Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “risers”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Dense Multiphase Flow Simulation: Continuum Model for Poly-Dispersed Systems Using Kinetic Theory

The overall objective of the project was to verify the applicability of the FCMOM approach to the kinetic equations describing the particle flow dynamics. For monodispersed systems the fundamental equation governing the particle flow dynamics is the Boltzmann equation. During the project, the FCMOM was successfully applied to several homogeneous and in-homogeneous problems in different flow regimes, demonstrating that the FCMOM has the potential to be used to solve efficiently the Boltzmann equation. However, some relevant issues still need to be resolved, i.e. the homogeneous cooling problem (inelastic particles cases) and the transition between different regimes. In this report, the results obtained in homogeneous conditions are discussed first. Then a discussion of the validation results for in-homogeneous conditions is provided. And finally, a discussion will be provided about the transition between different regimes. Alongside the work on development of FCMOM approach studies were undertaken in order to provide insights into anisotropy or particles kinetics in riser hydrodynamics. This report includes results of studies of multiphase flow with unequal granular temperatures and analysis of momentum re-distribution in risers due to particle-particle and fluid-particle interactions. The study of multiphase flow with unequal granular temperatures entailed both simulation and experimental studies of two particles sizes in a riser and, a brief discussion of what was accomplished will be provided. And finally, a discussion of the analysis done on momentum re-distribution of gas-particles flow in risers will be provided. In particular a discussion of the remaining work needed in order to improve accuracy and predictability of riser hydrodynamics based on two-fluid models and how they can be used to model segregation in risers.

42 ENGINEERING↗

Estimating the Size and Timing of Maximum Amplitude for Cycle 23 from Its Early Cycle Behavior

On the basis of the lowest observed smoothed monthly mean sunspot number, cycle 23 appears to have conventionally begun in May 1996, in conjunction with the first appearance of a new cycle, high-latitude spot-group. Such behavior, however, is considered rather unusual, since, previously (based upon the data- available cycles 12-22), the first appearance of a new cycle, high-latitude spot- group has always preceded conventional onset by at least 3 months. Furthermore, accepting May 1996 as the official start for cycle 23 poses a dilemma regarding its projected size and timing of maximum amplitude. Specifically, from the max-min and amplitude-period relationships we infer that cycle 23 should be above average in size and a fast riser, with maximum amplitude occurring before May 2000 (being in agreement with projections for cycle 23 based on precursor information), yet from its initial languid rate of rise (during the first 6 months of the cycle) we infer that it should be below average in size and a slow riser, with maximum amplitude occurring after May 2000. The dilemma vanishes, however, when we use a slightly later-occurring onset. For example, using August 1996, a date associated with a local secondary minimum prior to the rapid rise that began shortly thereafter (in early 1997), we infer that cycle 23's rate of rise is above that for the mean of cycles 1-22, the mean of cycles 10-22 (the modern era cycles), the mean of the modern era'fast risers,' and the largest of the modern era 'slow risers' (i.e., cycle 20), thereby, suggesting that cycle 23 will be both fast-rising and above average in size, peaking before August 2000. Additionally, presuming cycle 23 to be a well- behaved fast-rising cycle (regardless of whichever onset date is used), we also infer that its maximum amplitude likely will measure about 144.0 q+/- 28.8 (from the general behavior found for the bulk of modern era fast risers; i.e., 5 of 7 have had their maximum amplitude to lie within 20% of the mean curve for modern era fast risers). It is apparent, then, that sunspot number growth during 1998 will prove crucial for correctly establishing the size and shape of cycle 23.

