Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Integration and test”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,063 records · Page 59

Enabling Agile Testing through Continuous Integration

A Continuous Integration system is often considered one of the key elements involved in supporting an agile software development and testing environment. As a traditional software tester transitioning to an agile development environment it became clear to me that I would need to put this essential infrastructure in place and promote improved development practices in order to make the transition to agile testing possible. This experience report discusses a continuous integration implementation I lead last year. The initial motivations for implementing continuous integration are discussed and a pre and post-assessment using Martin Fowler's "Practices of Continuous Integration" is provided along with the technical specifics of the implementation. Finally, I’ll wrap up with a retrospective of my experiences implementing and promoting continuous integration within the context of agile testing.

97 MATHEMATICS AND COMPUTING↗

Integral Heat Transfer Test Method for Determining Thermal Resistance of Silicon Carbide Cladding and Liquid Tin System at Elevated Temperatures - Master's Thesis Presentation University of Idaho

Presentation for master's work at University of Idaho discussing Integral Heat Transfer Test Method for Determining Thermal Resistance of Silicon Carbide Cladding and Liquid Tin System at Elevated Temperatures. Presentation covers slight literature review results/previous work, discussions on system design and approach for thermal property measurement of SiC composite and Tin system, modeling efforts, and results.

36 - MATERIALS SCIENCE↗

Development, implementation, and test results on integrated optics switching matrix

A small integrated optics switching matrix, which was developed, implemented, and tested, indicates high performance. The matrix serves as a model for the design of larger switching matrices. The larger integrated optics switching matrix should form the integral part of a switching center with high data rate throughput of up to 300 megabits per second. The switching matrix technique can accomplish the design goals of low crosstalk and low distortion. About 50 illustrations help explain and depict the many phases of the integrated optics switching matrix. Many equations used to explain and calculate the experimental data are also included.

Rutz, E.↗

Design, Integration, Certification and Testing of the Orion Crew Module Propulsion System

The Orion Multipurpose Crew Vehicle (MPCV) is NASA's next generation spacecraft for human exploration of deep space. Lockheed Martin is the prime contractor for the design, development, qualification and integration of the vehicle. A key component of the Orion Crew Module (CM) is the Propulsion Reaction Control System, a high‐flow hydrazine system used during re‐entry to orient the vehicle for landing. The system consists of a completely redundant helium (GHe) pressurization system and hydrazine fuel system with monopropellant thrusters. The propulsion system has been designed, integrated, and qualification tested in support of the Orion program's first orbital flight test, Exploration Flight Test One (EFT‐1), scheduled for 2014. A subset of the development challenges and lessons learned from this first flight test campaign will be discussed in this paper for consideration when designing future spacecraft propulsion systems. The CONOPS and human rating requirements of the CM propulsion system are unique when compared with a typical satellite propulsion reaction control system. The system requires a high maximum fuel flow rate. It must operate at both vacuum and sea level atmospheric pressure conditions. In order to meet Orion's human rating requirements, multiple parts of the system must be redundant, and capable of functioning after spacecraft system fault events.

McKay, Heather↗

Cryo Testing of tbe James Webb Space Telescope's Integrated Science Instrument Module

The Integrated Science Instrument Module (ISIM) of the James Webb Space Telescope will be integrated and tested at the Environmental Test Facilities at Goddard Space Flight Center (GSFC). The cryogenic thermal vacuum testing of the ISIM will be the most difficult and problematic portion of the GSFC Integration and Test flow. The test is to validate the coupled interface of the science instruments and the ISIM structure and to sufficiently stress that interface while validating image quality of the science instruments. The instruments and the structure are not made from the same materials and have different CTE. Test objectives and verification rationale are currently being evaluated in Phase B of the project plan. The test program will encounter engineering challenges and limitations, which are derived by cost and technology many of which can be mitigated by facility upgrades, creative GSE, and thorough forethought. The cryogenic testing of the ISIM will involve a number of risks such as the implementation of unique metrology techniques, mechanical, electrical and optical simulators housed within the cryogenic vacuum environment. These potential risks are investigated and possible solutions are proposed.

