Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Reliability”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,045 records · Page 58

Operational Probabilistic Tools for Solar Uncertainty (OPTSUN) (Final Project Report for DOE Solar Forecasting II Project)

Increasing levels of solar PV can challenge system operations and may require novel methods to operate the power system reliably and efficiently. Power system operating plans generally use deterministic forecasts, in which the variable energy resources are represented by the expected value for each interval of the decision horizon. Probabilistic forecasts are relatively new but have the potential to address the shortfalls of deterministic forecasts. However, understanding how best to use such forecasts is still a key gap in industry and was the focus of this project. The project had three workstreams. In a forecasting workstream, improvements were made to baseline probabilistic forecasts using a number of new approaches such as machine learning methods and improved input data. In a design workstream, advanced simulation tools used these forecasts to investigate newly proposed reserve determination methods. Lastly, in a demonstration workstream a scheduling management platform (SMP) was developed to leverage probabilistic forecasts in a modular and customizable manner. In order to study the benefits that could be accrued, the project team collaborated with three utility partners (Duke Energy, Southern Company and Hawaiian Electric) to deliver improved probabilistic forecasts for each region and to model each region in case studies using advanced production cost modeling tools. Different methods to determine operating reserve requirements from probabilistic forecasts were developed, simulated, and tested across each region. The benefits of using these newly proposed methods varied by utility, but, in general, using probabilistic forecasts as well as historical data to set the reserve requirements seems to improve reliability related results, with less risk of reserve or supply shortfalls. The cost implications were not always straightforward; in some cases the new methods could show a reduction in expected operating costs, but often the increase in reserves associated with better risk mitigation using probabilistic forecasts could result in an increase in operating costs in the simulations. The SMP tool was developed to process probabilistic forecasts from their initial receipt through to scheduling decisions. This open-source tool consists of several modules for scenario development, reserve requirements calculation, and visualization. The SMP tool was demonstrated to a wide range of operators and stakeholders at all three utilities and further improved based on their feedback. The tool will be available on www.epri.com/optsun. The proposed probabilistic information-based reserve determination approaches have the potential to be implemented by different regions to ensure an economic and reliable power system operation on power systems integrating increasing levels of variable renewable resources. The innovative yet practical methods developed in this project demonstrated tangible benefits from using probabilistic forecasts beyond just study-based assessments to include three unique balancing areas. The demonstrated benefits across the multiple utility environments, are expected to provide system operators in all regions the confidence required and a platform to adopt the new forecasting and operating methods.

14 SOLAR ENERGY↗

Enhanced Component Performance Study: Air-Operated Valves 1998–2020

This report presents an enhanced performance evaluation of air-operated valves (AOVs) at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience failure reports from calendar year 1998 through 2020 as reported in the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS). The AOV failure modes considered are failure-to-open/close (FTOC), failure to operate or control (FTOP), and spurious operation (SO). The component reliability estimates and the reliability data are trended for the most recent 10-year period while yearly estimates for reliability are provided for the entire study period. The following trends were identified for the most recent 10-year period: o Extremely statistically significant increasing trend for the frequency of FTOC demands (demands per reactor year) for low-demand (= 20 demands per year) AOVs o Extremely statistically significant increasing trend for the frequency of FTOC demands for high-demand (> 20 demands per year) AOVs o Highly statistically significant decreasing trend for the failure rate of FTOP for low-demand AOVs o Highly statistically significant decreasing trend for the frequency of FTOP events (failures per reactor year) for low-demand AOVs o Statistically significant decreasing trend for the failure rate of SO for low-demand AOVs o Statistically significant decreasing trend for the frequency of SO events (failures per reactor year) for low-demand AOVs.

99 GENERAL AND MISCELLANEOUS↗

Enhanced Component Performance Study: Turbine-Driven Pumps 1998-2020

This report presents an enhanced performance evaluation of turbine-driven pumps (TDPs) at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience failure reports from calendar year 1998 through 2020 as reported in the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS). The TDP failure modes considered for standby systems are fail to start (FTS), fail to run (FTR) for one hour of operation (FTR≤1H), FTR after one hour of operation (FTR>1H), and for normally running systems FTS and FTR. An eight-hour unreliability estimate is also calculated and trended. The component reliability estimates and the reliability data are trended for the most recent 10-year period while yearly estimates for reliability are provided for the entire study period. No increasing trends were identified for TDPs for the most recent 10-year period: The following decreasing trends were identified for TDPs for the most recent 10-year period: • Standby TDP FTR>1H failure rate • Standby TDP unavailability • Standby MDP total unreliability (8-hour mission) • Standby TDP frequency of FTR>1H events (failures per reactor year) • Normally running TDP frequency of start demands (demands per reactor year) • Normally running TDP frequency of run hours (hours per reactor year).