Wilson, Robert M.↗

Discovery of the First Leaking Double-Shell Tank - Hanford Tank 241-AY-102

Full text - Long Abstract. A routine video inspection of the annulus region of double-shell tank 241-A Y-102 in August of 2012 indicated the presence material in the annulus space between the primary and secondary liners. A comparison was made to previous inspections performed in 2006 and 2007. which indicated that a change had occurred. The material was observed at two locations on the floor of the annulus and one location at the top of the annulus region where the primary and secondary top knuckles meet (RPP-ASMT-53793). Subsequent inspections were performed. leading to additional material observed on the floor of the annulus space in a region that had not previously been inspected (WRPS-PER-2012-1363). The annulus Continuous Air Monitor (CAM) was still operational and was not indicating elevated radiation levels in the annulus region. When the camera from the inspections was recovered. it also did not indicate increased radiation above minimum contamination levels (WRPS-PER-2012-1363). A formal leak assessment team was established August 10, 2012 to review tank 241-AY-102 construction and operating histories and to determine whether the material observed in the annulus had resulted from a leak in the primary tank. The team consisted of individuals from Engineering. Base Operations and Environmental Protection. As this was a first-of-its-kind task. a method for obtaining a sample of the material in the annulus was needed. The consistency of the material was unknown.and the location of a majority of the material was not conducive to using the sampling devices that were currently available at Hanford. A subcontractor was tasked with the development fabrication.and testing of a sampling device that would be able to obtain multiple samples from the material on the annulus floor. as well as the material originating from a refractory air-slot near the floor of the annulus space. This sampler would need to be able to collect and dispense the material it collected into a sample jar retrieval device for transportation of the material to the 222-S laboratory on the Hanford site for analysis. The subcontractor agency fabricated a remote underground sampler by modifying off-the-shelf robotics and parts. Limited testing of the sampler was conducted using a mock-up of the tank annulus and one simulated material type -a salt block. The mock-up testing indicated that the sampler would be able to maneuver within the confined space and that the device worked with full functionality. A total of six weeks had passed from initiation to implementation of the new sampler in the 241-AY-102 tank annulus. Initial sample material was obtained from the annulus floor using the Off-Riser Sampler System that has been used at Hanford tor years to obtain material from the primary tanks. This could be used at the location near Riser 83 since the material was collected directly from the annulus floor and not from a location on the wall or behind a pipe, as was needed from the two locations near Riser 90. After obtaining a small sample of the material on the annulus floor.this sampler sustained terminal damage due to conduit pipes it had to transverse in order to collect and recover material from this location. Several issues were also encountered during deployment of the new sampler into the annulus near Riser 90. These included: Difficulty fitting the sampler down the 12-inch riser into the annulus due to a small tolerance in the size of the sampler; Failure of sampler components and functions during deployment including the camera. pneumatics.and bearing seals; Delays in the field due to supporting equipment issues including cables. cameras. and scaffolding; and, Low recovery of sample material obtained for analysis. The complications that occurred during deployment and use of the new sampler during the sampling event ultimately resulted in lower recovery of material from these locations in the annulus than was obtained using the Off-Riser Sampler System and limited the analyses that could be performed for determining the origin of the material. Following completion of the sample analyses and the assessment of its construction history and use. there was a consensus among the leak assessment team members that two of the three materials sampled from the annulus floor region were the result of waste leaking from a breach in the primary tank. The probable leak cause was identified as corrosion at high temperatures in a tank whose containment margins had been reduced due to construction difficulties (RPP-ASMT-53793). A formal Lessons Learned was created concerning designing equipment tor unique purposes under time constraints. This document was published in OPEXShare on May 20. 2013. It highlighted some of the issues that arose with the subcontractor sampler development and provided recommendations to prevent a recurrence should this task need to be performed again in the future. The document can be found at http://msa.hanford.gov/opex/lesson.cfm/2013/5/20/3481/AY-102-Annulus-Sampler-Designing-Equipment-for-Unique-Purposes-under-Time-Constraints/.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

System and method of making an enhanced cast iron crankshaft

A method and system for manufacturing a cast iron crankshaft for a vehicle are provided. The system comprises a molding unit arranged to form a negative sand cast mold of the cast iron crankshaft. The mold comprising at least one molded cavity having a pattern with dimensions of the cast iron crankshaft. The system further comprises a feeding mechanism comprising a riser having a connector through which molten metallic material flows to the cast mold. The feeding mechanism feeds the molten metallic material at a riser connection angle in the at least one mold cavity. The riser connection angle corresponds to a connector modulus. The connector modulus is 20% greater than a cast modulus. The riser geometry corresponds to a riser modulus. The riser modulus is 20% greater than the connector modulus. The system further comprises a furnace, a cooling area, a separation unit, a controller and a power source.

