MSGP Stormwater Pollution Prevention Plan TA-60 Material Recycling Facility

This Stormwater Pollution Prevention Plan (SWPPP) was developed in accordance with the provisions of the Clean Water Act (33 U.S.C. §§1251 et seq., as amended), and the United States Environmental Protection Agency (EPA) National Pollutant Discharge Elimination System (NPDES) Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activity (MSGP) (U.S. EPA, June 2015) issued by EPA, and using the industry specific permit requirements for Sector N: Scrap Recycling and Waste Recycling Facilities as a guide. The applicable stormwater discharge permit is EPA General Permit Tracing Number NMR050013 [Triad National Security, LLC (Triad)]. This SWPPP applies to discharges of stormwater from the operational areas of the TA- 60 Material Recycling Facility at Los Alamos National Laboratory. Los Alamos National Laboratory (also referred to as LANL or the “Laboratory”) is owned by the Department of Energy (DOE), and is operated by Triad. Throughout this document, the term “facility” refers to the TA-60 Material Recycling Facility. The current MSGP expires at midnight on June 4, 2020.

54 ENVIRONMENTAL SCIENCES↗

Performance Evaluation of Whole-Body Counting Facilities in the Marshall Islands (2014-2017)

In 1998, the United States Department of Energy (U.S. DOE) began a series of initiatives to address the long-term radiological surveillance needs of resettling populations exposed to elevated levels of residual fallout at the former U.S. nuclear test sites within the Marshall Islands. With support from the local atoll governments, three whole-body counting facilities were established on Enewetak, Rongelap, and Majuro Atolls, and tasked with monitoring the health and safety of the populations living there. Each facility is operated and maintained by Marshallese technicians. Scientists from the Lawrence Livermore National Laboratory (LLNL) are responsible for equipment maintenance, training of Marshallese technicians, data quality assurance and for implementing performance testing measures. In addition, LLNL maintains a whole-body counting training facility which mirrors the facilities operating in the Marshall Islands.

63 RADIATION, THERMAL, AND OTHER ENVIRON. POLLUTAN↗

Benchmarking of Wellhead Safety Zone Criteria for Underground Gas Storage Facilities

Underground natural gas storage facilities are a vital part of the U. S. national infrastructure. However, the concept of hazard zones from fires and explosions at these facilities is not nearly as well defined as it is for natural gas transmission pipelines. This report will take a safety area predicted for underground gas storage facilities called the Wellhead Safety Zone or WSZ and benchmark it against the observed damage zone from the drill rig accident near Rama, Louisiana on November 15, 2007. When combined with earlier accidents, this new benchmark indicates the WSZ formula gives an accurate indication of the hazard radius from underground gas storage facility accidents over a wide range of casing sizes and pressures.

03 NATURAL GAS↗

Physical Security Model Development of an Electrochemical Facility.

Nuclear facilities in the U.S. and around the world face increasing challenges in meeting evolving physical security requirements while keeping costs reasonable. The addition of security features after a facility has been designed and without attention to optimization (the approach of the past) can easily lead to cost overruns. Instead, security should be considered at the beginning of the design process in order to provide robust, yet efficient physical security designs. The purpose of this work is to demonstrate how modeling and simulation can be used to optimize the design of physical protection systems. A suite of tools, including Scribe3D and Blender, were used to model up a generic electrochemical reprocessing facility. Physical protection elements such as sensors, portal monitors, barriers, and guard forces were added to the model based on best practices for physical security. One outsider theft scenario was examined with 4-8 adversaries to determine security metrics. This work fits into a larger Virtual Test Bed 2020 Milestone in the Material Protection, Accounting, and Control Technologies (MPACT) program through the Department of Energy (DOE). The purpose of the milestone is to demonstrate how a series of experimental and modeling capabilities across the DOE complex provide the capabilities to demonstrate complete Safeguards and Security by Design (SSBD) for nuclear facilities. ACKNOWLEDGEMENTS This work was funded by the Materials Protection, Accounting, and Control Technologies (MPACT) working group as part of the Nuclear Technology Research and Development Program under the U.S. Department of Energy, Office of Nuclear Energy.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

