Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “task work”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 865 records · Page 48

Online System ID for Predicting Power Plant Performance Throughout Cycling Operations

This presentation represents a review of the background research conducted by NETL to apply artificial intelligence, i.e. auto-recursive algorithms and data analytics to detect leaks in utility scale boilers and laboratory power systems. The new project being funded by the Advanced Sensors and Controls Program is part of the Field Work Proposal funded in EY21 as Task 53 to demonstrate the application of these techniques on a utility scale power system.

Shadle, Lawrence↗

Epitaxial Growth Development: CRADA Final Report

The purpose of this CRADA is to assist Trumpf Photonics in developing a procedure to grow ZnSe epilayers on the (110) facets of AlGaAs/InGaAs laser diodes that will provide high degrees of electronic passivation and performance reliability. Work will be divided into four tasks: 1) characterization of material growth at Trumpf Photonics, 2) development of a highly effective AlGaAs facet cleaning procedure at NREL, 3) development of a ZnSe epitaxy procedure at NREL, and 4) transfer of the procedures developed at NREL to the Trumpf Photonics site. This CRADA is designed to last 3 years total.

36 MATERIALS SCIENCE↗

Graph Neural Networks for Charged Particle Tracking on FPGAs

The determination of charged particle trajectories in collisions at the CERN Large Hadron Collider (LHC) is an important but challenging problem, especially in the high interaction density conditions expected during the future high-luminosity phase of the LHC (HL-LHC). Graph neural networks (GNNs) are a type of geometric deep learning algorithm that has successfully been applied to this task by embedding tracker data as a graph—nodes represent hits, while edges represent possible track segments—and classifying the edges as true or fake track segments. However, their study in hardware- or software-based trigger applications has been limited due to their large computational cost. In this paper, we introduce an automated translation workflow, integrated into a broader tool called hls4ml , for converting GNNs into firmware for field-programmable gate arrays (FPGAs). We use this translation tool to implement GNNs for charged particle tracking, trained using the TrackML challenge dataset, on FPGAs with designs targeting different graph sizes, task complexites, and latency/throughput requirements. This work could enable the inclusion of charged particle tracking GNNs at the trigger level for HL-LHC experiments.

Elabd, Abdelrahman↗

A model for task interference

Task interference model for interference among two or more continuous manual control tasks, suggesting metric for pilot mental work load

Levison, W. H.↗

Perform a gyro test of general relativity in a satellite and develop associated control technology

The progress accomplished in the Stanford Gyro Relativity program during the period November 1974 to October 1975 was described. Gyro developments were continued in the main laboratory dewar, concentrating on the operation of a three axis gyro readout and on improvements to the methods of canceling trapped fields in the rotor; these efforts culminated in the first successful observation of the London moment in the spinning gyro rotor in March 1975. Following a review meeting at that time, a new goal was formulated for the next 12 to 18 months, namely to operate a gyroscope in the new ultra-low field facility with readout resolution approaching 1 arc-second. The following other tasks were also completed: (1) sputtering work, (2) magnetometry, (3) construction and installation of the North Star simulator, (4) analysis of torques on the gyro, especially in inclined orbits, (5) equivalence principle accelerometer, and (6) analysis of a twin-satellite test of relativity.

Fairbank, W. M.↗

Spacelab task allocation - A preliminary determination of onboard versus ground operational priorities

A three-phase approach was developed for allocating specific mission tasks to the onboard crew or the ground support team in the Spacelab project. Phase one involved a list of potential operational tasks anticipated for Spacelab missions, phase two, the development of a set of criteria for allocating task-performance location, phase three, the combination of these criteria to allow tasks to be arranged in order of priority. The task-allocation criteria included crew safety, work load, cost, efficiency, weight/space, accessibility, complexity, response time, and capability.

