Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “white paper”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 955 records · Page 53

LDSD POST2 Simulation and SFDT-1 Pre-Flight Launch Operations Analyses

The Low-Density Supersonic Decelerator (LDSD) Project's first Supersonic Flight Dynamics Test (SFDT-1) occurred June 28, 2014. Program to Optimize Simulated Trajectories II (POST2) was utilized to develop trajectory simulations characterizing all SFDT-1 flight phases from drop to splashdown. These POST2 simulations were used to validate the targeting parameters developed for SFDT- 1, predict performance and understand the sensitivity of the vehicle and nominal mission designs, and to support flight test operations with trajectory performance and splashdown location predictions for vehicle recovery. This paper provides an overview of the POST2 simulations developed for LDSD and presents the POST2 simulation flight dynamics support during the SFDT-1 launch, operations, and recovery.

Bowes, Angela L.↗

GeoRePORT Case Study Examples: Reporting Using the Geothermal Resource Portfolio Optimization and Reporting Technique (GeoRePORT)

The Geothermal Research Portfolio Optimization & Reporting Technique (GeoRePORT) was developed with funding from the United States Department of Energy's Geothermal Technologies Office (GTO) to assist in identifying and pursuing long-term investment strategies through the development of a resource reporting protocol. GeoRePORT provides scientists and non-scientists a comprehensive and quantitative means of reporting: (1) features intrinsic to geothermal sites (project grade) and, (2) maturity of the development (project readiness). Because geothermal feasibility is not determined by any single factor (e.g. temperature, permeability, permitting), a site's project grade and readiness are evaluated on twelve independent attributes pertaining to geological, technical, or socio-economic feasibility. In this paper, we present case studies illustrating how GeoRePORT can be used to compare geological, technical, and socio-economic attributes between geothermal systems. The consistent and objective assessment protocols used in GeoRePORT allow for comparison of project attributes across unique locations and geological settings. GeoRePORT case studies outline the geological, socio-economic and technical features of four individual geothermal sites: Coso, Chena, Dixie Valley, and White Sands Missile Range. The case studies presented herein illustrate the usefulness of GeoRePORT in evaluating project risk/return, identifying gaps in reported data, evaluating R&D impact, and gathering insights on successes/failures as applicable to future projects.

40 EE - Geothermal Technologies Office (EE-4G)↗

Real time heat load calculation software based on EPICS for Fermilab PIP-II CM tests

Fermilab has a project to improve the proton beam energy which is called PIP-II (the 2nd Proton Improvement Plan). There is a superconducting linear accelerator, LINAC, to improve the proton beam power and the LINAC consists of 5 types of cryomodules (CM), 1 HWR CM, 2 SSR1 CM, 4 SSR2 CM, LB650 CM, and HB650 CM. The prototypes of these cryomodules are being tested at Fermilab’s CryoModule Test Facility (CMTF). Heat load measurements are an important part of the prototype CM testing. The CMTF cryogenic control system was developed based on the ACNET (Accelerator Control NETwork) for CM testing for other projects, but the PIP-II cryogenic control system will be implemented using the Experimental Physics and Industrial Control System (EPICS). As part of the prototype CM testing campaign an EPICS based control system has been implemented at CMTF. This EPICS cryogenic control system includes real time heat load calculation software utilizing the Fortran implementation of Hepak. This paper details the real time heat load calculation software developed for the prototype CM testing including the first results from the HB 650 CM.

Yoon, S. [Fermilab]↗

Examining Periodic Solar-Wind Density Structures Observed in the SECCHI Heliospheric Imagers