Wang, Liang↗

Robotic Solutions for Remote Access and Retrieval of High-Level Radioactive Waste - 19544

This paper describes the ongoing development of robotic solutions for accessing and retrieving high-level radioactive waste from underground storage bins as part of the Calcine Retrieval Project at the INL Site. The waste is in the form of a solid powder, referred to as calcine, stored in a set of stainless steel bins within an underground concrete vault. Due to the radiation field produced by the calcine, all operations must be performed remotely. The Calcine Retrieval Project is currently carrying out proof-of-concept testing of methods for the various stages of calcine retrieval. The bins were designed with no means for access, so retrieval operations will require welding access riser pipes to the bins, followed by cutting through the bin walls from within the risers. These tasks are complicated by the fact that four of the risers must be placed off center on a domed surface, resulting in a weld joint that is curved and tilted relative to the riser axis. The Access Riser Connection robot is being developed to perform these operations using interchangeable welding and plasma cutting attachments. The majority of the calcine will be removed using a vacuum system and pneumatically transferred to storage. This system is not described in this paper. However, the bins contain several internal features that are expected to retain calcine, most notably circumferential stiffening rings on the walls and radial ribs on the floors. One of the solutions being developed for the task of retrieving this residual calcine is a vacuum crawler, a wheeled robot using vacuum to adhere to the interior walls of the bins. The vacuum crawler would use a separate vacuum system to remove residual calcine or would use compressed air to move calcine to a location from which it can be retrieved more easily. While comparable welding and wall-climbing robots have been developed before, this particular application has several constraints that are not satisfied by existing systems. For this reason, both the access riser welder and the vacuum crawler, although still under development, may be of interest to other projects faced with similar constraints. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Crystal accumulation in the Hanford Waste Treatment Plant high level waste melter. Preliminary settling and resuspension testing

The full-scale, room-temperature Hanford Tank Waste Treatment and Immobilization Plant (WTP) High-Level Waste (HLW) melter riser test system was successfully operated with silicone oil and magnetite particles at a loading of 0.1 vol %. Design and construction of the system and instrumentation, and the selection and preparation of simulant materials, are briefly reviewed. Three experiments were completed. A prototypic pour rate was maintained, based on the volumetric flow rate. Settling and accumulation of magnetite particles were observed at the bottom of the riser and along the bottom of the throat after each experiment. The height of the accumulated layer at the bottom of the riser, after the first pouring experiment, approximated the expected level given the solids loading of 0.1 vol %. More detailed observations of particle resuspension and settling were made during and after the third pouring experiment. The accumulated layer of particles at the bottom of the riser appeared to be unaffected after a pouring cycle of approximately 15 minutes at the prototypic flow rate. The accumulated layer of particles along the bottom of the throat was somewhat reduced after the same pouring cycle. Review of the time-lapse recording showed that some of the settling particles flow from the riser into the throat. This may result in a thicker than expected settled layer in the throat.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Status Report on the Water-Based NSTF RCCS Capability: Preparations and Design for the Transformation of the Natural Convection Shutdown Heat Removal Test Facility (NSTF) From Air to Water-based Cooling

