Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “test assembly”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Biofouling Analysis for Wave Energy Piston Design: Post-Access Test Report

This report summarizes the purpose, procedures, results, and conclusions of prolonged seawater tank testing of a prototype wave energy converter apparatus. Test objectives included determination of the effectiveness of a biofouling mitigation element in one test assembly compared to a control, and system force over many cycles of actuation over months.

16 TIDAL AND WAVE POWER↗

A Fluid Solver for Studying Torsional Galloping in Solar-Tracking PV Panel Arrays

Solar-tracking photovoltaic arrays are susceptible to aeroelastic fluttering during high-wind events. This dynamic fluttering behavior can grow in amplitude until the panels enter an unstable mode known as torsional galloping which can lead to panel failure or total array destruction. To better understand the physics of the torsional galloping phenomenon, and to inform the discussion around panel design and recommended panel stow positions during high wind events, a fluid-structure interaction solver composed of a simulated atmospheric boundary layer with simplified panel structural responses was designed. The simulation choices and features of this solver were informed by the geometry and physical properties of an experimental panel array known to exhibit torsional galloping behavior during hind-wind events. These simulations revealed that the torsional galloping instability is driven by a combination of cyclic vortex shedding from the sun-facing side of the panel and the elastic properties of the torque tube linking the panel assemblies. Testing different stow angles across a range of wind speeds indicates that panels are generally more stable when stowed at negative angles where the leading edge is closer to the ground, hypothesized to be due to ground-blocking effects.

41 EE - Solar Energy Technologies Office (EE-4S)↗

Construction and Commissioning of Gas Electron Multiplier (GEM) Detectors in Advanced Assembly Design for Low-Energy Applications at High Rates and Analysis of GEM Data From the Muse Experiment at PSI

The search beyond the Standard Model explores dark matter and a potential fifth force. DarkLight@ARIEL investigates the dark photon as a mediator between ordinary and dark matter. The experiment aims to measure the process e?Ta ? e?TaX ? e?Ta(e?e+), by detecting a charged lepton pair in the final state. The spectrometers will be instrumented with Gas Electron Multiplier (GEM) detectors with minimal material budget for tracking. A novel GEM construction technique is employed for fabricating 25 cm x 40 cm GEM detectors, where all layers are mechanically stretched and assembled within a double frame. The dissertation outlines physics motivation, methods, experimental setup, and the role of GEM detectors in DarkLight. A comprehensive discussion on GEM detectors, focusing on the "NS2" technique, including design, parts, assembly, testing, and performance evaluation will be discussed. The proton has garnered attention due to discrepancies in measuring its charge radius using muonic hydrogen and electron-based methods. The 2010 muonic hydrogen measurement of the proton charge radius Rp = 0.84184(67) fm, showed a significant 7? discrepancy compared to the previously known value of Rp = 0.8775(51) fm, giving rise to the proton radius puzzle. Through simultaneous measurements of e ? p and ? ? p elastic scattering, MUSE facilitates a precise and direct comparison of the proton radius. The physics background of the proton radius puzzle, measurement techniques, the approach adopted by the MUSE experiment, its significance and the experimental setup will be discussed. Furthermore, the role of GEM detectors, along with an in-depth analysis of their data and efficiency will be discussed and evaluated.

Mohammed Prem Nazeer, Sahara↗

Assembly and Initial Testing of the Gamma-Ray Emission Tomography Assessment Prototype for Irradiated Fuel

The following report documents the final development, assembly, and initial testing of the gamma-ray emission tomography assessment system (GRETA-1) for post-irradiation examination of irradiated fuel. It includes descriptions of the system components, including the high-purity germanium gamma-ray detector, the surrounding shield and collimator, the sample scanning hardware, and the control and collection software package. A series of MCNP6 simulations were performed that modeled a fuel rod scan to test image reconstruction algorithms with a complex and understood source distribution. A bench-top scan of isotopic check sources was also performed and analyzed using standard image reconstruction algorithms. The system is currently awaiting deployment at Idaho National Laboratory’s Hot Fuel Examination Facility.