A Revised Architectural Survey of the Nuclear Engine Maintenance Assembly and Disassembly Facility, Area 25, Nevada National Security Site, Nye County, Nevada

The U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) anticipates closure activities under the Federal Facility Agreement Consent Order (FFACO) and eventual demolition of the Engine Maintenance and Disassembly (E-MAD) facility, to meet Environmental Management mission requirements. The NNSA/NFO has obligations under Section 106 of the National Historic Preservation Act (NHPA) and its implementing regulations (36 C.F.R. Part 800) to consider the effects of its actions and undertakings on historically important properties and to develop and implement strategies to minimize or mitigate adverse effects to these resources. This Section 106 architectural survey and evaluation of the buildings and structures in the E-MAD facility was done under requirements of 36 C.F.R § 800.4 - Identification of historic properties. Desert Research Institute (DRI) completed an architectural survey of a 21-acre area of potential effect in February 2019. DRI previously surveyed the entire E-MAD facility as a single architectural resource eligible for inclusion in the National Register of Historic Places (NRHP or National Register) under Criteria A and C and Consideration G and as a contributor to the potential Nuclear Rocket Development Station (NRDS) Historic District (Beck et al. 1996).

54 ENVIRONMENTAL SCIENCES↗

Preliminary Evaluation of Loading DOE Standardized Canisters in the CPP-603 Irradiated Fuel Storage Facility

This evaluation looks at the equipment and operations necessary to load United States Department of Energy (DOE) -owned Spent Nuclear Fuel (SNF) into DOE SNF Standardized Canisters in the CPP-603 Irradiated Fuel Storage Facility in the Idaho Nuclear Technology and Engineering Center (INTEC) area at Idaho National Laboratory (INL). Two types of fuels are looked at in this evaluation: Advanced Test Reactor (ATR) fuel (uranium-aluminide fuel with aluminum cladding) and Peach Bottom fuel (thorium-uranium carbide fuel in a graphite matrix). The ATR fuel ready for loading would come from fuel storage canisters in the CPP-603 facility, while the Peach Bottom fuel ready for loading could come from either fuel storage canisters in the CPP-603 facility and or containers in the CPP-749 Underground Fuel Storage Facility – Generation I Vaults.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

IAEA ITC28 Project Report. 28th International Training Course on the Physical Protection of Nuclear Materials and Nuclear Facilities

Sandia National Laboratories (SNL) has hosted the International Training Course on the Physical Protection of Nuclear Materials and Nuclear Facilities since 1978. This course is the flagship training course of the International Atomic Energy Agency (IAEA). On behalf of the National Nuclear Security Administration (NNSA), SNL manages, develops, and coordinates all course materials, and works closely with the IAEA to arrange all logistical details for the course. ITC-28 incorporated several new approaches based on feedback and experience with ITC-27 and earlier versions of the course. For ITC-28, an addition to the Integrated Security Facility (ISF) at SNL was a mock reactor hall with a mock reactor pool. Other facilities at the ISF include a mock processing facility, material receiving area, and central alarm station. The physical protection system at the ISF—an area that formerly housed Category I nuclear material—provides many opportunities for hands-on, real world training in the design and evaluation of a physical protection system (PPS). This document provides a brief description of ITC-28, including a summary of lessons learned and key recommendations for future development efforts.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

DOE National Laboratories' Computational Facilities - Research Workshop Report

DOE-ASCR researchers and computational facilities staff convened at Argonne National Laboratory for a two-day workshop on April 17–18, 2019. The intent of the workshop was to understand the requirements and challenges of the DOE computational facilities and to discuss and brainstorm research directions that can have an impact on DOE computational facilities. This report documents the background information on the workshop, its purpose and structure, the challenges the computational facilities are facing, and the key research directions of interest.