The following report provides an overview of the current status of the water-based transformation, including details of the design, geometry, and fabrication of the test section and network piping, for the ½ scale water-based NSTF program at Argonne National Laboratory. In early FY2015, efforts towards a water-based design began in parallel with on-going air-based work, and began by identifying top level objectives of the transformation. Scaling studies and preparation tasks with computational modeling were carried out to guide the design decisions, minimize distortions, and ensure relevant data among scales. This entailed close collaboration with AREVA, whose water-based RCCS (included as part of their 625 MWt SC-HTGR) served as the primary design basis for incorporation into the NSTF. A literature review of previous works was made, with an emphasis placed on similar facilities, relevance to passive decay heat removal, and details pertaining to two-phase flow and measurement techniques. The study focused on input from key designers and a thermal analysis of existing cooling panels (e.g. at TAMU and UW-Madison) and two proposed AREVA cooling panels. A base case was used as a reference point for parametric studies of effects from varying tube spacing (pitch), tube diameter, fin thickness, and materials. Then, a structural analysis was performed to ensure safe material stresses during high temperature operation. Details of the pipe network geometry and guidelines for design of the water storage tank are finally presented, followed by engineering drawings in the appendix. The results of this study have identified a suitable configuration to support both the ANL/DOE project goals and the DOE vision to provide AREVA with data suitable for characterizing the RCCS of their full scale HTGR design. The dimensions were not selected for optimal RCCS performance, but instead to serve as a representative yet bounding configuration for future implementation into a full scale design. Scaling distortions are unavoidable; however, they can be accurately predicted based on earlier works of derived similarity solutions. Flexibility remained a primary design philosophy, and will allow the test facility to easily accommodate future alterations. The final design for the test section and network piping is as follows: riser tubes: 1.5” Schedule 160, 5.91” (150-mm) pitch, 304L stainless, heat transfer panels: 5/16” plates, 4.01” (102-mm) width, full penetration weld to risers, 304L stainless, split into 4 panels per riser separated by horizontal 1/8” gaps, test section: Eight (x8) riser tubes and nine (x9) heat transfer panels, fabricated into banks of two (x2) riser tubes and three (x3) fins, joined to form single section, and network geometry: 4.0” Schedule 40, 304L stainless. Details of the water storage tank will reflect competing effects such as thermal hydraulic phenomena during single and two-phase operation. These considerations include mixing during single-phase jet penetration, condensation of rising bubbles during two-phase discharge, bubble entrainment into the liquid outlet, and liquid carry-over into the steam outlet.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Comparative study with two reduced test facilities for air-cooled RCCS scaling law

Korea Atomic Energy Research Institute (KAERI) and Argonne National Laboratory (ANL) conducted steady-state tests at constant heat flux conditions to investigate the scale effect on heat removal behavior of the air-cooled Reactor Cavity Cooling System (RCCS). Two differently scaled-down test facilities were used in this study, KAERI’s ¼ scale with 4.0-m cavity height, and ANL’s ½ scale with 6.8-m cavity height. Two scaling laws were proposed to simulate the radiation across the cavity and the buoyancy-driven duct flow in the riser, respectively. The test matrix for KAERI and ANL test facilities focused on the scaling effect of the heated riser length with constant heat flux at the PMR200 RCCS design. The test results showed that mixed convection in the riser duct is an important factor for accurately extrapolating the thermo-fluid behavior in the prototype from the test results in the scale-down facilities. The system analysis code, GAMMA+, with improved heat transfer models predicted fairly well the air-cooled RCCS test data from two facilities. GAMMA+ analysis results showed that the predicted radiation fractions on the heated plate in the scale-down test conditions were larger than those on the reactor vessel in the prototype. The scaling law for air-cooled RCCS was improved by considering the mixed convection in the riser duct and the same radiation fraction on the heated plate. The mixed convection effect was calculated by the height ratio. The same radiation fraction provided a conservative extrapolation from the scale-down test results.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

