Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “commissioning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 91 records · Page 5

Clean Energy Microgrids: Considerations for State Energy Offices and Public Utility Commissions to Increase Resilience, Reduce Emissions, and Improve Affordability

In fall 2019, the National Association of Regulatory Utility Commissioners (NARUC) and the National Association of State Energy Officials (NASEO) initiated a joint Microgrids State Working Group (MSWG), funded by the U.S. Department of Energy (DOE) Office of Electricity (OE). The MSWG aims to bring together NARUC and NASEO members to explore the capabilities, costs, and benefits of microgrids; discuss barriers to microgrid development; and develop strategies to plan, finance, and deploy microgrids to improve resilience. This report, Clean Energy Microgrids: Considerations for State Energy Offices and Public Utility Commissions to Increase Resilience, Reduce Emissions, and Improve Affordability, focuses specifically on how clean energy microgrids can achieve both resilience and clean energy benefits. The paper provides an overview of the challenges faced by clean energy microgrids, outlines benefits that clean energy microgrids can provide, and details economic and cost considerations for the development of clean energy microgrid projects. Outlined in the paper are the necessary technological components of a clean energy microgrid, including generation, storage, energy efficiency measures, and smart controls. Current technologies are highlighted, along with potential configurations of clean technologies that are approaching cost competitiveness with commercially available options. The paper concludes with both policy and regulatory considerations for State Energy Offices and Public Utility Commissions to enhance the development and deployment of clean energy microgrids. Although it touches on the clean energy microgrids’ role in integrating distributed energy resources (DERs) into the larger grid, this is not the focus of this paper.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Water-based Ria Testing in TREAT: Commissioning and Early Results

We have completed a series of reactivity-initiated accident commissioning tests with the static water capsule in the Transient Reactor Test Facility and completed some visual and non-destructive post-irradiation examinations on the fuel rods. The test campaign included a calibration test followed by five tests in the Static Environment Rodlet Transient Test Apparatus capsule. The conditions varied from room temperature and pressure up to 200°C and 2.5 MPa, with energy depositions varying between ~500–1100 J/gUO2. The series of tests allowed for a number of instrumentation qualifications and demonstrations, including cladding thermometry, rodlet plenum pressure, cladding elongation, and an electro-impedance boiling detector. This paper documents the design of the capsule and highlights some results from the commissioning tests and post-transient examination.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Enabling Solar Cybersecurity Solutions Through State Energy Office and Public Utility Commission Engagement with Private Sector Partners (Final Technical Report)

Between 2020 and 2025, the National Association of State Energy Officials (NASEO), together with the National Association of Regulatory Utility Commissioners (NARUC) established and managed the Enabling Solar Cybersecurity Solutions Through State Energy Office and Public Utility Commission Engagement with Private Sector Partners project, later informally retitled and recognized as the Cybersecurity Advisory Team for State Solar (CATSS). This effort convened State Energy Offices, Public Utility Commissions, and critical private sector and federal partners to inform the development of solar cybersecurity education and action-oriented resources for states. This is the final report.

14 SOLAR ENERGY↗

Slow Extraction Beam Commissioning for the Mu2e Experiment at Fermilab

Following the successful completion of the Muon g-2 experiment run at Fermilab, the Muon Campus facility has been reconfigured from delivering 3 GeV muon beams to the g-2 storage ring to providing slow-extracted 8 GeV proton beam spills for the Mu2e experiment. The first full-scale commissioning run with slow extraction was conducted during the 2025 run, followed by the second run in early 2026. We present the results and current status of this commissioning campaign.

