Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “installations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 991 records · Page 55

Scaling Up: Demonstrating Risk Reduction and Cost Compression for Commercial Heat Pump Water Heaters - CRADA 625 (Abstract)

Commercial heat pump water heater (CHPWH) systems significantly decarbonize the commercial and multifamily sectors by eliminating the reliance on gas-fired water heating. CHPWH systems are also well suited to include load shift controls that enable load-up and shed commands for supporting grid reliability and time-of-use pricing structure. However, they have not had wide adoption due to factors including price, complexity, and perceived risk. Although CHPWHs have been available in the US for decades, they have not made significant market gains in part because the systems have required significant and costly engineering design expertise and proved lackluster performance. Successful widespread market adoption requires a different approach; a shift from the current custom specialized expertise project design and installation to a repeatable approach that requires little specialized knowledge or expertise and can deliver persistent performance. Using this type of holistic systems approach requires effectively integrating four CHPWH system key components: primary air-to-water heat pumps; primary thermal storage tanks, a temperature maintenance system, and a control system which has capabilities to manage the primary heat pump cycles, any back-up, supplemental, or temperature maintenance heating, alarms, and grid connectivity allowing for demand response (DR), and/or load shifting. The project team has developed and will implement a suite of tools to support faster, less expensive, and more reliable field installations of CHPWH technology and with the resulting data used to further improve the tool set. These tools include: (1) A tool for optimizing system size and costs. (2) A tool that predicts annual energy use and overall system efficiency. (3) The Advanced Water Heater Specification (AWHS 8.0) defining the components of a full CHPWH system addressing performance requirements by climate zone. (4) The Qualified Products List: (QPL) of approved products that meet the specifications requirements. (5) Training materials including online on-demand modules, instructor-led training, and virtual interactive video tours of CHPWH installations in multifamily buildings. Demonstration site identification in low-income buildings in underserved communities is currently underway. Preliminarily, the team anticipates having three demonstrations in the Pacific Northwest and three in the Northeast for a total of six sites. After the demonstration sites are finalized, and M&V instrumentation installations are complete, the team will gather performance data and confirm whether the CHPWH systems perform as predicted and use the data to improve the existing tools.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

An Operations and Maintenance Roadmap for U.S. Offshore Wind: Enabling a Cost-Effective and Sustainable U.S. Offshore Wind Energy Industry Through Innovative Operations and Maintenance

The United States is currently targeting 30GW of offshore wind to be installed by 2030, and 150GW by 2050. Even considering future turbine sizes, this represents thousands of new turbines installed in a diverse set of environments, each with their unique design, installation, and maintenance challenges. While much can be learned from European and Asian experience with offshore wind over the past two decades, it is important to understand the unique circumstances of the U.S. This document explores operations and maintenance of offshore wind energy, specific to the U.S. and attempts to lay out a roadmap for needed activities to ensure reliability of future installations. The roadmap was informed through dozens of interviews with a wide cross-section of the industry, including representatives from OEMs, owner/operators, service companies, certification agencies, service providers, and researchers. The roadmap first describes the problem by component - blades, drivetrain and nacelle, structures and foundations, and electrical systems - through a look at current practices and opportunities for improvement in the areas of Failure Mode Analysis and Mitigation; Monitoring, Sensing, and Inspection; and Maintenance Execution. Crosscutting areas of Digitalization, Robotics and Automation, Prognostics and Health Management and O&M Optimization, Experimentation and Demonstration, Standardization, and Design Optimization Considering Reliability and O&M are then discussed. Finally, the roadmap summarizes all of these topics with recommendations for short (1-3 years), medium (4-7 years), and long term (8-12 years) activities, with a description of needed public and private sector contributions.

