DOE OSTI · 939958
EBIS preinjector construction status
Abstract
A new heavy ion preinjector is presently under construction at Brookhaven National Laboratory. This preinjector uses an Electron Beam Ion Source (EBIS), and an WQ and IH Linac, both operating at 100.625 MHz, to produce 2 MeV/u ions of any species for use, after further acceleration, at the Relativistic Heavy Ion Collider, and the NASA Space Radiation Laboratory. Among the increased capabilities provided by this preinjector are the ability to produce ions of any species, and the ability to switch between multiple species in 1 second, to simultaneously meet the needs of both physics programs. Fabrication of all major components for this preinjector is in process, with testing of the EBIS and WQ starting this year. The status of this construction is presented.
Explore related subjects
Keep this discovery
Explore connections, maps & timelines
Alessi, J, Barton, D, Beebe, E, Bellavia, S, Gould, O, Kponou, A, Lambiase, R, Lessard, E, Lockey, R, LoDestro, V, Mapes, M, McCafferty, D, McNerney, A, Okamura, M, Pendzick, A, Phillips, D, Pikin, A, Raparia, D, Ritter, J, Scaduto, J, Snydstrup, L, Wilinski, M, Zaltsman, A. 2008-09-29. EBIS preinjector construction status. https://engineeringpapers.com/record/osti%3A939958/ebis-preinjector-construction-status
Citations retain the original authors and DOI and include this site’s record URL. If this discovery service contributed to your research, you can also cite Engineering Papers by Indiciae: BibTeX · RIS.