Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Energy Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 919 records · Page 51

Adaptive Cyber-Physical Resilience for Building Control Systems

The main goal of the project is to develop an AI-based process layer cybersecurity suite for detection, isolation and mitigation of cyber-attack effects on operation of building energy management systems (BEMS). The following constituent key technologies were developed under the program towards fulfilling the program objectives: (1) developed a high fidelity BEMS testbed for generation of training data and validation of developed technologies; (2) developed a physics informed ML based attack detection and localization module (ADL) capable of detecting high impact stealthy attacks (HISA - attacks causing 30% energy utilization but no immediate visible impact otherwise) with 98% accuracy; (3) developed a methodology to determine ’representative days’ to limit the data required for training; (4) developed a virtual sensing system that can reconstruct affected sensors with 10% error for the same HISA set; (5) developed a resilient model predictive control system that can continue operation of the BEMS without jeopardizing stability for the HISA set; and (6) integrated and deployed all the constituent modules and demonstrated the efficacy of the technology in real-time in a hardware in loop simulation.

42 ENGINEERING↗

Optimal Dispatch for the US Virgin Islands to Increase Renewable Rates in Saint Croix

The US Virgin Islands, like many other small island nations, face significant challenges related to its energy supply. Their dependency on imported fossil fuels not only drives up energy costs, but also contributes to different environmental problems. Nevertheless, their generally sunny and windy climate makes this archipelago an ideal location for renewable energy development. Increasing the use of sources such as wind, and solar can help reduce their energy dependency, lower their levelized cost of electricity, and improve the health and wellbeing of local communities. In this paper, an optimal dispatcher is employed to analyze the implications on energy security of employing different technology options according to the plans of the local system operator. In this context, short term stability is ensured by inserting operational constraints in the energy management system based on stability analysis developed in PSCAD. The results highlight the usefulness of integrating PV and battery system, while further analysis are required to justify integrating wind power.

energy islands↗

Improving the Power Outage Resilience of Buildings with Solar PV through the Use of Battery Systems and EV Energy Storage

Buildings with solar photovoltaic (PV) generation and a stationary battery energy storage system (BESS) may self-sustain an uninterrupted full-level electricity supply during power outages. The duration of off-grid operation is dependent on the time of the power fault and the capabilities of the home energy management system (HEMS). In this paper, building resilience is quantified by analyzing the self-sustainment duration for all possible power outages throughout an entire year. An evaluation method is proposed and exercised on a reference house in California climate zone 9 for which the detailed electricity usage is simulated using the EnergyPlus software. The influence of factors such as energy use behavioral patterns, energy storage capacity from the BESS, and an electric vehicle (EV) battery on the building resilience is evaluated. Varying combinations of energy storage and controllable loads are studied for optimally improved resilience based on user preferences. It is shown that for the target home and region with a solar PV system of 7.2 kW, a BESS with a capacity of 11 kWh, and an EV with a battery of 80 kWh permanently connected to the home, off-grid self-sustained full operation is guaranteed for at least 72 h.

14 SOLAR ENERGY↗

The Dark Energy Survey Data Management System: The Processing Framework

The Dark Energy Survey Data Management (DESDM) system will process and archive the data from the Dark Energy Survey (DES) over the five year period of operation. This paper focuses on a new adaptable processing framework developed to perform highly automated, high performance data parallel processing. The new processing framework has been used to process 45 nights of simulated DECam supernova imaging data, and was extensively used in the DES Data Challenge 4, where it was used to process thousands of square degrees of simulated DES data.

Gower, Michelle↗

Distributed Energy Resource Visual Emulator: Phase 1

To help federal energy managers assess, monitor, and manage cybersecurity while achieving decarbonization, the National Renewable Energy Laboratory's Distributed Energy Resource Cybersecurity Framework (DER-CF) offers a comprehensive, web-based assessment tool focusing on cyber governance or policies, technical management, and physical security. The DER-CF currently presents users with a series of pertinent cybersecurity questions, which are used to generate a site-specific report and recommendations. This paper outlines a technical approach to integrate the DER-CF with another key asset—NREL's Advanced Research on Integrated Energy Systems (ARIES) Cyber Range—to visualize cybersecurity resilience and compliance and to enhance the usability and accessibility of the DER-CF. The result is a new tool called the Distributed Energy Resource Visual Emulator (DER-VE). Its development will include regular conversations with stakeholders to assess the effectiveness of these efforts, refine the visualization capability, and ensure its value to our partners. Phase 0 of the integration project was concluded in 2021. Phase 1, completed in 2022, has two components: The first is developing a working visualization of system compliance using the DER-CF, and the second is planning the design of a server application that takes input data from the DER-CF and creates a personal emulated environment of the user's system or a selected reference architect. Major components that were addressed in this phase are the DER-CF output, compliance visualization, data model, and compliance server design.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Risk Management for Distributed Energy Resources