17 WIND ENERGY↗

Kansas City, Missouri, Streetlight Electric Vehicle Charging: Strategies and challenges for site selection of streetlight electric vehicle infrastructure in Kansas City, Missouri (Final Report)

Public streetlight charging, whether on streets in central business districts or residential areas, provides easy charging access for apartment residents and homeowners alike. While most electric vehicle (EV) drivers charge at home, they do so in garages or on driveways they own. For renters and residents of multifamily housing (MFH), however, this may not be an option. EVs have a lower cost of ownership compared to conventional vehicles, and a used EV may be an affordable option for a lower-income household. But without easy access to charging, even a low-cost used EV may not be an option for a prospective buyer. An affordable curbside charging network has the potential to expand EV adoption into neighborhoods that have to date seen minimal interest and uptake of the technology and associated charging infrastructure. Streetlight charging networks can provide an economical, scalable, and effective approach to providing equitable and convenient charging. Metropolitan Energy Center (MEC) is dedicated to the mission of creating resource efficiency, environmental health, and economic vitality in the Kansas City region and beyond. Since 1983, MEC has provided resources, outreach, and training to make alternative fuels and energy efficiency commonplace. MEC led a streetlight charging pilot project that installed limited EV charging infrastructure on the streetlight system in Kansas City, Missouri, to demonstrate and test the benefits of curbside charging for EVs at existing on-street parking locations. The project aimed to cost-effectively expand the charging network in Kansas City to support residential charging and provide infrastructure in one or more charging deserts throughout the city. This pilot evaluates the impact and overall success of streetlight charging based on community feedback, utilization of charging infrastructure, technical feasibility, and cost. The project has pursued a data- and community-driven site selection process designed to identify sites with high demand and high opportunity for EV charging. This project was funded by the U.S. Department of Energy (DOE) and awarded to MEC through a competitive proposal process. The novelty and complexity of this project required an organization that could facilitate collaboration across levels of government, community members, and industry partners. For the past 25 years, through Kansas City Regional Clean Cities, MEC has worked with numerous public and private fleets on a variety of projects to improve the environmental performance and efficiency of the regional vehicle fleet. To advance affordable, efficient, and clean transportation efforts, DOE Clean Cities and Communities coalitions create local networks of public and private sector stakeholders and engage communities. Rooted within their local communities, the coalitions serve as experts and ambassadors, bringing to bear the collective knowledge, experience, and practical know-how of the entire network from within DOE, its national laboratories, and diverse stakeholders in the field. MEC and its project partners made in-kind contributions to leverage federal dollars for the benefit of the Kansas City community. Findings from this project will help determine the best applications for streetlight charging technologies to maximize funding impact and serve community needs. The team evaluated locations based on expected charging demand, technical feasibility, safety considerations, and enhanced charging network siting needs. Throughout the project, the team gathered feedback and evaluated ways to make public charging for EVs available to all community members. The insights will help Kansas City and other communities streamline future efforts to support EV drivers through public charging in the city right-of-way. Furthermore, this project will inform citywide guidance for future installations. MEC is committed to a transparent and publicly accessible approach that encourages the collaborative evaluation of streetlight charging. The project has engaged the community to proactively identify and evaluate the benefits and impacts of streetlight charging. It was a priority for the project to ensure the benefits of this pilot are distributed equitably to all members of the Kansas City community and that new charging opportunities and associated resources are available in diverse neighborhoods across the city. The charging infrastructure supports an affordable curbside charging network that will enable more drivers to choose EVs and provide easy charging access for all community members interested in driving an EV. The community feedback received through this project informed future resources and opportunities to make EVs more accessible to all members of the Kansas City community. MEC worked with several community partners on this project, including Missouri University of Science and Technology (MST), Pennsylvania State University (Penn State), the National Renewable Energy Laboratory (NREL); the city of Kansas City, Missouri; Evergy; Black and McDonald (B&M); LilyPad EV; EVNoire; and Westside Housing Organization (WHO). Project partners contributed to the cost match required for DOE grants through capital expenditures, personnel, and other in-kind contributions. Detailed descriptions of project team organizations can be found in Appendix A. Project Partners. Analysts at NREL and MST/PennState developed site maps based on demand and equity considerations. MEC conducted outreach to community members to garner input on project design and site selection, and received approval from the Missouri Public Service Commission (PSC) for Evergy’s EV charging station ownership. MEC worked with all partners to gather additional siting criteria and developed a site selection evaluation checklist, and partners conducted site visits to proposed installation sites. Next, B&M, Evergy, and the city executed all site agreements, conducted site-specific engineering design, acquired associated permits, and issued notices to proceed site by site or in small batches. Finally, from January to April 2023, the project team installed 23 EV charging stations built on Kansas City’s streetlight system in six council districts. Evergy will own, operate, and monitor the stations for 10 years, sharing charging data with MEC for at least 1 year.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Cost of Wind Energy Review: 2024 Edition [Slides]