VanCampen, Julie↗

Acceleration ground test program to verify GAS payload No. 559 structure/support avionics and experiment structural integrity

Acceleration ground tests were conducted on the Get Away Special (GAS) payload 559 to verify the structural integrity of the structure/support avionics and two of the planned three flight experiments. The ITA (Integrated Test Area) Standardized Experiment Module (ISEM) structure was modified to accommodate the experiments for payload 559. The ISEM avionics consisted of a heavy duty sliver zinc power supply, three orthogonal-mounted low range microgravity accelerometers, a tri-axis high range accelerometer, a solid state recorder/programmer sequencer, and pressure and temperature sensors. The tests were conducted using the Gravitational Plant Physiology Laboratory Centrifuge of the University City Science Center in Philadelphia, PA. The launch-powered flight steady state acceleration profile of the shuttle was simulated from lift-off through jettison of the External Tank (3.0 g's). Additional tests were conducted at twice the nominal powered flight acceleration levels (6 g's) and an over-test condition of four times the powered flight loads to 12.6 g's. The present test program has demonstrated the value of conducting ground tests to verify GAS payload experiment integrity and operation before flying on the shuttle.

Cassanto, John M.↗

Catalyst synthesis and evaluation using an integrated atomic layer deposition synthesis–catalysis testing tool

An integrated atomic layer deposition-catalysis (I-ALD-CAT) tool was developed, combining an ALD manifold with a plug-flow reactor system for the synthesis of supported catalytic materials by ALD and immediate evaluation of catalyst reactivity using gas-phase probe reactions. The I-ALD-CAT system can deliver gaseous reagents comprised of 12 different metal ALD precursors, 4 oxidizing or reducing agents, and 4 catalytic reaction feeds to either of the two plug-flow reactors. The system can employ reactor pressures and temperatures in the range of 10 -3 to 1 bar and 300–1000 K, respectively. Furthermore, the instrument is also equipped with a gas chromatograph and a mass spectrometer unit for the detection and quantification of volatile species from ALD and catalytic reactions. In this report, we demonstrate the use of the I-ALD-CAT tool for the ALD of platinum active sites and Al 2 O 3 overcoats, and evaluation of catalyst propylene hydrogenation activity.

47 OTHER INSTRUMENTATION↗

Human Exploration System Test-Bed for Integration and Advancement (HESTIA) Support of Future NASA Deep-Space Missions

The Engineering Directorate at the NASA - Johnson Space Center is outfitting a 20-Foot diameter hypobaric chamber in Building 7 to support future deep-space Environmental Control & Life Support System (ECLSS) research as part of the Human Exploration System Test-bed for Integration and Advancement (HESTIA) Project. This human-rated chamber is the only NASA facility that has the unique experience, chamber geometry, infrastructure, and support systems capable of conducting this research. The chamber was used to support Gemini, Apollo, and SkyLab Missions. More recently, it was used to conduct 30-, 60-, and 90-day human ECLSS closed-loop testing in the 1990s to support the International Space Station and life support technology development. NASA studies show that both planetary surface and deep-space transit crew habitats will be 3-4 story cylindrical structures driven by human occupancy volumetric needs and launch vehicle constraints. The HESTIA facility offers a 3-story, 20-foot diameter habitat consistent with the studies' recommendations. HESTIA operations follow stringent processes by a certified test team that including human testing. Project management, analysis, design, acquisition, fabrication, assembly and certification of facility build-ups are available to support this research. HESTIA offers close proximity to key stakeholders including astronauts, Human Research Program (who direct space human research for the agency), Mission Operations, Safety & Mission Assurance, and Engineering Directorate. The HESTIA chamber can operate at reduced pressure and elevated oxygen environments including those proposed for deep-space exploration. Data acquisition, power, fluids and other facility resources are available to support a wide range of research. Recently completed HESTIA research consisted of unmanned testing of ECLSS technologies. Eventually, the HESTIA research will include humans for extended durations at reduced pressure and elevated oxygen to demonstrate very high reliability of critical ECLSS and other technologies.

