Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Electrical Systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 883 records · Page 49

Deep Cyber-Physical Situational Awareness for Energy Systems: A Secure Foundation for Next-Generation Energy Management

This document provides the final report for the CYPRES project. The purpose is (1) to highlight and summarize its major accomplishments and (2) to provide guidance on how its outcomes have informed and can inform important additional research and technology transfer. The goal of CYPRES was the research, development, and demonstration of a security-oriented next generation cyber-physical EMS for electric power systems that detects malicious and abnormal events through the fusion of cyber and physical data. To achieve this, the CYPRES project team researched, developed, and built a prototype of the solution, referred to as the CYPRES EMS. The CYPRES EMS is a proof-of-concept cyber-physical platform that demonstrates the management of the energy system, communications, security, and cyber-physical grid modeling and analytics. As part of the capabilities of the CYPRES EMS, the team designed and developed a suite of power system applications for monitoring, risk analyses, detection, and control that are inherently cyberaware. At its core, the project aimed to research, develop, and demonstrate a security-oriented next-generation cyber-physical Energy Management System (EMS) capable of detecting malicious and abnormal events through the innovative fusion of cyber and physical data. This approach represents a fundamental shift from traditional EMS, reimagining how critical infrastructure can be protected through unified cyber-aware and physics-aware secure data flow pipelines. The project’s cornerstone deliverable, the CYPRES EMS, serves as a proof-of-concept cyber-physical platform that revolutionizes the management of energy systems, communications, security, and cyber-physical grid modeling and analytics. This prototype implements a comprehensive suite of power system applications for monitoring, risk analyses, detection, and control, all designed with inherent cyber awareness. The system’s architecture extends from end-devices in the field through to control center applications, establishing a secure and resilient control framework that addresses the challenges posed by diverse devices of unknown trustworthiness connecting to modern power systems. Through this innovative approach to deep cyber-physical situational awareness, the CYPRES project not only advances the state-of-the-art in energy infrastructure protection but also establishes a new paradigm for how EMS can be designed, deployed, and operated in an increasingly complex threat landscape. The findings and developments from this project provide crucial insights for stakeholders across the energy sector, offering a blueprint for enhancing the reliability and resilience of our nation’s critical energy infrastructure in the face of evolving cyber threats.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Energy Resilient Recovery in Puerto Rico: Hurricane Maria Recovery Support

This report covers microgrids as a special application of distributed energy resources (DERs) in Puerto Rico. This is one of a series of reports describing the U.S. Department of Energy (DOE) multi-laboratory efforts undertaken. To ensure the sustainable, long-term recovery of Puerto Rico's electric power grid from hurricanes Maria and Irma and to build capacity to manage future potential natural disasters in the most secure and resilient way, DOE convened experts from multiple national laboratories to develop a comprehensive set of data, models, analytic tools, and studies, considering inputs from a wide variety of stakeholder groups, to support technically sound recommendations for Puerto Rico's energy investment decisions. In Phase 1 of the multi-laboratory effort to support Puerto Rico's recovery, the National Renewable Energy Laboratory (NREL) provided the utility company Puerto Rico Electric Power Authority (PREPA) recommendations for a new framework of interconnection standards to accelerate the integration of utility-scale, transmission-connected, renewable electrical generation and energy storage that ensure cross-technology compatibility and enable high deployment levels without compromising grid reliability, safety, or security (https://www.nrel.gov/docs/fy19osti/73848.pdf). In Phase 2, NREL published a report focused on the interconnection of distributed energy resources (DERs) to the electric distribution system in Puerto Rico (https://www.nrel.gov/docs/fy21osti/77127.pdf). This report familiarized the reader with Puerto Rico's distribution infrastructure and operational practices and procedures that are relevant to DER interconnection. The report also provided considerations for streamlining the interconnection process given the expected increase in deployments resulting from Puerto Rico's renewable portfolio standard goal of 100% renewables by 2050. Accordingly, the report identifies considerations and concerns associated with the increase in intermittent generation, strategies for DER interconnection best practices, and the potential use of the latest technological solutions identified in the latest revision of the Institute of Electrical and Electronics Engineers 1547-2018 interconnection standard. Additionally, the report identified ways to improve the physical resiliency of installed DERs. This task describes how distributed energy systems may participate in and contribute to improving the resiliency of Puerto Rico's energy infrastructure in the future. This report presents an analysis of the Puerto Rico grid to illustrate the possible different microgrid and minigrid scenarios. The capability to form sustained microgrids and minigrids has the potential to provide a high level of resiliency during disturbances on the grid. DERs, on the other hand, have the capability to aid in the microgrid operation by providing grid support as well as grid-forming functionality. Other tasks in Phase 3 include voltage regulation in distribution networks using DERs and transmission-and-distribution co-simulation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Electric Vehicle Supply Equipment and Considerations for a Reasonable Rate of Return