46 - INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AN↗

Assembly and Functional Test of NRAD Heated Instrumentation Rig

This is a technical report (TEV-4296) which documents the configuration and materials of construction for a heated sensor test conducted in the NRAD reactor. It is being reviewed for external release so that operators of university reactors can evaluate whether this level of documentation will be acceptable for similar tests conducted in their reactors. The Objective section of this TEV is reproduced below. The purpose of this TEV is to document assembly and functional testing of a device which is designed to allow advanced sensors to be temporarily placed at the periphery of the NRAD reactor. While in this location, the operational characteristics of the sensors can be evaluated while they are exposed to a neutron flux. This device (or “rig”) consists of a cartridge heater surrounded by six guide tubes, which are in turn surrounded by insulation and an aluminum dry tube. The heater allows for the sensors to be tested while at elevated temperature.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Full-Scale Assembly 30 cm Drop Test

Can Spent Nuclear Fuel withstand the shocks and vibrations experienced during normal conditions of transport? This question was the motivation for the multi-modal transportation test (MMTT) (Summer 2017), 1/3-scale cask 30 cm drop test (December 2018), and full-scale assembly 30 cm drop tests (June 2019). The full-scale ENSA ENUN 32P cask with 3 surrogate 17x17 PWR assemblies was used in the MMTT. The 1/3-scale cask was a mockup of this cask. The 30 cm drop tests provided the accelerations on the 1/3-scale dummy assemblies. These data were used to design full-scale assembly drop tests with the goal to quantify the strain fuel rods experience inside a cask when dropped from a height of 30 cm. The drop tests were first done with the dummy and then with the surrogate assembly. This paper presents the preliminary results of the tests.

Transportation↗

IOTA Pre-Bake Test Development

The poster presentation prepared for the IOTA (Integrable Optics Test Accelerator) Pre-Bake Test Development project consists of introducing the background of the project, the work completed, and the new test configurations available with the newly designed assembly. It explains the scale of the projects, both within the IOTA ring assembly and test assembly, and describes the purpose in baking or incrementing and holding exterior heat on the beampipe to reduce impurities in the vacuum. The originally designed test, Configuration One, uses RCA scans on the interior of the pipe, increments and holds heat for a set amount of time, and is scanned again to check for water evaporation. Configuration Two begins with the same test for Configuration One but has a second cross section of beampipe separated by a gate valve. After configuration one is complete, the gate valve opens, and after a period of cooling the other side is heated, molecular movement is scanned and observed.

Seagrave, Kayla [DuPage Coll.]↗

An upgraded cryogenic test stand for HL-LHC cryo-assemblies

The Fermilab horizontal test stand previously used for testing the LHC inner triplet quadrupoles has been upgraded to test cryo-assemblies for the high-luminosity LHC upgrade (HL-LHC). The test requirements of these new cryo-assemblies required additional capabilities of the test stand cryogenic system, including controlled cool-down and warm-up, helium recovery after a quench, and operation at higher pressures. Most of these upgrades were completed to support a zero-magnet test in late 2020, with the remainder of the upgrades completed to support the first pre-series cryo-assembly test in early 2022. An overview of the design and initial operating experience of the upgraded test stand cryogenic system and associated process controls system are presented in this paper.

Rabehl, Roger J.↗

Test Stand Functional Requirements for Testing MQXFA Magnets and Q1/Q3 Cryostat Assemblies (Rev.3)

This document specifies test stand requirements for testing the High Luminosity LHC (HL-LHC, or HiLumi LHC) MQXFA magnets and LQXFA/B cryostat assemblies. Total of 12 (3 pre-series, 7 series production and 2 re-work) of these cryostat assemblies are expected to be fabricated and delivered to CERN by the U.S. HL-LHC Accelerator Upgrade Project (US HL-LHC AUP) as part of the U.S. contributions to the LHC High Luminosity Upgrade. These cryostat assemblies are the quadrupole magnetic components of the HL-LHC Q1 (LQXFA) and Q3 (LQXFB) inner triplet optical elements in front of the interactions points 1 (ATLAS) and 5 (CMS). One LMQXFA cold mass is installed in each cryostat assembly and each cold mass consists of two MQXFA quadrupole magnets. MQXFA, LMQXFA and LQXFA/B functional requirements are specified in [1,2,3].MQXFA magnets will be tested at BNL Vertical Magnet Test Facility (VMTF) and 12 cryostat assembly tests planned at Fermilab’s Horizontal Magnet Test Facility (HMTF). This document specifies the test stand functional requirements for testing MQXFA magnets and LQXFA/B cryostat assemblies.

