Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “simultaneous operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 955 records · Page 53

Paired Hydro-Battery Hybrid System Operations Using MIQP Based Multi-Objective Optimization

Hybridizing a hydropower plant with a battery energy storage system is often a very expensive decision. So to make the case for feasibility of hybridization the cost benefit analysis must be comprehensive. Most literature found on this subject only uses one out of many different available value streams to carry out a feasibility analysis. To that end, in this study we propose a multi-objective optimization formulation and a mixed-integer quadratic programming optimization engine that considers multiple different value streams and optimizes hydro-battery hybrid system paired operations to maximize revenue generated from energy arbitrage while simultaneously minimizing the total hydro turbine mileage thus reducing turbine starts and stops and improving turbines life all while following all environmental constraints and not violating any limitations either regulatory or preferential (i.e., to support recreational activities like white water rafting, etc.). In this study we also implemented the developed optimization methodology to a real-world case study of Bagnell dam hydropower facility (8 units totaling 240 MW rated power capacity) which is owned and operated by our industry partner Ameren Energy Inc. The case study outcomes shows that by hybridizing the Bagnell dam hydropower facility with a 60 MW x 2-hr battery energy storage system, the annual benefits can be increased over \$6 million while reducing the annual mileage averaged per turbine and number of start/stops by over 98\% and 85\% respectively.

Chalishazar, Vishvas H.↗

Dynamic Simulation Modeling and Control of a Desiccant Assisted Direct-expansion Air Handling Unit

Desirable built environments demand simultaneous regulation of thermal comfort and indoor air quality (IAQ) with energy-efficient operation of heating, ventilation and air conditioning (HV AC) systems, which involves controls of temperature, humidity and airborne contaminants simultaneously. This paper presents the efforts of dynamic modeling and initial development control strategy for a desiccant-assisted multi-functional air handling unit (AHU) coupled with a direct-expansion rooftop unit (RTU) system, which aims to achieve multiple functions for indoor environment conditioning with energy efficient control. The RTU-AHU system includes a desiccant wheel for dehumidification and a conceptual direct air capture (DAC) filtering device for CO2 regulation. A Modelica-based dynamic model is developed for this conceptual system, and a simple decentralized control strategy is designed, which combines a differential-enthalpy based AHU return-air ratio control, a demand-controlled ventilation, and supply-air temperature humidity control via the RTU and DW controls. The proposed control method is evaluated with the Modelica simulation model for a selected set of scenarios

Pan, Chao↗

GaAs solar cells for space applications

GaAs solar cells offer substantial advantages for space photovoltaic power over Si solar cells in the areas of efficiency, elevated temperature operation, and radiation damage stability. A mission cost comparison is made for GaAs and Si solar cells. For Si cell arrays, the total mission cost is found to be a minimum for a solar concentration of 2.9. For GaAs, modes of operation and construction are investigated. Modes having lower mission costs than the minimum Si mission cost are defined. These include higher concentrations, lightweight cells, and simultaneous power generation and annealing. The technological progress necessary for GaAs to operate in these modes is identified.

Conway, E. J.↗

Simulation of a photovoltaic/thermal heat pump system having a modified collector/evaporator

A new photovoltaic/thermal heat pump (PV/T-HP) system having a modified collector/evaporator (C/E) has been developed and numerically studied. Multi-port flat extruded aluminum tubes were used in the modified C/E, as compared to round copper tubes used in a conventional C/E. Simulation results suggested that a better operating performance can be achieved for a PV/T-HP system having such a modified C/E. In addition, using the meteorological data in both Nanjing and Hong Kong, China, the simulation results showed that this new PV/T-HP system could efficiently generate electricity and thermal energy simultaneously in both cities all-year-round. Furthermore, improved operation by using variable speed compressor has been designed and discussed. (author)

