Statistical Analysis of Complexity Generators for Cost Estimation

Predicting the cost of cutting edge new technologies involved with spacecraft hardware can be quite complicated. A new feature of the NASA Air Force Cost Model (NAFCOM), called the Complexity Generator, is being developed to model the complexity factors that drive the cost of space hardware. This parametric approach is also designed to account for the differences in cost, based on factors that are unique to each system and subsystem. The cost driver categories included in this model are weight, inheritance from previous missions, technical complexity, and management factors. This paper explains the Complexity Generator framework, the statistical methods used to select the best model within this framework, and the procedures used to find the region of predictability and the prediction intervals for the cost of a mission.

Rowell, Ginger Holmes↗

Reusable Reentry Satellite (RRS) system design study: System cost estimates document

The Reusable Reentry Satellite (RRS) program was initiated to provide life science investigators relatively inexpensive, frequent access to space for extended periods of time with eventual satellite recovery on earth. The RRS will provide an on-orbit laboratory for research on biological and material processes, be launched from a number of expendable launch vehicles, and operate in Low-Altitude Earth Orbit (LEO) as a free-flying unmanned laboratory. SAIC's design will provide independent atmospheric reentry and soft landing in the continental U.S., orbit for a maximum of 60 days, and will sustain three flights per year for 10 years. The Reusable Reentry Vehicle (RRV) will be 3-axis stabilized with artificial gravity up to 1.5g's, be rugged and easily maintainable, and have a modular design to accommodate a satellite bus and separate modular payloads (e.g., rodent module, general biological module, ESA microgravity botany facility, general botany module). The purpose of this System Cost Estimate Document is to provide a Life Cycle Cost Estimate (LCCE) for a NASA RRS Program using SAIC's RRS design. The estimate includes development, procurement, and 10 years of operations and support (O&S) costs for NASA's RRS program. The estimate does not include costs for other agencies which may track or interface with the RRS program (e.g., Air Force tracking agencies or individual RRS experimenters involved with special payload modules (PM's)). The life cycle cost estimate extends over the 10 year operation and support period FY99-2008.

Source record↗

Updated Conceptual Cost Estimating

16-page report discusses development and use of NASA TR-1508, the Kennedy Space Center Aerospace Construction Price Book for preparing conceptual, budget, funding, cost-estimating, and preliminary cost-engineering reports. Updated annually from 1974 through 1985 with actual bid prices and government estimates. Includes labor and material quantities and prices with contractor and subcontractor markups for buildings, facilities, and systems at Kennedy Space Center. While data pertains to aerospace facilities, format and cost-estimating techniques guide estimation of costs in other construction applications.

Brown, J. A.↗

Advanced transportation system studies technical area 2 (TA-2): Heavy lift launch vehicle development: Program Cost estimates - volume 3

The purpose of the TA-2 contract was to provide advanced launch vehicle concept definition and analysis to assist NASA in the identification of future launch vehicle requirements. Contracted analysis activities included vehicle sizing and performance analysis, subsystem concept definition, propulsion subsystem definition (foreign and domestic), ground operations and facilities analysis, and life cycle cost estimation. The basic period of performance of the TA-2 contract was from May 1992 through May 1993. No-cost extensions were exercised on the contract from June 1993 through July 1995. This document is part of the final report for the TA-2 contract. The final report consists of three volumes: Volume 1 is the Executive Summary, Volume 2 is Technical Results, and Volume 3 is Program Cost Estimates. The document-at-hand, Volume 3, provides a work breakdown structure dictionary, user's guide for the parametric life cycle cost estimation tool, and final report developed by ECON, Inc., under subcontract to Lockheed Martin on TA-2 for the analysis of heavy lift launch vehicle concepts.

McCurry, J. B.↗

Taking the Evolutionary Road to Developing an In-House Cost Estimate

This slide presentation reviews the process and some of the problems and challenges of developing an In-House Cost Estimate (IHCE). Using as an example the Space Network Ground Segment Sustainment (SGSS) project, the presentation reviews the phases for developing a Cost estimate within the project to estimate government and contractor project costs to support a budget request.

Jacintho, David↗

Commercial Crew Cost Estimating - A Look at Estimating Processes, Challenges and Lessons Learned

To support annual PPBE budgets and NASA HQ requests for cost information for commercial crew transportation to the International Space Station (ISS), the NASA ISS ACES team developed system development and per flight cost estimates for the potential providers for each annual PPBE submit from 2009-2014. This paper describes the cost estimating processes used, challenges and lessons learned to develop estimates for this key NASA project that diverted from the traditional procurement approach and used a new way of doing business

Battle, Rick↗

Improving and Expanding NASA Software Cost Estimation Methods

Estimators and analysts are increasingly being tasked to develop better models and reliable cost estimates in support of program planning and execution. While there has been extensive work on improving parametric methods for cost estimation, there is very little focus on the use of cost models based on analogy and clustering algorithms. In this paper we summarize the results of our research in developing an analogy method for estimating NASA spacecraft flight software using spectral clustering on system characteristics (symbolic nonnumerical data) and evaluate its performance by comparing it to a number of the most commonly used estimation methods. The strengths and weaknesses of each method based on their performance are also discussed. The paper concludes with an overview of the analogy estimation tool (ASCoT) developed for use within NASA that implements the recommended analogy algorithm.