This white paper identifies the following recommendations for states as they consider issues related to electric vehicle supply equipment program income under the National Electric Vehicle Infrastructure program and other programs covered by National Electric Vehicle Infrastructure Standards and Requirements in the U.S. Code of Federal Regulations (23 CFR 680): 1. Conduct value analysis for better outcomes 2. Promote pricing transparency

33 ADVANCED PROPULSION SYSTEMS↗

Cyber-Informed Engineering for Design and Operations

Pursuant to the National Cyber-Informed Engineering (CIE) Strategy published in 2022, INL is leading the development of philosophy and practices to identify and mitigate the inherent risks of digital technology by including cybersecurity as a core element of engineering risk management. This presentation will provide an overview of why we need CIE and what it is, a discussion of the major implications of CIE for electric power systems design and operations, and an update on significant milestones and resources from the CIE program.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Queued Up: 2025 Edition – Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2024 [Slides]

Electric transmission system operators (ISOs, RTOs, or utilities) require proposed power plants seeking to connect to the transmission grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. The lists of projects in this process are known as “interconnection queues”. In collaboration with interconnection.fyi, Berkeley Lab compiled, aggregated, and cleaned interconnection queue data from >50 transmission grid operators (7 ISO/RTOs and 49 non-ISO balancing areas), which collectively represent ~97% of currently installed U.S. electric generating capacity. The dataset includes requests submitted to queues through the end of 2024, and only includes requests seeking to connect to the transmission grid (not distribution-connected or behind-the-meter projects). The files below include both a PDF report and an Excel data file. The PDF report analyzes interconnection data and metrics through the end of 2024. The Excel data file includes (a) the full project-level interconnection queue dataset through 2024, (b) a codebook (data dictionary) describing each data field, and (c) 35 additional tabs featuring tables summarizing a range of interconnection metrics. Key highlights from the Queued Up: 2025 Edition (featuring data through 2024) include: • As of the end of 2024, there were ~10,300 projects actively seeking grid interconnection in the U.S., representing 1,400 GW of generation and approximately 890 GW of storage. • Historic withdrawal rates alongside relatively fewer new requests resulted in a 12% decrease in total active queue volume compared to the prior year. • Active natural gas capacity (136 GW, +72% year-over-year) increased in 2024, while solar (956 GW, -12%), storage (890 GW, -13%), and wind (271 GW, -26%) capacity decreased. • 408 GW of capacity already has a draft or executed interconnection agreement (IA) but has not yet reached commercial operations. • The time projects spend in queues before reaching COD is increasing. For the regions with available data, the median duration from IR to COD has doubled from <2 years for projects built in 2000-2007 to over 4 years for those built in 2018-2024. • Ultimately, most of this proposed capacity will not be built. Only 13% of capacity that submitted interconnection requests from 2000-2019 had reached commercial operations by the end of 2024; 77% of that capacity had been withdrawn and 10% was still active. • FERC Order 2023 and various other reforms are being implemented. These are important measures to reduce interconnection bottlenecks and enhance grid system reliability, but it is too early to measure and assess their full impact. • New additions for the 2025 edition include: (a) additional detail on data processing and gaps; (b) updates on interconnection reforms; (c) new analysis on interconnection agreements, and more.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Electric-field control of the nucleation and motion of isolated three-fold polar vertices

Recently various topological polar structures have been discovered in oxide thin films. Despite the increasing evidence of their switchability under electrical and/or mechanical fields, the dynamic property of isolated ones, which is usually required for applications such as data storage, is still absent. Here, we show the controlled nucleation and motion of isolated three-fold vertices under an applied electric field. At the PbTiO 3 /SrRuO 3 interface, a two-unit-cell thick SrTiO 3 layer provides electrical boundary conditions for the formation of three-fold vertices. Utilizing the SrTiO 3 layer and in situ electrical testing system, we find that isolated three-fold vertices can move in a controllable and reversible manner with a velocity up to ~629 nm s -1 . Microstructural evolution of the nucleation and propagation of isolated three-fold vertices is further revealed by phase-field simulations. This work demonstrates the ability to electrically manipulate isolated three-fold vertices, shedding light on the dynamic property of isolated topological polar structures.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Electrically Engaged UnduLation (EEL) Marine Energy System