The primary elements of this analysis include: Estimated LCOE for (1) a representative land-based wind energy project installed in a moderate wind resource in the United States, (2) a representative fixed-bottom offshore wind energy project installed in the U.S. North Atlantic, and (3) a representative floating offshore wind energy project installed off the U.S. Pacific Coast. It also updates the LCOE estimates for representative residential-, commercial-, and large-scale distributed wind projects installed in a moderate wind resource in the United States. A sensitivity analyses is included that shows the range of effects that basic LCOE variables could have on the cost of wind energy for land-based and offshore wind projects and provides updated Fiscal Year 2024 values for land-based and offshore wind energy used for Government Performance and Results Act (GPRA) reporting and illustrated progress toward established GPRA targets.

17 WIND ENERGY↗

Residential Solar-Adopter Income and Demographic Trends: 2024 Update [Slides]

The report describes income, demographic, and other socio-economic trends among U.S. residential rooftop solar adopters. The report is based on address-level data for roughly 4.1 million residential rooftop solar systems installed through 2023, representing 87% of all U.S. systems. With its unique size, geographic scope, and level of detail, this report is intended to serve as a foundational reference document for policy-makers, industry stakeholders, and researchers. Key findings include the following: -The median income of households that installed solar in 2023 was about $\$$115k/year, compared to a U.S. median of $\$$75k/year for all households and $\$$94k/year for all U.S. owner-occupied households. -Compared to owner-occupied households in the same state, 2023 solar-adopter incomes were 7% higher in the median case, and in 10 states, median solar-adopter incomes were below the corresponding median income for all owner-occupied households. -Roughly 49% of solar adopters in 2023 had incomes below 120% of their area median income (AMI), a threshold sometimes used to define “low-and-moderate income” (or LMI), while 26% were below 80% of AMI, often used to define “low-income”. -Solar adoption continues to shift toward less affluent households over time, with the median present-day income of solar adopters dropping from $\$$141k for households that installed systems in 2010 to $\$$115k in 2023. -PV systems installed in 2023 by households earning less than $\$$50k had a median size of 6.4 kW, 33% were third-party owned, and 6% included battery storage, compared to corresponding values of 8.0 kW, 18%, and 14% for households earning more than $\$$200k. -Compared to all households in their respective state, solar adopters in 2023 were slightly more likely to be college educated and to live in rural areas; had higher home values; and were more likely to live outside a disadvantaged community (DAC), be middle-aged, identify as non-Hispanic white, work in a business or financial occupation, and own a single-family home. In conjunction with the report, Berkeley Lab has published an updated accompanying set of online data visualizations that allow users to further explore the underlying data. Berkeley Lab is also offering related analytical support to states, local agencies, and other organizations on issues related to solar adoption among low-to-moderate income households; requests for analytical support may be submitted through this online form.

14 SOLAR ENERGY↗

Floating photovoltaic power plants: A review of energy yield, reliability, and operation and maintenance

