Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “cryogenics”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 919 records · Page 51

Cryogenic Carbon Capture Development (Final Report)

This project extends and leverages the work completed under funding from ARPA-E and other sources by exploring aspects of the Cryogenic Carbon Capture™ (CCC) process and issues discovered during those projects, but that were not within the scope or budget of previous projects or that became apparent during field tests. Our successful completion of the tasks outlined in this project has increased the reliability, efficiency, and scalability of the CCC process and we are better prepared for pilot-scale testing. The first phase of this project improved key areas of the process through iterative design and experiment, culminating with recommendations for improvements to the existing skid-scale system developed under non-federal funding. The second phase of this project implemented the improved unit operations into the Cryogenic Carbon Capture External Cooling Loop (CCC ECL™) skid and field tests the improved system at a coal-fired power plant. The specific areas of work in this project are: Budget Period 1: 1) Selection of the most energy-efficient drying system for ambient-pressure flue gas. Sustainable Energy Solutions, LLC (SES) has successfully demonstrated a dryer that removes bulk water using a low-temperature brine to remove about 99% of the water followed by a mol sieve 3A desiccant dryer to remove the remaining 1% water; 2) Selection and demonstration of efficient solution to fouling due to dissolved CO 2 . SES has tested several commercial heat exchangers that purport to be able to handle fouling issues similar to those experienced in the contact liquid chiller. Replicated tests using the CCC ECL™ skid and dimpled brazed plate heat exchangers demonstrate that quick throttling of refrigerant combined with a burst of clean gas mitigate the fouling caused by CO 2 solubility in contact liquid with only minor increases in parasitic load. SES models indicate that parasitic load would increase by approximately 0.0125 GJ/tonne, an order of magnitude less than what was determined to be the maximum allowable additional parasitic load caused by this system; 3) Selection and demonstration of efficient and scalable solid–liquid separation system. The screw press technology met or exceeded the 70% solids loading benchmark during several test runs exceeding 24 hours on the CCC ECL™ skid. The average solids loading during the entire 50-hour run was 67%. The energy demand for this system is less than 0.1 GJ e /tonne of CO 2 processed; 4) Optimize design and demonstration of patented desublimating heat exchangers. We designed and built a hybrid spray tower that was tested over many hundreds of hours and a 50-hour continuous test run was completed capturing over 0.5 tonne CO 2 /day at >90% capture; (5) Plan for safe dilution of oxygen-depleted, cleaned flue-gas stream. The AERSCREEN simulator developed by the EPA modeled the dispersion of oxygen-depleted flue gas from the CCC process at a commercial plant. The results indicate that this plan effectively mitigates the flue gas hazards; (6) Simulation of and experimental work related to multi-pollutant capture. SES programmed an upgrade to its solid/vapor/liquid equilibrium (SVLE) algorithm. This enables simultaneous modeling of multiple pollutants (i.e., CO 2 , SO x , NO x , Hg, HCl). Budget Period 2; (7) Modify the CCC ECL™ skid for field testing and complete shakedown testing. The plans for modifying the CCC ECL™ skid were finalized and put into place. Shakedown testing of the updated CCC ECL™ skid occurred at SES using closed-loop mode (i.e., using a synthetic flue gas consisting of only N 2 and CO 2 ) and at the Hunter Power Plant using flue gas from the coal-fired boiler. Shakedown testing took longer than expected due to delays in receiving equipment and unexpected equipment performance in the field; (8) Operate the CCC ECL™ skid in the field. Longer testing of the CCC ECL™ skid occurred at the Hunter Power Plant. Multiple tests exceeding 35 hours were completed, with a total of over 600 hours of CO 2 capture completed using flue gas at the Hunter Power Plant with an average CO 2 capture rate of over 91% during those hours. Extensive notes and documentation were acquired informing improved methods for controls, startup, operation, and shut down; (9) Determine figures of merit and quantify process improvement. SES defined figures of merit for unit operation performance and overall CCC ECL™ process performance. All figures of merit were achieved or surpassed, except for 500 continuous hours of demonstration at the Hunter Power Plant; (10) Complete an Environmental Health and Safety Risk assessment by a third party. Tri-State completed an Environmental Health and Safety Risk assessment; (11) Update techno-economic analysis with third-party validation. The techno-economic analysis has been completed. It confirms the potential large reduction in energy and cost of the CCC process compared with leading alternatives and that the estimates and estimation techniques are reliable.