Harris, W. J.↗

Determination of spectral signatures of substances in natural waters

Optical remote sensing of water pollution offers the possibility of fast, large scale coverage at a relatively low cost. The possibility of using the spectral characteristics of the upwelling light from water for the purpose of ocean water quality monitoring was explained. The work was broken into several broad tasks as follows: (1) definition of a remotely measured spectral signature of water, (2) collection of field data and testing of the signature analysis, and (3) the possibility of using LANDSAT data for the identification of substances in water. An attempt to extract spectral signatures of acid waste and sediment was successful.

Klemas, V.↗

Modified Petri net model sensitivity to workload manipulations

Modified Petri Nets (MPNs) are investigated as a workload modeling tool. The results of an exploratory study of the sensitivity of MPNs to work load manipulations in a dual task are described. Petri nets have been used to represent systems with asynchronous, concurrent and parallel activities (Peterson, 1981). These characteristics led some researchers to suggest the use of Petri nets in workload modeling where concurrent and parallel activities are common. Petri nets are represented by places and transitions. In the workload application, places represent operator activities and transitions represent events. MPNs have been used to formally represent task events and activities of a human operator in a man-machine system. Some descriptive applications demonstrate the usefulness of MPNs in the formal representation of systems. It is the general hypothesis herein that in addition to descriptive applications, MPNs may be useful for workload estimation and prediction. The results are reported of the first of a series of experiments designed to develop and test a MPN system of workload estimation and prediction. This first experiment is a screening test of MPN model general sensitivity to changes in workload. Positive results from this experiment will justify the more complicated analyses and techniques necessary for developing a workload prediction system.

White, S. A.↗

Thermal barrier coating life prediction model development

This report describes work performed to determine the predominat modes of degradation of a plasma sprayed thermal barrier coating system and to develop and verify life prediction models accounting for these degradation modes. The primary TBC system consisted of a low pressure plasma sprayed NiCrAlY bond coat, an air plasma sprayed ZrO2-Y2O3 top coat, and a Rene' 80 substrate. The work was divided into 3 technical tasks. The primary failure mode to be addressed was loss of the zirconia layer through spalling. Experiments showed that oxidation of the bond coat is a significant contributor to coating failure. It was evident from the test results that the species of oxide scale initially formed on the bond coat plays a role in coating degradation and failure. It was also shown that elevated temperature creep of the bond coat plays a role in coating failure. An empirical model was developed for predicting the test life of specimens with selected coating, specimen, and test condition variations. In the second task, a coating life prediction model was developed based on the data from Task 1 experiments, results from thermomechanical experiments performed as part of Task 2, and finite element analyses of the TBC system during thermal cycles. The third and final task attempted to verify the validity of the model developed in Task 2. This was done by using the model to predict the test lives of several coating variations and specimen geometries, then comparing these predicted lives to experimentally determined test lives. It was found that the model correctly predicts trends, but that additional refinement is needed to accurately predict coating life.

Hillery, R. V.↗

Development of a shuttle recovery Commercial Materials Processing in Space (CMPS) program

The work performed has covered the following tasks: update commercial users requirements; assess availability of carriers and facilities; shuttle availability assessment; development of optimum accommodations plan; and payload documentation requirements assessment. The results from the first four tasks are presented. To update commercial user requirements, contacts were made with the JEA and CCDS partners to obtain copies of their most recent official flight requests. From these requests the commercial partners' short and long range plans for flight dates, flight frequency, experiment hardware and carriers was determined. A 34 by 44 inch chart was completed to give a snapshot view of the progress of commercialization in space. Further, an assessment was made of the availability of carriers and facilities. Both existing carriers and those under development were identified for use by the commercial partners. A data base was compiled to show the capabilities of the carriers. A shuttle availability assessment was performed using the primary and secondary shuttle manifests released by NASA. Analysis of the manifest produced a flight-by-flight list of flight opportunities available to commercial users. Using inputs from the first three tasks, an Optimum Accommodations Plan was developed. The Accommodation Plan shows the commercial users manifested by flight, the experiment flown, the carrier used and complete list of commercial users that could not be manifested in each calendar year.