Hihn, Jairus↗

Weight and cost estimating relationships for heavy lift airships

Weight and cost estimating relationships, including additional parameters that influence the cost and performance of heavy-lift airships (HLA), are discussed. Inputs to a closed loop computer program, consisting of useful load, forward speed, lift module positive or negative thrust, and rotors and propellers, are examined. Detail is given to the HLA cost and weight program (HLACW), which computes component weights, vehicle size, buoyancy lift, rotor and propellar thrust, and engine horse power. This program solves the problem of interrelating the different aerostat, rotors, engines and propeller sizes. Six sets of 'default parameters' are left for the operator to change during each computer run enabling slight data manipulation without altering the program.

Gray, D. W.↗

Conceptual Design and Cost Estimate of a Subsonic NASA Testbed Vehicle (NTV) for Aeronautics Research

A conceptual design and cost estimate for a subsonic flight research vehicle designed to support NASA's Environmentally Responsible Aviation (ERA) project goals is presented. To investigate the technical and economic feasibility of modifying an existing aircraft, a highly modified Boeing 717 was developed for maturation of technologies supporting the three ERA project goals of reduced fuel burn, noise, and emissions. This modified 717 utilizes midfuselage mounted modern high bypass ratio engines in conjunction with engine exhaust shielding structures to provide a low noise testbed. The testbed also integrates a natural laminar flow wing section and active flow control for the vertical tail. An eight year program plan was created to incrementally modify and test the vehicle, enabling the suite of technology benefits to be isolated and quantified. Based on the conceptual design and programmatic plan for this testbed vehicle, a full cost estimate of $526M was developed, representing then-year dollars at a 50% confidence level.

Nickol, Craig L.↗

Estimating Costs Of Aerospace Construction

Report presents brief descriptions of techniques, instructional and reference literature, computer hardware and software, and compilations of data used to estimate costs of specially equipped buildings and other aerospace construction projects. Descriptions replete with practical examples. Experiences gained in estimating costs of specific projects included.

Brown, Joseph A.↗

COMPACT KNN V2: Analogy-Based Cost Estimation Model for CubeSats

The CubeSat Or Microsat Probabilistic and AnalogiesCost Tool, or COMPACT, is a NASA Headquarters fundedeffort to fill the gap in cost estimating capabilities for CubeSats,as well as other microsat spacecraft. The COMPACT team hasfocused mainly on CubeSats to date, and has collected technical,programmatic and cost data on dozens of flown CubeSatsmissions led by NASA, research labs, and universities. In late2019, the team released the first tool prototype which uses a nonparametricregression technique, k-Nearest Neighbors (KNN),on actual data from historical CubeSat missions to produceearly ballpark analogy-based cost estimates for new CubeSatconcepts. Since the KNN prototype was first released, theCOMPACT team has normalized 17 new missions to be addedto the model in COMPACT V2. COMPACT V2 also featureschanges to the KNN tool algorithm including the introduction ofPrincipal Component Analysis (PCA) to the model developmentprocess and changes to the input parameters which have madethe analogy results more intuitive and have improved modelperformance. This paper describes the current COMPACTKNN dataset, improvements made to the model in COMPACTV2, an assessment of current model performance, and a forwardlook at COMPACT’s planned future enhancements.

Hooke, Melissa↗

Blind Validation Study of Parametric Cost Estimation Tool SEER-H for NASA Space Missions

One of the primary parametric cost modeling tools used by NASA and the aerospace industry to estimate the development and production cost of future spacecraft hardware is SEER-H by Galorath. To date, no independent validation of this tool for cost estimation of space missions has been reported in the literature. In the present validation study, cost estimators used SEER-H to estimate the cost of twelve different past NASA science missions. The estimators were prevented from knowing the actual cost of the missions in an effort to minimize cognitive biases. The point estimates of SEER-H had an average error of 23%, median error of -0.3%, and a standard deviation of 43%. Nine of the twelve mission's actual costs fell within the 80% confidence interval of SEER's probabilistic estimates. Several factors independent of SEER that may have affected the accuracy of the results have been identified and are discussed; these include: uncertainty in the technical data used for the estimates, the methods used to estimate uncertainty in spacecraft component mass and numbers of prototypes, and the experience of the estimators.

SEER-H↗