99 GENERAL AND MISCELLANEOUS↗

Enhanced Component Performance Study: Motor-Driven Pumps 1998-2020

This report presents an enhanced performance evaluation of motor-driven pumps (MDPs) at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience failure reports from calendar year 1998 through 2020 as reported in the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS). The MDP failure modes considered for standby systems are fail to start (FTS), fail to run (FTR) for one hour of operation (FTR≤1H), FTR after one hour of operation (FTR>1H), and for normally running systems FTS and FTR. An eight-hour unreliability estimate is also calculated and trended. The component reliability estimates and the reliability data are trended for the most recent 10-year period while yearly estimates for reliability are provided for the entire study period. The following increasing trends were identified for MDPs for the most recent 10-year period: • Standby MDP frequency of start demands (demands per reactor year) • Standby MDP frequency of FTR≤1H hours (hours per reactor year) • Standby MDP frequency of FTR>1H hours • Normally running MDP frequency of run hours. The following decreasing trends were identified for MDPs for the most recent 10-year period: • Standby MDP FTR≤1H failure probability • Normally running MDP FTR failure rate • Standby MDP unavailability • Normally running MDP total unreliability (8-hour mission) • Standby MDP frequency of FTR≤1H events (failures per reactor year) • Normally running MDP frequency of FTR events.

99 GENERAL AND MISCELLANEOUS↗

Enhanced Component Performance Study: Motor-Operated Valves 1998-2020

This report presents an enhanced performance evaluation of motor-operated valves (MOVs) at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience failure reports from calendar year 1998 through 2020 as reported in the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS). The MOV failure modes considered are fail to open or close (FTOC), fail to operate or control (FTOP), and spurious operation (SO). The component reliability estimates and the reliability data are trended for the most recent 10-year period while yearly estimates for reliability are provided for the entire study period. The following increasing trend was identified for MOVs for the most recent 10-year period: • Low-demand MOV frequency of FTOC demands (demands per reactor year). The following increasing trends were identified for MOVs for the most recent 10-year period: • Low-demand MOV FTOC failure probability • Low-demand MOV frequency of FTOC events (failures per reactor year).

99 GENERAL AND MISCELLANEOUS↗

Situational Awareness of Grid Anomalies (SAGA) for Visual Analytics—Near-Real-Time Cyber-Physical Resiliency Through Machine Learning

The Situational Awareness of Grid Anomalies (SAGA) project built upon foundational power system tools developed at the National Renewable Energy Laboratory (NREL) integrated with an ever-increasing set of Gridmetrics data extracted from the cable television (CATV) broadband network infrastructure while assimilating other time-series geospatial data and information, such as weather and cyber-physical phenomena, to demonstrate a disruptive technology for power system data analytics relying on existing infrastructure. Three research thrusts supported (1) visual analytics, (2) cyber-physical power system simulation, and (3) anomaly detection. SAGA created technology that leverages, couples, and fortifies two vastly different realms - power and broadband - to increase the resiliency of the power grid in the face of increasing cyberattacks and operational challenges related to integrating DERs. The exploration of potential synergies of broadband-enabled grids resulted in identifying a mutually beneficial symbiosis that can increase the resiliency of both power and broadband services. Broadband networks perform better with reliable power and are good at providing real-time measurements that identify where the grid is under attack, is failing, or is weak. Likewise, sensor-starved distribution grids perform better and can be more reliable when their operation is buttressed with observations of broadband-detected anomalies. Future research can explore broadband's contribution to continuing to improve grid resiliency, reliability, and cost-effective operation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Probabilistic Failure Criterion of SiC/SiC Composites Under Multiaxial Loading