Source record↗

Advanced water window x-ray microscope design and analysis

The project was focused on the design and analysis of an advanced water window soft-x-ray microscope. The activities were accomplished by completing three tasks contained in the statement of work of this contract. The new results confirm that in order to achieve resolutions greater than three times the wavelength of the incident radiation, it will be necessary to use aspherical mirror surfaces and to use graded multilayer coatings on the secondary (to accommodate the large variations of the angle of incidence over the secondary when operating the microscope at numerical apertures of 0.35 or greater). The results are included in a manuscript which is enclosed in the Appendix.

Shealy, D. L.↗

Creating a foundation for a synergistic approach to program management

In order to accelerate the movement of humans into space within reasonable budgetary constraints, NASA must develop an organizational structure that will allow the agency to efficiently use all the resources it has available for the development of any program the nation decides to undertake. This work considers the entire set of tasks involved in the successful development of any program. Areas that hold the greatest promise of accelerating programmatic development and/or increasing the efficiency of the use of available resources by being dealt with in a centralized manner rather than being handled by each program individually are identified. Using this information, an agency organizational structure is developed that will allow NASA to promote interprogram synergisms. In order for NASA to efficiently manage its programs in a manner that will allow programs to benefit from one another and thereby accelerate the movement of humans into space, several steps must be taken. First, NASA must develop an organizational structure that will allow potential interprogram synergisms to be identified and promoted. Key features of the organizational structure are recommended in this paper. Second, NASA must begin to develop the requirements for a program in a manner that will promote overall space program goals rather than achieving only the goals that apply to the program for which the requirements are being developed. Finally, NASA must consider organizing the agency around the functions required to support NASA's goals and objectives rather than around geographic locations.

Knoll, Karyn T.↗

SRB Environment Evaluation and Analysis. Volume 3: ASRB Plume Induced Environments

Contract NAS8-37891 was expanded in late 1989 to initiate analysis of Shuttle plume induced environments as a result of the substitution of the Advanced Solid Rocket Booster (ASRB) for the Redesigned Solid Rocket Booster (RSRB). To support this analysis, REMTECH became involved in subscale and full-scale solid rocket motor test programs which further expanded the scope of work. Later contract modifications included additional tasks to produce initial design cycle environments and to specify development flight instrumentation. Volume 3 of the final report describes these analyses and contains a summary of reports resulting from various studies.

Bender, R. L.↗

Systems engineering studies of lunar base construction

Many ingenious concepts have been proposed for lunar base construction, but few systematic studies exist which relate time-consistent lunar base construction technologies and the choice of lunar base approach with the long-term SEI objectives - i.e., lunar indigenous base construction and Mars Exploration equipment development. To fill this gap, CSC has taken a two-pronged approach. First, the Center undertook basic geotechnical investigations of lunar soil, fabrication of a scale prototype of a lunar construction crane, a multi-robot construction team laboratory experiment, and a preliminary design of lunar base structures. Second, during Jun. and Jul. 1991 two lunar base construction systems engineering studies were accomplished - a 'near term lunar base' study, and a 'far-term lunar base' study. The goals of these studies were to define the major lunar base construction research problems in consistent technology/construction frameworks, and to define design requirements for construction equipment such as a lunar crane and a regolith mover. The 'near-term lunar base' study examined three different construction concepts for a lunar base comprised of pre-fabricated, pre-tested, Space Station Freedom-type modules, which would be covered with regolith shielding. Concept A used a lunar crane for unloading and transportation; concept B, a winch and cart; and concept C, a walker to move the modules from the landing site to the base site and assemble them. To evaluate the merits of each approach, calculations were made of mass efficiency measure, source mass, reliability, far-term base mass, Mars base mass, and base assembly time. The model thus established was also used to define the requirements for crane speed and regolith mover m(sup 3)/sec rates. A major problem addressed is how to 'mine' the regolith and stack it over the habitats as shielding. To identify when the cost of using indigenous lunar materials to construct the base exceeds the cost of development and delivery of the equipment for processing lunar materials, a study of construction of a candidate sintered regolith 'far term lunar base' was undertaken. A technique was devised for casting slabs of sintered (basaltic) regolith and assembling these into a hemispherical (or geodesic) dome. The major problem occurs with the inner liner. At 14.7 psi and 20 percent oxygen internal atmosphere, the entire structure is in tension, even with the regolith load. Also, another study has indicated that at 14.7 psi major resupply of air will be needed because of leakage, and astronauts may have to engage in extensive pre-breathing and post-breathing for extravehicular activity (EVA) tasks, thus detracting from useful mission work time. An alternative is to operate part of the base at, say, 5 psi and 70 percent oxygen, or to equip the astronauts with hard suits at 8.3 psi or greater. All of these choices directly influence base design and construction techniques.