20 FOSSIL-FUELED POWER PLANTS↗

Cryogenic Carbon Capture Development Final/Technical Report

This project extends and leverages the work completed under funding from ARPA-E and other sources by exploring aspects of the Cryogenic Carbon Capture™ (CCC) process and issues discovered during those projects, but that were not within the scope or budget of previous projects or that became apparent during field tests. Our successful completion of the tasks outlined in this project has increased the reliability, efficiency, and scalability of the CCC process and we are better prepared for pilot-scale testing. The first phase of this project improved key areas of the process through iterative design and experiment, culminating with recommendations for improvements to the existing skid-scale system developed under non-federal funding. The second phase of this project implemented the improved unit operations into the Cryogenic Carbon Capture External Cooling Loop (CCC ECL™) skid and field tests the improved system at a coal-fired power plant.

20 FOSSIL-FUELED POWER PLANTS↗

Energy-Storing Cryogenic Carbon Capture™ for Utility and Industrial-scale Processes (Final Report)

This project leverages work completed under funding from previous U.S. Department of Energy (DOE) projects and other sources of funding around the Cryogenic Carbon Capture Process™ (CCC). The purpose of this project is to further develop a perturbation of the CCC process that stores energy called the Cryogenic Carbon Capture™ Energy Storing (CCC-ES) process. The successful completion of the tasks in this project has prepared the CCC-ES process for scaling and developed initial plans and a feasibility analysis for an engineering-scale or small-commercial scale system that can store at least 10 MWh of energy. The specific areas of work in this project are: (1) Develop a conceptual, site-specific integrated process flow diagram: Sustainable Energy Solutions (SES) developed a conceptual, site-specific plan including a process flow diagram for integrating CCC-ES at a specific location. The proposed system was based on a typical engineering-scale CCC system designed to capture 30-50 metric tonnes of CO 2 per day (TPD), with modifications and additional changes and equipment put in place to add the energy storage element to the system. The 30-50 TPD scale corresponds to the required 10 MWh of stored energy. This task includes updating simulation software for transient analysis. SES also coordinated with the Jim Bridger Power Plant in Point of Rocks, Wyoming to get site-specific data. Using these data, SES completed site-specific preliminary process flow diagrams, estimated capital and operating costs for the CCC-ES system, and used the upgraded software package to estimate the primary figures of merit. (2) Complete a technoeconomic analysis (TEA): SES completed a full-scale TEA of the CCC-ES system to meet specific success criteria. This TEA used process information from the host site selected above. (3) Technology and data gap assessment for the CCC-ES process: As part of the technology gap assessment, SES performed an assessment of the best alternative energy storage solutions including figures of merit and operational strengths and weaknesses. SES then compared the proposed system with a discussion of how it addresses the weaknesses of alternative systems, showing for example a cost of stored energy at less than $50/MWh and with a roundtrip efficiency of greater than 95%. This assessment includes technical and other risk analyses and technology gaps with research and development needs to commercialize the process by 2030. Finally, work includes a commercialization roadmap/development pathway outlining the major milestones to move to a commercially operating CCC-ES system. (4) Phase II pre-FEED project plan: SES completed a project plan for the Phase II pre-FEED analysis using the same host site as in the Phase I conceptual study.

03 NATURAL GAS↗

The Cryogenic Dark Matter Search: First 5-Tower Data and Improved Understanding of Ionization Collection

The Cryogenic Dark Matter Search (CDMS) is searching for Weakly Interacting Massive Particles (WIMPs) with cryogenic particle detectors. These detectors have the ability to discriminate between nuclear recoil candidate and electron recoil background events by collecting both phonon and ionization energy from recoils in the detector crystals. The CDMS-II experiment has completed analysis of the first data runs with 30 semiconductor detectors at the Soudan Underground Laboratory, resulting in a world leading WIMP-nucleon spin-independent cross section limit for WIMP masses above 44 GeV/c 2 . As CDMS aims to achieve greater WIMP sensitivity, it is necessary to increase the detector mass and discrimination between signal and background events. Incomplete ionization collection results in the largest background in the CDMS detectors as this causes electron recoil background interactions to appear as false candidate events. Two primary causes of incomplete ionization collection are surface and bulk trapping. Recent work has been focused on reducing surface trapping through the modification of fabrication methods for future detectors. Analyzing data taken with test devices has shown that hydrogen passivation of the amorphous silicon blocking layer worsens surface trapping. Additional data has shown that the iron-ion implantation used to lower the critical temperature of the tungsten transition-edge sensors causes a degradation of the ionization collection. Using selective implantation on future detectors may improve ionization collection for events near the phonon side detector surface. Bulk trapping is minimized by neutralizing ionized lattice impurities. Detector investigations at testing facilities and in situ at the experimental site have provided methods to optimize the neutralization process and monitor running conditions to maintain full ionization collection. This work details my contribution to the 5-tower data taking, monitoring, and analysis effort as well as the SuperCDMS detector development with the focus on monitoring and improving ionization collection in the detectors.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Vacuum Bellows, Vacuum Piping, Cryogenic Break, and Copper Joint Failure Rate Estimates for ITER Design Use