Marmolejo, Jose↗

Designing Test Chips for Custom Integrated Circuits

Collection of design and testing procedures partly automates development of built-in test chips for CMOS integrated circuits. Testchip methodology intended especially for users of custom integratedcircuit wafers. Test-Chip Designs and Testing Procedures (including datareduction procedures) generated automatically by computer from programed design and testing rules and from information supplied by user.

Buehler, M. G.↗

Integrated circuit reliability testing

A technique is described for use in determining the reliability of microscopic conductors deposited on an uneven surface of an integrated circuit device. A wafer containing integrated circuit chips is formed with a test area having regions of different heights. At the time the conductors are formed on the chip areas of the wafer, an elongated serpentine assay conductor is deposited on the test area so the assay conductor extends over multiple steps between regions of different heights. Also, a first test conductor is deposited in the test area upon a uniform region of first height, and a second test conductor is deposited in the test area upon a uniform region of second height. The occurrence of high resistances at the steps between regions of different height is indicated by deriving the measured length of the serpentine conductor using the resistance measured between the ends of the serpentine conductor, and comparing that to the design length of the serpentine conductor. The percentage by which the measured length exceeds the design length, at which the integrated circuit will be discarded, depends on the required reliability of the integrated circuit.

Buehler, Martin G.↗

Integrated circuit reliability testing

A technique is described for use in determining the reliability of microscopic conductors deposited on an uneven surface of an integrated circuit device. A wafer containing integrated circuit chips is formed with a test area having regions of different heights. At the time the conductors are formed on the chip areas of the wafer, an elongated serpentine assay conductor is deposited on the test area so the assay conductor extends over multiple steps between regions of different heights. Also, a first test conductor is deposited in the test area upon a uniform region of first height, and a second test conductor is deposited in the test area upon a uniform region of second height. The occurrence of high resistances at the steps between regions of different height is indicated by deriving the measured length of the serpentine conductor using the resistance measured between the ends of the serpentine conductor, and comparing that to the design length of the serpentine conductor. The percentage by which the measured length exceeds the design length, at which the integrated circuit will be discarded, depends on the required reliability of the integrated circuit.

Buehler, Martin G.↗

Assembly, Integration, and Initial Test Results of a Stirling Radioisotope Power System Generator Testbed

The Stirling Generator Testbed is an on-going effort to demonstrate performance, behaviors, and typical interfaces that would be present in a flight-like Stirling radioisotope power system. Design of the Testbed occurred over the past several years, with the acquisition of parts beginning in 2022. The assembly, integration and initial test campaign for the Testbed involved an array of steps and processes, culminating with the initial test results.

Ernestina Wozniak↗

Inexpensive Multirotor Platform for Advanced Controls Testing (IMPACT): Development, Integration, and Experimentation

A comprehensive framework was explored and validated for rapid deployment and testing of custom flight control logic using the Inexpensive Multirotor Platform for Advanced Controls Testing (IMPACT). This vehicle facilitated the efficient validation and refinement of a custom flight control algorithm, which was designed using Simulink and deployed onto a Pixhawk flight computer running PX4 firmware through the utilization of the MathWorks UAV Toolbox. The robust and cost-effective design of IMPACT provides the groundwork for future flight testing of flight controls and model development research for electric vertical takeoff and landing (eVTOL) aircraft.

flight testing↗

Ensuring Safe Exploration: Ares Launch Vehicle Integrated Vehicle Ground Vibration Testing