Owing to its excellent mechanical properties and stability under high temperature and neutron irradiation conditions, SiC/SiC composites have emerged as a promising material for light water reactors (LWRs) in the development of accident-tolerant fuel (ATF) systems. Structural integrity and retention of hermeticity are two crucial requirements for SiC/SiC claddings during normal operations, and both of them are closely related to the proportional limit stress (PLS) of the material. Understanding the behavior of SiC/SiC composites under multiaxial stress states and developing a probabilistic approach for evaluating the structural vulnerability are of paramount importance for reliability-based analysis and design of SiC/SiC composite claddings. So far, there has been very limited effort towards experimental and analytical investigations of probabilistic failure of SiC/SiC claddings. This critical knowledge gap motivates this research. A probabilistic failure criterion for SiC/SiC composites under multi-axial loading is developed, and this criterion is incorporated into reliability analysis of the structural integrity of SiC/SiC fuel cladding. The research consists of two parts: 1) experimental investigation of multiaxial failure behavior of SiC/SiC composites, and 2) theoretical modeling of time-dependent probabilistic failure of SiC/SiC cladding. In the experimental investigation, the PLS is determined through the examination of stress-strain response, the acoustic emission measurement, as well as the X-ray computed tomography. The theoretical framework is derived by combin- ing the finite weakest-link statistical model and the subcritical damage growth model. This theoretical model captures the time-dependent failure mechanism of the material, which has a major consequence for predicting the lifetime distribution of the cladding. Meanwhile, the model also predicts that the failure statistics of the cladding depends strongly on the cladding length. The results of the multiaxial experiments reveal the level of statistical variation of the PLS of SiC/SiC materials under different stress states. The theoretical model provides a robust analytical tool for extrapolation of small-scale laboratory test results to the behavior of full-scale claddings. These findings establish a scientific foundation for the development of reliability-based design of SiC/SiC fuel claddings, which will play an essential role in improving the structural safety and integrity of LWRs.

42 ENGINEERING↗

Enhancing Radionuclide Production Capabilities at the Duke University Medical Center Cyclotron with a Focus on Astatine-211

Radionuclides play an important role in a diverse array of fields including physics, chemistry, agriculture, materials science, national security, medical research and patient care. Establishing a reliable domestic supply of key radionuclides is critical to our national competitiveness in these areas. Regarding medical applications, targeted alpha-particle therapy (TAT) has become of great interest to basic researchers and clinicians alike and is emerging as a valuable and cost-effective approach for cancer treatment. Unfortunately, progress in TAT, particularly with regard to its clinical translation, has been severely hampered by the limited availability of the most promising radionuclides at a reasonable cost, and with appropriate chemical and radiochemical purity. In this project, we have attempted to address this problem by focusing on production of the 7.2-h half-life α-particle emitter, 211 At, which has long been considered to be one of the most promising radionuclides for TAT. We note that he critical importance of improving the supply of 211 At in the United States was noted in the Funding Opportunity Announcement related to this project. At Duke University, we have a CS-30 cyclotron that is one of the few accelerators in the United States that has an alpha-particle beam that has enough energy to make useful quantities of 211 At. With this cyclotron, we have been able to produce more 211 At than anywhere else in the world because of our unique internal cyclotron target system. However, the CS-30 cyclotron is nearly 40 years old and was no longer reliable. In addition, its operation required considerable skill, largely because it had analog control systems, and vital parts including old-fashioned power supplies, were becoming unavailable. For these reasons, the current project was undertaken to evaluate all the subsystems of the CS-30 cyclotron and replace, repair, and update them. With help from our consultant, Ionetix, this has now been accomplished. We believe that because of this work, the CS-30 can reliably supply 211 At for basic research and clinical trials both at Duke and beyond.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Advanced Measurements for Resilient Integration of Inverter-Based Resources: PROGRESS MATRIX Year-1 Report

As nearly every aspect of the electric power grid undergoes rapid change, measurement technologies that support grid operation and planning must evolve as well. Recent large-scale deployments of inverter-based resources (IBRs) have brought to the forefront the critical need for new measurement technologies. Though these IBRs are vital to achieving the nation’s clean energy goals, their rapid deployment has in some cases led to negative impacts on the reliability and security of the bulk power system (BPS). Advanced power system measurements, including synchronized phasor and waveform measurements, are key to making IBR integration secure and reliable. To this end, the Department of Energy (DOE) initiated a project in 2022 to develop advanced measurement capabilities and analytics that will accelerate adoption of IBRs while improving the reliability and resilience of the BPS. This report discusses a portion of the findings from the project’s first year, which focused on surveying existing measurement capabilities of partner utilities and comparing these capabilities with the requirements of applications that support IBR integration. This report also discusses how these findings will guide the development and demonstration of a set of applications in the project’s second year.