The ITER international project design teams are working to produce an engineering design in preparation for construction of the International Thermonuclear Experimental Reactor (ITER) tokamak. During the course of this work, questions have arisen in regard to safety barriers and equipment reliability as important facets of system design. The vacuum system designers have asked several questions about the reliability of vacuum bellows and vacuum piping. The vessel design team has asked about the reliability of electrical breaks and copper-copper joints used in cryogenic piping. Research into operating experiences of similar equipment has been performed to determine representative failure rates for these components. The following chapters give the research results and the findings for vacuum system bellows, power plant stainless steel piping (amended to represent vacuum system piping), cryogenic system electrical insulating breaks, and copper joints.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

A Portable Miniature Cryogenic Environment for In Situ Neutron Diffraction

Neutron diffraction instruments offer a platform for materials science and engineering studies at extended temperature ranges far from ambient. As one of the widely used neutron sample environment types, cryogenic furnaces are usually bulky and complex, and they may need hours of beamtime overhead for installation, configuration, cooling, and sample change, etc. To reduce the overhead time and expedite experiments at the state-of-the-art high-flux neutron source, we developed a low-cost, miniature, and easy-to-use cryogenic environment (77–473 K) for in situ neutron diffraction. A travel-size mug serves for the environment where the samples sit inside. Immediate cooling and an isothermal dwell at 77 K are realized on the sample by direct contact with liquid N 2 in the mug. The designed Al inserts serve as the holder of samples and heating elements, alleviate the thermal gradient, and clear neutron pathways. Both a single-sample continuous measurement and multi-sample high-throughput measurements are demonstrated in this environment. High-quality and refinable in situ neutron diffraction patterns are acquired on model materials. The results quantify the orthorhombic-to-cubic phase transformation process in LiMn 2 O 4 and differentiate the anisotropic lattice thermal expansions and bond length evolutions between rhombohedral perovskite oxides with composition variation.

47 OTHER INSTRUMENTATION↗

Numerical Simulations of Cryogenic Hydrogen Cooling in Vortex Tubes with Smooth Transitions

Improving efficiency of hydrogen cooling in cryogenic conditions is important for the wider applications of hydrogen energy systems. The approach investigated in this study is based on a Ranque-Hilsch vortex tube (RHVT) that generates temperature separation in a working fluid. The simplicity of RHVT is also a valuable characteristic for cryogenic systems. In the present work, novel shapes of RHVT are computationally investigated with the goal to raise efficiency of the cooling process. Specifically, a smooth transition is arranged between a vortex chamber, where compressed gas is injected, and the main tube with two exit ports at the tube ends. Flow simulations have been carried out using STAR-CCM+ software with the real-gas Redlich-Kwong model for hydrogen at temperatures near 70 K. It is determined that a vortex tube with a smooth transition of moderate size manifests about 7% improvement of the cooling efficiency when compared vortex tubes that use traditional vortex chambers with stepped transitions and a no-chamber setup with direct gas injection.

08 HYDROGEN↗

Performance of a Highly Sensitive, 19-element, Dual-polarization, Cryogenic L-band Phased-array Feed on the Green Bank Telescope

A new 1.4 GHz, 19-element, dual-polarization, cryogenic phased-array feed (PAF) radio astronomy receiver has been developed for the Robert C. Byrd Green Bank Telescope (GBT) as part of the Focal L-band Array for the GBT (FLAG) project. Commissioning observations of calibrator radio sources show that this receiver has the lowest reported beam-formed system temperature (T {sub sys}) normalized by aperture efficiency (η) of any phased-array receiver to date. The measured T {sub sys}/η is 25.4 ± 2.5 K near 1350 MHz for the boresight beam, which is comparable to the performance of the current 1.4 GHz cryogenic single-feed receiver on the GBT. The degradation in T {sub sys}/η at ∼4′ (required for Nyquist sampling) and ∼8′ offsets from the boresight is, respectively, ∼1% and ∼20% of the boresight value. The survey speed of the PAF with seven formed beams is larger by a factor between 2.1 and 7 compared to a single-beam system, depending on the observing application. The measured performance, both in frequency and offset from the boresight, qualitatively agrees with predictions from a rigorous electromagnetic model of the PAF. The astronomical utility of the receiver is demonstrated by observations of the pulsar B0329+54 and an extended H ii region, the Rosette Nebula. The enhanced survey speed with the new PAF receiver will enable the GBT to carry out exciting new science, such as more efficient observations of diffuse, extended neutral hydrogen emission from galactic inflows and searches for fast radio bursts.