Nagaslaev, V. [Fermilab] (ORCID:0000000235719205)↗

Toward Trustworthy Detectors Detector Characterization for SuperCDMS SNOLAB Commissioning

SuperCDMS SNOLAB is a next generation direct detection experiment searching for low mass dark matter using cryogenic germanium and silicon detectors operated at millikelvin temperatures. As commissioning begins, establishing stable, predictable detector response to energy deposits is a prerequisite for future physics analysis. This work studies detector stability and calibration for four SuperCDMS SNOLAB detectors, det 7 and det 15 (germanium) and det 11 and det 14 (silicon), using Barium-133 calibration data (356 keV gamma ray reference) and low background data (ambient radiation, no external source). The Ba-133 data show no distinct line at the expected energy, and the low background data show a baseline that drifts and oscillates rather than remaining flat, consistently across multiple channels, suggesting a shared, detector wide cause. These observations point to the cryogenic support system as the likely source, since small temperature fluctuations could couple into the temperature sensitive detectors, informing the ongoing commissioning effort.

O'Hanlon, Vika [Skidmore Coll.]↗

Beam Commissioning Result of Polarized Target at SpinQuest

SpinQuest is a fixed-target experiment at Fermilab to measure the Drell-Yan process using transversely polarized NH$_3$ and ND$_3$ targets and unpolarized 120-GeV proton beam. In the Drell-Yan process, a quark in one scattering hadron and an anti-quark in the other hadron annihilate into a virtual photon and then decay into a muon (lepton) pair. The angular distribution of final-state muon pairs with respect to the target polarization is sensitive to the Sivers function of light antiquarks in the nucleon, which is one of the eight Transverse Momentum Dependent (TMD) parton distribution functions. The intensity of the proton beam is as high as $10^{12}$ protons/second, in order to accumulate the required statistics of Drell-Yan events. The polarized target system at SpinQuest has been carefully designed to accommodate such a high beam intensity. It is equipped with an evaporation refrigerator with a cooling power of around 5 W at 1 K. The target temperature is maintained at 1 K even under heat load caused by the proton beam and the DNP microwave. The target system and the spectrometer were commissioned with the proton beam from May through July 2024. The experimental setup of SpinQuest and the performance of the target system during the beam commissioning is reported.

Nakano, Kenichi [Virginia U.]↗

Towards a New μ→eγ Search with the MEG II Experiment: From Design to Commissioning

The MEG experiment represents the state of the art in the search for the Charged Lepton Flavour Violating μ + →e + γ decay. With its first phase of operations at the Paul Scherrer Institut (PSI), MEG set the most stringent upper limit on the BR (μ + →e + γ) ≤ 4.2×10 –13 at 90% confidence level, imposing one of the tightest constraints on models predicting LFV-enhancements through new physics beyond the Standard Model. An upgrade of the MEG experiment, MEG II, was designed and it is presently in the commissioning phase, aiming at a sensitivity level of 6×10 –14 . The MEG II experiment relies on a series of upgrades, which include an improvement of the photon detector resolutions, brand new detectors on the positron side with better acceptance, efficiency and performances and new and optimized trigger and DAQ electronics to exploit a muon beam intensity twice as high as that of MEG (7×10 7 μ + /s). This paper presents a complete overview of the MEG II experimental apparatus and the current status of the detector commissioning in view of the physics data taking in the upcoming three years.

79 ASTRONOMY AND ASTROPHYSICS↗

Commissioning the H i Observing Mode of the Beam Former for the Cryogenically Cooled Focal L-band Array for the GBT (FLAG)

We present the results of commissioning observations for a new digital beam-forming back end for the Focal plane L-band Array for the Robert C. Byrd Green Bank Telescope (FLAG), a cryogenically cooled Phased Array Feed (PAF) with the lowest measured T {sub sys}/η of any PAF outfitted on a radio telescope to date. We describe the custom software used to apply beam-forming weights to the raw element covariances to create research-quality spectral-line images for the new fine-channel mode, study the stability of the beam weights over time, characterize FLAG’s sensitivity over a frequency range of 150 MHz, and compare the measured noise properties and observed distribution of neutral hydrogen emission from several extragalactic and Galactic sources with data obtained with the current single-pixel L-band receiver. These commissioning runs establish FLAG as the preeminent PAF receiver currently available for spectral-line observations on the world’s major radio telescopes.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Magnetospheric Multiscale (MMS) Mission Commissioning Phase Orbit Determination Error Analysis