Photovoltaic (PV) systems are essential for the transition to sustainable energy, reducing fossil fuel dependence and mitigating climate change. Although PV requires minimal land area — PV can meet the European Union's energy needs using only 0.26% of its land — space for deployment is often scarce in densely populated regions. Floating photovoltaics (FPV) offer an effective solution to land-use challenges by installing PV systems on floating structures in water bodies. FPV is a growing niche within PV with a cumulative installed capacity reaching 7.7 GW globally by 2023. Almost 90% of the installed FPV capacity is in Asia, with close to 50% of in China alone, while the Netherlands and France are the largest markets outside Asia. FPV shows strong potential to support climate targets, but still faces challenges like regulatory barriers, cost competitiveness compared to ground-based PV (GPV), and uncertainties about environmental impacts and system reliability. FPV systems are currently installed mainly on sheltered inland waters, such as quarry lakes, irrigation ponds and reservoirs. FPV technical standards are still being developed. Guidelines have been published by the World Bank, DNV, and Solar Power Europe, and emerging national standards from South Korea, China, and Singapore address design, components, and safety. The International Electrotechnical Commission (IEC) is working on formal standards for floats, mooring systems, and electrical connectors. However, the published best practices lack quantitative guidance for yield modelling and reliability, which this report aims to address. It provides data-driven insights, models, and parameters essential for accurate energy yield, reliability, and maintenance predictions over FPV systems' lifetimes.

14 SOLAR ENERGY↗

Lessons from commissioning of the cryogenic system for the Short-Baseline Neutrino Detector at Fermilab

Results from commissioning and first year of operations of the cryogenic system of the Short-Baseline Neutrino Detector (SBND) and its membrane cryostat installed at the Fermi National Accelerator Laboratory are described. The SBND detector is installed in a 200 m3 membrane cryostat filled with liquid argon, which serves both as target and as active media. For the correct operation of the detector, the liquid argon must be kept in very stable thermal conditions while the contamination of electronegative impurities must be consistently kept at the level of small fractions of parts per billion. The detector is operated in Booster Neutrino Beams (BNB) at Fermilab for the search of sterile neutrinos and measurements of neutrino-argon cross sections. The cryostat and the cryogenic systems also serve as prototypes for the much larger equipment to be used for the LBNF/DUNE experiment. Since its installation in 2018-2023 and cooldown in spring of 2024, the cryostat and the cryogenic system have been commissioned to support the detector operations. The lessons learned through installation, testing, commissioning, cooldown, and initial operations are described.

Geynisman, Michael [Fermilab]↗

Federal Workplace Charging Program Guide

The 2015 Fixing America's Surface Transportation (FAST) Act authorizes the installation, operation, and maintenance of electric vehicle supply equipment (EVSE) for the purpose of recharging employees' privately owned vehicles (POVs) under the custody or control of the General Services Administration (GSA) or a Federal agency. It requires the collection of fees to recover the costs of installing, operating, and maintaining this equipment and imposes reporting requirements. This program guide reviews those requirements, excerpts the relevant language in Appendix A, and describes when and how fees may be required to cover costs of electricity, network costs, EVSE units, and installations in various scenarios. This program guide is designed to support Federal agencies developing and refining workplace charging programs for employee POVs. While it provides guidance and best practices, it does not replace agencywide policies or agency-specific legal counsel. It contains a roadmap for agency workplace charging programs and defines roles and responsibilities. This guide explains how to determine the number of POVs likely to charge at a given site and contains a sample employee survey in Appendix B. It reviews EVSE planning, including unit selection and acquisition, charger location(s), accounting for available power capacity, using existing infrastructure, and funding an incentive program. It also discusses the costs associated with EVSE acquisition, installation, and network management. These costs inform the subsequently provided information, which describes how to amortize costs to determine appropriate fees for each charging session. The final two sections of this guide address aspects of ongoing program management that the facility coordinator should consider and the reporting requirements associated with the FAST Act. The insights in this guide are applicable to all agency-owned and GSA-leased buildings or facilities offering the use of EVSE or a 120-volt receptacle for the purpose of recharging an employee's POV. However, the FAST Act requirements typically do not apply to any building or facility operated and maintained by a third-party vendor offering the use of EVSE as part of a commercial building lease unless the agency is managing the station and/or energy on behalf of the building and collecting POV fees.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Project FELICIA - A probe to survey the RHIC magnet beampipe diameter for EIC beam screen insertion

The Electron Ion Collider (EIC) Hadron Storage Ring (HSR) will reuse many of the existing superconducting (SC) magnets of the RHIC storage rings. To comply with the beamline vacuum requirements in more demanding operational scenarios, the beampipe of the RHIC SC magnets will be equipped with low surface impedance, low secondary electron yield (SEY) beam screens. The installation of these beam screens will be done with the SC magnets as installed today, thus making it a critical operation for a timely EIC installation. The beam screen inner dimensions must be maximized to retain enough aperture to the beam. On the other hand, keeping enough clearance between the screen and the beampipe is critical to ensure a smooth beam screen installation. A survey probe was designed and built to measure the inner diameter of several RHIC SC magnets in-situ and provide critical data for the beam screen design optimization. This paper reports on the design of the probe and the results from the survey campaign.