We present an analysis of small-scale, periodic, solar-wind density enhancements (length scales as small as approximately equals 1000 Mm) observed in images from the Heliospheric Imager (HI) aboard STEREO-A. We discuss their possible relationship to periodic fluctuations of the proton density that have been identified at 1 AU using in-situ plasma measurements. Specifically, Viall, Kepko, and Spence examined 11 years of in-situ solar-wind density measurements at 1 AU and demonstrated that not only turbulent structures, but also nonturbulent, periodic density structures exist in the solar wind with scale sizes of hundreds to one thousand Mm. In a subsequent paper, Viall, Spence, and Kasper analyzed the alpha-to-proton solar-wind abundance ratio measured during one such event of periodic density structures, demonstrating that the plasma behavior was highly suggestive that either temporally or spatially varying coronal source plasma created those density structures. Large periodic density structures observed at 1 AU, which were generated in the corona, can be observable in coronal and heliospheric white-light images if they possess sufficiently high density contrast. Indeed, we identify such periodic density structures as they enter the HI field of view and follow them as they advect with the solar wind through the images. The smaller, periodic density structures that we identify in the images are comparable in size to the larger structures analyzed in-situ at 1 AU, yielding further evidence that periodic density enhancements are a consequence of coronal activity as the solar wind is formed.

Viall, Nicholeen M.↗

Adaptive-Sweep Algorithm for Spacecraft Carrier Acquisition and Tracking: System Analysis and Implementation

This paper presents an adaptive-sweep algorithm that can be used in conjunction with a Phased-Lock Loop to acquire and track the carrier of a Binary Phase-shift Keying signal with residual carrier. This algorithm is useful in proximity links where no Doppler pre-compensation is available at the transmitter, and allows the receiver to acquire the incoming carrier even if the experienced Doppler shift is several orders of magnitude larger than the PLL bandwidth. Other applications for this algorithm include Multiple Uplink per Antenna at the Deep Space Network, and generation of observables (Doppler shift, Doppler rate, range rate) for in-situ navigation purposes. This paper enhances a previously presented adaptive-sweep algorithm and its performance analysis in two fronts. First, the algorithm now uses the direction function to automatically estimate the required frequency jump to achieve PLL lock. This enables a fully adaptive-sweep scheme in which system implementer does not need to manually select thresholds. On the other hand, we study the system performance in the presence of Additive White Gaussian Noise and derive necessary conditions for the system to operate at low signal-to-noise conditions. This allows us to create design rules that specify all parameters of the algorithm given a set of system-level requirements. To test the performance of the proposed algorithm, we implement it in GNU Radio, an open-source Software-Defined Radio that interfaces with several commercial radio peripherals. We use this implementation to demonstrate carrier lock and quantify system performance under different noise conditions. We also test the algorithm using open-loop recordings of two downlinks between the Lunar Reconnaissance Orbiter and the Deep Space Network. We show that even after large frequency jumps (tens of kHz), the proposed system is able to rapidly reacquire the carrier and continue operation.

Divsalar, Dariush↗

WSTF Propulsion and Pyrotechnics Corrective Action Test Program Status-2000

Extensive propulsion and pyrotechnic testing has been in progress at the NASA Johnson Space Center White Sands Test Facility (WSTF) since 1995. This started with the Mars Observer Propulsion and Pyrotechnics Corrective Action Test Program (MOCATP). The MOCATP has concluded, but extensive pyrovalve testing and research and development has continued at WSTF. The capability to accurately analyze and measure pyrovalve combustion product blow-by, evaluate propellant explosions initiated by blow-by, and characterize pyrovalve operation continues to be used and improved. This paper contains an overview of testing since MOCATP inception, but focuses on accomplishments since the status was last reported at the 35th Joint Propulsion Conference, June, 1999. This new activity includes evaluation of 3/8 inch Conax pyrovalves; development and testing of advanced pyrovalve technologies; investigation of nondestructive evaluation techniques to inspect pyrotechnically induced hydrazine explosions both through testing and modeling. Data from this collection of projects are now being formatted into a pyrovalve applications and testing handbook and consensus standard to benefit pyrovalve users and spacecraft designers. The handbook is briefly described here and in more detail in a separate paper. To increase project benefit, pyrovalve manufacturers are encouraged to provide additional valves for testing and consideration, and feedback is encouraged in all aspects of the pyrotechnic projects.