The Magnetospheric MultiScale (MMS) mission commissioning phase starts in a 185 km altitude x 12 Earth radii (RE) injection orbit and lasts until the Phase 1 mission orbits and orientation to the Earth-Sun li ne are achieved. During a limited time period in the early part of co mmissioning, five maneuvers are performed to raise the perigee radius to 1.2 R E, with a maneuver every other apogee. The current baseline is for the Goddard Space Flight Center Flight Dynamics Facility to p rovide MMS orbit determination support during the early commissioning phase using all available two-way range and Doppler tracking from bo th the Deep Space Network and Space Network. This paper summarizes th e results from a linear covariance analysis to determine the type and amount of tracking data required to accurately estimate the spacecraf t state, plan each perigee raising maneuver, and support thruster cal ibration during this phase. The primary focus of this study is the na vigation accuracy required to plan the first and the final perigee ra ising maneuvers. Absolute and relative position and velocity error hi stories are generated for all cases and summarized in terms of the ma ximum root-sum-square consider and measurement noise error contributi ons over the definitive and predictive arcs and at discrete times inc luding the maneuver planning and execution times. Details of the meth odology, orbital characteristics, maneuver timeline, error models, and error sensitivities are provided.

Chung, Lauren R.↗

A GNC Perspective of the Launch and Commissioning of NASA's SMAP (Soil Moisture Active Passive) Spacecraft

The NASA Soil Moisture Active Passive (SMAP) spacecraft was designed to use radar and radiometer measurements to produce global soil moisture measurements every 2-3 days. The SMAP spacecraft is a complicated dual-spinning design with a large 6 meter deployable mesh reflector mounted on a platform that spins at 14.6 rpm while the Guidance Navigation and Control algorithms maintain precise nadir pointing for the de-spun portion of the spacecraft. After launching in early 2015, the Guidance Navigation and Control software and hardware aboard the SMAP spacecraft underwent an intensive spacecraft checkout and commissioning period. This paper describes the activities performed by the Guidance Navigation and Control team to confirm the health and phasing of subsystem hardware and the functionality of the guidance and control modes and algorithms. The operations tasks performed, as well as anomalies that were encountered during the commissioning, are explained and results are summarized.

Brown, Todd S.↗

Transiting Exoplanet Survey Satellite (TESS) Flight Dynamics Commissioning Results and Experiences

The Transiting Exoplanet Survey Satellite (TESS) will perform the first-ever spaceborne all-sky exoplanet transit survey and is the first primary-mission application of a lunar-resonant orbit. Launched on April 18, 2018, TESS completed a two-month commissioning phase consisting of three phasing loops followed by a lunar flyby and a final maneuver to achieve resonance. During the mission orbit, no further station-keeping maneuvers are planned or required. NASA Goddard Space Flight Center is performing flight dynamics operations for the mission. This paper covers the design, implementation, and results from TESS commissioning, including the projected performance of the final mission orbit.

Satellite↗

Transiting Exoplanet Survey Satellite (TESS) Flight Dynamics Commissioning Results and Experiences

The Transiting Exoplanet Survey Satellite (TESS) will perform the first-ever spaceborne all-sky exoplanet transit survey and is the first primary-mission application of a lunar-resonant orbit. Launched on April 18, 2018, TESS completed a two-month commissioning phase consisting of three phasing loops followed by a lunar flyby and a final maneuver to achieve resonance. During the mission orbit, no further station-keeping maneuvers are planned or required. NASA Goddard Space Flight Center is performing flight dynamics operations for the mission. This paper covers the design, implementation, and results from TESS commissioning, including the projected performance of the final mission orbit.

Parker, Joel J. K.↗

Transiting Exoplanet Survey Satellite (TESS) Flight Dynamics Commissioning Results and Experiences

The Transiting Exoplanet Survey Satellite (TESS) will perform the first-ever spaceborne all-sky exoplanet transit survey and is the first primary-mission application of a lunar-resonant orbit. Launched on April 18, 2018, TESS completed a two-month commissioning phase consisting of three phasing loops followed by a lunar flyby and a final maneuver to achieve resonance. During the mission orbit, no further station-keeping maneuvers are planned or required. NASA Goddard Space Flight Center is performing flight dynamics operations for the mission. This paper covers the design, implementation, and results from TESS commissioning, including the projected performance of the final mission orbit.