79 ASTRONOMY AND ASTROPHYSICS↗

Field Testing of Cryogenic Carbon Capture

Sustainable Energy Solutions has been developing Cryogenic Carbon Capture™ (CCC) since 2008. In that time two processes have been developed, the External Cooling Loop and Compressed Flue Gas Cryogenic Carbon Capture processes (CCC ECL™ and CCC CFG™ respectively). The CCC ECL™ process has been scaled up to a 1TPD CO2 system. In this process the flue gas is cooled by an external refrigerant loop. SES has tested CCC ECL™ on real flue gas slip streams from subbituminous coal, bituminous coal, biomass, natural gas, shredded tires, and municipal waste fuels at field sites that include utility power stations, heating plants, cement kilns, and pilot-scale research reactors. The CO2 concentrations from these tests ranged from 5 to 22% on a dry basis. CO2 capture ranged from 95-99+% during these tests. Several other condensable species were also captured including NO2, SO2 and PMxx at 95+%. NO was also captured at a modest rate. The CCC CFG™ process has been scaled up to a .25 ton per day system. This system has been tested on real flue gas streams including subbituminous coal, bituminous coal and natural gas at field sites that include utility power stations, heating plants, and pilot-scale research reactors. CO2 concentrations for these tests ranged from 5 to 15% on a dry basis. CO2 capture ranged from 95-99+% during these tests. Several other condensable species were also captured including NO2, SO2 and PMxx at 95+%. NO was also captured at 90+%. Hg capture was also verified and the resulting effluent from CCC CFG™ was below a 1ppt concentration. This paper will focus on discussion of the capabilities of CCC, the results of field testing and the future steps surrounding the development of this technology.

20 FOSSIL-FUELED POWER PLANTS↗

(abstract) Simple Spreadsheet Thermal Models for Cryogenic Applications

Self consistent circuit analog thermal models, that can be run in commercial spreadsheet programs on personal computers, have been created to calculate the cooldown and steady state performance of cryogen cooled Dewars. The models include temperature dependent conduction and radiation effects. The outputs of the models provide temperature distribution and Dewar performance information. These models have been used to analyze the Cryogenic Telescope Test Facility (CTTF). The facility will be on line in early 1995 for its first user, the Infrared Telescope Technology Testbed (ITTT), for the Space Infrared Telescope Facility (SIRTF) at JPL. The model algorithm as well as a comparison of the model predictions and actual performance of this facility will be presented.

cryogenic thermal model cryostat SIRTF↗

CALISTO: A Cryogenic Far-Infrared/Submillimeter Observatory

We present a design for a cryogenically cooled large aperture telescope for far-infrared astronomy in the wavelength range 30 micrometers to 300 micrometers. The Cryogenic Aperture Large Infrared Space Telescope Observatory, or CALISTO, is based on an off-axis Gregorian telescope having a 4 m by 6 m primary reflector. This can be launched using an Atlas V 511, with the only optical deployment required being a simple hinged rotation of the secondary reflector. The off-axis design, which includes a cold stop, offers exceptionally good performance in terms of high efficiency and minimum coupling of radiation incident from angles far off the direction of maximum response. This means that strong astronomical sources, such as the Milky Way and zodiacal dust in the plane of the solar system, add very little to the background. The entire optical system is cooled to 4 K to make its emission less than even this low level of astronomical emission. Assuming that detector technology can be improved to the point where detector noise is less than that of the astronomical background, we anticipate unprecedented low values of system noise equivalent power, in the vicinity of 10(exp -19) WHz(exp -0.5), through CALISTO's operating range. This will enable a variety of new astronomical investigations ranging from studies of objects in the outer solar system to tracing the evolution of galaxies in the universe throughout cosmic time.

Cryogenic Aperture Large Infrared Space Telescope ↗

Design and Lessons Learned on the Development of a Cryogenic Pupil Select Mechanism (PSM)

Calibration and testing of the instruments on the Integrated Science Instrument Module (ISIM) of the James Webb Space Telescope (JWST) is being performed by the use of a cryogenic, full-field, optical simulator that was constructed for this purpose. The Pupil Select Mechanism (PSM) assembly is one of several mechanisms and optical elements that compose the Optical Telescope Element SIMulator, or OSIM. The PSM allows for several optical elements to be inserted into the optical plane of OSIM, introducing a variety of aberrations, distortions, obscurations, and other calibration states into the pupil plane. The following discussion focuses on the details of the design evolution, analysis, build, and test of this mechanism along with the challenges associated with creating a sub arc-minute positioning mechanism operating in an extreme cryogenic environment. In addition, difficult challenges in the control system design will be discussed including the incorporation of closed-loop feedback control into a system that was designed to operate in an open-loop fashion.

PSM Design↗