43 PARTICLE ACCELERATORS↗

Surrogate Assembly 30 cm Drop Test

The 30 cm drop is the remaining NRC normal conditions of transport (NCT) regulatory requirement (10 CFR 71.71) for which there are no data on the actual surrogate fuel. While obtaining data on the actual fuel is not a direct requirement, it provides definitive information which aids in quantifying the risk of fuel breakage resulting from a cask drop from a height of 30 cm or less. The 30 cm drop test with the full-scale surrogate assembly conducted in May 2020 was the last step needed for quantifying the strains on the surrogate assembly rods under NCT. The full-scale surrogate assembly used in the 2020 30 cm drop test was built using a new 17x17 Pressurized Water Reactor (PWR) Westinghouse skeleton filled with the copper rods and 3 zircaloy rods from the full-scale surrogate assembly used in the Multi-Modal Transportation Test (MMTT). Felt pads were attached to the surrogate assembly bottom prior to the 30 cm drop to adequately represent the effects of the impact limiters and the cask. Note that felt "programming material" has been used extensively in past drop tests and is known to be a good material for programming a desired shock pulse. The felt pad configuration was determined during a previous series of tests reported in. The acceleration pulses observed on the surrogate assembly during the test were in good agreement with the expected pulses. This confirmed that during the 30 cm drop the surrogate assembly experienced the same conditions as it would if it was dropped in the cask with the impact limiters.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

U.S. HL-LHC Accelerator Upgrade Project: Q1/Q3 Cryostat Assembly and Horizontal Test (Final Design Report)

The Inner Triplet (IT) quadrupoles are the magnetic system for reaching low beta functions around the Interaction Point (IP). The triplet is made of three optical elements: Q1, Q2, and Q3. The upgrade of the Inner Triplets in the high luminosity insertions is the cornerstone of the LHC upgrade. The decision for HL-LHC heavily relies on the success of the advanced Nb 3 Sn technology that provides access to magnetic fields well beyond 9 T, allowing the maximization of the aperture of the IT quadrupoles. A 15-year-long study led by the DOE in the US under the auspices of the U.S. LARP program, and lately by other EU programs, has shown the feasibility of Nb 3 Sn accelerator magnets. The HL-LHC is expected to be the first application of accelerator-quality Nb 3 Sn magnet technology in an operating particle accelerator.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Test Results of the LQXFA/B02 and LQXFA/B03 Cryo-Assemblies for the High Luminosity LHC Upgrade

Here, the US High-Luminosity LHC Accelerator Upgrade Project (AUP) is responsible for delivering cryo-assemblies for the Q1/Q3 quadrupole optical components of the High Luminosity LHC upgrade at CERN. Total of 10 cryo-assemblies containing two Nb3Sn quadrupole magnets per cold mass will be delivered within this program. After the successful test of the first pre-series cryo-assembly in 2023, two more cryo-assemblies were tested at Fermilab's horizontal test facility. Production overview and the test results of the LQXFA/B02 and LQXFA/B03 cryo-assemblies are summarized in this paper. After the first test, to increase the capability of the horizontal test facility, various improvements have been made. These improvements are also described in this paper.

