Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Positioning System”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 919 records · Page 51

Design approach for a microprocessor-based GPS time transfer receiver

The design concept and characteristics of a self-contained microprocessor-based Global Positioning System time transfer receiver is described. A prototype of this unit is currently in the test phase. It employs two-bit digital baseband correlation rather than analog IF correlation of the signals with the reference code. The correlator, numerically controlled oscillators and code generator are implemented in a special-purpose digital signal processor. The time is recovered in the digital code tracking loop, and final corrections are applied in the control processor. Other features of this design are: (1) drift-free digital mechanization; (2) high reliability of digital circuits; (3) flexible control capability of the microprocessor; and (4) potential for a high degree of digital VLSI chip development leading to compact, low-cost units.

Ould, P. C.↗

Long term frequency stability analysis of the GPS NAVSTAR 6 Cesium clock

Time domain measurements, taken between the NAVSTAR 6 Spacecraft Vehicle (SV) and the Vandenberg Global Positioning System (GPS) Monitor Site, by a pseudo random noise receiver, were collected over an extended period of time and analyzed to estimate the long term frequency stability of the NAVSTAR 6 onboard frequency standard, referenced to the Vandenberg MS frequency standard. The technique employed separates the clock offset from the composite signal by first applying corrections for equipment delays, ionospheric delay, tropospheric delay, Earth rotation and the relativistic effect. The data are edited and smoothed using the predicted SV ephemeris to calculate the geometric delay. Then all available passes from each of the four GPS monitor stations, are collected at 1-week intervals and used to calculate the NAVSTAR orbital elements. The procedure is then completed by subtracting the corrections and the geometric delay, using the final orbital elements, from the composite signal, thus leaving the clock offset and random error.

Mccaskill, T. B.↗

Unprecented syntonization and syncronization accuracy via simultaneous viewing with GPS receivers: Construction characteristics of an NBS/GPS receiver

The National Bureau of Standards/Global Positioning System (NBS/GPS) receiver is discussed. It is designed around the concept of obtaining high accuracy, low cost time and frequency comparisons between remote frequency standards and clocks with the intent to aid international time and frequency coordination. Preliminary tests of this comparison technique between Boulder, CO and Washington, D.C indicate the ability to do accurate time transfer to better that 10 ns, and frequency measurements to better than 1 part in 10 to the 14th power. The hardware and software of the receiver is detailed. The receiver is fully automatic with a built-in 0.1 ns resolution time interval counter. A microprocessor does data processing. Satellite signal stabilities are routinely at the 5 ns level for 15 s averages, and the internal receiver stabilities are at the 1 ns level.

Davis, D. D.↗

Crustal dynamics project session 4 validation and intercomparison experiments 1979-1980 report

As part of the Crustal Dynamics Project, an experiment was performed to verify the ability of Satellite Laser Ranging (SLR), Very Long Baseline interferometry (VLBI) and Doppler Satellite Positioning System (Doppler) techniques to estimate the baseline distances between several locations. The Goddard Space Flight Center (GSFC) lasers were in operation at all five sites available to them. The ten baselines involved were analyzed using monthly orbits and various methods of selecting data. The standard deviation of the monthly SLR baseline lengths was at the 7 cm level. The GSFC VLBI (Mark III) data was obtained during three separate experiments. November 1979 at Haystack and Owens Valley, and April and July 1980 at Haystack, Owens Valley, and Fort Davis. Repeatability of the VLBI in determining baseline lengths was calculated to be at the 2 cm level. Jet Propulsion Laboratory (JPL) VLBI (Mark II) data was acquired on the Owens Valley to Goldstone baseline on ten occasions between August 1979 and November 1980. The repeatability of these baseline length determinations was calculated to be at the 5 cm level. National Geodetic Survey (NGS) Doppler data was acquired at all five sites in January 1980. Repeatability of the Doppler determined baseline lengths results were calculated at approximately 30 cm. An intercomparison between baseline distances and associated parameters was made utilizing SLR, VLBI, and Doppler results on all available baselines. The VLBI and SLR length determinations were compared on four baselines with a resultant mean difference of -1 cm and a maximum difference of 12 cm. The SLR and Doppler length determinations were compared on ten baselines with a resultant mean difference of about 30 cm and a maximum difference of about 60 cm. The VLBI and Doppler lengths from seven baselines showed a resultant mean difference of about 30 cm and maximum difference of about 1 meter. The intercomparison of baseline orientation parameters were consistent with past analysis.

Liebrecht, P.↗

LANDSAT-D flight segment operations manual, volume 2

Functions, performance capabilities, modes of operation, constraints, redundancy, commands, and telemetry are described for the thematic mapper; the global positioning system; the direct access S-band; the multispectral scanner; the payload correction; the thermal control subsystem; the solar array retention, deployment, and jettison assembly; and the boom antenna retention, deployment, and jettison assembly for LANDSAT 4.