The National Institute of Standards and Technology will be hosting on Tuesday, February 2 and Wednesday, February 3, 2021, the second workshop in a new series focusing on the Open Security Controls Assessment Language. NREL extended the scope of the DERCF to include the NIST Risk Management Framework (RMF), addressing the challenges faced by federal energy managers when complying with the NIST RMF for DER systems. The NIST RMF is a cyclical process designed to incorporate principles of security and risk management into an organization’s system policies and procedures. The DER-RM will be downloadable application that runs locally and documents all the major requirements for achieving Authority to Operate the DER.

cybersecurity↗

Using Whole-Building Electric Load Data in Continuous or Retro-Commissioning

Whole-building electric load data can often reveal problems with building equipment or operations. In this paper, we present methods for analyzing 15-minute-interval electric load data. These methods allow building operators, energy managers, and commissioning agents to better understand a building's electricity consumption over time and to compare it to other buildings, helping them to 'ask the right questions' to discover opportunities for electricity waste elimination, energy efficiency, peak load management, and demand response. For example: Does the building use too much energy at night, or on hot days, or in the early evening? Knowing the answer to questions like these can help with retro-commissioning or continuous commissioning. The methods discussed here can also be used to assess how building energy performance varies with time. Comparing electric load before and after fixing equipment or changing operations can help verify that the fixes have the intended effect on energy consumption. Analysis methods discussed in this paper include: ways to graphically represent electric load data; the definition of various parameters that characterize facility electricity loads; and a regression-based electricity load model that accounts for both time of week and outdoor air temperature. The methods are illustrated by applying them to data from commercial buildings. We demonstrate the ability to recognize changes in building operation, and to quantify changes in energy performance. Some key findings are: 1) Plotting time series electric load data is useful for understanding electricity consumption patterns and changes to those patterns, but results may be misleading if data from different time intervals are not weather-normalized. 2) Parameter plots can highlight key features of electric load data and may be easier to interpret than plots of time series data themselves. 3) A time-of-week indicator variable (as compared to time-of-day and day-of-week indicator variables) improves the accuracy of regression models of electric load. 4) A piecewise linear and continuous outdoor air temperature dependence can be derived without the use of a change-point model (which would add complexity to the modeling algorithm) or assumptions about when structural changes occur (which could introduce inaccuracy). 5) A model that includes time-of-week and temperature dependence can be used for weather normalization and can determine whether the building is unusually temperature-sensitive, which can indicate problems with HVAC operation.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A Preliminary Investigation into the Mitigation of Plug-in Hybrid Electric Vehicle Tailpipe Emissions Through Supervisory Control Methods Part 2: Experimental Evaluation of Emissions Reduction Methodologies

Plug-in hybrid electric vehicle (PHEV) technologies have the potential for considerable petroleum consumption reductions, possibly at the expense of increased tailpipe emissions due to multiple 'cold' start events and improper use of the engine for PHEV specific operation. PHEVs operate predominantly as electric vehicles (EVs) with intermittent assist from the engine during high power demands. As a consequence, the engine can be subjected to multiple cold start events. These cold start events may have a significant impact on the tailpipe emissions due to degraded catalyst performance and starting the engine under less than ideal conditions. On current hybrid electric vehicles (HEVs), the first cold start of the engine dictates whether or not the vehicle will pass federal emissions tests. PHEV operation compounds this problem due to infrequent, multiple engine cold starts. A continuation of previous analytical work, this research, experimentally verifies a vehicle supervisory control system for a pre-transmission parallel PHEV powertrain architecture. Energy management strategies are evaluated and implemented in a virtual environment for preliminary assessment of petroleum displacement benefits and rudimentary drivability issues. This baseline vehicle supervisory control strategy, developed as a result of this assessment, is implemented and tested on actual hardware in a controlled laboratory environment over a baseline test cycle. Engine cold start events are aggressively addressed in the development of this control system, which leads to enhanced pre-warming and energy-based engine warming algorithms that provide substantial reductions in tailpipe emissions over the baseline supervisory control strategy. The flexibility of the PHEV powertrain allows for decreased emissions during any engine starting event through powertrain 'torque shaping' algorithms. The results of the research show that PHEVs do have the potential for substantial reductions in fuel consumption. Tailpipe emissions from a PHEV test platform have been reduced to acceptable levels through the development and refinement of vehicle supervisory control methods only. Impacts on fuel consumption were minimal for the emissions reduction techniques implemented.