ANALYSIS OF SAMPLES FROM TANK 6F CHEMICAL CLEANING

Savannah River Remediation (SRR) is preparing Tank 6F for closure. The first step in preparing the tank for closure is mechanical sludge removal. In mechanical sludge removal, personnel add liquid (e.g., inhibited water or supernate salt solution) to the tank to form a slurry. They mix the liquid and sludge with pumps, and transfer the slurry to another tank for further processing. Mechanical sludge removal effectively removes the bulk of the sludge from a tank, but is not able to remove all of the sludge. In Tank 6F, SRR estimated a sludge heel of 5,984 gallons remained after mechanical sludge removal. To remove this sludge heel, SRR performed chemical cleaning. The chemical cleaning included two oxalic acid strikes, a spray wash, and a water wash. SRR conducted the first oxalic acid strike as follows. Personnel added 110,830 gallons of 8 wt % oxalic acid to Tank 6F and mixed the contents of Tank 6F with two submersible mixer pumps (SMPs) for approximately four days. Following the mixing, they transferred 115,903 gallons of Tank 6F material to Tank 7F. The SMPs were operating when the transfer started and were shut down approximately five hours after the transfer started. SRR collected a sample of the liquid from Tank 6F and submitted it to SRNL for analysis. Mapping of the tank following the transfer indicated that 2,400 gallons of solids remained in the tank. SRR conducted the second oxalic acid strike as follows. Personnel added 28,881 gallons of 8 wt % oxalic acid to Tank 6F. Following the acid addition, they visually inspected the tank and transferred 32,247 gallons of Tank 6F material to Tank 7F. SRR collected a sample of the liquid from Tank 6F and submitted it to SRNL for analysis. Mapping of the tank following the transfer indicated that 3,248 gallons of solids remained in the tank. Following the oxalic acid strikes, SRR performed Spray Washing with oxalic acid to remove waste collected on internal structures, cooling coils, tank top internals, and tank walls. The Acid Spray Wash was followed by a Water Spray Wash to remove oxalic acid from the tank internals. SRR conducted the Spray Wash as follows. Personnel added 4,802 gallons of 8 wt % oxalic acid to Tank 6F through the spray mast installed in Riser 2, added 4,875 gallons of oxalic acid through Riser 7, added 5,000 gallons of deionized water into the tank via Riser 2, and 5,000 gallons of deionized water into the tank via Riser 7. Following the Spray Wash, they visually inspected the tank and transferred 22,430 gallons of Tank 6F material to Tank 7F. SRR collected a sample of the liquid from Tank 6F and submitted it to SRNL for analysis. Following the Spray Wash and transfer, Savannah River Site (SRS) added 113,935 gallons of well water to Tank 6F. They mixed the tank contents with a single SMP and transferred 112,699 gallons from Tank 6F to Tank 7F. SRR collected a sample of the liquid from Tank 6F and submitted to SRNL for analysis. Mapping of the tank following the transfer indicated that 3,488 gallons of solids remained in the tank. Following the Water Wash, SRR personnel collected a solid sample and submitted it to SRNL for analysis to assess the effectiveness of the chemical cleaning and to provide a preliminary indication of the composition of the material remaining in the tank.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of Crystal-Tolerant High-Level Waste Glasses

Twenty five glasses were formulated. They were batched from HLW AZ-101 simulant or raw chemicals and melted and tested with a series of tests to elucidate the effect of spinel-forming components (Ni, Fe, Cr, Mn, and Zn), Al, and noble metals (Rh2O3 and RuO2) on the accumulation rate of spinel crystals in the glass discharge riser of the high-level waste (HLW) melter. In addition, the processing properties of glasses, such as the viscosity and TL, were measured as a function of temperature and composition. Furthermore, the settling of spinel crystals in transparent low-viscosity fluids was studied at room temperature to access the shape factor and hindered settling coefficient of spinel crystals in the Stokes equation. The experimental results suggest that Ni is the most troublesome component of all the studied spinel-forming components producing settling layers of up to 10.5 mm in just 20 days in Ni-rich glasses if noble metals or a higher concentration of Fe was not introduced in the glass. The layer of this thickness can potentially plug the bottom of the riser, preventing glass from being discharged from the melter. The noble metals, Fe, and Al were the components that significantly slowed down or stopped the accumulation of spinel at the bottom. Particles of Rh2O3 and RuO2, hematite and nepheline, acted as nucleation sites significantly increasing the number of crystals and therefore decreasing the average crystal size. The settling rate of ≤10-μm crystal size around the settling velocity of crystals was too low to produce thick layers. The experimental data for the thickness of settled layers in the glasses prepared from AZ-101 simulant were used to build a linear empirical model that can predict crystal accumulation in the riser of the melter as a function of concentration of spinel-forming components in glass. The developed model predicts the thicknesses of accumulated layers quite well, R2 = 0.985, and can be become an efficient tool for the formulation of the crystal-tolerant HLW glasses for higher waste loading. A physical modeling effort revealed that the Stokes and Richardson-Zaki equations can be used to adequately predict the accumulation rate of spinel crystals of different sizes and concentrations in the glass discharge riser of HLW melters. The determined shape factor for the glass beads was only 0.73% lower than the theoretical shape factor for a perfect sphere. The shape factor for the spinel crystals matched the theoretically predicted value to within 10% and was smaller than that of the beads, given the larger drag force caused by the larger surface area-to-volume ratio of the octahedral crystals. In the hindered settling experiments, both the glass bead and spinel suspensions were found to follow the predictions of the Richardson-Zaki equation with the exponent n = 3.6 and 2.9 for glass beads and spinel crystals, respectively.