43 PARTICLE ACCELERATORS↗

Automated Air Sealing Demonstration: Denver Federal Center Building 40

This project aimed to demonstrate building airtightness achieved by automated air sealing in a commercial building setting. The automated air sealing demonstrated in this project uses a modified blower door to pressurize and distribute the sealing aerosol to achieve the required building airtightness. To demonstrate this technology, Building 40 at the Denver Federal Center, a federally owned campus under the jurisdiction, custody and control of the U.S. General Services Administration (GSA), was selected for testing (Figure 2). This building is currently undergoing several retrofit projects, including increasing insulation, installing high-performance windows, and adding advanced equipment, control systems, and automated air sealing. This demonstration project involved installing automated air sealing and measuring the improvements in the building's airtightness. The automated air sealing was installed over two days by AeroBarrier, the vendor. An external blower door test contractor measured the airtightness of the demonstration space before and after air sealing. The new airtightness value and the percentage increase in airtightness were used to evaluate the energy savings potential of automated air sealing. These airtightness values were used to compute the energy savings and CO 2 emissions reduction for different climate zones, building types, and initial airtightness conditions. In addition, the heating, ventilation and air conditioning (HVAC) load reduction attributable to the reduced building air leakage was studied. This study included research to determine the cost and time reduction of automated air sealing. Finally, the automated air sealing performance was evaluated qualitatively using a focus group discussion that included GSA and Bristol, the general contractor. The installation has shown the demonstration site, with a floor size of 4,462 ft 2 , air leakage has reduced by more than 50% in less than 7 hours, including preparation, site sealing, and cleanup. The performance objectives were classified as quantitative or qualitative based on the evaluation metrics used to assess the project’s success. The key performance objectives for this project were the level of airtightness achieved, the time and cost required to perform the sealing, and the HVAC load reduction attributable to air sealing. Table 1 shows the quantitative performance objectives.

42 ENGINEERING↗

EVI-LOCATE User Manual

One of the longest stages in the deployment of electric vehicle supply equipment (EVSE) is the initial planning of the infrastructure itself. Engineers and fleet experts from the National Renewable Energy Laboratory (NREL) have supported dozens of charging infrastructure site plans over the past couple decades, including the generation of site schematics, determinations of electric capacity, and estimates for likely costs. As the market for electric vehicles (EVs) has matured, this approach should no longer require a time and personnel intensive process. In order to shorten the time taken to develop site plans and cost estimates, NREL developed a tool that fleet managers, facility managers, electricians, EVSE installers, and members of the public can use to develop initial schematics and ballpark pricing for charging station installations. The Electric Vehicle Infrastructure - Locally Optimized Charger Assessment Tool and Estimator (EVI-LOCATE) provides a structured and consistent way for users to enter information about their planned EVSE project in a relatively simple web-based format. EVI-LOCATE then calculates electrical equipment capacity, wiring runs, and project costs. It produces a site diagram optimized around surface characteristics with differential trenching costs for softscape such as grass compared to hardscape such as asphalt that can be adjusted by users in the tool. It also stores the resulting site plans and costs in a dashboard for access at a later date, including plan revisions if necessary. This document guides users through the EVI-LOCATE screens and associated questions. It contains tip text boxes throughout on how best to interface with the tool and find additional information or context. The appendices contain the assumptions and calculations underpinning the tool. Much of the information for EVI-LOCATE was gathered through industry engagements with EVSE installers, invoices from completed EVSE installations, Gordian's RS Means construction data, and the General Services Administration blanket purchase agreement for EVSE. For a visual tutorial of the tool, users can watch EVI-LOCATE Step-by-Step Video. The tool itself is available at https://evi-locate.nrel.gov.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Why Tunable? A Look at Schools Using Tunable Lighting

