Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “engine operability”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 919 records · Page 51

Factors that Affect Operational Reliability of Turbojet Engines

The problem of improving operational reliability of turbojet engines is studied in a series of papers. Failure statistics for this engine are presented, the theory and experimental evidence on how engine failures occur are described, and the methods available for avoiding failure in operation are discussed. The individual papers of the series are Objectives, Failure Statistics, Foreign-Object Damage, Compressor Blades, Combustor Assembly, Nozzle Diaphrams, Turbine Buckets, Turbine Disks, Rolling Contact Bearings, Engine Fuel Controls, and Summary Discussion.

Source record↗

The Software Engineering Laboratory: An operational software experience factory

For 15 years, the Software Engineering Laboratory (SEL) has been carrying out studies and experiments for the purpose of understanding, assessing, and improving software and software processes within a production software development environment at NASA/GSFC. The SEL comprises three major organizations: (1) NASA/GSFC, Flight Dynamics Division; (2) University of Maryland, Department of Computer Science; and (3) Computer Sciences Corporation, Flight Dynamics Technology Group. These organizations have jointly carried out several hundred software studies, producing hundreds of reports, papers, and documents, all of which describe some aspect of the software engineering technology that was analyzed in the flight dynamics environment at NASA. The studies range from small, controlled experiments (such as analyzing the effectiveness of code reading versus that of functional testing) to large, multiple project studies (such as assessing the impacts of Ada on a production environment). The organization's driving goal is to improve the software process continually, so that sustained improvement may be observed in the resulting products. This paper discusses the SEL as a functioning example of an operational software experience factory and summarizes the characteristics of and major lessons learned from 15 years of SEL operations.

Basili, Victor R.↗

The workload book: Assessment of operator workload to engineering systems

The structure and initial work performed toward the creation of a handbook for workload analysis directed at the operational community of engineers and human factors psychologists are described. The goal, when complete, will be to make accessible to such individuals the results of theoretically-based research that are of practical interest and utility in the analysis and prediction of operator workload in advanced and existing systems. In addition, the results of laboratory study focused on the development of a subjective rating technique for workload that is based on psychophysical scaling techniques are described.

Gopher, D.↗

Factors that Affect Operational Reliability of Turbojet Engines

The problem of improving operational reliability of turbojet engines is studied. Failure statistics for this engine are presented, the theory and experimental evidence on how engine failures occur are described, and the methods available for avoiding failure in operation are discussed.

Pinkel, Benjamin↗

Enhanced Engine Control for Emergency Operation

C-MAPSS40k engine simulation has been developed and is available to the public. The authenticity of the engine performance and controller enabled the development of realistic enhanced control modes through controller modification alone. Use of enhanced control modes improved stability and control of an impaired aircraft. - Fast Response is useful for manual manipulation of the throttles - Use of Fast Response improved stability as part of a yaw rate feedback system. - Use of Overthrust shortened takeoff distance, but was generally useful in flight, too. Initial lack of pilot familiarity resulted in discomfort, especially with yaw rate feedback, but that was the only drawback, overall the pilot found the enhanced modes very helpful.

Litt, Jonathan S.↗

Re-Engineering the ISS Payload Operations Control Center During Increased Utilization and Critical Onboard Events

With an increase in the utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS realtime operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art media wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project.

Marsh, Angela L.↗

Re-Engineering the ISS Payload Operations Control Center During Increased Utilization and Critical Onboard Events

With an increase in utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four-month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS real-time operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art Video Wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project. This paper describes the logistics and lessons learned in upgrading a control center capability in the middle of complex real-time operations. Combining the efficiencies of controller interaction and new technology infusion were prime drivers for this upgrade to handle the increased utilization of science research on ISS. The success of this project could not jeopardize the current operations while these facility upgrades occurred.

Dudley, Stephanie R. B.↗

Engineering, construction, and operations in space - III: Space '92; Proceedings of the 3rd International Conference, Denver, CO, May 31-June 4, 1992. Vols. 1 & 2

The present volume on engineering, construction, and operations in space discusses surface structures on the moon and Mars, surface equipment, construction, and transportation on the moon and Mars, in situ materials use and processing, and space energy. Attention is given to such orbital structures as LEO and the space station, space mining and excavation, space materials, space automation and robotics, and space life support systems. Topics addressed include lunar-based astronomy, space systems integration, terrestrial support for space functions, and space education. Also discussed are space plans, policy, and history, space science and engineering, geoengineering and space exploration, and the construction and development of a human habitat on Mars.