36 MATERIALS SCIENCE↗

Scaling solid resuspension and sorption for the small column ion exchange processing tank

The Small Column Ion Exchange (SCIX) process is being developed to remove cesium, strontium, and actinides from Savannah River Site (SRS) Liquid Waste using an existing 1.3 million gallon waste tank (i.e., Tank 41H) to house the process. Savannah River National Laboratory (SRNL) is conducting pilot-scale mixing tests to determine the pump requirements for suspending and resuspending Monosodium Titanate (MST), Crystalline Silicotitanate (CST), and simulated sludge. In addition, SRNL will also be conducting pilot-scale tests to determine the mixing requirements for the strontium and actinide sorption. As part of this task, the results from the pilot-scale tests must be scaled up to a full-scale waste tank. This document describes the scaling approach. The pilot-scale tank is a 1/10.85 linear scale model of Tank 41H. The tank diameter, tank liquid level, pump nozzle diameter, pump elevation, and cooling coil diameter are all 1/10.85 of their dimensions in Tank 41H. The pump locations correspond to the proposed locations in Tank 41H by the SCIX Program (Risers B5 and B2 for two pump configurations and Risers B5, B3, and B1 for three pump configurations). MST additions are through Riser E1, the proposed MST addition riser in Tank 41H. To determine the approach to scaling the results from the pilot-scale tank to Tank 41H, the authors took the following approach. They reviewed the technical literature for methods to scale mixing with jets and suspension of solid particles with jets, and the technical literature on mass transfer from a liquid to a solid particle to develop approaches to scaling the test data. SRNL assembled a team of internal experts to review the scaling approach and to identify alternative approaches that should be considered.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Crystal accumulation in the Hanford Waste Treatment Plant high level waste melter: Summary of FY2016 experiements

Five experiments were completed with the full-scale, room temperature Hanford Waste Treatment and Immobilization Plant (WTP) high-level waste (HLW) melter riser test system to observe particle flow and settling in support of a crystal tolerant approach to melter operation. A prototypic pour rate was maintained based on the volumetric flow rate. Accumulation of particles was observed at the bottom of the riser and along the bottom of the throat after each experiment. Measurements of the accumulated layer thicknesses showed that the settled particles at the bottom of the riser did not vary in thickness during pouring cycles or idle periods. Some of the settled particles at the bottom of the throat were re-suspended during subsequent pouring cycles, and settled back to approximately the same thickness after each idle period. The cause of the consistency of the accumulated layer thicknesses is not year clear, but was hypothesized to be related to particle flow back to the feed tank. Additional experiments reinforced the observation of particle flow along a considerable portion of the throat during idle periods. Limitations of the system are noted in this report and may be addressed via future modifications. Follow-on experiments will be designed to evaluate the impact of pouring rate on particle re-suspension, the influence of feed tank agitation on particle accumulation, and the effect of changes in air lance positioning on the accumulation and re-suspension of particles at the bottom of the riser. A method for sampling the accumulated particles will be developed to support particle size distribution analyses. Thicker accumulated layers will be intentionally formed via direct addition of particles to select areas of the system to better understand the ability to continue pouring and re-suspend particles. Results from the room temperature system will be correlated with observations and data from the Research Scale Melter (RSM) at Pacific Northwest National Laboratory, and coordinated with modeling efforts underway at Idaho National Laboratory.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of Criteria and Identification of Particle Cluster Size Based on Measurements of Void Fraction in Gas-Solid Systems

A circulating fluidized bed (CFB) built at FIU was used to study particle motion in the riser in order to simulate flow regimes in a cold gasifier. High speed imaging was used in order to capture the dynamics of the particles flowing in the riser. The imaging method used here is called the shadow sizing technique which allowed the determination of particle areas and trajectories at various flow rates in the riser. The solid volume fraction and particle velocities calculated using the images acquired during the experiments can be related to granular temperature in order to detect formations of clusters in the riser section of the CFB. The shadow sizing technique was observed to be an effective method in detecting dynamics of particles in motion and formation of clusters when supported with high-speed imaging.