Varhola, J.↗

A Covariance Analysis for the Determination of Baseline Observing GPS Satellites

Results of covariance analyses are presented for the determination of baseline vectors of length from 150 m to 4000 km. The data are doubly differenced ranges derived from the signals transmitted by the satellites of the Global Positioning System. The modeling of various error sources is described. The results indicate the low cost baseline determination system is capable of subdecimeter accuracy for baselines up to 1000 km in length.

Wu, S. C.↗

Test results of the STI GPS time transfer receiver

Global time transfer, or synchronization, between a user clock and USNO UTC time can be performed using the Global Positioning System (GPS), and commercially available time transfer receivers. This paper presents the test results of time transfer using the GPS system and a Stanford Telecommunications, Inc. (STI) Time Transfer System (TTS) Model 502. Tests at the GPS Master Control Site (MCS) in Vandenburg, California and at the United States Naval Observatory (USNO) in Washington, D.C. are described. An overview of GPS, and the STI TTS 502 is presented. A discussion of the time transfer process and test concepts is included.

Hall, D. L.↗

One nanosecond time synchronization using series and GPS

Subnanosecond time sychronization between two remote rubidium frequency standards is verified by a traveling clock comparison. Using a novel, code ignorant Global Positioning System (GPS) receiver developed at JPL, the SERIES geodetic baseline measurement system is applied to establish the offset between the 1 Hz. outputs of the remote standards. Results of the two intercomparison experiments to date are presented as well as experimental details.

Buennagel, A. A.↗

Landsat-D, about to be reality

The space and ground segments of the Landsat-D thematic mapper (TM) for remote sensing of a 185 km swath with 30 m resolution are described. Scanning the full earth once every 16 days from its 705 km sunsynchronous orbit, Landsat-D will relay its data on the ku-band through the TDRSS satellite to a ground station. The X-band will also be used to transmit data directly to foreign and domestic ground stations; the S-band will be reserved for MSS data only. Landsat-D comprises the multimission modular spacecraft and the instrument module, which features the MSS and TM, a wideband communication subsystem, a solar array, and an L-band global positioning system. Three computers on the ground provide a high degree of automation for reception, storage, retrieval, back-up, and transmission of data and commands. Additionally, a van is equipped with transportable equipment, including an antenna. Procedures followed for image generation from the MSS and TM are detailed, noting storage at Goddard until dispersal of tapes under the direction of the EROS data center.

Aepli, T. C.↗

Calibrating for Ionospheric Phase Delays

Technique determines ionospheric phase delay on real-time universally applicable basis in terms of electrons per meter squared by coherently modulating two L-band carrier frequencies received from two Global Positioning System satelites. Two pseudorandom number sequences cross-correlated to derive delay time.

Macdoran, P. F.↗

First Results of GPS Time Transfer to Australia

A global positioning system (GPS) time transfer unit was installed at Tidbinbilla Deep Space Communications Complex of the DSN in June 1983. It was used to estimate the relationship to UTC(USNO MC) of the Tidbinbilla frequency and time system TID(FTS) based on a hydrogen maser, and to estimate the performance of the Australian free-running time scale UTC(AUS). Data from the first 3 months were analyzed three ways: by two-hop common view using JPL as intermediary; by long-arc interpolation of measurements against space vehicle clocks; and by long arc interpolation of GPS-Time results. Residuals from a single quadratic fit through 3 months of UTC(USNO MC) -TID(FTS) results were white noise with standard error 15 ns, and a flying clock measurement gave 70 ns agreement. A straight line fit through results UTC(USNO MC) - UTC(AUS) gave 90 ns standard error and 120 ns agreement. It is proposed to use the GPS measurements to steer UTC(AUS) to UTC(BIH), and to rename the existing time scale TA(AUS).

Mck.luck, J.↗

Satellite Emission Range Inferred Earth Survey (SERIES) project

The Global Positioning System (GPS) was developed by the Department of Defense primarily for navigation use by the United States Armed Forces. The system will consist of a constellation of 18 operational Navigation Satellite Timing and Ranging (NAVSTAR) satellites by the late 1980's. During the last four years, the Satellite Emission Range Inferred Earth Surveying (SERIES) team at the Jet Propulsion Laboratory (JPL) has developed a novel receiver which is the heart of the SERIES geodetic system designed to use signals broadcast from the GPS. This receiver does not require knowledge of the exact code sequence being transmitted. In addition, when two SERIES receivers are used differentially to determine a baseline, few cm accuracies can be obtained. The initial engineering test phase has been completed for the SERIES Project. Baseline lengths, ranging from 150 meters to 171 kilometers, have been measured with 0.3 cm to 7 cm accuracies. This technology, which is sponsored by the NASA Geodynamics Program, has been developed at JPL to meet the challenge for high precision, cost-effective geodesy, and to complement the mobile Very Long Baseline Interferometry (VLBI) system for Earth surveying.