24 POWER TRANSMISSION AND DISTRIBUTION↗

An Assessment of Deploying Advanced Pumped Storage Hydropower Technology in U.S. Electricity Markets

Pumped storage hydropower (PSH) is a type of hydropower technology where energy can be stored and generated by moving water between two reservoirs of differing elevations. In addition to providing 97% of the total utility-scale hydropower storage in the United States, PSH plants have operational characteristics - such as high ramp rates and the ability to provide reserves - that contribute to greater flexibility and reliability of the power grid. New PSH technologies can provide additional flexibility beyond existing, fixed-speed units. With the emergence of high levels of variable renewable energy resources (e.g., wind and solar), energy storage is expected to be crucial to the reliability and reliance of the power grid in a low-carbon future. At diurnal and longer durations, PSH plants have some of the lowest costs per unit of energy, have been proven to be reliable and efficient, are not cycle-limited, and typically have long lives, often exceeding 50 years. The work presented here focuses on a new generation of PSH: ternary PSH and quaternary PSH (together referred to as T/Q-PSH). Given recent experience in Europe, grid operators in the United States and elsewhere are increasingly focusing their attention on T/Q-PSH as a proven, financeable technology that can offer utility-scale, long-duration, fast-acting energy storage capabilities and grid services. T/Q-PSH differs from conventional PSH in that it can provide fast-response ancillary services during both generating and pumping operations. This capability together with fast mode switching times are key attributes that make T/Q-PSH technologies attractive for managing and stabilizing electricity systems with high amounts of variable renewable energy.

ENERGY PLANNING, POLICY, AND ECONOMY,HYDRO ENERGY↗

Design, Development and Testing Plan for Energy Efficiency Algorithms Related to Building-Integrated Cooling, Heating, and Power Systems

Building-integrated cooling, heating and power (CHP) systems are more efficient than conventional systems at providing local power and thermal energy, and favorable fuel prices are bound to spur their increased adoption. It is estimated that the total CHP technical potential in the commercial building sector is approximately 76 GW, but only a small fraction of it is actually deployed. Advanced control and monitoring systems that realize the full potential of these CHP systems can transform this capacity into an asset for both the owner and the grid and also accelerate the adoption of these systems in the building sector. However, to realize the full benefit of the CHP systems, we must ensure persistence of energy efficient operations. It has been demonstrated by several studies that as much as 30% of building energy use is wasted. Much of the waste results from the inability to anticipate load variations (design day vs. non-design day operations; diurnal variation of loads), identify improper operation, and efficiently operate, control and maintain building systems. Moreover, many buildings, even those with adequate control infrastructure, lack knowledgeable staff to operate and maintain energy systems. Operators of buildings with CHP systems will constantly need to make tradeoffs (economic dispatch) between onsite power generation and purchasing power, between onsite heat production from distributed generation versus heating/cooling from conventional systems, and different passive and active load management measures. Much of the inefficiency in the current building operations can be eliminated by use of automated performance monitoring (PM), real-time commissioning verification (CxV) and automated fault detection and diagnostic (AFDD) tools. Automation can help system operators make intelligent decisions. Remote and continuous monitoring of system conditions and performance will enable better management and integration of CHP with existing building systems. Continuous PM, real-time CxV and AFDD could alleviate burdens for operations staff, enhance operations and maintenance (O&M), and improve reliability of building and CHP systems. To address the O&M challenges and to provide a means to maximize the rate-of-return of building-integrated CHP systems, the Building Technologies Office (BTO) within the U.S. Department of Energy’s (DOE’s) Office of Energy Efficiency and Renewable Energy (EERE) initiated a project to design, develop, and field test a VOLTTRON™-based supervisory controller and associated open-source algorithms. These algorithms will ensure real-time optimal operation of a building-integrated CHP system, support electric grid reliability, and lead to achieving the goal of a clean, efficient, reliable and affordable next-generation integrated energy systems. This report lists the components for which PM, real-time CxV and AFDD algorithms will be developed, how the algorithms will be tested, and metrics that will be used to validate the algorithms and easy of deployment. Deployment of these algorithms in the field will result in savings reduction in energy consumption of between 10% and 20%.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Implementation Plan for Combined Heat and Power Systems VOLTTRON Controller: Performance Monitoring and Real-Time Commissioning Algorithm Verification