01 COAL, LIGNITE, AND PEAT↗

Off-axis silicon carbide substrates

A method of epitaxial growth of a material on a crystalline substrate includes selecting a substrate having a crystal plane that includes a plurality of terraces with step risers that join adjacent terraces. Each terrace of the plurality or terraces presents a lattice constant that substantially matches a lattice constant of the material, and each step riser presents a step height and offset that is consistent with portions of the material nucleating on adjacent terraces being in substantial crystalline match at the step riser. The method also includes preparing a substrate by exposing the crystal plane; and epitaxially growing the material on the substrate such that the portions of the material nucleating on adjacent terraces merge into a single crystal lattice without defects at the step risers.

36 MATERIALS SCIENCE↗

Commercial Submersible Mixing Pump For SRS Tank Waste Removal - 15223

The Savannah River Site Tank Farms have 45 active underground waste tanks used to store and process nuclear waste materials. There are 4 different tank types, ranging in capacity from 2839 m 3 to 4921 m 3 (750,000 to 1,300,000 gallons). Eighteen of the tanks are older style and do not meet all current federal standards for secondary containment. The older style tanks are the initial focus of waste removal efforts for tank closure and are referred to as closure tanks. Of the original 51 underground waste tanks, six of the original 24 older style tanks have completed waste removal and are filled with grout. The insoluble waste fraction that resides within most waste tanks at SRS requires vigorous agitation to suspend the solids within the waste liquid in order to transfer this material for eventual processing into glass filled canisters at the Defense Waste Processing Facility (DWPF). SRS suspends the solid waste by use of recirculating mixing pumps. Older style tanks generally have limited riser openings which will not support larger mixing pumps, since the riser access is typically 58.4 cm (23 inches) in diameter. Agitation for these tanks has been provided by four long shafted standard slurry pumps (SLP) powered by an above tank 112KW (150 HP) electric motor. The pump shaft is lubricated and cooled in a pressurized water column that is sealed from the surrounding waste in the tank. Closure of four waste tanks has been accomplished utilizing long shafted pump technology combined with heel removal using multiple technologies. Newer style waste tanks at SRS have larger riser openings, allowing the processing of waste solids to be accomplished with four large diameter SLPs equipped with 224KW (300 HP) motors. These tanks are used to process the waste from closure tanks for DWPF. In addition to the SLPs, a 224KW (300 HP) submersible mixer pump (SMP) has also been developed and deployed within older style tanks. The SMPs are product cooled and product lubricated canned motor pumps designed to fit within available risers and have significant agitation capabilities to suspend waste solids. Waste removal and closure of two tanks has been accomplished with agitation provided by 3 SMPs installed within the tanks. In 2012, a team was assembled to investigate alternative solids removal technologies to support waste removal for closing tanks. The goal of the team was to find a more cost effective approach that could be used to replace the current mixing pump technology. This team was unable to identify an alternative technology outside of mixing pumps to support waste agitation and removal from SRS waste tanks. However, the team did identify a potentially lower cost mixing pump compared to the baseline SLPs and SMPs. Rather than using the traditional procurement using an engineering specification, the team proposed to seek commercially available submersible mixer pumps (CSMP) as alternatives to SLPs and SMPs. SLPs and SMPs have a high procurement cost and the actual cost of moving pumps between tanks has shown to be significantly higher than the original estimates that justified the reuse of SMPs and SLPs. The team recommended procurement of “off-the-shelf” industry pumps which may be available for significant savings, but at an increased risk of failure and reduced operating life in the waste tank. The goal of the CSMP program is to obtain mixing pumps that could mix from bulk waste removal through tank closure and then be abandoned in place as part of tank closure. This paper will present the development, progress and relative advantages of the CSMP.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Passive techniques for long-term reactor cooling