Buennagel, L. A.↗

SERIES - Satellite Emission Range Inferred Earth Surveying

The Satellite Emission Range Inferred Earth Surveying (SERIES) concept is based on the utilization of NAVSTAR Global Positioning System (GPS) radio transmissions without any satellite modifications and in a totally passive mode. The SERIES stations are equipped with lightweight 1.5 m diameter dish antennas mounted on trailers. A series baseline measurement accuracy demonstration is considered, taking into account a 100 meter baseline estimation from approximately one hour of differential Doppler data. It is planned to conduct the next phase of experiments on a 150 m baseline. Attention is given to details regarding future baseline measurement accuracy demonstrations, aspects of ionospheric calibration in connection with subdecimeter baseline accuracy requirements of geodesy, and advantages related to the use of the differential Doppler or pseudoranging mode.

Macdoran, P. F.↗

Comparison of NAVSTAR satellite L band ionospheric calibrations with Faraday rotation measurements

It is pointed out that interplanetary navigation at the Jet Propulsion Laboratory (JPL) is performed by analyzing measurements derived from the radio link between spacecraft and earth and, near the target, onboard optical measurements. For precise navigation, corrections for ionospheric effects must be applied, because the earth's ionosphere degrades the accuracy of the radiometric data. These corrections are based on ionospheric total electron content (TEC) determinations. The determinations are based on the measurement of the Faraday rotation of linearly polarized VHF signals from geostationary satellites. Problems arise in connection with the steadily declining number of satellites which are suitable for Faraday rotation measurements. For this reason, alternate methods of determining ionospheric electron content are being explored. One promising method involves the use of satellites of the NAVSTAR Global Positioning System (GPS). The results of a comparative study regarding this method are encouraging.

Royden, H. N.↗

Method and apparatus for calibrating the ionosphere and application to surveillance of geophysical events

The columnar electron content of the ionosphere between a spacecraft and a receiver is measured in realtime by cross correlating two coherently modulated signals transmitted at different frequencies (L1,L2) from the spacecraft to the receiver using a cross correlator. The time difference of arrival of the modulated signals is proportional to electron content of the ionosphere. A variable delay is adjusted relative to a fixed delay in the respective channels (L1,L2) to produce a maximum at the cross correlator output. The difference in delay required to produce this maximum is a measure of the columnar electron content of the ionosphere. A plurality of monitoring stations and spacecraft (Global Positioning System satellites) are employed to locate any terrestrial event that produces an ionospheric disturbance.

Macdoran, P. F.↗

First results of GPS time transfer to Australia

A Global Positioning System time transfer unit built by NBS under contract to JPL was installed at Tidbinbilla Deep Space Communications Complex of the NASA Deep Space Network in June 1983. It has been used to estimate the relationship to UTC(USNO MC) of the Tidbinbilla frequency and time system TID(FTS) based on a hydrogen maser, and thence to estimate the performance of the Australian free-running time scale UTC(AUS). Data from the first three months has been analyzed three ways: by two-hop common view using JPL as intermediary; by long-arc interpolation of measurements against space vehicle clocks; and by long-arc interpolation of GPS-Time results. Residuals from a single quadratic fit through three months of UTC(USNO MC) - TID (FTS) results were white noise with standard error 15 ns, and a flying clock measurement gave 70 ns agreement. A straight line fit through results UTC(USNO MC) - UTC (AUS) gave 90 ns standard error and 120 bns agreement. It is proposed to use the GPS measurements to steer UTS(AUS) to UTC(BIH), and to rename the existing time scale TA(AUS).

Luck, J. M.↗

Rubidium and cesium frequency standards status and performance on the GPS program

The on-oribt operational performance of the frequency standards on the Global Positioning System (GPS) 1 to 10 NAVSTAR satellites are discussed. The history of the Rb frequency standards showing the improvements incorporated at various stages of the program and the corresponding results are presented. Also presented is the operational history of the NAVSTAR cesium frequency standards. The frequency standards configuration data presented covers the chronology of events from the concept validation satellites, NAVSTAR 1 to 10, starting in 1978 to the present, including the configurations of clocks to be used on the GPS Production Program. Data are presented showing the results of long-term laboratory testing of a production Rb frequency standard with the necessary data taken to calculate Delta F, drift, time error, and Allan variance.

Bethke, H.↗

Application of differential GPS to civil helicopter terminal guidance

NASA is conducting a research program to evaluate differential Global Positioning System (GPS) concepts for civil helicopter navigation. It is pointed out that the civil helicopter community will probably be an early user of GPS because of the unique mission operations in areas where precise navigation aids are not available. Applications with very demanding accuracy requirements are related to remote area search and rescue, offshore oil platform approach, remote area precision landing, and other precise navigation operations. Differential GPS appears to provide a solution for meeting the accuracy requirements involved in the considered operations. The present investigation is concerned with results obtained in three areas studied in connection with the conducted research program. Attention is given to mission-tailored satellite selection, a satellite selection algorithm concept, satellite selection algorithm simulation results, and differential GPS ground station design.

Denaro, R. P.↗