Saulsberry, R.↗

Demonstration of background rejection using deep convolutional neural networks in the NEXT experiment

Convolutional neural networks (CNNs) are widely used state-of-the-art computer vision tools that are becoming increasingly popular in high-energy physics. In this paper, we attempt to understand the potential of CNNs for event classification in the NEXT experiment, which will search for neutrinoless double-beta decay in $^{136}$Xe. To do so, we demonstrate the usage of CNNs for the identification of electron-positron pair production events, which exhibit a topology similar to that of a neutrinoless double-beta decay event. These events were produced in the NEXT-White high-pressure xenon TPC using 2.6 MeV gamma rays from a $^{228}$Th calibration source. We train a network on Monte Carlo-simulated events and show that, by applying on-the-fly data augmentation, the network can be made robust against differences between simulation and data. The use of CNNs offers significant improvement in signal efficiency and background rejection when compared to previous non-CNN-based analyses.[graphic not available: see fulltext]

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Real time heat load calculation software based on EPICS for Fermilab PIP-II CM tests

Fermilab has a project to improve the proton beam energy which is called PIP-II (the 2nd Proton Improvement Plan). There is a superconducting linear accelerator, LINAC, to improve the proton beam power and the LINAC consists of 5 types of cryomodules (CM), 1 HWR CM, 2 SSR1 CM, 4 SSR2 CM, LB650 CM, and HB650 CM. The prototypes of these cryomodules are being tested at Fermilab’s CryoModule Test Facility (CMTF). Heat load measurements are an important part of the prototype CM testing. The CMTF cryogenic control system was developed based on the ACNET (Accelerator Control NETwork) for CM testing for other projects, but the PIP-II cryogenic control system will be implemented using the Experimental Physics and Industrial Control System (EPICS). As part of the prototype CM testing campaign, an EPICS based control system has been implemented at CMTF. This EPICS cryogenic control system includes real-time heat load calculation software utilizing the Fortran implementation of Hepak. This paper details the real time heat load calculation software developed for the prototype CM testing including the first results from the HB650 CM.

Yoon, S. [Fermilab]↗

Minimal time change detection algorithm for reconfigurable control system and application to aerospace

System parameters should be tracked on-line to build a reconfigurable control system even though there exists an abrupt change. For this purpose, a new performance index that we are studying is the speed of adaptation- how quickly does the system determine that a change has occurred? In this paper, a new, robust algorithm that is optimized to minimize the time delay in detecting a change for fixed false alarm probability is proposed. Simulation results for the aircraft lateral motion with a known or unknown change in control gain matrices, in the presence of doublet input, indicate that the algorithm works fairly well. One of its distinguishing properties is that detection delay of this algorithm is superior to that of Whiteness Test.

Kim, Sungwan↗

National Aeronautics and Space Administration's (NASA) Third-Generation Tracking and Data Relay Satellites (TDRS)

NASA has contracted with Boeing to provide two third-generation Tracking and Data Relay Satellites (TDRS) designated TDRS K and L, with an option to provide two additional satellites designated TDRS M and N. These TDRS will be used to continue and enhance the user support services of the existing first- and second-generation TDRS spacecraft. The existing TDRS, in conjunction with the TDRS Ground Terminals at the White Sands NM Complex (WSC) and Guam, constitute the Tracking and Data Relay Satellite System (TDRSS). The TDRSS, with other supporting elements, is referred to as the Space Network (SN). The launch of the TDRS K is projected for 2012 with TDRS L planned to follow in 2013. The contract also provides for the modifications to the TDRS Ground Terminals at the WSC required for operation of the new TDRS. This paper provides an overview of the customer services provided by the existing and new TDRS. In addition, planned future customer services such as Bandwidth Efficient Modulation (BEM) and new coding schemes are briefly discussed.