97 MATHEMATICS AND COMPUTING↗

Integrated Energy System Investigation for the Eastman Chemical Company, Kingsport, TN Facility

The industrial manufacturing industry is looking to implement new methods of energy production to ensure a consistent energy supply while reducing economic costs and environmental impacts. Much of the manufacturing industry relies on fossil fuels—primarily coal and natural gas—of which there are finite resources subject to price volatility due to an inelastic demand. These resources also come with significant negative environmental impacts related to emissions. While complete independence from fossil fuels is not immediately realistic, options are available to significantly reduce dependency on fossil fuel supplies, including integrated energy systems (IESs) which tightly couple nuclear energy source generators with energy consumers (i.e., industrial factories) to fulfill power and energy requirements. Once realized, optimized IESs may yield significant economic and environmental benefits over traditionally isolated generator and consumer facilities. This report presents a feasibility study for siting an IES to meet the steam and electricity needs of Eastman Chemical Company’s facility in Kingsport, Tennessee. This study explored reactor technology options, evaluation,and optimization,with a focus on meeting the facility’s operational and reliability requirements. This work is part of an ongoing effort by Eastman to be good environmental stewards and meet the demands of their customers by shifting to more environmentally sustainable solutions for their energy needs. Outcomes of this report are also of general interest and value to any design or development team seeking to deploy an IES,as many topics described herein are generally applicable to any nuclear power facility.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Integrated Energy System Investigation for the Eastman Chemical Company, Kingsport, Tennessee Facility

The industrial manufacturing industry is looking to implement new methods of energy production to ensure a consistent energy supply while reducing economic costs and environmental impacts. Much of the manufacturing industry relies on fossil fuels—primarily coal and natural gas—of which there are finite resources subject to price volatility due to an inelastic demand. These resources also come with significant negative environmental impacts related to emissions. While complete independence from fossil fuels is not immediately realistic, options are available to significantly reduce dependency on fossil fuel supplies, including integrated energy systems (IESs) which tightly couple nuclear energy source generators with energy consumers (i.e., industrial factories) to fulfill power and energy requirements. Once realized, optimized IESs may yield significant economic and environmental benefits over traditionally isolated generator and consumer facilities. This report presents a feasibility study for siting an IES to meet the steam and electricity needs of Eastman Chemical Company’s facility in Kingsport, Tennessee. This study explored reactor technology options, evaluation, and optimization, with a focus on meeting the facility’s operational and reliability requirements. This work is part of an ongoing effort by Eastman to be good environmental stewards and meet the demands of their customers by shifting to more environmentally sustainable solutions for their energy needs. Outcomes of this report are also of general interest and value to any design or development team seeking to deploy an IES, as many topics described herein are generally applicable to any nuclear power facility.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Proposed guidance for preparing and reviewing a molten salt non-power production or utilization facility application