Building-integrated cooling, heating, and power (CHP) systems are more efficient than conventional systems at providing local power and thermal energy, and favorable fuel prices are bound to spur their increased adoption. However, to realize the full benefit of the CHP systems, we must ensure persistence of energy efficient operations. Much of the inefficiency in the current building operations can be eliminated by use of automated performance monitoring (PM), real-time commissioning verification (CxV) and automated fault detection and diagnostic (AFDD) tools. Automation can help system operators make intelligent decisions. Remote and continuous monitoring of system conditions and performance will enable better management and integration of CHP with existing building systems. Continuous PM, real-time CxV, and AFDD could alleviate burdens for operations staff, enhance operations and maintenance (O&M), and improve reliability of building and CHP systems. To address the O&M challenges and to provide a means to maximize the rate-of-return of building-integrated CHP systems, the Building Technologies Office (BTO) within the U.S. Department of Energy’s (DOE’s) Office of Energy Efficiency and Renewable Energy (EERE) initiated a project to design, develop, and field test a VOLTTRON™-based supervisory controller and associated open-source algorithms. These algorithms will ensure real-time optimal operation of a building-integrated CHP system, support electric grid reliability, and lead to achieving the goal of clean, efficient, reliable, and affordable next-generation integrated energy system. Previous report listed the components for which PM, real-time CxV, and AFDD algorithms will be developed, how the algorithms will be tested, and the metrics that will be used to validate the algorithms and their ease of deployment. Deployment of these algorithms in the field will result in a reduction in energy consumption of between 10% and 20% (for both CHP and conventional building systems). This report builds upon the previous report by detailing the process by which PNNL will implement performance monitoring and real-time commissioning algorithms for CHP systems in conjunction with the use of the VOLTTRON CHP economic dispatch agent in host facilities.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Exploring the Limits of Cooling for Extreme Heat Flux Applications: Data Centers and Power Electronic

We developed an Extreme Heat Flux Micro-cooler (EHFµ-C) capable of removing heat flux of ~1 kW/cm 2 with a small temperature rise ~10°C. This represents greater than 10× reduction in thermal resistance compared to the state-of-the-art single-phase cooling technologies (~0.5 cm 2 -°C/W) that greatly increases the efficiency, resulting in improved performance and reliability for microprocessors and power electronics. The EHFµ-Cooler utilizes liquid wicking (no pump) and thin-film evaporation in a 30 µm thick wick porous microstructure such as copper inverse opal (CIO), silicon and AlN pin fins along with a 3D manifold (copper wiremesh and silicon) with liquid routing and vapor extraction channels achieving an unprecedented vapor quality ~ >0.9. The proposed EHFµ-Cooler significantly reduces device temperature, resulting in 25-50% improvement in reliability and device performance. Based on very conservative estimates, the total energy saving for data centers due to improved performance can be 6 billion kWh/year (>$300M). Better cooling, leading to more efficient, higher performance and more reliable power electronics, would save the nation 3 Quad of primary energy in 2030. Just for automotive application, a 10% increase in fuel efficiency for SiC-based power electronics equates to >20 million gallons of fuel savings annually. The proposed EHFµ-Cooler technology ensures the United States maintains its technological lead in high-performance computing and high-power electronics, while at the same time improving the energy efficiency, and as a result reducing energy-related emissions such as greenhouse gases.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Assessing the Resource Adequacy and Community Impacts of an Evolving Grid: Considerations for State Regulators

As U.S. power systems continue to decarbonize, state regulators must be able to broadly assess the cost and reliability implications of proposed fossil retirements and the corresponding resources that are coming online to replace them. Specifically, regulators must evaluate whether proposed infrastructure investments are sufficient to ensure the long-term reliability of the system, while also protecting rate payers by ensuring that such investments are necessary and not excessive. Broadly speaking, this objective is typically framed in terms of maintaining long-term resource adequacy at the lowest cost, while also ensuring that other social and/or environmental objectives are satisfied. System planners currently have a host of sophisticated analytical tools at their disposal to evaluate the cost-benefit trade-offs of different approaches to ensuring resource adequacy. However, most of these tools and associated metrics were designed with traditional power systems in mind. Over the past decade, it has become increasingly clear that the metrics and models that have reliably assessed resource adequacy in systems dominated by large thermal and hydropower resources will be insufficient for systems with significant contributions from emerging technologies such as wind, solar and storage. Therefore, in recent years many new metrics and modeling approaches have been developed, and are increasingly being implemented, to meet the needs of the clean energy transition.