Morgenthaler, George W.↗

Ultra-high resolution water window x ray microscope optics design and analysis

This project has been focused on the design and analysis of an ultra-high resolution water window soft-x-ray microscope. These activities have been accomplished by completing two tasks contained in the statement of work of this contract. The new results from this work confirm: (1) that in order to achieve resolutions greater than three times the wavelength of the incident radiation, it will be necessary to use spherical mirror surfaces and to use graded multilayer coatings on the secondary in order to accommodate the large variations of the angle of incidence over the secondary when operating the microscope at numerical apertures of 0.35 or greater; (2) that surface contour errors will have a significant effect on the optical performance of the microscope and must be controlled to a peak-to-valley variation of 50-100 A and a frequency of 8 periods over the surface of a mirror; and (3) that tolerance analysis of the spherical Schwarzschild microscope has been shown that the water window operations will require 2-3 times tighter tolerances to achieve a similar performance of operations with 130 A radiation. These results have been included in a manuscript included in the appendix.

Shealy, David L.↗

Space and Earth Sciences, Computer Systems, and Scientific Data Analysis Support, Volume 1

This Final Progress Report covers the specific technical activities of Hughes STX Corporation for the last contract triannual period of 1 June through 30 Sep. 1993, in support of assigned task activities at Goddard Space Flight Center (GSFC). It also provides a brief summary of work throughout the contract period of performance on each active task. Technical activity is presented in Volume 1, while financial and level-of-effort data is presented in Volume 2. Technical support was provided to all Division and Laboratories of Goddard's Space Sciences and Earth Sciences Directorates. Types of support include: scientific programming, systems programming, computer management, mission planning, scientific investigation, data analysis, data processing, data base creation and maintenance, instrumentation development, and management services. Mission and instruments supported include: ROSAT, Astro-D, BBXRT, XTE, AXAF, GRO, COBE, WIND, UIT, SMM, STIS, HEIDI, DE, URAP, CRRES, Voyagers, ISEE, San Marco, LAGEOS, TOPEX/Poseidon, Pioneer-Venus, Galileo, Cassini, Nimbus-7/TOMS, Meteor-3/TOMS, FIFE, BOREAS, TRMM, AVHRR, and Landsat. Accomplishments include: development of computing programs for mission science and data analysis, supercomputer applications support, computer network support, computational upgrades for data archival and analysis centers, end-to-end management for mission data flow, scientific modeling and results in the fields of space and Earth physics, planning and design of GSFC VO DAAC and VO IMS, fabrication, assembly, and testing of mission instrumentation, and design of mission operations center.

Estes, Ronald H.↗

Specialized data analysis of SSME and advanced propulsion system vibration measurements

The basic objectives of this contract were to perform detailed analysis and evaluation of dynamic data obtained during Space Shuttle Main Engine (SSME) test and flight operations, including analytical/statistical assessment of component dynamic performance, and to continue the development and implementation of analytical/statistical models to effectively define nominal component dynamic characteristics, detect anomalous behavior, and assess machinery operational conditions. This study was to provide timely assessment of engine component operational status, identify probable causes of malfunction, and define feasible engineering solutions. The work was performed under three broad tasks: (1) Analysis, Evaluation, and Documentation of SSME Dynamic Test Results; (2) Data Base and Analytical Model Development and Application; and (3) Development and Application of Vibration Signature Analysis Techniques.

Coffin, Thomas↗