Development of non-power molten salt reactors (MSRs) are under consideration to further establish an MSR experience base, support the requirements of Title 10 of the Code of Federal Regulations (10 CFR) Section 50.43(e), and provide any additional analyses needed for development of a full-scale MSR. Guidance provided in this report is based on MSRs operating with liquid fuel (i.e., fuel dissolved within a molten salt). These reactors, unless owned by the DOE or DOD, will require licensing by the US Nuclear Regulatory Commission (NRC) staff. Standard review plan (SRP) guidance for large light water reactors (LWRs) is available in NUREG-0800, Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants; Light Water Reactor (LWR) Edition. However, NRC staff observed that NUREG-0800 is very cumbersome to apply to non-power reactors “because of the great differences in complexity and hazards between non-power reactors and nuclear power plants.” Therefore, a program to develop performance-based guidance applicable to non-power reactors was initiated. In 1996, NUREG-1537, Parts 1 and 2, Guidelines for Preparing and Reviewing Applications for the Licensing of Non-Power Reactors, was published. Part 1, the format and content guide, suggests a uniform format for presenting information in non-power reactor applications that is acceptable to the NRC staff, but conformance with the format and content is not required. Part 2, the SRP, ensures the quality and uniformity of the staff review of an application. Unfortunately, the application guidelines and SRP do not provide adequate guidance for all advanced non-LWR technologies and applications. This discrepancy eventually led to the 2012 development of interim staff guidance (ISG) for NUREG-1537, which includes criteria for describing and reviewing aqueous homogeneous reactors (AHRs). Specifically, NUREG-1537 ISG, 2012 expanded the original document to address three areas: 1. updated criteria for heterogeneous non-power reactors, 2. criteria for licensing AHRs, and 3. criteria for licensing a Part 50-licensed isotope production facility. In 2015, the US Department of Energy (DOE) opted to build on the AHR NUREG-1537 ISG experience by performing a gap analysis of the guidance that would be used to license a non-power MSR. MSRs represent one of the advanced non-LWR technologies selected by DOE for development through a multiyear cost share award with Southern Company Services. Under this Advanced Reactor Concepts 2015 (DOE Advanced Reactor Concepts [ARC] 15) award program, the DOE tasked Oak Ridge National Laboratory (ORNL) to evaluate the guidance changes that the NRC may need to consider when licensing an MSR non-power reactor. ORNL staff, with support from Boston Government Services, LLC, focused on five system-related chapters in NUREG-1537 that were considered most relevant to inform the effort that would be required for a non-power MSR applicant. ORNL documented this review in a technical report, ORNL/TM-2018/834, Proposed Guidance for Preparing and Reviewing Molten Salt Non-Power Reactor License Applications (NUREG-1537). The report was subsequently shared with industry and the NRC. The 2018 review was limited in scope, focusing on key system chapters based on the expected significance of each chapter relative to expected differences in addressing advanced non-LWR technologies, specifically non-power MSRs, compared with heterogeneously fueled non-power reactors. In the ORNL report, proposed generic adaptations were suggested for the following NUREG-1537 chapters: Chapter 4, “Reactor Description”; Chapter 5, “Reactor Coolant Systems”; Chapter 6, “Engineered Safety Features”; Chapter 9, “Auxiliary Systems”; Chapter 11, “Radiation Protection Program and Waste Management” The inclusion of Chapter 11 in the previous review effort was intended to provide guidance for categorizing the waste-handling process for an MSR operating with homogenous fuel. The introductions from Parts 1 and 2 of the 2012 NUREG-1537 ISG provide guidance for the application and review of production facilities. After a period of operation, non-power MSRs with homogenous fuel will include gaseous and soluble fission products. The gaseous fission products will be collected and held for decay in an off-gas system. There might also be an initiative to polish or filter the soluble fission products in the fuel salt by some mechanical or chemical means. The treatment and handling of fission products in the non-power MSR fuel salt and the description of this process in the safety analysis report (SAR) must be very precise to avoid the waste treatment facility being construed as a co-located special nuclear material (SNM) fuel cycle facility (see Section 2.3 of this report). Subsequent to the release of ORNL/TM-2018/834, NRC staff expressed a desire to continue the regulatory gap analysis that was begun in that report. This would provide additional clarity and information addressed in certain sections of the original report, while also providing new guidance on certain topics not addressed in the original report. This revision would benefit the NRC staff reviewing applications involving non-power MSR designs and would help developers understand how the NRC staff might approach the review of such applications. The focus of this report is to provide infrastructure support to the NRC staff for the regulatory review of non-power MSRs.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Supporting Risk-Based Decision-Making to Minimize Facility-Associated Re-Introduction of Poliovirus: Phase I

Sandia National Laboratories and Gryphon Scientific, as supported and directed by the CDC Center for Preparedness and Response (CPR), studied the process of risk assessment and risk-based decision-making in facilities expected to continue possessing poliovirus strains. The first phase of the study was conducted in anticipation of developing a tool to support decision-making processes for poliovirus containment to minimize the risk of facility-associated re-introduction of poliovirus. The study results supported the starting assumption that risk management of poliovirus will be aided by more rigorous and consistent risk assessment and that experience-based risk assessment is, by itself, inadequate to understand risk in a post-eradication world. These results were derived from review of polio virus literature, oversight documents, current and expected practices, and from discussions with affected facilities. Based on these results and on additional discussions with facilities, the study team recommends development of a quantitative risk assessment tool as well as improving access to and the quality of data for informing risk-based decision-making.