In a pressurized water reactor (PWR), emergency core cooling (ECC) responds to depressurization due to a vessel penetration break at the top of the pressure vessel by draining water from a body of water through an injection line into the pressure vessel. A barrier operates concurrently with the ECC to suppress flow of liquid water from the pressure vessel out the vessel penetration break. The barrier may comprise one or more of: (1) an injection line extension passing through the central riser to drain water into the central riser; (2) openings in a lower portion of a central riser to shunt some upward flow from the central riser into a lower portion of the downcomer annulus; and (3) a surge line providing fluid communication between a pressurizer volume at the top of the pressure vessel and the remainder of the pressure vessel which directs water outboard toward the downcomer annulus.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Passive techniques for long-term reactor cooling

In a pressurized water reactor (PWR), emergency core cooling (ECC) responds to depressurization due to a vessel penetration break at the top of the pressure vessel by draining water from a body of water through an injection line into the pressure vessel. A barrier operates concurrently with the ECC to suppress flow of liquid water from the pressure vessel out the vessel penetration break. The barrier may comprise one or more of: (1) an injection line extension passing through the central riser to drain water into the central riser; (2) openings in a lower portion of a central riser to shunt some upward flow from the central riser into a lower portion of the downcomer annulus; and (3) a surge line providing fluid communication between a pressurizer volume at the top of the pressure vessel and the remainder of the pressure vessel which directs water outboard toward the downcomer annulus.

Malloy, III, John D.↗

Commercial submersible mixing pump for SRS tank waste removal - 15223

The Savannah River Site Tank Farms have 45 active underground waste tanks used to store and process nuclear waste materials. There are 4 different tank types, ranging in capacity from 2839 m{sup 3} to 4921m{sup 3} (750,000 to 1,300,000 gallons). Eighteen of the tanks are older style and do not meet all current federal standards for secondary containment. The older style tanks are the initial focus of waste removal efforts for tank closure and are referred to as closure tanks. Of the original 51 underground waste tanks, six of the original 24 older style tanks have completed waste removal and are filled with grout. The insoluble waste fraction that resides within most waste tanks at SRS requires vigorous agitation to suspend the solids within the waste liquid in order to transfer this material for eventual processing into glass filled canisters at the Defense Waste Processing Facility (DWPF). SRS suspends the solid waste by use of recirculating mixing pumps. Older style tanks generally have limited riser openings which will not support larger mixing pumps, since the riser access is typically 58.4 cm (23 inches) in diameter. Agitation for these tanks has been provided by four long shafted standard slurry pumps (SLP) powered by an above tank 112 kW (150 HP) electric motor. The pump shaft is lubricated and cooled in a pressurized water column that is sealed from the surrounding waste in the tank. Closure of four waste tanks has been accomplished utilizing long shafted pump technology combined with heel removal using multiple technologies. Newer style waste tanks at SRS have larger riser openings, allowing the processing of waste solids to be accomplished with four large diameter SLPs equipped with 224 kW (300 HP) motors. These tanks are used to process the waste from closure tanks for DWPF. In addition to the SLPs, a 224 kW (300 HP) submersible mixer pump (SMP) has also been developed and deployed within older style tanks. The SMPs are product cooled and product lubricated canned motor pumps designed to fit within available risers and have significant agitation capabilities to suspend waste solids. Waste removal and closure of two tanks has been accomplished with agitation provided by 3 SMPs installed within the tanks. In 2012, a team was assembled to investigate alternative solids removal technologies to support waste removal for closing tanks. The goal of the team was to find a more cost effective approach that could be used to replace the current mixing pump technology. This team was unable to identify an alternative technology outside of mixing pumps to support waste agitation and removal from SRS waste tanks. However, the team did identify a potentially lower cost mixing pump compared to the baseline SLPs and SMPs. Rather than using the traditional procurement using an engineering specification, the team proposed to seek commercially available submersible mixer pumps (CSMP) as alternatives to SLPs and SMPs. SLPs and SMPs have a high procurement cost and the actual cost of moving pumps between tanks has shown to be significantly higher than the original estimates that justified the reuse of SMPs and SLPs. The team recommended procurement of 'off-the-shelf' industry pumps which may be available for significant savings, but at an increased risk of failure and reduced operating life in the waste tank. The goal of the CSMP program is to obtain mixing pumps that could mix from bulk waste removal through tank closure and then be abandoned in place as part of tank closure. This paper will present the development, progress and relative advantages of the CSMP. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