Space life support systems↗

Roman Space Telescope Coronagraph Engineering Design and Operating Concept

NASA’s Nancy Grace Roman Space Telescope (formerly known as WFIRST) is a flagship astrophysics mission planned for launch in 2025. The coronagraph instrument (CGI) on Roman will demonstrate the technology for direct imaging and spectroscopy of exoplanets around nearby stars. It will work with the obscured 2.4 meter diameter telescope and demonstrate starlight suppression that is up to 3 orders of magnitude deeper than the preceding space-based and ground-based coronagraphs by using active wavefront control in space with deformable mirrors. CGI has passed its Preliminary Design Review (PDR) in September 2019 and is working toward the instrument Critical Design Review (CDR) in the spring of 2021. We will describe the flow down of key and driving CGI requirements from high level performance to the instrument hardware and software, current instrument configuration and engineering design, operational concept planned for CGI observations, integrated modeling status, and performance predictions.

Tanga, Hong↗

Automated workstation for the operation of spacecraft engineering subsystems

This paper addresses the development of a workstation that exploits automated tools to enable an operator to monitor concurrently several engineering subsystems and/or several space missions. The use of artificial intelligence and advanced graphics capabilities to achieve fast prototypes is discussed. The monitoring of engineering telemetry data from the Power and Pyro Subsystem of the Galileo spacecraft is emphasized.

Bahrami, K. A.↗

Simulator Investigation of Pilot Aids for Helicopter Terminal Area Operations with One Engine Inoperative

Two recent piloted simulation experiments have investigated advanced display concepts applied to civil transport helicopter terminal area operations. Civil Category A helicopter operations apply to multi-engine helicopters wherein a safe recovery (land or fly out) is required in the event of a single engine failure. The investigation used the NASA Ames Research Center Vertical Motion Simulator, which has a full six degrees of freedom, to simulate the flight task as closely as possible. The goal of these experiments was to use advanced cockpit displays to improve flight safety and enhance the mission performance of Category A terminal area operations in confined areas. The first experiment investigated the use of military display formats to assist civil rotorcraft in performing a Category A takeoff in confined terminal areas. Specifically, it addressed how well a difficult hovering backup path could be followed using conventional instruments in comparison to panel mounted integrated displays. The hovering backup takeoff, which enables pilots to land back to the confined area pad in the event of an engine failure, was chosen since it is a difficult task to perform. Seven NASA and Army test pilots participated in the experiment. Evaluations, based on task performance and pilot workload, showed that an integrated display enabled the pilot to consistently achieve adequate or desired performance with reasonable pilot workload. Use of conventional instruments, however, frequently resulted in unacceptable performance (poor flight path tracking), higher pilot workload, and poor situational awareness. Although OEI landbacks were considered a visual task, the improved performance on the backup portion, in conjunction with increased situational awareness resulting from use of integrated displays, enabled the pilots to handle an engine failure and land back safely. In contrast, use of conventional instruments frequently led to excessive rates of sink at touchdown. A second simulation (in progress - July - August) is being conducted to investigate the use of advanced displays to perform vertical and short takeoffs and landings. One Engine Inoperative trajectories, which were optimized based on safety of flight restrictions, are utilized. Based on comments from the first experiment and further analytic development, appropriate fly out and approach guidance was added. Displays include conventional instruments with raw data, and the following integrated displays: multi-view and side-view hover displays based on the Apache Pilot Night Vision System, and variations of the pathway-in-the-sky displays with a flight-path-vector, a leader and flight director modifications. Panel mounted and head-up displays are being evaluated. Engine modifications have been incorporated to simulate 30 second and 2 minute contingency power ratings. Evaluations are based on task performance and pilot workload. NASA, Army, FAA, and industry test pilots participated. Details concerning the design, conduct, and the results of the experiment will be reported in the proposed paper.