Between 2016-2019, Pacific Northwest National Laboratory (PNNL), documented two early pilot installations of tunable lighting in schools, supported by U.S. Department of Energy (DOE) Solid-State Lighting (SSL) program. These pilot installations were opportunities for the schools to become more familiar with the technology, save energy, and support teachers and students. Tunable lighting continues to be of interest, particularly in classrooms for students with disabilities. This case study looks at tunable lighting systems installed in classrooms at eight school districts across the U.S. since 2015, the earliest known installation.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Impacts of non-residential solar on residential adoption decisions

Household decisions to adopt rooftop solar photovoltaics are partly driven by social influence. Previous research on solar adoption influence has focused on influence among residential peers. Here, we expand the framework of solar adoption influence by exploring the influence of non-residential installations on residential adoption decisions. We use staggered differences-in-differences to estimate non-residential influence effects using a large data sample of residential adoptions. We also critically evaluate prevailing frameworks for solar adoption influence. We find that non-residential installations are associated with accelerated residential adoption rates, on the order of 0.4 additional residential adoptions per quarter per non-residential installation. We show that non-residential systems exert a continuous, long-term influence on residential adoption decisions. We explore separate results and influence mechanisms for solar installed on commercial buildings, government buildings, and houses of worship. The results suggest that non-residential solar adopters could serve as partners in policies to “seed” residential adoption in underserved communities.

14 SOLAR ENERGY↗

Climate Change Mitigation Potential of Wind Energy

Global wind resources greatly exceed current electricity demand and the levelized cost of energy from wind turbines has shown precipitous declines. Accordingly, the installed capacity of wind turbines grew at an annualized rate of about 14% during the last two decades and wind turbines now provide ~6–7% of the global electricity supply. This renewable electricity generation source is thus already playing a role in reducing greenhouse gas emissions from the energy sector. Here we document trends within the industry, examine projections of future installed capacity increases and compute the associated climate change mitigation potential at the global and regional levels. Key countries (the USA, UK and China) and regions (e.g., EU27) have developed ambitious plans to expand wind energy penetration as core aspects of their net-zero emissions strategies. The projected climate change mitigation from wind energy by 2100 ranges from 0.3–0.8 °C depending on the precise socio-economic pathway and wind energy expansion scenario followed. The rapid expansion of annual increments to wind energy installed capacity by approximately two times current rates can greatly delay the passing of the 2 °C warming threshold relative to pre-industrial levels. To achieve the required expansion of this cost-effective, low-carbon energy source, there is a need for electrification of the energy system and for expansion of manufacturing and installation capacity.

17 WIND ENERGY↗

A Comparison Between Industrial Energy Efficiency Measures in Guatemala and the United States

Energy auditing has been cited as a key tool in closing the gap between the actual energy consumption in industrial facilities and what should be at an environmentally sustainable level. Several factors affect the likelihood that energy audits will be effective in closing that gap, and more analysis is needed to understand these factors, especially for developing nations. This study compares three energy efficiency measures (EEMs) frequently recommended in both the United States and Guatemala, namely, installing solar panels to generate electricity, installing higher-efficiency lighting, and upgrading to premium efficiency motors. The implementation of each of these EEMs contributes to more sustainable energy consumption, and each of these EEM’s payback periods is affected by capital costs, energy costs, and other local factors analyzed in this study. Projected payback periods for each EEM based on Guatemalan and U.S. capital cost and energy cost ranges are assessed via EEM-specific payback period calculations and compared to the energy audit data from each country. While lower capital costs incentivize EEM implementation and reduce payback periods, there is an interplay between energy cost and capital cost that impacts the trends in the U.S. and Guatemala. As in the case of the solar panel installation EEM, though Guatemalan companies pay ~110% more for electricity than U.S. companies, when Guatemalan capital costs are lower, payback periods are lower than in the U.S. Conversely, in cases where Guatemalan capital costs are higher—as for higher-efficiency lighting and motor installation—Guatemalan payback periods are roughly the same as those in the U.S. because of the higher Guatemalan energy costs.