14 SOLAR ENERGY↗

A Method of Monitoring Non-Resonant Raman Lidar Returns During Daylight Hours

A method for using non-resonant Raman lidar during daytime hours is presented. A dual (or quadruple) arrangement of electro-optical channels is set up in the lidar receiver. Each channel contains its own optical spectral response as determined by an appropriate set of interference filters. The incoming signal is split and fed into two channels, filtered (simultaneously) and then inserted into the input terminals of an operational amplifier. The difference signal is selected and amplified whereas the common portion of the signal is highly attenuated (Common Mode Re.jection Ratio = 75-80db). For the present hardware, daylight intensities 10(exp 2)-10(exp 3) times Raman signals are received simultaneously. Mean values of intensities of daylight signals which give rise to a constant differences merely shift the value of the measured variable at the ground. These mean value signals have their common part highly attenuated. The differences of the fluctuation portions of the daylight signal represents a noise signal. Identical (space-time) optical paths for each component of the daylight signal produce the same fluctuational spectra in each channel. Hence noise levels, much less than signal levels, are anticipated. First a N2-H2 ) signal pair is differenced. Then an N2-O2 pair is differenced and used for instrumental normalization purposes. Signal levels to be encountered are quite well known as a result of prior field work. Improved optical design of laser system can reduce mean value of daylight intensities by 10(exp 2). Thus the mean daylight intensity can be set equal to the expected signal levels by more advanced optical design. Performance characteristics of photomultiplier pairs are discussed in this connection.

Cooney, John↗

Enhanced efficiency in the excitation of higher modes for atomic force microscopy and mechanical sensors operated in liquids

Recent developments in dynamic Atomic Force Microscopy where several eigenmodes are simultaneously excited in liquid media are proving to be an excellent tool in biological studies. Despite its relevance, the search for a reliable, efficient, and strong cantilever excitation method is still in progress. Herein, we present a theoretical modeling and experimental results of different actuation methods compatible with the operation of Atomic Force Microscopy in liquid environments: ideal acoustic, homogeneously distributed force, distributed applied torque (MAC Mode™), photothermal and magnetostrictive excitation. From the analysis of the results, it can be concluded that magnetostriction is the strongest and most efficient technique for higher eigenmode excitation when using soft cantilevers in liquid media.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Plasma-wakefield accelerator simultaneously boosts electron beam energy and brightness

High-energy particle colliders and X-ray free-electron lasers demand electron beams with qualities currently achieved only in kilometer-scale radio-frequency accelerators. Plasma accelerators promise a compact alternative but have faced challenges in delivering the needed beam quality at relevant energies. Here, we demonstrate that a plasma-wakefield accelerator operating in the nonlinear regime acts as a transformer to simultaneously boost the energy and brightness of an electron bunch injected from the plasma. Using a 10-GeV drive bunch and a three-stage meter-scale plasma source, we generated electron bunches exceeding 20 GeV with sub-percent energy spread, 2 mm·mrad normalized emittance, and multi-kA peak current. A significant number of drive-bunch electrons lost over 90% of their energy, a prerequisite for high energy-conversion efficiency. This demonstration of an energy transformer ratio exceeding two and a brightness enhancement over an order of magnitude opens a path towards cost-effective accelerators for future colliders and light sources.

experimental particle physics↗

PERFORMANCE, EFFICIENCY AND EMISSIONS EVALUATION OF GASOLINE PORT-FUEL INJECTION, NATURAL GAS DIRECT INJECTION AND BLENDED OPERATION

The need to further reduce fuel consumption and decrease the output of emissions — in order to be within future emissions legislation — is still an ongoing effort for the development of internal combustion engines. Natural gas is a fossil fuel which is comprised mostly of methane and makes it very attractive for use in internal combustion engines because of its higher knock resistance and higher molar hydrogen-to-carbon ratio compared to gasoline. The current paper compares the combustion and emissions behavior of the test engine being operated on either a representative U.S. market gasoline or natural gas. Moreover, specific in-cylinder blend ratios with gasoline and natural gas were also investigated at part-load and wide open throttle conditions. The dilution tolerance for part-load operation was investigated by adding cooled exhaust gas recirculation. The engine used for these investigations was a single cylinder research engine for light duty application which is equipped with two separate fuel systems. Gasoline was injected into the intake port; natural gas was injected directly into the cylinder to overcome the power density loss usually connected with port fuel injection of natural gas. Injecting natural gas directly into the cylinder reduced both ignition delay and combustion duration of the combustion process compared to the injection of gasoline into the intake port. Injecting natural gas and gasoline simultaneously resulted in a higher dilution tolerance compared to operation on one of the fuels alone. Significantly higher net indicated mean effective pressure and indicated thermal efficiency were achieved when natural gas was directly injected after intake valve closing at wide open throttle, compared to an injection while the intake valves were still open. In general it was shown that the blend ratio and the start of injection need to be varied depending on load and dilution level in order to operate the engine with the highest efficiency or highest load.