Chlachidze, Guram [Fermi National Accelerator Labo↗

Brief Overview of the ASD Integrated Test Stand, Activities and Hazards

The ITS venue provides the first opportunity to fully assemble and test the performance of the injector; integrate, assemble and test four modules; measure the severity of the Beam Break-Up instability and perform the first set of beam measurements. Figure 1 shows a high level configuration of the ITS without the system of overhead cable management trays. The final configuration will integrate the injector, 4 modules (12 accelerator cells), 264 SSPP Line Replaceable Units (LRUs), global controls, data acquisition, and a subset of the downstream transport, Table 1. This was chosen because it provides the minimum accelerator cells required to measure the Beam Break-Up (BBU) instability and perform measurements required to validate the ASD beam transport computer models, which are priority measurements for commissioning.

43 PARTICLE ACCELERATORS↗

Status Update for the Canister Deposition Field Demonstration

This report updates the high-level test plan for evaluating surface deposition on three commercial 32PTH2 spent nuclear fuel (SNF) canisters inside NUTECH Horizontal Modular Storage (NUHOMS) Advanced Horizontal Storage Modules (AHSMs) from Orano (formerly Transnuclear Inc.) and provides a description of the surface characterization activities that have been conducted to date. The details contained in this report represent the best designs and approaches explored for testing as of this publication. Given the rapidly developing nature of this test program, some of these plans may change to accommodate new objectives or requirements. The goal of the testing is to collect highly defensible and detailed dust deposition measurements from the surface of dry storage canisters in a marine coastal environment to guide chloride-induced stress corrosion crack (CISCC) research. To facilitate surface sampling, the otherwise highly prototypic dry storage systems will not contain SNF but rather will be electrically heated to mimic the decay heat and thermal hydraulic environment. Test and heater design is supported by detailed computational fluid dynamics modeling. Instrumentation throughout the canister, storage module, and environment will provide extensive information about thermal-hydraulic behavior. Manual sampling over a comprehensive portion of the canister surface at regular time intervals will offer a high-fidelity quantification of the conditions experienced in a harsh yet realistic environment. Functional testing of the finalized heater assemblies and test apparatus is set to begin in December 2022. The proposed delivery of the canisters to the host test site is June/July 2023, which is well ahead of when the AHSM installations would be completed.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

200 MV Record Voltage Of vCM And LCLS-II-HE Cryomodules Production Start At Fermilab

The Linac Coherent Light Source (LCLS) is an X-ray science facility at SLAC National Accelerator Laboratory. The LCLS-II project (an upgrade to LCLS) is in the commissioning phase; the LCLS-II-HE (High Energy) project is another upgrade to the facility, enabling higher energy operation. An electron beam is accelerated using superconducting radio frequency (SRF) cavities built into cryomodules. It is planned to build 24 1.3 GHz standard cryomodules and one 1.3 GHz single-cavity Buncher Capture Cavity (BCC) cryomodule for the LCLS-II-HE project. Fourteen of these standard cryomodules and the BCC are planned to be assembled and tested at Fermilab. Procurements for standard cryomodule components are nearing completion. The first LCLS-II-HE cryomodule, referred to as the verification cryomodule (vCM) was assembled and tested at Fermilab. Fermilab has completed the assembly of the second cryomodule. This paper presents LCLS-II-HE cryomodule production status at Fermilab, emphasizing the changes done based on the successes, challenges, mitigations, and lessons learned from LCLS-II; validation of the changes with the excellent vCM results.

43 PARTICLE ACCELERATORS↗

AUP First Pre-Series Cryo-Assembly Design Production and Test Overview

New high field and large-aperture quadrupole magnets for the low-beta inner triplets (Q1, Q2, Q3) have been built and tested as part of the high-luminosity upgrade of the Large Hadron Collider (HL-LHC). These new quadrupole magnets are based on Nb3Sn superconducting technology. The US Accelerator Upgrade Project (US-AUP) is producing the Q1 and Q3 Cryo-Assemblies: a pair of ~5 m long magnet structures installed in a stainless-steel helium vessel (Cold Mass) and surrounded by cryostat shields, piping, and a vacuum vessel. In conclusion, this paper gives an overview of the design, production, and the results of the horizontal test of the first pre-series Q1/Q3 Cryo-Assembly.

43 PARTICLE ACCELERATORS↗