59 BASIC BIOLOGICAL SCIENCES↗

NorthStar Facility Target Fab and Flow Testing - FY 21

The facility target fabrication and flow testing activity will consist of flow tests using the blower system at LANL to test the disk holder and target, both redesigned by the NorthStar prime contractor. The housing and transition system delivering helium cooling to the disc holder and target will be fabricated and tested at LANL facilities. The tests will include pressure drop versus flow measurements through the target and housing, optical flow diagnostics and fiber optic imaging of the disc stack. The pressure drop measurements will be compared to CFD simulations to verify the latter, the optical flow diagnostics will be used to determine whether modifications made to the housing and target holder allow sufficient flow through the bottom of the housing to adequately cool it and the fiber optics will be used to image the discs during operation as a proof of concept of the diagnostic, to be used at NorthStar facilities during preproduction testing. The work is a Partial Fulfillment of the Deliverable Requirement for NorthStar Facility Target Fab and Flow Testing and Production Target Testing Support by LANL

42 ENGINEERING↗

Development of Cable Aging Acceptance Criteria for Nuclear Facilities

The aging of nuclear power plant electrical cables has been the subject of substantial research and development (R&D) projects in the nuclear industry, national and international laboratories, universities, and vendor organizations for several years. More specifically, these R&D efforts were conducted to develop equipment and techniques for assessing age-related degradation of in-service cables in nuclear facilities including power plants, research reactors, waste facilities and fuel fabrication plants. In recent years, cable R&D efforts in the nuclear arena have also included work to develop new cables for the next generation of reactors. Over time, exposure to harsh environmental conditions such as elevated temperatures, radiation, and humidity in nuclear installations can result in age-related degradation and failure of cables. In the current fleet of nuclear reactors, there are thousands of miles of cabling installed in each plant and many of these cables are exposed to these harsh environmental conditions. For these cables, the jacket and insulation polymers harden and become brittle over time, making them more susceptible to crack formation and growth, moisture intrusion, and other mechanisms that can lead to cable failure. Moreover, the existing U.S. fleet of 98 nuclear reactors has an average operating age of 38 years. Many of these nuclear power plants have applied for and almost all have been granted regulatory approval for license renewals to operate for 60 years, 20 years beyond their original 40-year life. Further, subsequent license renewals (SLRs) are underway with a few commercial nuclear power sites already approved to operate up to 80 years. As these reactors pursue operating life extensions, utilities must find a way to address issues associated with age-related degradation of cables. Designers of small modular reactors are also in need of technologies to evaluate the performance of cables that will be installed in harsher environments (e.g. higher temperatures, radiation doses, dose rates, etc.) than those present in current-generation reactors. Today, a variety of cable condition monitoring (CM) techniques have been developed and successfully used in nuclear facilities. These techniques are used to identify age-related degradation and assess the condition of cables to determine if their performance characteristics have changed with age. However, objective criteria must be developed for these CM tests to help quantify cable condition and thereby develop repair and replacement schedules. With operating life extending to 80 years and more SLRs on the horizon, both nuclear facilities and regulators need an objective means to determine the aged condition of cables.

36 MATERIALS SCIENCE↗

Initial Engineering and Design for CO 2 Capture from Ethanol Facilities

The Energy & Environmental Research Center, in partnership with the U.S. Department of Energy (DOE) and North Dakota ethanol producer Red Trail Energy, LLC (RTE) and with technical support from Trimeric Corporation and the KLJ engineering firm, completed an initial engineering design (IED) for a hybrid capture system to estimate associated costs for retrofitting the operational RTE ethanol plant. The project goal supports the DOE objective to achieve negative emissions using commercially available technologies to attain Technology Readiness Level 6+ from a facility emitting >100,000 tonnes of carbon dioxide (CO 2 ) annually. The RTE CCS (carbon capture and storage) Project is currently operating a CO 2 capture facility, adjacent to the RTE ethanol facility in western North Dakota, and injecting the CO 2 more than a mile below RTE property for permanent storage. This novel hybrid capture system would process about 310,000 tonnes of CO 2 annually for the RTE host site and includes CO 2 capture and compression from bioprocessing as well as capturing CO 2 produced from natural gas boilers. The bioprocessing capture process, based on past RTE studies investigating ammonia liquefaction technology with CO 2 produced from natural gas boilers captured utilizing chemical absorption with amine, was shown to be technically feasible for the RTE site. Activities conducted to support the project goal included 1) designing a hybrid capture system using CO 2 emissions from both bioprocessing and heat production at the host site facility; 2) conducting a pre-front-end engineering and design analysis of the hybrid capture system to include environmental health and safety, a constructability report, identification of permits, and corporate approvals; and 3) performing a techno-economic assessment in accordance with DOE’s methodology, as demonstrated by the bituminous baseline study. In addition, a life cycle assessment (LCA) was completed for the RTE site to estimate the carbon life cycle for ethanol-CCS implementation using the designed hybrid capture system to determine potential for net-negative carbon emissions. Results of the IED showed the hybrid system to be technically viable, with a moderate estimated cost of $55/tonne CO 2 captured for the hybrid system. The cradle-to-gate LCA showed preliminary net-negative carbon emissions potential anticipated from implementing a hybrid CCS system at a commercial scale. Recommended next steps toward potential implementation include hybrid capture system demonstration testing for detailed engineering and LCA model comparisons with low-carbon fuel incentive programs for financial support.