Ground vibration testing has been an integral tool for developing new launch vehicles throughout the space age. Several launch vehicles have been lost due to problems that would have been detected by early vibration testing, including Ariane 5, Delta III, and Falcon 1. NASA will leverage experience and testing hardware developed during the Saturn and Shuttle programs to perform ground vibration testing (GVT) on the Ares I crew launch vehicle and Ares V cargo launch vehicle stacks. NASA performed dynamic vehicle testing (DVT) for Saturn and mated vehicle ground vibration testing (MVGVT) for Shuttle at the Dynamic Test Stand (Test Stand 4550) at Marshall Space Flight Center (MSFC) in Huntsville, Alabama, and is now modifying that facility to support Ares I integrated vehicle ground vibration testing (IVGVT) beginning in 2012. The Ares IVGVT schedule shows most of its work being completed between 2010 and 2014. Integrated 2nd Stage Ares IVGVT will begin in 2012 and IVGVT of the entire Ares launch stack will begin in 2013. The IVGVT data is needed for the human-rated Orion launch vehicle's Design Certification Review (DCR) in early 2015. During the Apollo program, GVT detected several serious design concerns, which NASA was able to address before Saturn V flew, eliminating costly failures and potential losses of mission or crew. During the late 1970s, Test Stand 4550 was modified to support the four-body structure of the Space Shuttle. Vibration testing confirmed that the vehicle's mode shapes and frequencies were better than analytical models suggested, however, the testing also identified challenges with the rate gyro assemblies, which could have created flight instability and possibly resulted in loss of the vehicle. Today, NASA has begun modifying Test Stand 4550 to accommodate Ares I, including removing platforms needed for Shuttle testing and upgrading the dynamic test facilities to characterize the mode shapes and resonant frequencies of the vehicle. The IVGVT team expects to collect important information about the new launch vehicles, greatly increasing astronaut safety as NASA prepares to explore the Moon and beyond.

Tuma, M. L.↗

Simulator verification techniques study. Integrated simulator self test system concepts

Software and hardware requirements for implementing hardware self tests are presented in support of the development of training and procedures development simulators for the space shuttle program. Self test techniques for simulation hardware and the validation of simulation performance are stipulated. The requirements of an integrated simulator self system are analyzed. Readiness tests, fault isolation tests, and incipient fault detection tests are covered.

Montoya, G.↗

Enhancements to the NASA/Goddard Space Flight Center (GSFC) Space Environment Simulator (SES) Facility to Support Cryogenic Testing of the James Webb Space Telescope (JWST) Integrated Science Instrument Module (ISIM)

NASA is the mission lead for the James Webb Space Telescope (JWST), the next of the "Great Observatories", scheduled for launch in 2014. It is directly responsible for the integration and test of the Integrated Science Instrument Module (ISIM), which includes a composite truss structure provided by NASA, and four science instruments sponsored and provided by NASA, the European Space Agency (ESA), the Canadian Space Agency (CSA), and the European Consortium (EC). Three of the four instruments are passively cooled and designed to operate at temperatures in the 36K to 40K range, and the fourth instrument is actively cooled to approximately 6K. The ISIM will undergo several performance tests at various levels of integration in the NASA Goddard Space Flight Center's (GSFC) Space Environment Simulator (SES), GSFC's largest thermal vacuum chamber. These activities range from Cryo-cycling the bare flight composite structure to thermal balance and performance testing of the full ISIM module. This paper describes the enhancements made to the SES chamber in order to support all cryogenic thermal vacuum testing of the ISIM. Upgrades discussed include: design and fabrication of a very large, removable and reconfigurable helium shroud; a new valve box permitting independent flow control of gaseous helium (GHe) to up to ten zones; and development of in-situ 3-dimensional photogrammetry capability in a cryogenic environment. Also presented will be select results from several facility tests already conducted to verify the chamber capabilities and optimize operational procedures, including the Helium Shroud -03 Configuration Acceptance Test, and the Helium Shroud -01 Configuration Chamber Certification Test.

Cleveland, Paul↗