Advanced Combustion↗

Simultaneous Thermal and Gamma Radiation Aging of Electrical Cable Polymers

The polymers used for insulation in nuclear power plant electrical cables are susceptible to aging during long term operation. Elevated temperature is the primary contributor to changes in polymer structure that result loss of mechanical and electrical properties, but gamma radiation is also a significant source of degradation for polymers used within relevant plant locations. Despite many years of polymer degradation research, the combined effects of simultaneous exposure to thermal and radiation stress are not well understood. As nuclear operators contemplate and prepare for extended operations beyond initial license periods, a predictive understanding of exposure-based cable material degradation is becoming an increasingly important input to safety, licensing, operations and economic decisions. We are focusing on carefully-controlled simultaneous thermal and gamma radiation accelerating aging and characterization of the most common nuclear cable polymers to understand the relative contributions of temperature, time, dose and dose rate to changes in cable polymer material structure and properties. Improved understanding of cable performance in long term operation will help support continued sustainable nuclear power generation.

Cables, Nuclear, Polymers, Thermal aging, Gamma ag↗

Broad Ion Beam Extraction from Large Bore ECR Ion Source with Cylindrically Comb-Shaped Magnetic Fields Configuration by Feeding Simultaneously 11 to 13 GHz and 2.45 GHz Microwaves

We tried to enlarge the operation window of an electron cyclotron resonance (ECR) ion source for producing the ECR plasma confined by cylindrically comb-shaped magnetic field, and for extracting the broad ion beam under the low pressures and low microwave powers. The magnetic field by permanent magnets constructs ECR zones at different positions for 2.45 GHz and 11 to 13 GHz microwaves, respectively. According to probe measurements, profiles of plasma density and temperature are different for using each single microwave. We conduct production of ECR plasma by launching simultaneously these two frequency microwaves, and obtain flat profiles of the electron density and the electron temperature. These profiles are not achieved by feeding single frequency microwave. It is found that plasma can be controllable on spatial profiles beyond wide operation window of plasma parameters. We conducted preliminary extracting and forming large bore ion beam from this source. We will make this source a part of tandem type ion source for the first stage. We investigated feasibility and hope to realize the device which has wide range operation window in a single device to produce many kinds of ion beams as like to universal source based on ECR ion source.

43 PARTICLE ACCELERATORS↗

The Shortwave Spectral Radiometer for Atmospheric Science: Capabilities and Applications from the ARM User Facility

Industry advances have greatly reduced the cost and size of ground-based shortwave (SW) sensors for the ultraviolet, visible, and near-infrared spectral ranges that make up the solar spectrum, while simultaneously increasing their ruggedness, reliability, and calibration accuracy needed for outdoor operation. These sensors and collocated meteorological equipment are an important part of the U.S. Department of Energy (DOE) Atmospheric Radiation Measurement (ARM) User Facility, which has supported parallel integrated measurements of atmospheric and surface properties for more than two decades at fixed and mobile sites around the world. The versatile capability of these ground-based measurements includes 1) rich spectral information required for retrieving cloud and aerosol microphysical properties, such as cloud phase, cloud particle size, and aerosol size distributions, and 2) high temporal resolution needed for capturing fast evolution of cloud microphysical properties in response to rapid changes in meteorological conditions. Here we describe examples of how ARM's spectral radiation measurements are being used to improve understanding of the complex processes governing microphysical, optical, and radiative properties of clouds and aerosol.