Parker, Joel J. K.↗

Astrobee On-Orbit Commissioning

The Astrobee free flying robots operate in the interior of the International Space Station (ISS) under supervisory control of a ground operator or ISS crew. They replace the Synchronized Position Hold Engage and Reorient Experimental Satellites (SPHERES) as research platforms for zero-g free-flying robotics. Astrobee also provides a tool for improving the efficiency of ISS operations as a mobile camera/sensor platform available to flight and payload controllers. The Astrobee system consists of three robots with perching arms, a docking station, and a ground data system. Development began in late-2014, and flight hardware has been deployed to ISS on several launches starting in November 2018 and concluding in October 2019. Shortly after the first two robots arrived on ISS in April, we began a series of “commissioning” activities to validate both space and ground segments. This paper provides an overview of the Astrobee system, a description of the on-orbit activities, and commissioning results.

Astrobee↗

Astrobee On-Orbit Commissioning Manuscript and Presentation

The Astrobee free flying robots operate autonomously inside the International Space Station (ISS) with oversight from a ground operator or ISS crew. They replace the Synchronized Position Hold Engage and Reorient Experimental Satellites (SPHERES) as research platforms for zero-g free-flying robotics. Astrobee can also serve as a mobile camera/sensor platform for flight and payload controllers to improve ISS operations. Development began in late 2014, and flight hardware deployed to the ISS on several launches starting from November 2018 to October 2019. Shortly after the first two robots arrived in April 2019, we began a series of commissioning activities to validate the Astrobee robots. This paper reviews the Astrobee system and describes the on-orbit commissioning activities and results.

ISS↗

Astrobee On-Orbit Commissioning

The Astrobee free flying robots operate autonomously inside the International Space Station (ISS) with oversight from a ground operator or ISS crew. They replace the Synchronized Position Hold Engage and Reorient Experimental Satellites (SPHERES) as research platforms for zero-g free-flying robotics. Astrobee can also serve as a mobile camera/sensor platform for flight and payload controllers to improve ISS operations. Development began in late 2014, and flight hardware deployed to the ISS on several launches starting from November 2018 to October 2019. Shortly after the first two robots arrived in April 2019, we began a series of commissioning activities to validate the Astrobee robots. This paper reviews the Astrobee system and describes the on-orbit commissioning activities and results.

ISS↗

Commissioning the James Webb Space Telescope Optical Telescope Element

The James Webb Space Telescope (JWST) launched on December 25th, 2021. The observatory was deployed and commissioned during its first six months. The Optical Telescope Element includes both large deployments of the Deployable Tower Assembly, Secondary Mirror Support Structure and the Primary Mirror Wings and it includes the deployment and alignment of the 18 primary mirror segments and the secondary mirror. The initial phase included cooldown and ice mitigation efforts followed by telescope deployments, mirror deployment and wavefront sensing and control. This paper will discuss the entire OTE commissioning from deployment through alignment including a discussion of results and lessons learned.

Lee D Feinberg↗

The Science Performance of JWST as Characterized in Commissioning

This paper characterizes the actual science performance of the James Webb Space Telescope (JWST), as determined from the six month commissioning period. We summarize the performance of the spacecraft, telescope, science instruments, and ground system, with an emphasis on differences from pre-launch expectations. Commissioning has made clear that JWST is fully capable of achieving the discoveries for which it was built. Moreover, almost across the board, the science performance of JWST is better than expected; in most cases, JWST will go deeper faster than expected. The telescope and instrument suite have demonstrated the sensitivity, stability, image quality, and spectral range that are necessary to transform our understanding of the cosmos through observations spanning from near-earth asteroids to the most distant galaxies.

Infrared astronomy↗