Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Integration and test”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 883 records · Page 49

Report to the administrator by the NASA Aerospace Safety Advisory Panel on the Skylab program. Volume 1: Summary report

Contractor and NASA technical management for the development and manufacture of the Skylab modules is reviewed with emphasis on the following management controls: configuration and interface management; vendor control; and quality control of workmanship. A review of the modified two-stage Saturn V launch vehicle which focused on modifications to accommodate the Skylab payload; resolution of prior flight anomalies; and changes in personnel and management systems is presented along with an evaluation of the possible age-life and storage problems for the Saturn 1-B launch vehicle. The NASA program management's visibility and control of contractor operations, systems engineering and integration, the review process for the evaluation of design and flight hardware, and the planning process for mission operations are investigated. It is concluded that the technical management system for development and fabrication of the modules, spacecraft, and launch vehicles, the process of design and hardware acceptance reviews, and the risk assessment activities are satisfactory. It is indicated that checkout activity, integrated testing, and preparations for and execution of mission operation require management attention.

Source record↗

Joint USAF/NASA hypersonic research aircraft study

A joint USAF/NASA study has developed a conceptual design for a new high-speed research airplane (X-24C) and identified candidate flight research experiments in the Mach 3 to 6 speed range. Four major categories of high priority research experiments are described as well as the X-24C design concept. The vehicle, a rocket-boosted, delta planform aircraft, is air launched from a B-52 and is capable of forty seconds of rocket cruise at Mach 6 with a research scramjet. Research provisions include a dedicated 10-foot long research experiments section, removable fins and strakes, and provisions for testing integrated airbreathing propulsion systems.

F. S. Kirkham↗

Mapping X-ray heliometer for Orbiting Solar Observatory-8

An instrument combining mechanical collimators and proportional counter detectors was designed to record solar X-rays with energies of 2-30 keV with good temperal, spectral, and spatial resolution. The overall operation of the instrument is described to the degree needed by personnel who interact with the experimenter during SC/experiment interfacing, experiment testing, observatory integration and testing, and pre/post launch data processing. The general layout of the instrument is given along with a summary of the instrument characteristics.

Acton, L. W.↗

Procedures used in flight tests of an integrated propulsion control system on an F-111E airplane

A digital integrated propulsion control system (IPCS) was tested on an F-111E airplane. The IPCS provided full authority control of the left inlet and the TF30 afterburning engine. Supersonic test conditions were of primary interest. The operational procedures and maneuvers developed for IPCS evaluation, displays for test monitoring and data acquisition, flight safety, and problems encountered are discussed. The software refinements that made modifications to standard flight test procedures necessary are described. The flexibility of digital control and the ways software was used to overcome hardware deficiencies are discussed. Application of these procedures to a typical IPCS flight is described.

Baer, J. L.↗

Report of the Power Sub systems Panel

Problems in spacecraft power system design, testing, integration, and operation are identified and solutions are defined. The specific technology development problems discussed include substorm and plasma design data, modeling of the power subsystem and components, power system monitoring and degraded system management, rotary joints for transmission of power and signals, nickel cadmium battery manufacturing and application, on-array power management, high voltage technology, and solar arrays.

Source record↗

YF-12 cooperative airframe/propulsion control system program, volume 1

Several YF-12C airplane analog control systems were converted to a digital system. Included were the air data computer, autopilot, inlet control system, and autothrottle systems. This conversion was performed to allow assessment of digital technology applications to supersonic cruise aircraft. The digital system was composed of a digital computer and specialized interface unit. A large scale mathematical simulation of the airplane was used for integration testing and software checkout.

Anderson, D. L.↗

Submillimeter wave survey of the galactic plane

The survey measured, over virtually the entire galactic plane, the distribution and basic physical conditions of the coolest dust component of the interstellar medium. The instrument designed for observations of extended, low surface brightness continuum emission consisted of a balloon borne, gyro stablized, 1.2 m Cassegrain telescope and a liquid cooled photometer. The design, integration, tests, and flight operation of the survey are presented.

Cheung, L. H.↗

Space Shuttle cargo processing.

The spacecraft processing techniques to be used at the Kennedy Space Center for the assembly and check-out of Space Shuttle cargoes are discussed. The processing flow for vertically handled spacecraft, which are inserted into the Shuttle orbiter cargo bay while the orbiter is in the vertical position and often are attached to a separate solid booster stage, includes assembly into unified payloads in the Vertical Processing Facility, followed by Cargo Integration Test Equipment tests to ensure cargo bay compatibility, and transportation to the launch pad. Horizontally handled spacecraft such as Spacelab, which are inserted into the Orbiter cargo bay while it is in the Orbiter Processing Facility in the horizontal position, are assembled and checked out within the Operations and Checkout Building, where the CITE tests are performed and the Spacelab will be disassembled, and then transported to the Orbiter Processing Facility. It is pointed out that during the Space Shuttle era, when the number of spacecraft to be processed simultaneously at Kennedy will double or triple, all spacecraft processing facilities will be required to handle the workload.