Berndt, Allen K.↗

NICS (NASA Instrument Capabilities Study) Instrument Schedule and Cost Study

This paper summarizes work performed on the Flight Projects Directorate Planetary Science Projects Division (PSPD, Code 430) NICS (NASA Instrument Capabilities study) instrument schedule and cost study. Included are a short summary of the original NICS (NASA, 2008), and the design and approach, data collection, analysis, preliminary findings and recommendations from select areas of the current study. The NICS (2008) was chartered by then NASA Chief Engineer Michael Ryschkewitsch and chaired by Goddard Space Flight Center (GSFC) engineer, John Leon. The focus was to identify problem areas in instrument development and, if possible, to offer solutions. In the area of instrument developments, the NICS (2008) identified a lack of resources and authority to successfully manage to instrument cost and schedule requirements; and a lack of critical skills, expertise, and leadership to successfully implement unique (one-of-a-kind) high technology developments (NASA, 2008, pp. 51, 52). Additionally, the NICS (2008) found problems in requirements formulation, reviews and management; unrealistic caps and overly optimistic estimates; and externally directed changes which increased the likelihood of overrunning cost and schedule (NASA, 2008, pp.53, 54). It is noteworthy that NICS findings are consistent with previous studies at the mission level (Robbins, Schmidt & White, 2020). Five years later in 2013, the Instrument Projects Division (IPD) was established to implement and manage instrument projects greater than $20M. The IPD was known as Code 490. Its structure incorporated several of the NICS (2008) recommendations. To see if these incorporated recommendations made a difference, and to identify other potential challenges in instrument developments, two parallel studies were initiated. Originally led by the IPD, now led by the PSPD, and the Instrument and Payload Systems Engineering Branch (IPSE, Code 592), respectively, the instrument schedule and cost study and the instrument technical complexity study began in 2017. Data collection was initiated in 2020 and is on-going. This paper is limited to the IPD/PSPD study. Among other findings, preliminary data indicate IPD/PSPD project management support positively influenced instrument development as related to providing a dedicated level of support staff, including a deputy Instrument Project Manager (dIPM), reducing IPM leadership changes, and providing other project support. Next steps include continued data collection and analysis, and mapping to technical complexity data.

NICS implementation↗

Thermal Vacuum/Balance Test Results of Swift BAT with Loop Heat Pipe Thermal System

The Swift Burst Alert Telescope (BAT) Detector Array is thermally well coupled to eight constant conductance heat pipes (CCHPs) embedded in the Detector Array Plate PAP), and two loop heat pipes (LHPs) transport heat from the CCHPs to a radiator. The CCHPs have ammonia as the working fluid and the LHPs have propylene as the working fluid. Precision heater controllers, which have adjustable set points in flight, are used to control the LHP compensation chamber and Detector Array xA1 ASIC temperatures. The radiator has AZ-Tek's AZW-LA-II low solar absorptance white paint as the thermal coating, and is located on the anti-sun side of the spacecraft. A thermal balance (T/B) test on the BAT was successfully completed. It validated that the thermal design satisfies the temperature requirements of the BAT in the flight thermal environments. Instrument level and observatory level thermal vacuum (TN) cycling tests of the BAT Detector Array by using the LHP thermal system were successfully completed. This paper presents the results of the T/B test and T N cycling tests.

Choi, Michael K.↗

Impact of junction temperature on microelectronic device reliability and considerations for space applications

This paper provides a summary of an industry survey on junction temperature derating from key microelectronics suppliers, and offers recommendations to users for temperature derating for reliable operation over time. Background information on established derating factors, and reccommendations for safe operating junction temperatures for newer technologies are also presented.

device reliability↗

Post-flight Analysis of Mars Science Laboratory Entry Aerothermal Environment and Thermal Protection System Response

The Mars Science Laboratory successfully landed on the Martian surface on August 5th, 2012. The rover was protected from the extreme heating environments of atmospheric entry by an ablative heatshield. This Phenolic Impregnated Carbon Ablator heatshield was instrumented with a suite of embedded thermocouples, isotherm sensors, and pressure transducers. The sensors monitored the in-depth ablator response, as well as the surface pressure at discrete locations throughout the hypersonic deceleration. This paper presents a comparison of the flight data with post-entry estimates. An assessment of the aerothermal environments, as well as the in-depth response of the heatshield material is made, and conclusions regarding the overall performance of the ablator at the suite locations are presented.

mars science laboratory↗

Radiative Heating for MSL Entry: Verification of Simulations from Ground Test to Flight Data