Current technologies at the forefront of instrumentation for ocean observation through acoustic mapping are powered by batteries that cannot achieve the lasting durations required for high-resolution measurements. Pyro-E has designed an Electrically Engaged unduLation (EEL) system capable of in situ energy harvest and deployment in sub-sea configurations. By extracting kinetic energy from the ocean, EEL proposes to provide power output ranging from 1 mW to 1,000 mW. Such a magnitude of power can sustain active instrumentation with onboard processing of data and over-the-horizon telemetry. Pyro-E and Oak Ridge National Laboratory have utilized software tools and powerful computing resources to develop a techno-economic design of the EEL capable of harvesting 5 W. The material response of the EEL under simulated hydromechanical loads is described through time-accurate predictions. All physical tests were conducted by Pyro-E to guide simulations at Oak Ridge National Laboratory.

16 TIDAL AND WAVE POWER↗

Electromagnetic propulsion system

An electromagnetic propulsion system is provided. The system comprises first and second pluralities of stator coils wound about first and second axes, a plurality of support structures, first and second couplers that surround portions of the first and second pluralities of stator coils, and first and second pluralities of sets of rotor coils wound about axes that are parallel to the first and second axes. The stator coils are configured to receive electric current through an outside controller selecting appropriately coupled stator sections or through a sliding electrical contact system or bearing system to induce at least a first magnetic field. The plurality of support structures supports the first and second plurality of stator coils. The first and second couplers include notches and are oriented so that their notches pass over the plurality of support structures when the couplers move along the stator coils. The couplers may have an adjustable segment to close the notch. The sets of rotor coils are equidistantly attached to the couplers and are configured to receive electric current to induce magnetic fields that interact with the magnetic fields of the stator coils so that magnetic forces are applied to the plurality of rotor coils, thereby propelling the couplers along the stator coils.

Hartman, Seth↗

Electromagnetic propulsion system

An electromagnetic propulsion system is provided. The system comprises first and second pluralities of stator coils wound about first and second axes, a plurality of support structures, first and second couplers that surround portions of the first and second pluralities of stator coils, and first and second pluralities of sets of rotor coils wound about axes that are parallel to the first and second axes. The stator coils are configured to receive electric current through an outside controller selecting appropriately coupled stator sections or through a sliding electrical contact system or bearing system to induce at least a first magnetic field. The plurality of support structures supports the first and second plurality of stator coils. The first and second couplers include notches and are oriented so that their notches pass over the plurality of support structures when the couplers move along the stator coils. The couplers may have an adjustable segment to close the notch. The sets of rotor coils are equidistantly attached to the couplers and are configured to receive electric current to induce magnetic fields that interact with the magnetic fields of the stator coils so that magnetic forces are applied to the plurality of rotor coils, thereby propelling the couplers along the stator coils.

Hartman, Seth↗

Queued Up: 2026 Edition, Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2025 [Slides]

Electric transmission system operators (ISOs, RTOs, or utilities) require proposed power plants seeking to connect to the transmission grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. The lists of projects in this process are known as “interconnection queues”. In collaboration with https://www.interconnection.fyi. Berkeley Lab compiled, aggregated, and cleaned interconnection queue data from >50 transmission grid operators (7 ISO/RTOs and 50 non-ISO balancing areas), which collectively represent ~98% of currently installed U.S. electric generating capacity.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Charging Infrastructure Technologies: Smart Electric Vehicle Charging for a Reliable and Resilient Grid (RECHARGE)

Annual Merit review of the Smart Electric Vehicle Charging for a Reliable and Resilient Grid (RECHARGE) project. This project will demonstrate the value of smart charge management to reduce the impact of Electric Vehicles at Scale. Assess management of Plug-in Electric Vehicle (PEV) charging at scale to avoid negative grid impacts, identify critical strategies and technologies, and enhance value for PEV / EVSE / grid stakeholders.

47 OTHER INSTRUMENTATION↗

Electric Motor Thermal Management

Thermal management enables more efficient and cost-effective motors. This Annual Merit Review presentation describes the technical accomplishments and progress in electric motor thermal management R&D over the last year. This project supports a broad industry demand for data, analysis methods, and experimental techniques to improve and better understand motor thermal management.