24 POWER TRANSMISSION AND DISTRIBUTION↗

2023 FORCE Development Status Update

Technical and economic analysis of integrated energy systems (IES) using software models is a complex process requiring multiple commodity market decision analysis, optimal control, process modeling, and stochastic analysis. Many assumptions used in traditional energy analysis tools do not hold in future energy markets with significant storage and variable renewable energy sources (VRE), let alone with multiple commodity markets. Capturing these intricate elements for accurate techno-economic analysis of IES led to the development of the Framework for Optimization of ResourCes and Economics (FORCE) tool suite under the U.S. Department of Energy’s Integrated Energy Systems crosscutting technology program. With the aim of a full framework release in 2025, many improvements to the FORCE tool suite were developed in fiscal year 2023 (FY23). These improvements broadly fit into three focuses for development of FORCE: capability, accessibility, and reliability. Capability refers to the ability of FORCE to accurately model the technical and economic viability of various IES. Accessibility refers to ease-of-use for new and existing IES analysts to efficiently set up, analyze, and produce results using FORCE. Reliability refers to the consistency of the software, allowing consistency to analysis regardless of erstwhile changes to the software. In addition to many smaller changes, there are three major capability improvements in FORCE in FY23. In summary, FORCE developments in FY23 have moved us close to all the capability requirements for FORCE 1.0 to be delivered in FY25. Inclusion of Bayesian optimization, resilience metrics, and levelized cost analysis expand the capability, accessibility, and reliability of FORCE.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Enhanced Component Performance Study: Motor Driven Pumps 1998–2022

This report presents an enhanced performance evaluation of motor-driven pumps (MDPs) at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience failure reports from calendar year 1998 through 2022 as reported in the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS). The MDP failure modes considered for standby systems are fail to start (FTS), fail to run (FTR) for one hour of operation (FTR=1H), FTR after one hour of operation (FTR>1H), and for normally running systems FTS and FTR. An eight-hour unreliability estimate is also calculated and trended. The component reliability estimates and the reliability data are trended for the most recent 10-year period while yearly estimates for reliability are provided for the entire study period. The following increasing trends were identified for MDPs for the most recent 10-year period: (1) Standby MDP frequency of start demands (demands per reactor year), (2) Standby MDP frequency of FTR=1H hours (hours per reactor year), (3) Standby MDP frequency of FTR>1H hours, and (4) Normally running MDP frequency of run hours. The following decreasing trends were identified for MDPs for the most recent 10-year period: (1) Standby MDP FTR=1H failure probability, (2) Normally running MDP FTR failure rate, (3) Standby MDP unavailability, (4) Standby MDP total unreliability (8-hour mission), and (5) Normally running MDP total unreliability (8-hour mission).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Enhanced Component Performance Study: Motor Operated Valves 1998–2022

This report presents an enhanced performance evaluation of motor-operated valves (MOVs) at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience failure reports from calendar year 1998 through 2022 as reported in the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS). The MOV failure modes considered are fail to open or close (FTOC), fail to operate or control (FTOP), and spurious operation (SO). The component reliability estimates and the reliability data are trended for the most recent 10-year period while yearly estimates for reliability are provided for the entire study period. The following increasing trend was identified for MOVs for the most recent 10-year period: • Low-demand MOV frequency of FTOC demands (demands per reactor year). The following decreasing trends were identified for MOVs for the most recent 10-year period: • Low-demand MOV FTOC failure probability • Low-demand MOV frequency of FTOC events (failures per reactor year).

99 GENERAL AND MISCELLANEOUS↗

Enhanced Component Performance Study: Turbine Driven Pumps 1998–2022

This report presents an enhanced performance evaluation of turbine driven pumps (TDPs) at U.S. commercial nuclear power plants. The data used in this study are based on the operating experience failure reports from calendar year 1998 through 2022 as reported in the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS). The TDP failure modes considered for standby systems are fail to start (FTS), fail to run (FTR) for one hour of operation (FTR=1H), FTR after one hour of operation (FTR>1H), and for normally running systems FTS and FTR. An eight hour unreliability estimate is also calculated and trended. The component reliability estimates and the reliability data are trended for the most recent 10 year period while yearly estimates for reliability are provided for the entire study period. No increasing trends were identified for TDPs for the most recent 10 year period: The following decreasing trends were identified for TDPs for the most recent 10 year period: • Standby TDP FTR>1H failure rate • Normally running TDP FTR failure rate • Standby TDP unavailability • Standby MDP total unreliability (8-hour mission) • Standby TDP frequency of start demands (demands per reactor year) • Standby TDP frequency of FTR=1H hours (hours per reactor year) • Standby TDP frequency of FTR>1H events (failures per reactor year) • Normally running TDP frequency of start demands • Normally running TDP frequency of run hours • Normally running TDP frequency of FTR events.

99 GENERAL AND MISCELLANEOUS↗