Iseler, Laura↗

Analysis of Acceleration, Airspeed, and Gust-Velocity Data From a Four-Engine Transport Airplane Operating Over a Northwestern United States Alaska Route

Acceleration, airspeed, and altitude data obtained with an NACA VGH recorder from a four-engine commercial transport airplane operating over a northwestern United States-Alaska route were evaluated to determine the magnitude and frequency of occurrence of gust and maneuver accelerations., operating airspeeds, and gust velocities. The results obtained were then compared with the results previously reported in NACA Technical Note 3475 for two similar airplanes operating over transcontinental routes in the United States. No large variations in the gust experience for the three operations were noted. The results indicate that the gust-load experience of the present operation closely approximated that of the central transcontinental route in the United States with which it is compared and showed differences of about 4 to 1 when compared with that of the southern transcontinental route in the United States. In general, accelerations due to gusts occurred much more frequently than those due to operational maneuvers. At a measured normal-acceleration increment of 0.5g, accelerations due to gusts occurred roughly 35 times more frequently than those due to operational maneuvers.

Engel, Jerome N.↗

Oxidizer heat exchanger component test

The RL10-IIB engine, is capable of multimode thrust operation. The engine operates at two low-thrust levels: tank head idle (THI), approximately 1 to 2 percent of full thrust; and pumped idle, 10 percent of full thrust. Operation at THI provides vehicle propellant settling thrust and efficient thermal conditioning; PI operation provides vehicle tank prepressurization and maneuver thrust for low-g deployment. Stable combustion of the RL10-IIB engine during the low-thrust operating modes can be accomplished by using a heat exchanger to supply gaseous oxygen to the propellant injector. The oxidized heat exchanger (OHE) vaporizes the liquid oxygen using hydrogen as the energy source. This report summarizes the test activity and post-test data analysis for two possible heat exchangers, each of which employs a completely different design philosophy. One design makes use of a low-heat transfer (PHT) approach in combination with a volume to attenuate pressure and flow oscillations. The test data showed that the LHT unit satisfied the oxygen exit quality of 0.95 or greater in both the THI and PI modes while maintaining stability. The HHT unit fulfilled all PI requirements; data for THI satisfactory operation is implied from experimental data that straddle the exact THI operating point.

Kanic, P. G.↗

Computational Assessment of Inlet Backflow Effects on Rotating Detonation Engine Performance and Operability

The performance impact of flow reversal at the inlet of an airbreathing rotating detonation engine (RDE) is investigated using 2 and 3-dimensional computational fluid dynamic (CFD) simulations. Flow reversal, or backflow, occurs in RDE inlets in the high-pressure region directly behind the rotating detonation front. This is also where most of the engine thrust or pressure gain is produced. The amount of backflow relative to throughflow depends on the inlet design. For the present work, a simple annular ‘slit’ design is used. The simulations are idealized in several ways, including that fuel and air are premixed, but prevented from reacting when within the inlet region. The results indicate that even with idealizations, the impact of inlet backflow on pressure gain can be substantial. The simulations also reveal an intriguing instability that develops in certain configurations. The mass flow rate into the RDE begins to oscillate at a regular frequency that is substantially less than the detonation rotational frequency. This is accompanied by oscillations in the detonation height. The oscillation amplitude grows over time until the detonation ultimately fails. Both the performance and instability results emphasize the need for carefully designed RDE inlets that provide low loss when flow is in the forward direction, but high resistance when the flow is reversed. Development of such high-diodicity inlets is critical to achieving pressure gain in airbreathing RDE’s.

Detonation↗

Computational Assessment of Inlet Backflow Effects on Rotating Detonation Engine Performance and Operability

The performance impact of flow reversal at the inlet of an airbreathing rotating detonation engine (RDE) is investigated using 2 and 3-dimensional computational fluid dynamic (CFD) simulations. Flow reversal, or backflow, occurs in RDE inlets in the high-pressure region directly behind the rotating detonation front. This is also where most of the engine thrust or pressure gain is produced. The amount of backflow relative to throughflow depends on the inlet design. For the present work, a simple annular ‘slit’ design is used. The simulations are idealized in several ways, including that fuel and air are premixed, but prevented from reacting when within the inlet region. The results indicate that even with idealizations, the impact of inlet backflow on pressure gain can be substantial. The simulations also reveal an intriguing instability that develops in certain configurations. The mass flow rate into the RDE begins to oscillate at a regular frequency that is substantially less than the detonation rotational frequency. This is accompanied by oscillations in the detonation height. The oscillation amplitude grows over time until the detonation ultimately fails. Both the performance and instability results emphasize the need for carefully designed RDE inlets that provide low loss when flow is in the forward direction, but high resistance when the flow is reversed. Development of such high-diodicity inlets is critical to achieving pressure gain in airbreathing RDE’s.

detonation↗