ADVANCED PROPULSION SYSTEMS↗

Design and Operation of Energy Systems with Large Amounts of Variable Generation: IEA Wind TCP Task 25 (Final Summary Report)

This report summarizes findings on wind integration from the 17 countries or sponsors participating in the International Energy Agency Wind Technology Collaboration Program (IEA Wind TCP) Task 25 from 2006-2020. Both real experience and studies are reported. Many wind integration studies incorporate solar energy, and most of the results discussed here are valid for other variable renewables in addition to wind. The national case studies address several impacts of wind power on electric power systems. In this report, they are grouped under long-term planning issues and short-term operational impacts. Long-term planning issues include grid planning and capacity adequacy. Short-term operational impacts include reliability, stability, reserves, and maximizing the value of wind in operational timescales (balancing related issues). The first section presents the variability and uncertainty of power system-wide wind power, and the last section presents recent studies toward 100% shares of renewables. The appendix provides a summary of ongoing research in the national projects contributing to Task 25 for 2021-2024. The design and operation of power and energy systems is an evolving field. As ambitious targets toward net-zero carbon energy systems are announced globally, many scenarios are being made regarding how to reach these future decarbonized energy systems, most of them involving large amounts of variable renewables, mainly wind and solar energy. The secure operation of power systems is increasingly challenging, and the impacts of variable renewables, new electrification loads together with increased distribution system resources will lead to somewhat different challenges for different systems. Tools and methods to study future power and energy systems also need to evolve, and both short-term operational aspects (such as power system stability) and long-term aspects (such as resource adequacy) will probably see new paradigms of operation and design. The experience of operating and planning systems with large amounts of variable generation is accumulating, and research to tackle the challenges of inverter-based, nonsynchronous generation is on the way. Energy transition and digitalization also bring new flexibility opportunities, both short and long term.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Solar Futures Study

Dramatic improvements to solar technologies and other clean energy technologies have enabled recent rapid growth in deployment and are providing cost-effective options for decarbonizing the U.S. electric grid. The Solar Futures Study explores the role of solar in decarbonizing the grid. Through state-of-the-art modeling, the study envisions deep grid decarbonization by 2035, as driven by a required emissions-reduction target. It also explores how electrification could enable a low-carbon grid to extend decarbonization to the broader energy system (the electric grid plus all direct fuel use in buildings, transportation, and industry) through 2050.

14 SOLAR ENERGY↗

Supporting Electric Vehicle Supply Equipment Deployment

FEMP assists federal agencies with the transition to zero-emission vehicles (ZEVs) by offering technical guidance on electric vehicle supply equipment (EVSE) installations and site-specific planning through partnerships with the National Renewable Energy Laboratory's (NREL's) EVSE Tiger Teams. This fact sheet introduces the EVSE Tiger Team site assessment and technical assistance process.

ADVANCED PROPULSION SYSTEMS↗

Opening Up Transactive Systems: Introducing TESS and Specification in a Field Deployment

Transactive energy systems (TS) use automated device bidding to access (residential) demand flexibility and coordinate supply and demand on the distribution system level through market processes. In this work, we present TESS, a modularized platform for the implementation of TS, which enables the deployment of adjusted market mechanisms, economic bidding, and the potential entry of third parties. TESS thereby opens up current integrated closed-system TS, allows for the better adaptation of TS to power systems with high shares of renewable energies, and lays the foundations for a smart grid with a variety of stakeholders. Furthermore, despite positive experiences in various pilot projects, one hurdle in introducing TS is their integration with existing tariff structures and (legal) requirements. In this paper, we therefore describe TESS as we have modified it for a field implementation within the service territory of Holy Cross Energy in Colorado. Importantly, our specification addresses challenges of implementing TS in existing electric retail systems, for instance, the design of bidding strategies when a (non-transactive) tariff system is already in place. We conclude with a general discussion of the challenges associated with “brownfield” implementation of TS, such as incentive problems of baseline approaches or long-term efficiency.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Power Electronics Thermal Management

This project conducts research to develop new power electronics thermal management technologies to increase power density, enable high WBG temperature operation, and decrease cost. One of the main challenges to achieving high power densities is associated with packaging of high-temperature (up to 250 degrees C) WBG devices near lower-temperature-rated components (e.g., electrical boards and capacitors). Additionally, the high junction temperatures of the WBG devices will result in large temperature gradients through the power module layers, which will present reliability challenges and require higher-temperature substrates and bonding materials.

ADVANCED PROPULSION SYSTEMS↗