01 COAL, LIGNITE, AND PEAT↗

Facility-Level Industry Representation for Decarbonization Modeling [Slides]

The largest facilities of energy-intensive materials processing industries are disproportionate contributors to U.S. greenhouse gas (GHG) emissions. In general, industrial energy system modeling for the United States currently represents industrial demands at a much lower resolution than other end-use sector modeling. Therefore, characterizing even a subset of energy-intensive materials processing facilities will capture a significant portion of industrial GHG emissions. In order to further the development of publicly-available data to support modeling of industrial decarbonization, we summarize a set of approaches and results for characterizing the location, energy intensity and mix, process emissions intensity, and general production technology of existing clinker, ammonia, and iron and steel facilities in the United States. We also characterize facilities that represent options for reducing GHG emissions from each industry.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

LANSCE Facility Longevity Assessment

This LANSCE Facility Longevity Assessment examined 34 total systems critical to the operation of the LANSCE accelerator complex. These systems are primarily owned, operated, and maintained by AOT Division. Based on the criteria used in this assessment, there are 12 AOT Division systems that are potential high risk as related to longterm LANSCE operations. These systems may also impact the success of LAMP. Also summarized in this report are the facility activities planned over the next decade. These include general facility maintenance and infrastructure upgrades, as well as planned electrical system upgrades. The LANSCE Facility Operations (LFO) Division is responsible for this activity scope and budget planning. Most of the planned activities are general in nature and should have little impact on accelerator operations or LAMP activities as currently envisioned. However, close coordination with between AOT, LFO, and LAMP would be prudent. A next step should be to develop an actionable plan to address the high-risk systems. Potential criteria for developing such a plan could include: (1) Evaluating the global impact of the system (operations, program, safety, etc.), (2) Ranking by impact (ranked now by risk), (3) Estimating cost to implement the corrective actions (Is there already a plan or not?), and (4) Estimating the time required for corrective actions. An alternative could include integration of the assessment data into both the Asset Management System and the Maintenance Analytics Risk Register.

43 PARTICLE ACCELERATORS↗

Integration of a new Cryogenic Liquefier into the IB-1 Cryogenic Test Facility

aThe increase over the last years of the testing activities related to superconducting quantum materials, SRF cavities for the PIP-II and the LCLS-II projects, as well as superconducting magnets for the HL-LHC project and Fusion research activities, has required the addition of a new Helium cryogenic plant into the existing IB-1 Industrial Cryogenic Test Facility. The new cryogenic plant is composed of a cryogenic liquefier (Cold Box) able to provide up to 340 L/h, a 4kL Dewar and two Mycom compressors providing up to 120 g/s. AL-AT (Air Liquide Advanced Technologies) has taken part of this project by designing and manufacturing the cryogenic liquefier. This new cryogenic plant is connected through a cryogenic distribution system to a 10 kL Dewar, which is part of the existing cryogenic test facility, itself composed of another Cold Box and a Sullair compressor. The new cryogenic plant has two main operating modes: one allows to transfer liquid helium at 1.7 bar between the two Dewars, the other allows to transfer supercritical Helium at 2 bar or more between the new Cold Box and the 10 kL Dewar. The entire industrial cryogenic facility is handled by a common Inventory Control System, composed of three regulatory valves, and 9 tanks giving a total buffer volume of more than 1000 m3. This paper presents the technical features of the new Helium cryogenic plant, as well as the main results of the liquefier commissioning phase and details of the helium transfer between the two dewars, making the connection between the cryogenic plants at the IB-1 Industrial Cryogenic Test Facility.