02 PETROLEUM↗

Decarbonization Considerations: Grid-Interactive Efficient Buildings [Slides]

The Federal Energy Management Program (FEMP) is helping federal agencies understand how to meet decarbonization goals with grid interactive efficient buildings (GEB). This training will provide attendees with an introduction to GEB, how to work with utilities, and opportunities for federal sites.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Probabilistic Look-ahead Contingency Analysis Integration with Commercial Tool and Practical Data

This paper presents an initial effort of integrating a smart sampling-based probabilistic look-ahead contingency analysis algorithm with General Electric (GE) Grid Solutions’ commercial energy management system (EMS) tool as a proof-of-concept for a seamless research tool integration using real world large-scale grid data. With the increasing impact of random forces such as variable generation and load, their stochastic behaviors cannot be ignored. However, the current practices are still dominated by deterministic tools. They are becoming increasingly inadequate for the future grid. The developed look-ahead contingency analysis algorithm incorporates forecast errors of variable energy and load to address the challenges brought by the increasing uncertainty of power system. The algorithm can reveal the potential violations caused by the variance of variable energy and load that are not normally detected by traditional deterministic approaches. To test its performance under practical environments ( real data with real commercial tool), significant efforts have been made to prepare test cases, modify GE EMS tool, and adapt an extreme value distribution algorithm to analyze the GE EMS’s violation-only outputs. The test results clearly demonstrate the effectiveness of the developed algorithm as new transformer violations that were not previously detected have been identified. This performance provides better situational awareness to engineers for their decision-making process under uncertainty. Moreover, with the discussion of computational performance and future work, this paper has shown a clear path for integrating the probabilistic algorithm with commercial tools to make us better equipped for the changing power system.

Modeling and simulation of power systems, constrai↗

Analysis of electric vehicle interconnection with commercial building microgrids

The outline of this presentation is: (1) global concept of microgrid and electric vehicle (EV) modeling; (2) Lawrence Berkeley National Laboratory's Distributed Energy Resources Customer Adoption Model (DER-CAM); (3) presentation summary - how does the number of EVs connected to the building change with different optimization goals (cost versus CO{sub 2}); (3) ongoing EV modeling for California: the California commercial end-use survey (CEUS) database, objective: 138 different typical building - EV connections and benefits; (4) detailed analysis for healthcare facility: optimal EV connection at a healthcare facility in southern California; and (5) conclusions. Conclusions are: (1) EV Charging/discharging pattern mainly depends on the objective of the building (cost versus CO{sub 2}); (2) performed optimization runs show that stationary batteries are more attractive than mobile storage when putting more focus on CO{sub 2} emissions. Why? Stationary storage is available 24 hours a day for energy management - more effective; (3) stationary storage will be charged by PV, mobile only marginally; (4) results will depend on the considered region and tariff - final work will show the results for 138 different buildings in nine different climate zones and three major utility service territories.

25 ENERGY STORAGE↗

AI-Driven Smart Community Control for Accelerating PV Adoption and Enhancing Grid Resilience

The U.S. Department of Energy (DOE) has launched a Connected Communities program that supports projects that expand DOE's network of grid-interactive, efficient building communities nationwide. As an early pilot of Connected Communities, the National Renewable Energy Laboratory (NREL) and its partners have developed and demonstrated a community-scale, hierarchical control solution to address the potential grid issues arising from high penetration of solar photovoltaics (PV) as well as to improve grid reliability and resilience in this residential community. A field pilot study has been performed at an affordable housing development called the Basalt Vista Community, which was built for school teachers and other professionals in the local workforce and represents an autonomous energy grid with all-electric, energy-efficient homes. With no natural gas line in the community, this is the first all-electric net-zero community in rural Colorado. In the field pilot study, NREL has validated the performance of the hierarchical control solution, which consists of NREL's foresee home energy management systems (HEMS) and community aggregators, in increasing demand flexibility and self-consuming PV, reducing potential over-voltages, and supporting critical loads during emergency events. In this presentation, we will present the methodology, simulation and field pilot results, and lessons learned from the project.

all-electric community↗

Golden Gate National Recreation Area Federal Fleet Tiger Team EVSE Site Assessment

The U.S. Department of Energy Federal Energy Management Program (FEMP) helps federal agencies reduce petroleum consumption and increase alternative fuel use through its resources for sustainable federal fleets. A key element of this assistance involves supporting agencies in the transition to zero-emission vehicles (ZEVs). Fleet electrification is part of a federal policy to achieve net-zero emissions economy-wide and a carbon pollution-free electricity sector, established through two executive orders (EOs) - EO 14008: Tackling the Climate Crisis at Home and Abroad and EO 14057: Catalyzing America's Clean Energy Industries and Jobs through Federal Sustainability. This site report supports the development of a ZEV deployment plan for the Golden Gate National Recreation Area, which can ultimately be incorporated into the overall U.S. Department of the Interior ZEV fleet strategy.