54 ENVIRONMENTAL SCIENCES↗

Monitoring a Silent Phase Transition in CH 3 NH 3 PbI 3 Solar Cells via Operando X-ray Diffraction

The relatively modest temperature of the tetragonal-to-cubic phase transition in CH 3 NH 3 PbI 3 perovskite is likely to occur during real world operation of CH 3 NH 3 PbI 3 solar cells. In this work, we simultaneously monitor the structural phase transition of the active layer along with solar cell performance as a function of the device operating temperature. The tetragonal to cubic phase transition is observed in the working device to occur reversibly at temperatures between 60.5 and 65.4 degrees C. In these operando measurements, no discontinuity in the device performance is observed, indicating electronic behavior that is insensitive to the structural phase transition. Here, this decoupling of device performance from the change in long-range order across the phase transition suggests that the optoelectronic properties are primarily determined by the local structure in CH 3 NH 3 PbI 3 . That is, while the average crystal structure as probed by X-ray diffraction shows a transition from tetragonal to cubic, the local structure generally remains well characterized by uncorrelated, dynamic octahedral rotations that order at elevated temperatures but are unchanged locally.

14 SOLAR ENERGY↗

The Cyclone meteor radar system for routine wind measurements in the lower thermosphere

A new meteor wind radar system called Cyclone was devised to extend and update the meteor radar network and for unattended operation. The Cyclone meteor radar system obtains information from four directions simultaneously. To automate data processing a special digital device was developed. An algorithm used to determine the Doppler shifts was adopted, which makes it possible to eliminate selectivity with respect to slow velocity meteor drifts. The operation of the Cyclone system is described.

Lysenko, I. A.↗

RFI Statistical Distribution and Missed Detection in Aquarius Radiometer Measurements

Aquarius is an microwave active/passive sensor whose main goal is to globally estimate sea surface salinity from space. Two instruments, a radar scatterometer and a radiometer, operate at L-band observing the same surface footprint almost simultaneously. The sensitivity to sea surface salinity (SSS) is given by the radiometer, while the scatterometer measurements provide a correction for sea surface roughness. Although the primary objective is the measurement of SSS, the instrument combination operates continuously, acquiring data over land and sea ice as well. Radio Frequency Interference (RFI) can occur in both the radiometer and the scatterometer bands of operation, and for this reason detection and mitigation of RFI was included in the data processing of both active and passive instruments. This paper will focus on the RFI processing for the Aquarius radiometer only and provide an update on the efforts to reduce the amount of missed RFI detection.

RFI↗

Re-Engineering the ISS Payload Operations Control Center During Increased Utilization and Critical Onboard Events

With an increase in the utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS realtime operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art media wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project.

Marsh, Angela L.↗

Re-Engineering the ISS Payload Operations Control Center During Increased Utilization and Critical Onboard Events

With an increase in utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four-month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS real-time operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art Video Wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project. This paper describes the logistics and lessons learned in upgrading a control center capability in the middle of complex real-time operations. Combining the efficiencies of controller interaction and new technology infusion were prime drivers for this upgrade to handle the increased utilization of science research on ISS. The success of this project could not jeopardize the current operations while these facility upgrades occurred.

Dudley, Stephanie R. B.↗

CMS Endcap Timing Layer: System Validation and Assembly

The High-Luminosity Large Hadron Collider (HL-LHC) will operate at unprecedented luminosities, resulting in up to 200 simultaneous interactions per bunch crossing. To mitigate the resulting pileup challenges, the CMS experiment is implementing the MIP Timing Detector (MTD), designed to provide precise timing information with a resolution of 30 – 40 picoseconds per track. The MTD consists of the Barrel Timing Layer (BTL) and the Endcap Timing Layer (ETL), each optimized for different regions of the detector. The ETL, comprising two double-sided disks, utilizes Low-Gain Avalanche Diode (LGAD) sensors coupled with the Endcap Timing Readout Chip (ETROC) to achieve high-precision timing measurements in the forward region. Significant progress has been made toward the realization of the ETL through extensive system-level validation of the ETROC readout chain and the development of scalable module assembly procedures. This presentation will provide a comprehensive overview of the ETL and highlight recent advances in system validation and module assembly, emphasizing their roles in ensuring the detector readiness for HL-LHC operation.

Lee, Dongyub [Kyungpook Natl. U.] (ORCID:000000034↗