. Other uses of the SPAR models include: Screening & Resolution of Generic Safety Issues, License Amendment reviews and Notice of Enforcement Discretion (NOEDs). This paper presents the current status of SPAR model development activities, future development objectives, and issues related to the development, verification and maintenance of the SPAR models.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Status of the NSLS-II Injection System Design

The NSLS-II is a new ultra-bright 3rd generation 3 GeV light source that will be built at Brookhaven National Laboratory. Its design is well under way. The requirements for the compact injector complex, which will continuously provide 3 GeV electrons for top-off injection into the storage ring, are demanding: high reliability, relatively high charge and low losses. The injector consists of a linear accelerator, a full-energy booster, as well as transport lines, and an injection straight section. In this paper we give an overview of the NSLS-II injector, discuss its status, specifications, and the design challenges.

43 PARTICLE ACCELERATORS↗