33 ADVANCED PROPULSION SYSTEMS↗

Yellowstone National Park Federal Fleet Tiger Team EVSE Site Assessment [Slides]

The U.S. Department of Energy Federal Energy Management Program (FEMP) helps federal agencies reduce petroleum consumption and increase alternative fuel use through its resources for sustainable federal fleets. A key element of this assistance involves supporting agencies in the transition to zero-emission vehicles (ZEVs). Fleet electrification is part of a federal policy to achieve net-zero emissions economy-wide and a carbon pollution-free electricity sector, established through two executive orders (EOs) - EO 14008: Tackling the Climate Crisis at Home and Abroad and EO 14057: Catalyzing America's Clean Energy Industries and Jobs through Federal Sustainability. This site report supports the development of a ZEV deployment plan for Yellowstone National Park, which can ultimately be incorporated into the overall U.S. Department of the Interior ZEV fleet strategy.

33 ADVANCED PROPULSION SYSTEMS↗

Y-12 National Security Complex Water Assessment

The Department of Energy's Federal Energy Management Program (FEMP) sponsored a water assessment at the Y 12 National Security Complex (Y 12) located in Oak Ridge, Tennessee. Driven by mandated water reduction goals of Executive Orders 13423 and 13514, the objective of the water assessment is to develop a comprehensive understanding of the current water-consuming applications and equipment at Y 12 and to identify key areas for water efficiency improvements that could be applied not only at Y-12 but at other Federal facilities as well. FEMP selected Pacific Northwest National Laboratory to coordinate and manage the water assessment. PNNL contracted Water Savers, LLC to lead the technical aspects of the water assessment. Water Savers provided key technical expertise in water auditing, metering, and cooling systems. This is the report of that effort, which concluded that the Y-12 facility could realize considerable water savings by implementing the recommended water efficiency opportunities.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Smart buildings with electric vehicle interconnection as buffer for local renewables?

Some conclusions from this presentation are: (1) EV Charging/discharging pattern mainly depends on the objective of the building (cost versus CO{sub 2}); (2) performed optimization runs show that stationary batteries are more attractive than mobile storage when putting more focus on CO{sub 2} emissions because stationary storage is available 24 hours a day for energy management - it's more effective; (3) stationary storage will be charged by PV, mobile only marginally; and (4) results will depend on the considered region and tariff. Final research work will show the results for 138 different buildings in nine different climate zones and three major utility service territories.

25 ENERGY STORAGE↗

Federal Home-to-Work Electric Vehicle Program Guide

This document serves as a comprehensive resource for Federal agencies in developing their own program resources that promote the efficient and effective use of electric vehicles (EVs) for home-to-work travel while ensuring compliance with Federal regulations and sustainability objectives. One mission of the U.S. Department of Energy's Federal Energy Management Program (FEMP) Fleet program is to help federal fleet managers meet or exceed statutory requirements related to energy and environmental performance while improving overall fleet efficiency, reducing costs, and meeting mission requirements. To further this mission, FEMP provides resources to support Federal agencies with increasing alternative fuel vehicle (AFV) acquisitions and reducing petroleum use. EVs are AFVs and help agencies meet federal fleet requirements. Federal fleets include government-owned EVs used for home-to-work travel. The purpose of this document is to serve as a guide for Federal agencies in developing their own internal program documents to manage government-owned EVs used for home-to-work travel. Federal agencies should consult their counsel and consider their own policies and authorities in the implementation of any policies or best practices regarding government-owned EVs used for home-to-work travel. The guide provides key considerations for agencies, including launching a pilot program to fine-tune best practices, conducting a cost-benefit analysis to compare home versus public charging, and exploring cost-effective solutions, such as installing standard outlets instead of dedicated charging stations. The guide underscores the importance of legal and financial considerations, such as verifying agency authority to install home charging infrastructure at an employee's home, ensuring the availability and appropriateness of using agency funds for home charging infrastructure, and understanding the tax implications of reimbursements.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