Khosla, Radhika↗

Force-triggered, Bio-based, Sealants for Prefabricated Building Components: Towards Improved Efficiency, Performance and Sustainability

The prefabricated building construction industry has made extensive progress in expediting the manufacture of prefabricated components at offsite plants. However, this progress has not translated to the assembly of the prefabricated components at the construction site. Case in point, sealing the joints between components to prevent air leaks requires the manual application of tape, caulk, or spray foam at the jobsite, and performance is highly dependent on the skills of the installer. To reduce assembly time and improve the airtightness and waterproofness of prefabricated components, we developed a sealant that can be installed at the plant and have its curing reaction triggered at the jobsite. Additionally, we used this opportunity to explore the use of bio-based feedstocks that are abundant and not used for food. We evaluated a series of force-triggered, bio-based, high strength, and fast curing sealants, consisting of a one-part heterogeneous system. These sealants are derived from formulations with ≥80% of bio-based components, consisting of a cardanol derived diepoxy that is microencapsulated in a polymer shell and embedded in a cardanol derived amine curing agent. The microcapsule shell allows separation of the reactive species in the one-part sealant allowing a fast-curing system to remain unreacted until the right trigger is applied. When the microcapsules are activated and broken by force, the highly reactive species mix and cure, exhibiting peel strengths up to 143 ppi. The open-air shelf stability of the sealant complexes was demonstrated by peel strength values of ~16 ppi when triggering the curing reaction even after being exposed for 8 months to open air and humidity. The successful on-demand triggering of curing reactions and the shelf stability provide efficacy of these force-triggered sealants for installation on prefabricated components, storage for months prior to delivery, and assembly at the jobsite. These force-triggered bio-based sealants for prefabricated buildings could result in lower installation time and cost as well as better performance than tapes and caulks at the jobsite.

Cortes Guzman, Karen [ORNL] (ORCID:000000028793468↗

Innovating the next generation of commercial smart building software

Nearly 30% of commercial building energy use is wasted due to equipment faults and HVAC controls problems. The result is increased emissions, compromised comfort and productivity, and less reliable coordination of building power needs with a clean grid. The energy impact alone represents $17 billion in potential savings. Today’s smart building software provides a robust solution to address these operational deficiencies. Energy management and information systems (EMIS) are saving up to 9% on average, with two-year paybacks. They are being incorporated into energy management processes, commissioning services, and utility programs. As effective as they are, two barriers prevent even deeper benefits; limited personnel to fix problems once they are identified, and the expense and time to manually implement changes in control systems. In partnership with the research community, the EMIS industry is developing new capabilities to overcome these barriers. Moving beyond siloed products for either fault detection and diagnostics, or optimal control, these new capabilities empower users to not only automatically identify faults, but also to push corrective action, and control improvements to their buildings. In this paper, several areas for enhancements are documented: ‘one-time’ correction of faults such as setpoints, schedules, and economizer lockouts; short-term active testing for automated proportional integral derivative (PID) loop tuning and functional testing; and continuous supervisory control for demand flexibility and year-round efficiency. Results are presented from a pair of partner implementations out of a dozen providers integrating these enhancements into their products, including field tests from across the country, and insights into operator acceptance and integration into operations and maintenance practices.

Casillas, Armando↗

Summary of External-Store Drag

The drag problems associated with the addition of external stores to airplanes are reviewed. Current analytic techniques for estimating drag penalties associated with the addition of stores in both subsonic and supersonic flight are discussed. In subsonic flight, the drag penalty caused by the addition of external stores is shown to be a function of the type of store installation. In supersonic flight, the drag is shown to be a function of the type of store installation and also of the location of the store installation with respect to the rest of the airplane components. Special store arrangements and attention to the design of the store itself can reduce the drag penalty of the store installation.

Shrout, B. L.↗