The heat shield of the Mars Science Laboratory (MSL) was equipped with thermocouplestacks to measure in-depth heating of the thermal protection system during atmosphericentry. The heat load derived from the thermocouples in the stagnation region was found tobe 33 lower than corresponding post-flight predictions of convective heating alone. It washypothesized that this difference could be attributed to radiation from the shock-heated gas,a mechanism not considered in post-flight analyses of flow fields. In order to test thehypothesis and quantify the contribution of shock-layer radiation to total surface heating,ground tests and simulations (both flow and radiation) were performed at several pointsalong the best-estimated entry trajectory of MSL. The present paper provides anassessment of the quality of the radiation model and its impact to stagnation point heating.Although the impact of radiative heating is shown to be significant, it only accounts for 43of the discrepancy. Additional factors behind the remaining discrepancy are discussed.

Aeroheating↗

Design Evolution and Verification of the A-3 Chemical Steam Generator

Following is an overview of the Chemical Steam Generator system selected to provide vacuum conditions for a new altitude test facility, the A-3 Test Stand at Stennis Space Center (SSC) in Bay St. Louis, MS. A-3 will serve as NASA s primary facility for altitude testing of the J-2X rocket engine, to be used as the primary propulsion device for the upper stages of the Ares launch vehicles. The Chemical Steam Generators (CSGs) will produce vacuum conditions in the test cell through the production and subsequent supersonic ejection of steam into a diffuser downstream of the J-2X engine nozzle exit. The Chemical Steam Generators chosen have a rich heritage of operation at rocket engine altitude test facilities since the days of the Apollo program and are still in use at NASA White Sands Test Facility (WSTF) in New Mexico. The generators at WSTF have been modified to a degree, but are still very close to the heritage design. The intent for the A-3 implementation is to maintain this heritage design as much as possible, making minimal updates only where necessary to substitute for obsolete parts and to increase reliability. Reliability improvements are especially desired because the proposed system will require 27 generators, which is nine times the largest system installed in the 1960s. Improvements were suggested by the original design firm, Reaction Motors, by NASA SSC and NASA WSTF engineers, and by the A-3 test stand design contractor, Jacobs Technology, Inc. (JTI). This paper describes the range of improvements made to the design to date, starting with the heritage generator and the minor modifications made over time at WSTF, to the modernized configuration which will be used at A-3. The paper will discuss NASA s investment in modifications to SSC s E-2 test facility fire a full-scale Chemical Steam Generator in advance of the larger steam system installation at A-3. Risk mitigation testing will be performed in early 2009 at this test facility to verify that the CSGs operate as expected. The generator which will undergo this testing is of the most recent A-3 configuration, and will be instrumented far in excess of what is normally required for operation. The extra data will allow for easier troubleshooting and more complete knowledge of expected generator performance. In addition, the early testing will give SSC personnel experience in operating the CSG systems, which will expedite the process of installation and activation at A-3. Each Chemical Steam Generator is supported by a complement of valves, instruments, and flow control devices, with the entire assembly called a "module." The generators will be installed in groups of three, historically called "units". A module is so called because of its modular ability to be replaced or serviced without disturbing the other two modules installed on the same unit. A module is pictured in Figure 1, shown with its generator secured by white bands in its shipping (vs. installed) configuration. The heritage system at WSTF is composed of a single unit (three generator modules), pictured in Figure 2 as it was installed in 1965. In contrast, A-3 will have nine units operating in parallel to achieve vacuum conditions appropriate for testing the J-2X engine. Each of the combustors operates in two modes and achieves the so-called "full-steam" mode after all three of its stages ignite. Ignition of the first stage is achieved by exciting a spark plug; the second stage and main stage are lit by the flame front of the previous stage. The main stage burns approximately 97% of the total propellant flow and uses the heat energy to vaporize water into superheated steam. While the main stage remains unlit, the combustor is in so-called "idle" mode. In the WSTF system, this idle mode is not optimized for water usage, and does not need to be, as the water is pumped from a large reservoir. The water supply at A-3 will be contained in tanks with finite volume, so water optimization is preferred for the modnized configuration. Multiple solutions for this issue have been proposed, with the leading concept being a change to the operational definition of "idle mode," with the generator running in a lower heat flux condition.

Kirchner, Casey K.↗