Neilon, J. J.↗

Development techniques for generic software

In developing the first version of a generic implementation of X.25, Levels 2 and 3, three development techniques are examined: table driven finite state machine implementation, an integrated testing environment, and top down design. A finite state machine (FSM) is a powerful tool for both specifying and implementing protocols. This technique was used in the X.25 specification. A table driven implementation of the FSM was chosen to facilitate changes and simplify coding. The effect that this technique have on program size, speed of execution, coding time, and debugging time are investigated.

Hamilton, R. L.↗

A method for determining the flight readiness of the integrated Space Shuttle system

The Space Shuttle Dynamic Integrated Test (DIT) system is described. The DIT is an open-loop system which makes no attempt to simulate Shuttle sensors, and by which the Shuttle redundancy management system is left unmodified. Open-loop operation is shown to inherently require less computing capacity during a test than the closed-loop alternative. DIT tests have generated a high degree of confidence in the Shuttle hardware, allowing the identification of such problems as a sluggish main fuel valve, which caused a countdown hold seconds before the simulated T-zero, and Main Engine Controller software malfunctions. Attention is given to the combination and substitution of sensor data, the modification of nominal flight software, and the preparation of simulation data. It is noted that greater performance would have been achieved if the interface with DIT had been a design requirement from the outset of Space Shuttle development.

Bacon, I.↗

The OSS-1/STS-3 mission

Integration, test, flight operations, program and science management, and experiment results from the OSS-1/STS-3 flight are reviewed. The experimental pallet, manufactured by ESA members, carried instrumentation for astronomy, space plasma studies, physics, planetology, solar physics, and life sciences. The ability of the equipment to operate in a worst-case Orbiter thermal environment was tested, as was the plasma environment around the Orbiter. The solar UV spectral irradiance monitor microprocessor was found to reset concurrently with start-up of the Shuttle hydraulic pumps. Degradations were also observed in one of the three solar flare X ray polarimeter modules, the thermal cannister experiment microprocessor, and the scientific data recorder no. 2. The Orbiter was determined to perform well during firing of an electron beam. A contamination monitor recorded matter accretion to be dependent on the solar orientation of the Orbiter. Finally, the distribution of the responsibilities and tasks for mission management are reviewed.

Kissin, K.↗

Status Panel For Video Cassette Recorders

Central array of light-emitting diodes displays status of 30 video cassette recorders (VCR's) monitoring integrated testing of Space Shuttle. Remote status panel linked to VCR's by one 37-conductor cable. Transistor/ transistor logic chips in interface circuit allow LED array to function without drawing power from VCR control circuits.

Talley, G. L., Jr.↗

Integrated System for Environmental Simulation

Integrated testing system subjects ground-support equipment for Space Shuttle to conditions that prevail during launch. Concept also applies to testing other equipment that must function faultlessly in difficult environment.

Uda, R.↗

Autonomy and automation for Space Station housekeeping and maintenance functions

The Space Station crew will be a critical resource for economical operation of science and commercial payloads. Core station housekeeping and maintenance functions should be provided in a manner that requires a minimum of crew interaction. This paper outlines a prospective functional architecture for allocation of autonomous and automated control of these functions and discusses implementation issues arising from safety of manned operations, integration test requirements, and evolution of future station capabilities.

Turner, P. R.↗

Point Simulator for Synthetic-Aperture Radar

Reflection from point target imitated electronically. SAR simulator produces amplitude- and phase-modulated 60-MHz signal that resembles SAR return of point scatterer. Designed to test integrated optical SAR receivers, simulator applies phase modulation necessary to turn radio-frequency pulse train into electronic equivalent of unfocused radar image of target.

Psaltis, D.↗

Integrated design checkout of shuttle payload avionics interfaces

Orbiter/payload avionics integration testing in the shuttle program are discussed. Payloads show extensive orbiter interfaces. The three testing modes used to verify orbiter/payload avionics interfaces are described. These modes consist of orbiter testing using generic payload simulators, payload testing utilizing the actual payload and a high fidelity orbiter simulator, and interface testing with the actual orbiter and payload. Several special avionics techniques, such as the split flight computer technique were developed for this testing. Experience from the first six shuttle cargoes is reviewed and problems found in testing that would have hampered mission success are emphasized.

Muratore, J. F.↗

External tank processing from barge to pad

Delivery and launch readiness events for the External Tanks (ET) are discussed. The ET is off-loaded at the KSC Barge Turning Basin and towed to the Vertical Assembly Building (VAB), High Bay Transfer Aisle. It is erected vertically and placed in the ET Checkout Area of High Bay 2 or 4 for standalone checkout. At the completion of checkout the ET is transferred to storage or to the Integration Area of High Bay 1 or 3 for SRB and Orbiter Mate. A Systems Integration Test performed with the Orbiter and Solid Rocket Booster is described. Final checkout activities are also described.

Carpenter, J. E.↗